[Code of Federal Regulations]
[Title 15, Volume 2]
[Revised as of January 1, 2001]
From the U.S. Government Printing Office via GPO Access
[CITE: 15CFR750.11]

[Page 398-399]
 
                  TITLE 15--COMMERCE AND FOREIGN TRADE
 
  CHAPTER VII--BUREAU OF EXPORT ADMINISTRATION, DEPARTMENT OF COMMERCE
 
PART 750--APPLICATION PROCESSING, ISSUANCE OR AND DENIAL--Table of Contents
 
Sec. 750.11  Shipping tolerances.

    (a) Applicability and use of shipping tolerances. Under some 
circumstances, you may use a license issued for the export of items from 
the United States to export more than the quantity or value shown on 
that license. This additional amount is called a shipping tolerance. 
This section tells you, as the licensee, when you may take advantage of 
a shipping tolerance and the amount of shipping tolerance you are 
permitted to use.
    (1) If you have already shipped the full amount approved on your 
license, you may not use this shipping tolerance provision. No further 
shipment may be made under the license.
    (2) The amount of shipping tolerance you are permitted is based on 
the ``Unit'' specified for the item you want to export in the applicable 
ECCN on the CCL (see Supplement No. 1 to part 774 of the EAR). You must 
calculate shipping tolerance based on the applicable ``Unit'' whether 
that be Number, Dollar Value, or Area, Weight, or other Measure. You may 
not use any other unit that may appear on your license.
    (b) Calculating shipping tolerances. There are three basic rules, 
one for items licensed by ``Dollar Value'', one for items licensed by 
``Number'', and another for items licensed by ``Area, Weight or other 
Measure''.
    (1) Items licensed by ``Dollar Value''. If the ``Unit'' paragraph in 
the ECCN applicable to your item reads ``Sec. value'' or ``in 
Sec. value'', there is no shipping tolerance. You may not ship more than 
the total dollar value stated on your license.
    (2) Items licensed by ``Number''. If the ``Unit'' paragraph in the 
ECCN applicable to your item reads ``Number'' or ``in Number'', there is 
no shipping tolerance with respect to the number of units. However, the 
value of all of your shipments under one license may exceed the total 
dollar value stated on that license by up to 25%.
    (3) Items licensed by ``Area, Weight or Measure''. If the ``Unit'' 
paragraph in the ECCN applicable to your item reads ``kilograms'' or 
``square meters'' or some other unit of area, weight or measure, your 
shipment may exceed the unshipped balance of the area, weight or other 
measure listed on your license by up to 10% and the total dollar value 
shown on your license by up to 25%, unless;
    (i) Your license stipulates a specific shipping tolerance; or
    (ii) Your item is controlled for short supply reasons and a smaller 
tolerance has been established. (See part 754 of the EAR).
    (c) Examples of shipping tolerances.--(1) A license authorizes the 
export of 100,000 kilograms of an item controlled by an ECCN where the 
``Unit'' is stated as ``kilograms'', the total cost of which is 
$1,000,000:
    (i) One shipment. If one shipment is made, the quantity that may be 
exported may not exceed 110,000 kg (10% tolerance on the unshipped Area, 
Weight, or Measure balance), and the total cost of that one shipment may 
not exceed $1,250,000:

  $1,000,000  (the total value shown on the license)
    +250,000  (25% of the total value shown on the license)
-------------
  $1,250,000


    (ii) Two shipments. If the first shipment is for 40,000 kg (valued 
at $400,000), the second shipment may not exceed 66,000 kg (10% of the 
unshipped balance of 60,000 kg (6,000 kg) plus the unshipped balance), 
and the total cost of the second shipment shall not exceed $850,000:

    $600,000  (the value of the unshipped balance of 60,000 kg)
    +250,000  (25% of the original total value shown on the license)
-------------
    $850,000


    (iii) Three shipments. If the first shipment is for 40,000 kg 
(valued at $400,000) the second shipment is for 20,000 kg (valued at 
$200,000), the third shipment may not exceed 44,000 kg (10% of the 
unshipped balance of 40,000 kg (4,000 kg) plus the unshipped balance), 
and the total cost of the third shipment can not exceed $650,000:

    $400,000  (the value of the unshipped balance of 40,000 kg)
    +250,000  (25% of the original total value on the license)
-------------
    $650,000


    (2) A license authorizes the export of an item controlled by an ECCN 
where the ``Unit'' is stated as ``$ value'', the total cost of which is 
$5,000,000. There is no shipping tolerance on this license

[[Page 399]]

because the items are controlled by an ECCN where ``$ value'' is the 
stated ``Unit''.
    (3) A license authorizes the export of 10 pieces of equipment 
controlled by an ECCN where the ``Unit'' is stated as ``Number'', with a 
total value of $10,000,000 and the export of parts and accessories 
covered by that same entry valued at $1,000,000:
    (i)(A) If one shipment is made, the quantity of equipment that may 
be exported may not exceed 10 pieces of equipment because there is no 
shipping tolerance on the ``number'' of units. That one shipment of 
equipment may not exceed $12,500,000:

 $10,000,000  (the total value shown on the license)
  +2,500,000  (25% of the total value shown on the license)
-------------
 $12,500,000


    (B) If the one shipment includes parts and accessories, those parts 
and accessories may not exceed $1,000,000 because there is no shipping 
tolerance on any commodity licensed in terms of dollar value.
    (ii)(A) If the first shipment is for 4 pieces of equipment valued at 
$4,000,000, the second shipment may not exceed 6 pieces of equipment (no 
tolerance on ``number'') valued at no more than $8,500,000:

  $6,000,000  (the value of the unshipped 6 pieces).
  +2,500,000  (25% of the original total value shown on the license).
-------------
  $8,500,000


    (B) If the first shipment includes $300,000 of parts and 
accessories, the second shipment may not exceed $700,000 of parts and 
accessories because there is no shipping tolerance on any commodity 
licensed in terms of dollar value.
    (iii)(A) If the first shipment is for 4 pieces of equipment valued 
at $4,000,000 and the second shipment is for 3 pieces of equipment 
valued at $3,000,000, the third shipment may not exceed 3 pieces of 
equipment (no tolerance on ``number'') valued at no more than 
$5,500,000:

  $3,000,000  (the value of the unshipped 3 pieces).
  +2,500,000  (25% of the original value shown on the license),
-------------
  $5,500,000


    (B) If the first shipment includes $300,000 of parts and accessories 
and the second shipment includes another $300,000, the third shipment 
may not exceed $400,000 because there is no shipping tolerance on 
commodities licensed in terms of dollar value.