P25 DSR Home > Interfaces and Systems > Inter-RF Subsystem Interface Documents, Scope 2 – Additional Services
Inter-RF Subsystem Interface Documents, Scope 2 – Additional Services
Optional |
Provides guidance necessary to meet the optional (mandatory if supporting RFSS ) Scope 2 P25 protocol standards defining ISSI support of four additional P25 services among multi-jurisdictional systems: |
Description and Specification Documents
Overview (Informative)
(No documents are currently under development)
Protocol (Normative)
Project 25 Inter-RF Subsystem Interface Messages and Procedures — Packet Data/Over-the-Air Rekeying (OTAR), TIA-102.BACA-X (Data TG draft, Jun 2008; TR8.19 approval, Apr 2009)
Project 25 Inter-RF Subsystem Interface Messages and Procedures — Addendum 2 — Trunked Console ISSI, TIA-102.BACA-2 (Apr 2007)
(Architecture and Protocol Suite Overview; Sip Messages and Parameters Definition, RTP Message Vocabulary, Mobility Management, Mobility Management, Push-To-Talk Management, Annex A (Normative) – Table of Timers and Constants; Annex B (Informative) – SU-to-SU Call Flows; Annex C (Informative) – Group Call Flows; Annex D (Informative) – Future Considerations; Annex E (Informative) – Console Functionality)
Project 25 Inter-RF Subsystem Interface Messages and Procedures for Voice and Mobility Management Services — Addendum 3 — Supplementary Data, TIA-102.BACA-3 (Apr 2007)
(P25 Supplementary Data Services, P25 Packet Data on the Ed Interface, ISSI Support of the P25 Console Subsystem Interface, P25 Conventional Voice Service)
Project 25 Inter-RF Subsystem Interface (ISSI) Messages and Procedures for Supplementary Data Services, TIA-102.BACD-A (Mar 2008)
(Overview of Architecture and Protocol Suite, SIP Messages and Parameters Definition, Mobility Management, Supplementary Data Procedures, Message Sequence Charts (Informative))
Project 25 Inter-RF Subsystem Interface (ISSI) Messages and Procedures for Supplementary Data Services, TIA-102.BACD-B (Projected TR8 approval date to publish, tbd)
(Overview of Architecture and Protocol Suite, SIP Messages and Parameters Definition, Mobility Management, Supplementary Data Procedures, Message Sequence Charts (Informative))
Project 25 Inter-RF Subsystem Interface Messages and Procedures for Conventional Operation, TIA-102.BACE (Aug 2008)
(Overview of Architecture and Protocol Suite, Application Protocols – Complexity 1, Call and Transmission Control, Timer Values and Constants, Transmission Control Call Flows)
Project 25 Packet Data OTAR ISSI Messages and Procedures, TIA-102.BACx (Projected TR8 approval date to publish, Apr 2009)
Testing Documents
Conformance Tests Procedures
Project 25 Inter-RF Subsystem Interface Conformance Test Procedures for Trunked Console, TIA-102.BAxx (ISSI TG approval, tbd; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Conformance Test Procedures for Packet Data, TIA-102.BAxx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Conformance Test Procedures for Conventional, TIA-102.BAxx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Conformance Test Procedures for Supplementary Data, TIA-102.BAxx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Measurement Methods
Project 25 Inter-RF Subsystem Interface Measurement Methods for Voice Services — Addendum 1 — Trunked Console, TIA-102.CACA-1 (CITG approval, Jan 2008; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Measurement Methods for Packet Data, TIA-102.CACx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Measurement Methods for Conventional, TIA-102.CACx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Measurement Methods for Supplementary Data, TIA-102.BAxx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Performance Recommendations
Project 25 Inter-RF Subsystem Interface Measurement Recommendations for Voice Services — Addendum 1 — Trunked Console, TIA-102.CACB-1 (Projected TR8 approval date to publish, Oct 2008)
Project 25 Inter-RF Subsystem Interface Performance Recommendations for Packet Data, TIA-102.CACx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Performance Recommendations for Conventional, TIA-102.CACx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Performance Recommendations for Supplementary Data, TIA-102.BAxx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Interoperability Test Procedures
Project 25 Inter-RF Subsystem Interface Interoperability Test Procedures for Trunked Console, TIA-102.XXXX (ISSI TG approval, tbd; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Interoperability Tests for Packet Data, TIA-102.CACx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Interoperability Tests for Conventional, TIA-102.CACx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Project 25 Inter-RF Subsystem Interface Interoperability Tests for Supplementary Data, TIA-102.BAxx (ISSI TG approval, tdb; TR8.19 approval, tbd)
Compliance Assessment Documents
(No documents are currently under development)