CA1869 1. GENERAL VIEW OF SLC-3W SHOWING SOUTH FACE AND EAST SIDE OF A-FRAME MOBILE SERVICE TOWER (MST). MST IN SERVICE POSITION OVER LAUNCHER AND FLAME BUCKET. CABLE TRAYS BETWEEN LAUNCH OPERATIONS BUILDING (BLDG. 763) AND SLC-3W IN FOREGROUND. LIQUID OXYGEN APRON VISIBLE IMMEDIATELY EAST (RIGHT) OF MST; FUEL APRON VISIBLE IMMEDIATELY WEST (LEFT) OF MST. A PORTION OF THE FLAME BUCKET VISIBLE BELOW THE SOUTH FACE OF THE MST. CAMERA TOWERS VISIBLE EAST OF MST BETWEEN ROAD AND CABLE TRAY, AND SOUTH OF MST NEAR LEFT MARGIN OF PHOTOGRAPH. 2. VIEW OF SOUTH FACE OF SLC-3W MST SHOWING FLAME BUCKET BENEATH LAUNCH DECK, AND DELUGE CHANNEL. THEODOLITE SHELTER (BLDG. 786) IN FOREGROUND. 3. DETAIL VIEW OF SOUTH FACE AND EAST SIDE OF SLC-3W MST 4. GENERAL VIEW OF NORTH FACE OF SLC-3W MST. SLC-3E MST VISIBLE IN BACKGROUND. NOTE MST RAILS AND STOPS IN FOREGROUND. 5. DETAIL VIEW OF NORTH FACE OF SLC-3W MST WITH ENVIRONMENTAL DOORS OPEN AND SERVICE PLATFORMS DOWN. SLC-3E MST IN BACKGROUND. 6. DETAIL VIEW OF SOUTH FACE OF SLC-3W MST WITH ENVIRONMENTAL DOORS OPEN AND SERVICE PLATFORMS DOWN 7. DETAIL VIEW OF SOUTH FACE AND EAST SIDE OF SLC-3W MST WITH ENVIRONMENTAL DOORS OPEN. LOWER SERVICE PLATFORMS DOWN; UPPER SERVICE PLATFORMS RAISED. 8. VIEW OF NORTH FACE OF SLC-3W MST WITH ENVIRONMENTAL DOORS OPEN AND SERVICE PLATFORMS RAISED 9. VIEW OF SOUTH FACE OF SLC-3W MST WITH ENVIRONMENTAL DOORS OPEN AND SERVICE PLATFORMS RAISED. LAUNCHER VISIBLE BELOW LOWEST SET OF ENVIRONMENTAL DOORS. 10. PARTIAL VIEW OF SOUTH FACE OF MST AND BRIDGE CRANE MOVED TO ITS SOUTHERN LIMIT 11. PARTIAL VIEW OF NORTH FACE OF MST AND BRIDGE CRANE MOVED TO ITS NORTHERN LIMIT 12. VIEW OF NORTH FACE OF MST AND PARTIALLY ERECTED UMBILICAL MAST. UMBILICAL MAST TRENCH AND DOORS IN FOREGROUND. 13. VIEW OF NORTH FACE OF MST AND FULLY ERECTED UMBILICAL MAST 14. VIEW OF SOUTH FACE OF MST, FULLY ERECTED UMBILICAL MAST, LAUNCHER, AND FLAME BUCKET 15. VIEW OF NORTH FACE AND EAST SIDE OF MST IN PARKED POSITION, NORTH OF THE FULLY ERECTED UMBILICAL MAST. SLC-3E MST IN PARKED POSITION IN BACKGROUND (LEFT). 16. DETAIL OF MST "DRIVE HOUSE" AND MOTOR ON WEST SIDE OF NORTH FACE. MST IN PARKED POSITION AND RESTING AGAINST STOP AT THE NORTHERN END OF THE RAILS. 17. VIEW OF INTERIOR, EAST SIDE, DECK LEVEL OF MST. NOTE CANVAS CURTAIN (RIGHT) USED TO COVER SOUTH SIDE OF MST BELOW LOWEST ENVIRONMENTAL DOORS. 18. DETAIL OF MISSILE PRESSURIZATION CONTROL PANEL ON INTERIOR, EAST SIDE, DECK LEVEL OF MST 19. VIEW OF INTERIOR, WEST SIDE, DECK LEVEL OF MST SHOWING ELEVATOR 20. VIEW FROM DECK UPWARD INTO SLC-3W MST SHOWING UNDERSIDES OF LOWERED SERVICE PLATFORMS. NOTE NARROWING OF CENTRAL OPENING MOVING UPWARD INTO THE TOWER. 21. DETAIL OF AIR HANDLER 1 (MST AIR-CONDITIONING SYSTEM) INTERIOR, SOUTHEAST CORNER, STATION 30, SLC-3W MST 22. DETAIL OF CHILLERS 1 AND 2 (MST AIR-CONDITIONING SYSTEM) INTERIOR, NORTHEAST CORNER, STATION 30, SLC-3W MST 23. VIEW DOWN INTO LAUNCHER AND FLAME BUCKET FROM STATION 48 IN SLC-3W MST. NOTE REMOVABLE METAL PLANKS BELOW LAUNCHER AND ROPE NET OVER FLAME BUCKET. 24. VIEW OF BOXES CONTAINING SOLENOIDS AND HYDRAULIC PUMP CONTRACTORS FOR ENVIRONMENTAL DOORS AND BREAKERS FOR RECEPTACLES ON SEVERAL STATIONS. BOXES LOCATED IN THE SOUTHEAST CORNER OF SLC-3W MST STATION 63. 25. DETAIL OF SOLENOID BOX FOR ENVIRONMENTAL DOORS ON NORTH SIDE OF SLC-3W MST 26. GENERAL VIEW OF SLC-3W MST STATION 63 (TOP SERVICE STATION FOR DELIVERY VEHICLE) FROM NORTHEAST CORNER SHOWING REMOVABLE SAFETY RAILS SURROUNDING CENTRAL OPENING, PULLEY AND WINCH SYSTEM FOR RAISING SERVICE PLATFORM, AND PLATFORM HINGES 27. DETAIL OF PULLEYS, CABLE, AND MOTORIZED WINCH FOR RAISING SERVICE PLATFORM ON SLC-3W MST STATION 63 28. VIEW SOUTH FROM SLC-3W MST STATION 63. FOREGROUND LEFT: THEODOLITE SHELTER (BLDG. 786) CENTER LEFT TO RIGHT: GLOBAL POSITIONING SYSTEM AZIMUTH STATION (BLDG. 775), PYROTECHNIC SHED (BLDG. 757), PORTABLE GUARD SHED, METEOROLOGICAL SHED (BLDG. 756), METEOROLOGICAL TOWER. BACKGROUND CENTER TO RIGHT: STORAGE SHED (BLDG. 776), LIQUID OXYGEN APRON, SLC-3E MST, TOP OF SLC-3E FUEL STORAGE TANK. 29. DETAIL OF OUTLET DUCTS FOR MST AIR-CONDITIONING SYSTEM IN NORTHWEST CORNER OF SLC-3W MST STATION 70.5 (LOWEST PAYLOAD SERVICE STATION). NOTE RING ATTACHMENT FOR PERSONNEL SAFETY HARNESS IN LEFT FOREGROUND. 30. DETAIL OF CONTROL PANEL FOR SLC-3W MST ENVIRONMENTAL DOORS. CONTROL PANEL LOCATED IN NORTHEAST CORNER OF STATION 70.5. 31. DETAIL OF PRESSURE GAUGE AND ASSOCIATED VALVES AND TUBING FOR STRETCH SLING CYLINDER. GAUGE LOCATED IN SOUTHWEST CORNER OF SLC-3W MST STATION 78. 32. DETAIL OF PAYLOAD PRESSURIZATION PANEL LOCATED IN NORTHEAST CORNER OF SLC-3W MST STATION 78 33. DETAIL OF PLATFORM HYDRAULIC PUMP LOCATED IN NORTHWEST CORNER OF SLC-3W MST STATION 78 34. VIEW FROM STATION 78 OF STRETCH SLING HYDRAULIC CYLINDER, PULLEY, AND LANYARDS LOCATED ON EAST SIDE OF SLC-3W MST STATION 85.5. LANYARDS (STOWED BEHIND SOME TUBING ON STATION 78 IN THIS PHOTO) PASS THROUGH OPENINGS IN STATION 78 TO BE ATTACHED NEAR TOP OF ATLAS AIRFRAME. 35. DETAIL OF STRETCH SLING CYLINDER AND PULLEY LOCATED ON EAST SIDE OF SLC-3W MST STATION 85.5 36. GENERAL VIEW OF SLC-3W MST STATION 85.5 FROM SOUTHEAST CORNER SHOWING REMOVABLE SAFETY RAILS AROUND CENTRAL OPENING, STRETCH SLING CYLINDER, AND PULLEY ON WEST SIDE, AIR-CONDITIONING DUCTING IN NORTHWEST CORNER, PLATFORM SEGMENTS AND HINGES 37. GENERAL VIEW OF SLC-3W MST STATION 85.5 FROM NORTHEAST CORNER SHOWING PLATFORM CONTROLS IN SOUTHWEST CORNER, COMMUNICATION STATION AND ELEVATOR ON WEST SIDE. STRETCH SLING CYLINDER PRESSURE GAUGE IN SOUTHWEST CORNER OF STATION 78 VISIBLE THROUGH CENTRAL OPENING. 38. VIEW OF NORTHWEST CORNER OF STATION 85.5 ANTEROOM SHOWING HYDRAULIC ACTUATOR ARM (NEAR CEILING) FOR WEST ENVIRONMENTAL DOOR ON NORTH SIDE OF SLC-3W MST. HYDRAULIC PUMP FOR ARM, AND CORNER OF ELEVATOR DOOR VISIBLE IN LOWER LEFT CORNER OF PHOTOGRAPH. WRIGHT SPEEDWAY WINCH MOTOR AND PULLEY FOR RAISING SERVICE PLATFORM ON LEFT. 39. DETAIL OF COVER FOR CENTRAL OPENING LOCATED ON SLC-3W MST STATION 100.5 (PLATFORM ABOVE TOP OF PAYLOAD) 40. DETAIL OF COMMUNICATIONS PANEL ON STATION 100.5 41. VIEW OF DOOR FROM WEST ANTEROOM ON MST STATION 111 INTO SERVICE AREA SHOWING SECURITY LOCK ON DOOR AND CONTROLS FOR WEST PLATFORMS IMMEDIATELY SOUTH (RIGHT) OF DOOR 42. VIEW OF ARRANGEMENT OF PULLEY AND WINCH SYSTEM FOR RAISING SERVICE PLATFORMS ON WEST SIDE OF STATION 111. WINCH MOTOR MOUNTED TO CEILING OF WEST ANTEROOM. TOP OF DOOR VISIBLE IN LOWER LEFT CORNER. 43. VIEW OF NORTHWEST CORNER OF STATION 111 WEST ANTEROOM SHOWING HYDRAULIC ACTUATOR ARM (LEFT) AND PUMP (RIGHT) FOR WEST ENVIRONMENTAL DOOR ON NORTH FACE OF MST. NOTE LOCATION NEAR FLOOR RATHER THAN NEAR CEILING AS ON STATION 85.5 (CA-133-1-C-38). 