WEEKLY MEETING MINUTES Week 47, November 20-26, 2000 1. Announcements ---------------- * Amy Skowronek needs to do some work on the FDDI concentrator at the EAF. Downtime is scheduled for half an hour Tuesday the 21st starting at noon. Any EAF machines on FDDI (and perhaps some in the EOF) will have no network connectivity. This includes the soho-archive filers. * Tuesday, Nov. 21, a group of 8 teachers will be in the EAF with Don Michels 11-12 noon local time. * The weekly planning meeting will be held on Wednesday next week since Thursday is Thanksgiving holiday. No planning meetings will be held on Thursday or Friday. ECS operators will be here on Friday, and the weekend (per usual). 2. Operations Constraints ------------------------- * DSS-27 Downlink Station Tuesday 14:10-20:45 UT 3. Coordinated Observations --------------------------- M Nov 20 (W 47) UVCS/Ulysses South Pole Magnetic Reversal (#6623), UVCS/Ulysses, POC: Ester Antonucci Photospheric Magnetic Signature Study, (#6630) MDI/TRACE/Yohkoh/Sac Peak collaboration, 15-24 UT (Sac Peak), POC: Ted Tarbell, Toshifumi Shimizu T Nov 21 UVCS/Ulysses South Pole Magnetic Reversal (#6623), UVCS/Ulysses, POC: Ester Antonucci Photospheric Magnetic Signature Study, (#6630) MDI/TRACE/Yohkoh/Sac Peak collaboration, 15-24 UT (Sac Peak), POC: Ted Tarbell, Toshifumi Shimizu W Nov 22 Daily and Weekly Meeting Due to Holiday MDI Continuous starts November 22 at 06:50 UT UVCS/Ulysses South Pole Magnetic Reversal (#6623), UVCS/Ulysses, POC: Ester Antonucci JOP134 High-Resolution Supergranulation Study, (#6615), MDI/THEMIS, 07-17 UT, POC: Emily Zamkoff Photospheric Magnetic Signature Study, (#6630) MDI/TRACE/Yohkoh/Sac Peak collaboration, 15-24 UT (Sac Peak), POC: Ted Tarbell, Toshifumi Shimizu T Nov 23 Happy Thanksgiving Holiday !!! UVCS Delta Sco Annual star observations MDI Continuous JOP134 High-Resolution Supergranulation Study, (#6615), MDI/THEMIS, 07-17 UT, POC: Emily Zamkoff Photospheric Magnetic Signature Study, (#6630) MDI/TRACE/Yohkoh/Sac Peak collaboration, 15-24 UT (Sac Peak), POC: Ted Tarbell, Toshifumi Shimizu F Nov 24 UVCS Delta Sco Annual star observations MDI Continuous JOP134 High-Resolution Supergranulation Study, (#6615), MDI/THEMIS, 07-17 UT, POC: Emily Zamkoff S Nov 25 UVCS Delta Sco Annual star observations MDI Continuous JOP134 High-Resolution Supergranulation Study, (#6615), MDI/THEMIS, 07-17 UT, POC: Emily Zamkoff S Nov 26 MDI Continuous JOP134 High-Resolution Supergranulation Study, (#6615), MDI/THEMIS, 07-17 UT, POC: Emily Zamkoff Other activities for Week 47: * Nov 6-Dec 8 MMOP008 Moreton/EIT Observing Campaign, (#6636) EIT/MDI/HASTA/Nancay/Kanzelhohe/Yohkoh/Huairou/ Helio Research/Solar Radio Spectrograph of Porto/ Brasilian Solar Spectroscope/MCCD Imaging Spectrograph Multichannel Flare Spectrograph (Czech Republic) POC: Marta Rovira (rovira@iafe.uba.ar) * Nov 19-Dec 21 JOP129 The Gravitational Focusing Cone of Interstellar Helium (#6610), POC: Eberhard Mobius (Eberhard.Moebius@unh.edu) CDS/SUMER/EIT/UVCS/SWAN/CELIAS SEM and PM EUVE/ACE/Ulysses/Wind/Geotail/Cluster * Nov 20-26 CDS Flare interrupt studies, POC: Enrico Landi/Andrzej Fludra Submodes: Submode 6 all week. Planners for Week 47: CDS -- Andrzej Fludra MDI -- Emily Zamkoff EIT -- Frederic Auchere SUMER -- Not observing LASCO -- Ops Team UVCS -- Ester Antonucci (until Nov 21st.) TRACE -- Jake Wolfson L. Gardner and J. Raymond Relevant Notes -------------- CDS: Possible flare observations, but probably not on Tuesday due to DSN schedule, full sun full spectrum observations for 13 hours either Thursday or Friday UVCS: Monday - Wednesday: South Pole observations continue. Thursday through Saturday stellar observations. Sunday: calibration work and JOP129. LASCO: C2 and C3 synoptics. EIT: 195 CME watch and synoptics. MDI: Monday and Tuesday MDI will follow the TRACE and Sac Peak target. Tuesday will be monthly calibrations from 16:00-19:00 UT. Wednesday morning continuous contact starts. MDI will be doing JOP134 and the default plan is to be in the high res field. The campaign will take an extract of half of the high res field in all 3 variables. MDI hopes to stay in the high res field for the rest of the week, but that depends on what the sun is doing. TRACE: On Wednesday they will load a plan that will last through Monday to cover the holidays so they will need to know targets 5 days in advance.