RICH MECHANICAL MEETING AGENDA 10/9/01 -HC Liquid Radiator - Matching the stud spacing to the stress gradient FEA updates Windows- Kevlar samples with seams, trying to quantify seam strength Testing update Beam Pipe- The CDF Be Beam Pipe appears to be available Mayling doesnt want the RICH to put an axial load on the beam pipe. Options appear to be a bellows in front of the RICH or having a tube go thru the RICH so the actual beam pipe is not attached to the windows. Mtg with Mayling and Brush Wellman Oct 11th - 10:30am. Radiator gas Expansion volume for the beam test stand- Describe updated design PMT Holder - FEA results on injection molded piece. Mirrors- Discussion on smaller mirror tiles, and new array layout Comments about beam test stand- Comments about 3-point mirror mounts- Comments about HPD hex-ad prototype- Comments about mu-metal assembly fixture- Glue /compatibility / sealing tests for the liquid radiator vessel.