44. VIEW OF ELEVATOR MOTOR LOCATED ABOVE TOP OF ELEVATOR NEAR WEST WALL OF MST STATION 111 ANTEROOM 45. VIEW OF SERVICE AREA OF STATION 111 FROM SOUTHWEST CORNER. DOORWAY TO EAST ANTEROOM VISIBLE ON RIGHT. BRIDGE CRANE VISIBLE NEAR TOP CENTER OF PHOTO. 46. VIEW OF SERVICE AREA OF STATION 111 FROM NORTHWEST CORNER 47. VIEW OF SLC-3W BRIDGE CRANE FROM NORTHEAST CORNER OF MST STATION 111. CORNER OF HALF-TON HOIST VISIBLE NEAR RIGHT MARGIN OF PHOTO. 48. VIEW OF HALF-TON MONORAIL HOIST LOCATED AT NORTH END OF BRIDGE CRANE 49. VIEW OF CONTROL PANEL FOR BRIDGE CRANE AND HOIST LOCATED ON WEST WALL NEAR NORTHWEST CORNER OF STATION 111 SERVICE AREA 50. VIEW OF TOP OF SLC-3W BRIDGE CRANE FROM UNUMBERED STATION ABOVE 111 51. VIEW OF NORTH END OF SLC-3W UMBILICAL MAST IN TRENCH WITH TRENCH DOORS OPEN. SLC-3W MST IN SERVICE POSITION OVER LAUNCHER IN BACKGROUND. 52. VIEW FROM NORTH END OF SLC-3W MAST TRENCH SHOWING NORTH FACE OF ERECT UMBILICAL MAST. LAUNCHER IN BACKGROUND. METEOROLOGICAL TOWER AND SLC-3E MST IN DISTANT BACKGROUND. 53. VIEW FROM FLOOR OF MAST TRENCH SHOWING BASE OF ERECT UMBILICAL MAST. AIR-CONDITIONING DUCTS VISIBLE ON RIGHT SIDE OF MAST. HYDRAULIC ACTUATOR ARMS FOR OPENING TRENCH DOORS VISIBLE ON LEFT SIDE OF PHOTO. "DOOR STOP" PEDESTAL IN FOREGROUND. 54. DETAIL OF AIR-CONDITIONING EXHAUST DUCTS ON NORTH FACE OF ERECT UMBILICAL MAST 55. DETAIL OF ELECTRICAL JUNCTION BOX ON SOUTH FACE OF SLC-3W UMBLICAL MAST 56. DETAIL OF PAYLOAD ELECTRICAL AND AIR-CONDITIONING UMBILICAL CONNECTIONS ON NORTH FACE OF SLC-3W UMBILICAL MAST 57. DETAIL OF PAYLOAD ELECTRICAL UMBILICAL CONNECTIONS ON NORTH FACE OF SLC-3W UMBILICAL MAST 58. DETAIL OF SLC-3W UMBILICAL MAST CONTROL PANEL LOCATED ON WEST SIDE OF MAST TRENCH APPROXIMATELY HALF WAY BETWEEN THE NORTH END OF TRENCH AND LAUNCHER 59. GENERAL VIEW OF ATLAS E/F LAUNCHER AT SLC-3W FROM ITS SOUTHWEST CORNER. SOUTH FACE OF ERECT UMBILICAL MAST IN BACKGROUND. 60. GENERAL VIEW OF ATLAS E/F LAUNCHER AT SLC-3W FROM ITS NORTHEAST CORNER 61. VIEW SOUTH SHOWING MST RAIL, FIRE SUPPRESSION EQUIPMENT (LEFT OF RAIL), MST ANCHORING GROMETS (IN LIGHT SQUARE NEAR CENTER OF PHOTO AND IN BACKGROUND NEAR TERMINUS OF RAIL). NORTHWEST CORNER OF LAUNCHER IN LEFT BACKGROUND. BACK OF MAST CONTROL PANEL ON RIGHT. 62. TYPICAL ELECTRICAL CONNECTION STATION FOR SLC-3W MST. STORAGE SHED (BLDG. 773) IN LEFT BACKGROUND. 63. GENERAL VIEW OF SOUTH FACE OF SLC-3W MST AND LAUNCH DECK SHOWING FLAME BUCKET AND DELUGE CHANNEL. RETENTION BASIN IN FOREGROUND. 64. VIEW OF SOUTH FACE OF SLC-3W MST, LAUNCH DECK, AND FLAME BUCKET FROM DELUGE CHANNEL. NOTE SQUARED CORNERS OF FLAME BUCKET. 65. DETAIL OF ANGLED DELUGE NOZZLE IN SLC-3W FLAME BUCKET 66. GENERAL VIEW OF NORTH FACE AND WEST SIDE OF THEODOLITE SHELTER (BLDG. 786). PORTION OF DELUGE CHANNEL IN FOREGROUND. 67. GENERAL VIEW OF SOUTH FACE AND EAST SIDE OF THEODOLITE SHELTER (BLDG. 786). SLC-3W FUEL STORAGE TANK IN RIGHT BACKGROUND. 68. GENERAL VIEW OF SOUTH AND EAST SIDES OF SLC-3W LIQUID OXYGEN APRON. CABLE TRAYS IN FOREGROUND 69. GENERAL VIEW OF SOUTH SIDE OF SLC-3W LIQUID OXYGEN APRON. EQUIPMENT SKIDS IN FOREGROUND. LARGE LIQUID OXYGEN TANKS FLANKING NITROGEN GAS STORAGE TANKS VISIBLE BEHIND SKIDS. LAUNCH DECK VISIBLE IMMEDIATELY WEST. MST IN PARKED POSITION AT NORTHERN TERMINUS OF RAILS IN BACKGROUND. 