Online databases status
Submitted by testadmin on Fri, 2009-02-13 04:46.1-189, 510A, at 14:00 (GMT), duration : 01:00
Online->Offline migration scripts :
- onllinux6 scripts segfault with Load Balancer config undefined. How to add or remove Load Balancer config (seems to be not required for migrations)?
- http://online.star.bnl.gov/admin/status.php says "mode = hand" for some migrations. How to do that?
- what is "Offline-Autocalibration db-Data"?
gdb output for segfault is :
*** Debug line=1558 *** StDbManagerImpl::getDataBaseInfo(dbName,type,domain)
Found dbType=RunLog & dbDomain=onl from DataBase Name=RunLog_onl
Program received signal SIGSEGV, Segmentation fault.
[Switching to Thread -1218565792 (LWP 14563)]
0x05a85090 in StDbManagerImpl::lookUpServers (this=0xbf70808) at .sl309_gcc323/obj/StRoot/StDbLib/StDbManagerImpl.cc:582
582 LOG_INFO << "StDbManagerImpl::lookUpServers(): config file name is "<<dbLoadBalancerConfig<<endm;
[onllinux6] ~/dbcron/macros-2009/> printenv|grep DB
DB_SERVER_LOCAL_CONFIG=/afs/rhic.bnl.gov/star/packages/conf/dbLoadBalancerLocalConfig_BNL.xml
[onllinux6] ~/dbcron/macros-2009/> ls -ltra /afs/rhic.bnl.gov/star/packages/conf/dbLoadBalancerLocalConfig_BNL.xml
-rw-r--r-- 1 jeromel rhstar 3436 Nov 5 13:09 /afs/rhic.bnl.gov/star/packages/conf/dbLoadBalancerLocalConfig_BNL.xml
So, config variable is set...
Generic questions :
- How can I get _complete_ list of db nodes ?
- What is the "root" password for database at heston.star.bnl.gov:3306 ?
- What is the purpose of bogart.star.bnl.gov node ? It contains offline slave, but seems to be unused?
PID in the upsilon pp 2006 data set
Submitted by rjreed on Fri, 2009-02-13 02:15.Some defintions:
nHitsFit = # hit points in the TPC used for the fit
nHitsPot = # of possible of hit points in the TPC
HFT Software
Submitted by margetis on Thu, 2009-02-12 16:12.510-4867333, at 18:30 (GMT), duration : 01:00
Below:
Correlated pedestals - BTOW
Submitted by balewski on Thu, 2009-02-12 15:41.The goal of this exercise is to establish if there is a correlation between correlated pedestal noise and 60 Hz power line.
Method:
February 2009 BNL to KISTI data transfer
Submitted by jeromel on Thu, 2009-02-12 13:21.Following a Mock Data Transfer (MDT) challenge, here are results from transfering data from BNL counting house to KISTI. The parameters were
Spin PWG meeting (2/12/09)
Submitted by ahoffman on Thu, 2009-02-12 10:58. Under:The PDF for my slides is linked below.
test production
Submitted by bouchet on Thu, 2009-02-12 09:00.- test done locally in DEV with files from Yifei.
The files are AuAu MB events with |Zvertex| < 40 cm and sigma_vertex
W-algo BTOW
Submitted by balewski on Thu, 2009-02-12 00:22. Under:L2 W-algo for BTOW, p+p 500 GeV , 2009 run
Run time params 2 int dbg, randomAcceptPrescale
M-C W prod request 2009, worksheet
Submitted by balewski on Wed, 2009-02-11 23:45.We would like equivalent of LT=50/pb QCD Pythia events @ 500 GeV