Mechanism Data Report: Common Display Subsystem Phase 2
Mechanism Hierarchy
Systems
Air Traffic Control Systems
Air Traffic Control Automation
Workstation
Common Display Subsystem Phase 2
Legend: Hierarchy Element - Mechanism

Mechanism Data
Name (acro/abbrev) Common Display Subsystem Phase 2 (CDSS Phase 2)
Description The Common Display Subsystem Phase 2 (CDSS Phase 2) mechanism provides funding for a technical refresh of the Common Display Subsystem Workstation developed in Phase 1.  In the future, the CDSS will exchange data with the NextGen Automation Platform (NAP), which combines Flight Object and Surveillance Data Processing (SDP).  The CDSS will be installed in En Route and Arrival/Departure facilities and will perform display of surveillance data processing and tracking.  The CDSS is a workstation that provides the controller interface for the Flight Object Management System (FOMS), as well as the SDP functions.
Mechanism Type System
NAS Domain Automation
Last Certified 24-Nov-2008
 
Related Location Types Air Route Traffic Control Center, Terminal Radar Approach Control
Flight Domain En Route, Terminal
Initiatives Target System Description
 

Mechanism Schedule 
Concept StartInitial OperationFull OperationBegin DecommissionEnd of Service
CDSS Phase 203-Aug-201201-Jun-201901-Jun-202001-Jun-202801-Jun-2030

Attachments
No attachments found for this mechanism.

Programmatic Information
Mechanism Common Display Subsystem Phase 2
Legend: Program Program, Project Project, Segment Segment, Mechanism Mechanism

Mechanism Predecessor/Successor ScheduleText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
Common Display Subsystem Phase 1 (CDSS Phase 1)Common Display Subsystem Phase 1 (CDSS Phase 1)Design PhaseConcept Start to Initial Operational Capability (IOC)03-Aug-2003 to 01-May-2015Common Display Subsystem Phase 1 (CDSS Phase 1)
Design Phase
Concept Start to Initial Operational Capability (IOC)
03-Aug-2003 to 01-May-2015
Common Display Subsystem Phase 1 (CDSS Phase 1)Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC)01-May-2015 to 01-May-2017Common Display Subsystem Phase 1 (CDSS Phase 1)
Installation Phase
Initial Operational Capability (IOC) to Full Operational Capability (FOC)
01-May-2015 to 01-May-2017
Common Display Subsystem Phase 1 (CDSS Phase 1)Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD)01-May-2017 to 01-May-2028Common Display Subsystem Phase 1 (CDSS Phase 1)
Daily Operations
Full Operational Capability (FOC) to Begin Decommission (BD)
01-May-2017 to 01-May-2028
Common Display Subsystem Phase 1 (CDSS Phase 1)DecommissionBegin Decommission (BD) to End of Service (EOS)01-May-2028 to 01-May-2030Common Display Subsystem Phase 1 (CDSS Phase 1)
Decommission
Begin Decommission (BD) to End of Service (EOS)
01-May-2028 to 01-May-2030
---predecessors above---
Common Display Subsystem Phase 2 (CDSS Phase 2)No data points in this rangeCommon Display Subsystem Phase 2 (CDSS Phase 2)Design PhaseConcept Start to Initial Operational Capability (IOC)03-Aug-2012 to 01-Jun-2019Common Display Subsystem Phase 2 (CDSS Phase 2)
Design Phase
Concept Start to Initial Operational Capability (IOC)
03-Aug-2012 to 01-Jun-2019
Common Display Subsystem Phase 2 (CDSS Phase 2)Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC)01-Jun-2019 to 01-Jun-2020Common Display Subsystem Phase 2 (CDSS Phase 2)
Installation Phase
Initial Operational Capability (IOC) to Full Operational Capability (FOC)
01-Jun-2019 to 01-Jun-2020
Common Display Subsystem Phase 2 (CDSS Phase 2)Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD)01-Jun-2020 to 01-Jun-2028Common Display Subsystem Phase 2 (CDSS Phase 2)
Daily Operations
Full Operational Capability (FOC) to Begin Decommission (BD)
01-Jun-2020 to 01-Jun-2028
Common Display Subsystem Phase 2 (CDSS Phase 2)DecommissionBegin Decommission (BD) to End of Service (EOS)01-Jun-2028 to 01-Jun-2030Common Display Subsystem Phase 2 (CDSS Phase 2)
Decommission
Begin Decommission (BD) to End of Service (EOS)
01-Jun-2028 to 01-Jun-2030
---successors below---
no data found.
Legend:   Design PhaseConcept Start to Initial Operational Capability (IOC) - Design Phase   Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC) - Installation Phase   Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD) - Daily Operations   DecommissionBegin Decommission (BD) to End of Service (EOS) - Decommission

Location ScheduleText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
no data found.

Operational ImprovementsText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
Initial Conflict Resolution AdvisoriesNo data points in this rangeInitial Conflict Resolution AdvisoriesDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Initial Conflict Resolution Advisories
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Reduce Horizontal Separation Standards -3 MilesNo data points in this rangeReduce Horizontal Separation Standards -3 MilesDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Nov-2015 to 01-Feb-2020Reduce Horizontal Separation Standards -3 Miles
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Nov-2015 to 01-Feb-2020
Delegated Responsibility for Horizontal SeparationNo data points in this rangeDelegated Responsibility for Horizontal SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Delegated Responsibility for Horizontal Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Use Aircraft Provided Intent Data to Improve ConflNo data points in this rangeUse Aircraft Provided Intent Data to Improve ConflDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Mar-2012 to 01-Feb-2020Use Aircraft Provided Intent Data to Improve Confl
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Mar-2012 to 01-Feb-2020
ADS-B SeparationNo data points in this rangeADS-B SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Feb-2020ADS-B Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Feb-2020
Use Improved Terrain Information To Delegate RespoNo data points in this rangeUse Improved Terrain Information To Delegate RespoDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2016 to 30-Sep-2018Use Improved Terrain Information To Delegate Respo
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2016 to 30-Sep-2018
Tactical Trajectory ManagementNo data points in this rangeTactical Trajectory ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2019 to 02-Jan-2026Tactical Trajectory Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2019 to 02-Jan-2026
Legend:   Daily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement - Daily Operations

Interfaces
Show Legend
Data Providers Data Consumers
Common Display Subsystem Phase 2 (CDSS Phase 2)
Data Communication Data Communication
FTI FTI
Flight Data Flight Data
ERAM R8  
ERAM R9  
FOMS - ER FOMS - ER
FOMS - Term FOMS - Term
SWIM Segmt. 3 SWIM Segmt. 3
NAS Status Data NAS Status Data
ERAM R8  
ERAM R9  
Position Data Position Data
ERAM R8  
ERAM R9  
Power Power
Pwr Sys  
Surveillance Data Surveillance Data
ERAM R8  
ERAM R9  
Track Data Track Data
ERAM R8  
ERAM R9  
Weather Data Weather Data
ERAM R8  
ERAM R9  

Mechanism Relative Quantities

Mechanism ID 6299
Last Update 11 / 24 / 2008
Last Certified: 11 / 24 / 2008


Data Last Updated On: 30-Jan-2009