70. DETAIL OF OXYGEN TRANSFER PRESSURE GAUGE IN UPPER LEFT CORNER OF SKID ON RIGHT IN CA-133-1-C-69 71. DETAIL OF NITROGEN GAS STORAGE TANKS AND TRANSFER TUBING ON SLC-3W LIQUID OXYGEN APRON 72. GENERAL VIEW OF WEST SIDE OF CENTER SKID IN CA-133-1-C-69 73. DETAIL OF LIQUID OXYGEN STORAGE PRESSURE GAUGE IN UPPER LEFT CORNER OF WEST SIDE OF CENTER SKID IN CA-133-1-C-69 74. DETAIL OF PUMP IN SKID ON LEFT IN CA-133-1-C-69 75. GENERAL VIEW OF PORTABLE PAYLOAD AIR-CONDITIONING SYSTEM LOCATED ON NORTH SIDE OF SLC-3W LIQUID OXYGEN APRON 76. DETAIL OF AIR-CONDITIONING DUCT BETWEEN PORTABLE PAYLOAD AIR-CONDITIONING SYSTEM AND LSB (BLDG. 770) 77. VIEW OF COOLING TOWER NEAR NORTH FACE OR LSB (BLDG. 779). MST ELECTRICAL CONNECTION PANEL ON LAUNCH DECK IN CENTER BACKGROUND. MST IN PARKED POSITION VISIBLE IN UPPER RIGHT CORNER OF PHOTO. 78. GENERAL VIEW OF SLC-3W FUEL APRON FROM NORTH. HELIUM AND NITROGEN STORAGE TANKS AND CONTROL SKIDS IN LEFT CENTER. FUEL STORAGE TANK AND CONTROL SKID IN RIGHT BACKGROUND. SLC-3E MST IN DISTANT RIGHT BACKGROUND. 79. VIEW FROM SOUTH OF NITROGEN AND HELIUM STORAGE TANKS AND CONTROL SKIDS ON SLC-3W FUEL APRON 80. DETAIL OF TYPICAL PRESSURE GAUGE IN NITROGEN AND HELIUM STORAGE AND TRANSFER CONTROL SKIDS ON NORTH END OF SLC-3W FUEL APRON 81. GENERAL VIEW FROM NORTH OF FUEL STORAGE TANK ON SOUTH END OF SLC-3W FUEL APRON. CORNER OF CONTROL SKID VISIBLE ON LEFT. 82. GENERAL VIEW FROM NORTH OF FUEL STORAGE AND TRANSFER CONTROL SKID (SKID 2) ON SOUTH END OF SLC-3W FUEL APRON 83. VIEW OF INTERIOR OF SKID 2 84. DETAIL OF FUEL CONTROL GAUGES IN SKID 2 85. VIEW FROM SOUTHWEST OF FUEL PIPELINE TO LAUNCH DECK. SOUTHEAST CORNER OF SKID 2 VISIBLE ON LEFT. DOORS OF ROOMS ON SOUTHWEST SIDE OF LSB (BLDG. 770) VISIBLE IN CENTER OF PHOTO. 86. VIEW OF LIQUID NITROGEN STORAGE FACILITY LOCATED DIRECTLY WEST OF THE SLC-3W FUEL APRON. NOTE HEAT EXCHANGER IN BACKGROUND. CAMERA TOWER LOCATED DIRECTLY IN FRONT OF LIQUID NITROGEN STORAGE TANK. NITROGEN AND HELIUM GAS STORAGE TANKS AT SOUTH END OF FUEL APRON IN LOWER RIGHT CORNER. 87. MECHANICAL EQUIPMENT ROOM (101), LSB (BLDG. 770). VIEW OF MAIN SUPPLY FAN AND AIR WASH ON RIGHT; CHILLED-WATER TANK ON LEFT. 88. MECHANICAL EQUIPMENT ROOM (101), LSB (BLDG. 770). FEATURES LEFT TO RIGHT: S-2 SUPPLY FAN TO BOOSTER POD, R-4 COMPRESSOR, S-4 SUPPLY FAN TO PAYLOAD (SYSTEM 1). 89. MOTOR CONTROL CENTER 2 ON SOUTH WALL OF MECHANICAL EQUIPMENT ROOM (101), LSB (BLDG. 770) 90. VIEW OF WEST WALL OF MECHANICAL EQUIPMENT ROOM (101), LSB (BLDG. 770). FEATURES LEFT TO RIGHT: EXHAUST FAN, TWO OF THREE COMPRESSORS FOR REFRIGERANT COOLING. 91. REFRIGERANT CONDENSER TANKS IN NORTHEAST CORNER OF MECHANICAL EQUIPMENT ROOM (101), LSB (BLDG. 770). PREFILTERS AND PRESSURE CONTROLS IN CENTER OF PHOTOGRAPH. 92. EAST WALL OF MECHANICAL EQUIPMENT ROOM (101), LSB (BLDG. 770). TEMPERATURE, FLOW RATE, AND HUMIDITY MONITORING CONTROLS FOR SYSTEM 1 AND SYSTEM 2 AIR HANDLING. 93. TEMPERATURE AND FLOW RATE CONTROLS FOR SYSTEM 1 AND SYSTEM 2, FACING WEST IN MECHANICAL EQUIPMENT ROOM (101), LSB (BLDG. 770) 94. VIEW OF LSB (BLDG. 770) EAST EXIT FROM SOUTH SIDE OF LANDLINE INSTRUMENTATION ROOM (106). SOUTHWEST CORNER OF UNINTERRUPTABLE POWER SUPPLY (UPS) VISIBLE ON EAST WALL OF LANDLINE INSTRUMENTATION ROOM (106). ROOM 101 ENTRANCE OFF HALLWAY TO LEFT OF EXIT. 95. VIEW OF SOUTHWEST CORNER OF LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770). BATTERY RACK FOR BACKUP BOOSTER POWER ON LEFT; BATTERY RACK FOR BACKUP AEROSPACE GROUND EQUIPMENT (AGE) POWER ON RIGHT. BATTERY CHARGER IS RIGHT OF BATTERY RACKS. 