General Decision Number: OR080007 02/06/2009 OR7 Superseded General Decision Number: OR20070007 State: Oregon Construction Type: Residential Counties: Benton, Clackamas, Columbia, Jackson, Lane, Marion, Multnomah, Polk, Washington and Yamhill Counties in Oregon. RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)(including site preparation work) Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 04/25/2008 3 06/06/2008 4 06/20/2008 5 07/04/2008 6 08/29/2008 7 09/19/2008 8 10/24/2008 9 11/21/2008 10 01/02/2009 11 02/06/2009 BROR0001-008 06/01/2008 BENTON (NORTH), CLACKAMAS, COLUMBIA, MARION, MULTNOMAH, POLK, WASHINGTON AND YAMHILL COUNTIES Rates Fringes BRICKLAYER.......................$ 31.12 13.80 ---------------------------------------------------------------- BROR0001-009 06/01/2008 BENTON (South), JACKSON, AND LANE COUNTIES Rates Fringes BRICKLAYER.......................$ 29.90 13.45 ---------------------------------------------------------------- BROR0001-010 05/01/2008 Rates Fringes TILE SETTER......................$ 26.53 12.60 ---------------------------------------------------------------- * ELEC0048-011 01/01/2009 CLACKAMAS, COLUMBIA, MULTNOMAH, WASHINGTON AND YAMHILL (northern half) COUNTIES: Rates Fringes ELECTRICIAN......................$ 19.00 3%+6.85 ---------------------------------------------------------------- ELEC0280-004 01/01/2009 BENTON, LANE (lying east of a line running north and south from the northeast corner of Coos County to the southeast corner of Lincoln County), MARION, POLK, AND YAMHILL (southern half) COUNTIES Rates Fringes ELECTRICIAN......................$ 25.65 3%+$10.90 ---------------------------------------------------------------- ELEC0659-005 01/01/2008 JACKSON COUNTY Rates Fringes ELECTRICIAN......................$ 26.90 3%+$6.55 ---------------------------------------------------------------- ELEC0932-005 01/01/2009 LANE COUNTIES (western portion) Rates Fringes ELECTRICIAN......................$ 21.87 3%+$7.70 ---------------------------------------------------------------- * ENGI0701-006 01/01/2009 SITE WORK ONLY: Rates Fringes Power equipment operators: BACKHOE: Hydraulic Backhoe, wheel type; Hydraulic backhoe, track type up to and including 20,000 lbs.......$ 31.71 10.90 Robotic Hydraulic Backhoe, track and wheel type up to and including 20,000 lbs, with any or all attachments............$ 32.78 10.90 BLADE/GRADER: Blade operator; blade operator, finish; blade externally controlled by electronic, mechanical hydraulic means; blade operator multi-engine......$ 32.78 10.90 CURB MACHINE OPERATOR.......$ 31.71 10.90 HEAVY DUTY REPAIRMAN........$ 32.78 10.90 LUBE SERVICE ENGINEER.......$ 31.71 10.90 PAVING MACHINE, Asphalt.....$ 32.78 10.90 ROLLER, Asphalt.............$ 31.71 10.90 SCRAPER OPERATOR: Rubber-tired scraper operator single engine, single scraper;Self- loading, paddle wheel, auger type under 15 cu. yds.;Rubber-tired scraper operator, twin engine; Rubber-tired Scraper operator, with push-pull attachments................$ 32.78 10.90 Rubber-tired Scraper operator with tandem scrapers...................$ 33.69 10.90 Rubber-tired scraper operator, with tandem scrapers, multi-engine.....$ 34.65 10.90 Self-Loading, paddle wheel,auger type 15 cy. yds. andover single engine.$ 32.78 10.90 Self-loading, paddle wheel,auger type, finish and/or2 or more units......$ 33.69 10.90 SCREEDMAN EXCLUDING SITE WORK: SCREEDMAN:Conrete & Asphalt.$ 32.78 10.90 ---------------------------------------------------------------- IRON0029-001 07/01/2008 BENTON, CLACKAMAS, COLUMBIA, JACKSON, LANE, MARION, MULTNOMAH, POLK, WASHINGTON AND YAMHILL COUNTIES Rates Fringes IRONWORKER, STRUCTURAL...........$ 31.65 17.87 ---------------------------------------------------------------- LABO0355-026 06/01/2007 BENTON, CLACKAMAS, COLUMBIA, JACKSON, LANE, MARION, MULTNOMAH, POLK, WASHINGTON AND YAMHILL COUNTIES Rates Fringes Laborers: (SITE WORK ONLY) ASPHALT RAKER/IRONER........$ 24.54 11.07 FLAGGER.....................$ 20.12 11.07 GENERAL.....................$ 23.12 11.07 ---------------------------------------------------------------- PLAS0555-004 06/01/2008 SITE WORK ONLY Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 26.80 14.83 ---------------------------------------------------------------- PLUM0290-006 10/01/2008 Rates Fringes Plumbers and Pipefitters.........$ 24.40 16.02 ---------------------------------------------------------------- SFOR0669-003 01/01/2007 Rates Fringes SPRINKLER FITTER.................$ 22.61 2.35 ---------------------------------------------------------------- SHEE0016-008 07/01/2007 LANE COUNTY Rates Fringes Sheet metal worker (including HVAC duct work)..................$ 20.70 10.18 ---------------------------------------------------------------- SHEE0016-009 07/01/2007 BENTON, CLACKAMAS, COLUMBIA, MARION, MULTNOMAH, POLK, WASHINGTON AND YAMHILL COUNTIES Rates Fringes Sheet metal worker (INCLUDING HVAC DUCT WORK)..................$ 22.59 12.29 ---------------------------------------------------------------- SHEE0016-010 07/01/2008 JACKSON COUNTY Rates Fringes Sheet metal worker (including HVAC duct work)..................$ 24.58 13.55 ---------------------------------------------------------------- SUOR2002-001 01/08/2002 Rates Fringes Brick Tender.....................$ 14.69 Carpenters: EXCLUDING SITE WORK.........$ 15.84 SITE WORK ONLY..............$ 15.22 1.15 CEMENT MASON/CONCRETE FINISHER...$ 17.18 8.62 Laborers: EXCLUDING SITE WORK: Concrete Laborer...........$ 8.50 General Laborer............$ 10.08 Pipelayer..................$ 13.00 3.00 SITE WORK ONLY: Concrete Laborer...........$ 8.00 .94 Grade Checker..............$ 15.65 Pipelayer..................$ 16.53 .80 Painter, Brush, Spray and Roller...........................$ 14.38 Power equipment operators: EXCLUDING SITE WORK: Backhoe....................$ 7.00 .19 Bobcat (Skid Loader).......$ 13.17 1.36 SITE WORK ONLY: Bulldozer..................$ 18.61 .80 Excavator..................$ 17.50 Forklift...................$ 12.33 .80 Loader.....................$ 19.60 .80 Screedman..................$ 17.50 Truck drivers: EXCLUDING SITE WORK: Over 10 yards..............$ 8.75 SITE WORK ONLY: End Dump...................$ 13.00 1.03 Water less than 2000 gallons....................$ 18.00 ---------------------------------------------------------------- TEAM0037-006 06/01/2008 Rates Fringes Truck drivers: LOWBOY......................$ 26.52 11.91 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION