Tableland Project Priorities
1. North Fitzhugh diversion pipe (Ditch Liner completed
2002)
2. Little Juniper and Juniper Hill stockponds (Completed)
3. Neckdown/close gaps (Completed)
4. Rim fence maintenance (Completed)
5. Antelope Trap fence replacement (Completed)
6. Yankee Jim ponds/ditch system/duck ponds (First stage
completed)
7. Indian/Roberts Spring development and fencing (Completed
2003)
8. East/West Spring development and fencing (Scheduled for
2004 construction)
9. Yankee Jim Pasture and perimeter fencing (Perimeter
Completed)
10. Millward fence removal/division fencing/spring exclosure/pond
(Pasture fence to be constructed 2003/2004)
11. Dobe Swale Reservoir/fencing/division rocks (Division rocks
not completed)
12. Prospect Spring development and fencing
13. Rock Spring development and fencing (Scheduled for 2004
construction)
14. Ranch House dispositon (based on public input)
15. Tablelands signing
16. Cab Field fence realignment (Completed)
17. Signal Butte Well repair (Scheduled for propane fired
generator - 2004))
18. Yankee Jim juniper cuts (Jim Creek completed)
19. Yankee Jim road closure/reroute:
a. Near pond 2
b. South side of Yankee Jim meadow
c. Road crossing on W. Spring
d. Eckland boundary gate culvert
e. Jim Creek/Ranch House crossing
f. East Spring crossing
g. Hershey Spring/Fitzhugh Creek
20. Rock armor headcut below `78 exclosure
21. Fitzhugh Creek juniper cuts
22. Feasibility study on mineral withdrawals
23. Install cattleguards at Signal Butte and Big Juniper Creek
(Signal Butte completed)
24. Millward Field stockpond
25. Pine Creek Mesa north fence
26. Pine Creek Mesa CDF&G boundary fence (Completed)
27. Corbie Field exchange
28. Stevens Allotment exchange
29. Dispose of land west of highway 395
30. Clean up debris around ranch
31. Burn drug lab (Completed)
32. Repair/rebuild nesting islands
33. Fence nesting islands
34. North Fork/Jim Creek diversion study
35. Riparian planting at Fitzhugh Creek
36. Fitzhugh Creek Canyon prescribed burn