96. RECTIFIER NUMBER 1 AND RECTIFIER NUMBER 2 ON EAST WALL OF LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770) 97. VIEW OF NORTH SIDE OF LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770). EAST ROW OF CABINETS INCLUDES, LEFT TO RIGHT: CABLE DISTRIBUTION UNITS, AUTOPILOT CHECKOUT CONTROLS, AND POWER DISTRIBUTION UNITS. NOTE OVERHEAD DUCTS FOR INSTRUMENT AIR CONDITIONING AND CABLE TRAYS ON EAST, WEST, AND SOUTH WALLS. 98. VIEW OF NORTH SIDE OF LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770). POWER DISTRIBUTION UNITS AND CABLE DISTRIBUTION UNITS IN EAST ROW OF CABINETS; LOGIC CONTROL AND MONITOR UNITS FOR BOOSTER AND FUEL SYSTEMS, AND SIGNAL CONDITIONERS IN WEST ROW OF CABINETS. CABLE TRAY TUNNEL ENTRANCE TO LSB (BLDG. 770) AT THE SOUTH END OF LANDLINE INSTRUMENTATION ROOM (106). 99. POWER DISTRIBUTION UNITS FOR BATTERIES AND RECTIFIERS, NORTHEAST SIDE OF LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770) 100. MISSILE ORDNANCE TEST FIXTURE (FLEMING UNIT) ON NORTHEAST WALL OF LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770) 101. CABLE DISTRIBUTION UNITS, SOUTHEAST SIDE OF LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770). NOTE CABLES ENTER CABLE DISTRIBUTION UNITS FROM OVERHEAD CABLE TRAYS. 102. VIEW OF WEST ROW OF CABINETS IN LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770). LOGIC CONTROL AND MONITOR UNITS BOOSTER AND FUEL SYSTEMS ON LEFT; LANDLINE SIGNAL CONDITIONERS ON RIGHT. 103. LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770): LOGIC CONTROL AND MONITOR UNIT FOR BOOSTER AND FUEL SYSTEMS, INCLUDING MISSILE GROUND POWER, HYDRAULICS, PURGE, AND COMMIT 104. SIGNAL CONDITIONERS FOR BOOSTER INSTRUMENTATION, SOUTHWEST SIDE OF LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770) 105. CABLE TRAY TUNNEL ENTRANCE TO LSB (BLDG. 770) AT SOUTH END OF LANDLINE INSTRUMENTATION ROOM 106. INTERIOR OF CABLE TRAY TUNNEL, FROM LANDLINE INSTRUMENTATION ROOM (106), LSB (BLDG. 770), TOWARDS CABLE TRAY SHED 107. UMBILICAL MAST HYDRAULIC CONTROL PANEL IN CENTER OF ROOM UMBILICAL MAST PUMP ROOM (109), LSB (BDLG. 770), FACING WEST 108. ACCUMULATORS AT LOWER RIGHT SIDE OF HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (109), LSB (BLDG. 770) 109. REDUNDANCY SYSTEM CONTROLS FOR UMBILICAL MAST RETRACTION AT LOWER LEFT SIDE OF HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (109), LSB (BLDG. 770) 110. TUBING FOR HYDRAULIC FLUID AT BACK OF HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (109), LSB (BLDG. 770) ACCUMULATOR FOR MAST RETRACTION ON LEFT. 111. RELAY BOX AND SWITCHES AT SOUTH END OF HYDRAULIC CONTROL PANEL, UMBILICAL MAST PUMP ROOM (109), LSB (BLDG. 770) 112. VIEW OF SOUTH SIDE OF MECHANICAL AND ELECTRICAL ROOM (110), LSB (BLDG. 770). VEHICLE MECHANICAL SYSTEMS ROOM (111) AND PNEUMATIC SUPPLY PANEL VISIBLE AT SOUTH END OF MECHANICAL AND ELECTRICAL ROOM (110). PAYLOAD CABLE DISTRIBUTION BOX ON LEFT OF PHOTO, FACING WEST. 113. VIEW OF NORTH SIDE OF MECHANICAL AND ELECTRICAL ROOM (110), LSB (BLDG. 770). QUALITY ASSURANCE ROOM (106A) ON RIGHT SIDE OF PHOTO; CABLE TRAYS OVERHEAD AT TOP; STAIRS TO LSB (BLDG. 770) ADDITION (ROOMS 117 THROUGH 120) IN CENTER OF PHOTO. 