Notes from South Pole TDRSS Relay (SPTR) Mtg/Telcon held on 8/19/97 Participants: GSFC (530, NISN, Eng Team) WSC (Richard Von Wolff) SP User Rep at GSFC (Troy Ames) MSFC (Rusty Morphew) UofChi (Bob Loewenstein) ASA (Ed Blaine) WSC ITEM - Richard Von Wolff will be in class during telcon periods so Jim Edgington (ATSC Engineering) should be contacted (505-527-7208) for telcons. INTERNET CONNECTIVITY AT WSC - Rusty Morphew sent email to Stan Rubin identifying the WSC router addresses. - ASA (Ed Blaine) reported that they will provide the SP FOTs equipment to connect the "Ginko" router to the SPTR router. - MSFC will proceed with the Malabar SP IP traffic re-routed via the NSI in preparation for the WSGT Internet routers installation to preclude too many changes at one time in case there are problems. - MSFC reported they will need to modify the existing CISCO contract to provide additional M&O support for the WSC 4500 Internet routers. ENGINEERING TEAM STATUS - The pacing items needed for progress right now are the computer hardware items. Some incorrect parts have been received or are no longer available as submitted, so RSC was requested to work with Kevin C. to look into what could be done to expedite things that are needed right away. - It was decided for the KB TWTA that a PLC will be procured ASAP and used for the control interface it the MCS. A loaner PLC will be requested from LandSat to allow development to start. Further interface info is still required from Logimetrics. The 2nd TWTA is still being worked at Logimetrics and no cost has been obtained yet. - The KB Tx filter (diplexer) 2nd harmonic suppression test is being conducted at the RFSOC (Fred Gamms). - Ed Blaine will provide a detailed Elevated Dorm Room 204 floor diagram depicting the layout and power hook-up available. - The team will attempt to run a quick RF BER test via TDRS-1 to WSC. SSAR service will be used to checkout the SP satellite modem Tx capability in the mock-up at B25. Target date is next week at earliest. Ops and Testing people need to get involved to get a temporary NCC test schedule (SHO) code setup. SPTR STATUS REVIEW PRESENTATION ITEMS - Bob Loewenstein will provide an email list defining all the SP projects that will be support by the SPTR project. Troy Ames will help gather the info for a presentation slide. - In addition to the status review on 8/21 there will be a special review for Code 170 (Mike King) held on Tuesday 8/26 @ 8:45 AM in B16/Rm 236. - The remainder of the meeting was spent reviewing and completing the presentation material for the Status Review.