114. OVERHEAD CABLE TRAYS AT NORTH SIDE OF MECHANICAL AND ELECTRICAL ROOM (110), LSB (BLDG. 770) 115. QUALITY CONTROL BOARD FOR MAINTENANCE AND INSPECTION AT SOUTH SIDE OF MECHANICAL AND ELECTRICAL ROOM (110), LSB (BLDG. 770), FACING WEST ON EXTERIOR WALL OF QUALITY ASSURANCE ROOM (106A) 116. PNEUMATIC SUPPLY PANEL IN CENTER OF VEHICLE MECHANICAL SYSTEMS ROOM (111) OF LSB (BLDG. 770), FACING NORTH. CONTROLS FOR FLOW AND PRESSURE REGULATION OF NITROGEN ON RIGHT SIDE OF PANEL; CONTROLS FOR HELIUM ON LEFT SIDE OF PANEL (AT LEFT EDGE OF PHOTO). 117. PNEUMATIC SUPPLY PANEL IN CENTER OF VEHICLE MECHANICAL SYSTEMS ROOM (111), LSB (BLDG. 770), FACING NORTH. CONTROLS FOR FLOW AND PRESSURE REGULATION OF HELIUM ON LEFT SIDE OF PANEL; CONTROLS FOR NITROGEN ON RIGHT SIDE OF PANEL (AT RIGHT EDGE OF PHOTO). 118. TUBING AT BACK SIDE OF PNEUMATIC SUPPLY PANEL IN CENTER OF VEHICLE MECHANICAL SYSTEMS ROOM (111), LSB (BLDG. 770) 119. EQUIPMENT DATA TRANSMITTER (EDT) CONDITIONING PANEL FOR NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) PAYLOADS IN NORTHEAST CORNER OF VEHICLE MECHANICAL SYSTEMS ROOM (111), LSB (BLDG. 770) 120. INERTIAL MEASUREMENT UNIT (IMU) NITROGEN PURGE REGULATOR PANEL FOR DEFENSE METEOROLOGICAL SYSTEM PROGRAM (DMSP) PAYLOADS IN SOUTHWEST CORNER OF VEHICLE MECHANICAL SYSTEMS ROOM (111), LSB (BLDG. 770) 121. VIEW OF SOUTH SIDE OF TRANSFORMER ROOM (112), LSB (BLDG. 770), FROM MECHANICAL AND ELECTRICAL ROOM (110) 122. SOUTH SIDE OF TRANSFORMER ROOM (112), LSB (BLDG. 770), WITH MECHANICAL AND ELECTRICAL ROOM (110) AND LANDLINE INSTRUMENTATION ROOM (106) VISIBLE THROUGH OPEN DOORS. POWER PANEL 2A AT LEFT EDGE OF PHOTO. FIRE SUPPRESSION DELUGE PANEL ON RIGHT EDGE OF PHOTO. 123. FIRE SUPPRESSION DELUGE PANEL ON SOUTH WALL OF TRANSFORMER ROOM (112), LSB (BLDG. 770) 124. FIRE ALARM SYSTEM PANEL AT WEST SIDE OF SOUTH WALL, TRANSFORMER ROOM (112), LSB (BLDG. 770) 125. TRANSFORMER SUBSTATIONS ON NORTH SIDE OF TRANSFORMER ROOM (112), FACING SOUTH 126. MOTOR CONTROL CENTER 1 (MCC-1), FACING NORTH IN ROW OF ELECTRICAL CABINETS JUST SOUTH OF TRANSFORMER SUBSTATION CABINETS IN TRANSFORMER ROOM (112), LSB (BLDG. 770) 127. POWER PANEL A1 AND A2 MASTER SHUTOFFS FOR PRIMARY POWER ON EAST WALL OF TRANSFORMER ROOM (112), LSB (BLDG. 770) 128. VIEW OF NORTHWEST CORNER OF TRANSFORMER ROOM (112), BUILDING 751. JEFFRIES COMPANY TRANSFORMER FOR LIGHTING SYSTEMS ON NORTH WALL, FACING SOUTH; POWER PANEL A1 ON EAST WALL, FACING WEST 129. VIEW OF WEST SIDE OF ACID TRUCK ROOM (113), LSB (BLDG. 770). BAY DOOR OPENS TO FUEL APRON ON WEST SIDE. BRICK FLOOR DATES FROM AGENA PERIOD WHEN ACID WAS STORED IN THE ROOM. 130. VIEW OF CONTROL ROOM (114), LSB (BLDG. 770), FROM WEST. HYDRAULIC PUMPING UNIT (HPU) IN CENTER OF PHOTO, FACING NORTH. NITROGEN SUPPLY PANEL ON SOUTH WALL (LEFT EDGE OF PHOTO); RELAY BOX FOR HPU ON SOUTH WALL BEHIND HPU. 131. HYDRAULIC PUMPING UNIT IN CONTROL ROOM (114), LSB (BLDG. 770) 132. INTERIOR OF HYDRAULIC PUMPING UNIT RELAY BOX ON SOUTH WALL OF CONTROL ROOM (114), LSB (BLDG. 770) 133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM (114), LSB (BLDG. 770) 134. THRUST SECTION HEATER IN SOUTHEAST CORNER OF CONTROL ROOM (114), LSB (BLDG. 770) 135. CONTROL PANEL FOR THRUST SECTION HEATER IN SOUTHWEST CORNER OF CONTROL ROOM (114), LSB (BLDG. 770) 136. VIEW OF LIQUID NITROGEN/HELIUM HEAT EXCHANGER IN LIQUID NITROGEN CONTROL ROOM (115), LSB (BLDG. 770), FROM FUEL APRON WITH BAY DOOR OPEN 137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM (115), LSB (BLDG. 770) 138. LIQUID NITROGEN INSTRUMENT PANEL ON EAST WALL OF LIQUID NITROGEN CONTROL ROOM (115), LSB (BLDG. 770) 139. VIEW OF AGENA TRANSFER AREA SHELTER (117A), LSB (BLDG. 770), FROM VEHICLE CHECKOUT AREA (117). STAINLESS STEEL FLOOR SQUARE BY LOCKER WAS LEVEL PEDESTAL. 140. VIEW OF CHECKOUT AREA (117), LSB (BLDG. 770), FROM AGENA TRANSFER AREA SHELTER (117A). NITROGEN TEST PANEL ON EAST WALL OF AGENA TRANSFER AREA SHELTER (117A). 141. NITROGEN TEST PANEL ON EAST WALL OF AGENA TRANSFER AREA SHELTER (117A), LSB (BLDG. 770) 142. OVERHEAD CRANES ON SOUTH WALL AND CEILING OF AGENA TRANSFER AREA SHELTER (117A), LSB (BLDG. 770). FORMERLY USED FOR VEHICLE TRANSFER. 143. GENERAL DYNAMICS SPACE SYSTEMS DIVISION SCHEDULE BOARD IN LUNCH ROOM (120), LSB (BLDG. 770) 144. Photocopy of drawing (1967 structural drawing by Koebig & Koebig Inc.) MOBILE SERVICE TOWER (MST) MODIFICATION AND REFURBISHMENT, TOWER ELEVATIONS AND GENERAL NOTES, SHEET S-3 145. Photocopy of drawing (1967 structural drawing by Koebig & Koebig Inc.) MST MODIFICATION AND REFURBISHMENT; PLAN, SECTIONS, AND DETAILS FOR STATION 55.5, SHEET S-8 146. Photocopy of drawing (1967 electrical drawing by Koebig & Koebig Inc.) MST MODIFICATION AND REFURBISHMENT; LIGHTING, AND POWER PLANS FOR STATIONS 12, 21, 30, AND 39, SHEET E-5 147. Photocopy of drawing (1967 structural drawing by Koebig & Koebig Inc.) MST MODIFICATION AND REFURBISHMENT; PLANS, SECTIONS, AND DETAILS FOR STATIONS 135, 124, 111, AND 100.5, SHEET S-4 148. Photocopy of drawing (1972 architectural drawing by the Ralph M. Parsons Company) MST ELEVATIONS AND GENERAL NOTES, SHEET A-2 149. Photocopy of drawing (1972 architectural drawing by the Ralph M. Parsons Company) PLATFORM PLANS FOR MST STATIONS 63, 55.5, 48, 39, 30, SHEET A-5 150. Photocopy of drawing (1972 structural drawing by the Ralph M. Parsons Company) PLANS, SECTIONS, AND DETAILS FOR PLATFORMS AT MST STATIONS 48, 55.5, 70.5, 78, AND 85.5, SHEET S-9 151. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) MST PLANS, ELEVATION, SECTIONS, AND DETAILS, SHEET P-18 152. Photocopy of drawing (1974 structural drawing by Stearns-Roger Incorporated) PLATFORM FRAMING AND INSERTS, SECTIONS, AND DETAILS FOR MST STATION 70.5, SHEET 509-S1 153. Photocopy of drawing (1975 architectural drawing by Stearns-Roger Incorporated) PLATFORM PLAN AND DETAILS FOR MST STATION 70.5, SHEET 509-A1 154. Photocopy of drawing (1976 structural drawing by Stearns-Roger Incorporated) SEASAT PLATFORM MODIFICATIONS; PLANS, SECTIONS, AND DETAILS FOR MST STATION 61.5, SHEET 511-S37 155. Photocopy of drawing (1977 structural drawing by Stearns-Roger Incorporated) SEASAT MODIFICATION; PLANS, SECTIONS, AND DETAILS FOR INSTALLING 3-TON BRIDGE CRANE INSTALLATION AT MST STATION 124, SHEET 511-S35 156. Photocopy of drawing (1975 structural drawing by Stearns-Roger Incorporated) MST STATION 70.5 EMERGENCY SHOWER FLOOR PLANS, SECTIONS, AND DETAILS, SHEET 511-S2 157. Photocopy of drawing (1966 civil engineering drawing by AETRON) PLOT AND LOCATION PLAN, SECTIONS, AND DETAILS FOR THE UNDERGROUND CHECKOUT FACILITY ON THE WEST PAD, SHEET C-1 158. Photocopy of drawing (1966 structural drawing by AETRON) FRAMING PLAN, ELEVATIONS, SECTIONS, AND DETAILS FOR THE TRANSFER AREA SHELTER AND UNDERGROUND CHECKOUT FACILITY, SHEET S-4 159. Photocopy of drawing (1966 structural drawing by AETRON) CONCRETE SECTIONS AND DETAILS NO. 1 OF THE UNDERGROUND CHECKOUT FACILITY, SHEET S-2 160. Photocopy of drawing (1967 electrical drawing by Koebig & Koebig, Inc.) MST MODIFICATION AND REFURBISHMENT; ELECTRICAL MODIFICATIONS OF LAUNCH DECK, SHEET E-3 161. Photocopy of drawing (1967 structural drawing by Koebig & Koebig, Inc.) MST MODIFICATION AND REFURBISHMENT; LAUNCH PAD AND MISCELLANEOUS STRUCTURAL DETAILS, SHEET S-2 162. Photocopy of drawing (1967 structural drawing by Koebig & Koebig, Inc.) MST MODIFICATION AND REFURBISHMENT; SITE PLAN AND MISCELLANEOUS DETAILS, SHEET S-1 163. Photocopy of drawing (1973 piping drawing by Stearns-Roger Incorporated) TRICHLOROETHYLENE RECOVERY SYSTEM FUNNELS AND SUPPORTS, SHEET 200-128 164. Photocopy of drawing (1973 mechanical drawing by Stearns-Roger Incorporated) TRICHLOROETHYLENE RECOVERY SYSTEM SLC-3W DETAILS, SHEET 212-M4 165. Photocopy of drawing (1975 mechanical drawing by Stearns-Roger Incorporated) FLAME BUCKET REPAIR, SHEET 500-10 166. Photocopy of drawing (1979 piping drawing by Stearns-Roger Incorporated) HELIUM AND NITROGEN PUMPING SYSTEMS FLOW DIAGRAM, SHEET 511-P6 167. Photocopy of drawing (1979 piping drawing by Stearns-Roger Incorporated) HELIUM AND NITROGEN PUMPING SYSTEMS PIPING PLAN, SHEET 511-P8 168. Photocopy of drawing (1979 civil engineering drawing by the Space and Missile Test Center, USAF) NITROGEN AND HELIUM PUMPING SYSTEM INSTALLATION SITE PLAN, SHEET 511-C-1 169. Photocopy of drawing (1983 architectural drawing by the Strategic Air Command, USAF) LSB (BLDG. 770) ROOM 117 PARTITIONS AND LOADING DOCK DOOR, SHEET 511-A12 170. Photocopy of drawing (1983 architectural drawing by the Strategic Air Command, USAF) LSB (BLDG. 770) LOADING DOCK DOOR AND DETAILS, SHEET 511-A13 171. Photocopy of drawing (1984 structural drawing by Stearns-Roger Incorporated) LSB (BLDG. 770) ROOM 116 MONORAIL HOIST BEAM, SHEET 511-S-97 172. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) ORIENTATION PLAN AND LEGEND FOR THE LSB (BLDG. 770), SHEET P1 173. Photocopy of drawing (1972 structural drawing by the Ralph M. Parsons Company) SITE PLAN AND MISCELLANEOUS DETAILS, SHEET S-1 174. Photocopy of drawing (1972 structural drawing by the Ralph M. Parsons Company) PLANS, SECTIONS, AND DETAILS FOR MODIFICATION OF THE LSB (BLDG. 770), SHEET S-14 175. Photocopy of drawing (1972 structural drawing by the Ralph M. Parsons Company) PLANS, SECTIONS, AND DETAILS FOR MODIFICATION OF THE LSB (BLDG. 770), SHEET S-15 176. Photocopy of drawing (1972 structural drawing by the Ralph M. Parsons Company) DEMOLITION PLAN FOR THE LSB (BLDG. 770), SHEET S-13 177. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) PLAN, SECTIONS, AND DETAILS FOR LSB (BLDG. 770), SHEET P-15 178. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) PLAN AND DETAILS FOR THE LSB (BLDG. 770), SHEET P-14 179. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) LIQUID OXYGEN STORAGE PLAN FOR THE LSB (BLDG. 770), SHEET P-7 180. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) LIQUID OXYGEN FLOW DIAGRAM FOR THE LSB (BLDG. 770), SHEET P-2 181. Photocopy of drawing (1973 architectural drawing by the Space and Missile Test Center, VAFB, USAF) SITE PLAN, SECTIONS, AND DETAILS FOR THE FUEL TANK RETAINING WALL, SHEET 27A OF 53 182. Photocopy of drawing (1972 piping drawing by the Ralph M. Parsons Company) PLAN FOR THE LIQUID NITROGEN STORAGE AND BOOSTER CONTROL ROOM FOR THE LSB (BLDG. 770), SHEET P-12 183. Photocopy of drawing (1972 structural drawing by the Ralph M. Parsons Company) PLAN, ELEVATIONS, AND SECTIONS FOR PROPELLANT LOADING SYSTEM SKID 1, SHEET S-18