SIIDStateINGPri RoadmapNameDescriptionTarget CY DateTarget FY DateCriticalActual DateStatusLast Update
G Completed  Y Automation Approve ERAM Release 2 package contents En Route Automation Modernization (ERAM) Release 2 candidates -  Automated execution of predeparture aircraft reroutes from TFM - Support to Initial ADS-B for non-radar areas (Gulf of Mexico (GoMex)) ERAM Releases 2 or 3 candidates - Trajectory constraint sharing supporting TFM planning and en route execution - Enhanced Required Navigation Performance (RNP) filing and assignment of adapted RNP routes 2007FY07 Q2 - FY08 Q1Yes04-Mar-2008 Completed.  Green. The ERAM Release 2 Package content was briefed to the Executive Council on March 4, 2008.  This item is completed. 30-Jan-2009
Y Active  N Automation AIM Modernization Segment 1 Final Investment Decision Final Investment Decision to create an AIM Modernization program that supports current and future aeronautical information service needs. Plan the evolution of Aeronautical Information Management (AIM) by allocating functionalities and assuring data integrity of systems that make up AIM. 2009 Q4FY10 Q1Yes The PT has determined the anticipated date for the FID will be April 2009.  The annual update for the roadmap shall shift DP#2 to April 2009 2 Qtr.

DP #2 and DP #120 AIM Segment 1 Initial Investment Decision are dependent upon each other. 
30-Jan-2009
G Completed  Y Automation NIMS sustainment or total resumption service by RMMS decision NAS Infrastructure Management System (NIMS) sustainment or total resumption service by Remote Monitoring and Maintenance System (RMMS) decision. 2007FY07 Q2 - FY08 Q1No28-Mar-2007 On 28 Mar 2007 the JRC approved the FY 2007 funding to implement the rehost plan and to terminate the NIMS Phase 2 program.  Decision will be archived with the termination of NIMs Phase 2 program. 30-Jan-2009
G Completed  Y Communications Final Investment Decision for SWIM Ground Segment 1 Implementation (Baseline for FY 09 - 10) Selects COTS for SWIM core services, and deploy's CIWS Publication, SUA Automated Data Exchange, and publication of Initial flight data services. 2007FY07 Q2 - FY08 Q1No01-Jun-2007 Funding for SWIM Segment 1 has been approved for FY 09 and FY 10. Funding for SWIM Segment 1+ for FY 11 thru FY13 has not yet been approved. 30-Jan-2009
G Completed  N Navigation VOR decision for drawdown based on GNSS Decide when and how to begin drawing down the number of Very High Frequency (VHF) Omnidirectional Range (VOR) navigation systems. There are approximately 1,000 in the inventory. It is assumed that we will keep some smaller number of VORs in the inventory based on the use of a Global Navigation Satellite System (GNSS) such as the Global Positioning System (GPS). 2007FY07 Q2 - FY08 Q1No17-Dec-2007 Decision is complete 12/17/07. 30-Jan-2009
G Completed  N Navigation Develop rightsizing DME requirements, e.g., service volume, DME architecture, pathway. Required Navigation Performance (RNP) will be supported by both Global Navigation Satellite Systems (GNSS) and Distance Measuring Equipment/Distance Measuring Equipment (DME-DME) systems for the foreseeable future. Based on that, we must determine the best way to support RNP with DME including how many DME systems we need, their best placement, if we need to do analytical work to expand their service volumes, etc. A new DME procurement is needed to sustain existing systems and expand the inventory. 2007FY07 Q2 - FY08 Q1No01-Jul-2007 This has been completed in July 2007. 30-Jan-2009
G Completed  Y Surveillance Decision for ADS-B/TIS-B/FIS-B Segment 2 (NAS wide) implementation, including backup strategy (the approved backup strategy is to retain limited secondary radar and all terminal primary radars) Investment decision to expand Automatic Dependent Surveillance-Broadcast (ADS-B), Traffic Information Service-Broadcast (TIS-B), and Flight Information Service-Broadcast (FIS-B) ground infrastructure to the entire NAS. Also, includes decision on ADS-B backup strategy and plan for rulemaking. Now known as the Surveillance and Broadcast Services (SBS) program. 2007FY07 Q2 - FY08 Q1No27-Aug-2007 Approved Final Investment Decision August 27, 2007.  Decision is complete. 30-Jan-2009
Y Replaced  Y Surveillance Decision for legacy radar/beacon (ASR-8/ATCBI-4/5, ASR-9/Mode S) low activity refresh through 2020 (no extension of ASR-11 deployment) Given that we will transition to an Automatic Dependent Surveillance-Broadcast (ADS-B)-based surveillance system, this decision will determine how should we sustain the legacy radar capability during the transition. 2007FY07 Q2 - FY08 Q1No Investment Decision initially proposed for December of 2007 has slipped to May 2008. Status has been changed to Yellow. 30-Jan-2009
G Completed  Y Weather Investment Decision for Terminal Doppler Weather Radar (TDWR) SLEP 1 The Terminal Doppler Weather Radar (TDWR) Service Life Extension Program (SLEP 1) investment decision is required to extend the service life of the TDWR (NAS CIP W03.03-01) at 45 sites. 2007FY07 Q2 - FY08 Q1No01-Aug-2007 Completed August 2007. 30-Jan-2009
G10  Deleted  N Weather Investment Decision for continued funding  to evaluate lower troposphere aircraft Wx Obs An investment decision to determine if Lower Tropospheric aircraft Wx Obs from aircraft can result in RUC model improvements and improve ITWS wind products for reliever airports (where there isn't a TDWR). 2009FY09 Q2 - FY10 Q1No Status Green: Evaluation complete and awaiting final report but decision made by FAA (ATO-P) during Executive meeting that FAA would not acquire lower Tropospheric aircraft observations (raw data from AirDat) directly, but continue getting the benefit from RUC model output as before that will be improved by the addition of TAMDAR data. Earlier, MIT/LL had provided information that these data would not benefit CIWS or ITWS. 13-Oct-2008
G11  Active  Y Weather Investment Decision to transfer the Comms functionality of WARP WINS into SWIM (System Wide Information Management) Seg 2 as component of NNEW Weather and Radar Processor (WARP) Weather Information Network Server (WINS) communications (dissemination) functionality to be subsumed by the System Wide Information Management (SWIM) by 2012 (Segment 2). 2009 Q3FY09 Q4No WARP no longer a part of SWIM Segment 1, therefore target date needs moved to reflect Segment 2 inclusion. Investment decision is scheduled for 2009 but is dependent on the SWIM segment 2.   30-Jan-2009
R12  Replaced  Y Weather Investment Decision for WARP Sustain until subsumed into NextGen Wx Processor Work Package 1  (WP1) This Tech Refresh sustains the existing WARP and its subsystems (e.g., FBWTG and WINS) until those functions can migrate into NextGen Wx Processor WP1, which will employ an open, modular, and scalable architecture to position it as a potential platform for additional NextGen Wx functions 2007FY07 Q2 - FY08 Q1No Status remains Red (as 2007 milestone couldn't be attained). WARP Product Team unable to meet milestone of Dec '07 EC/2B decision as during pre-EC work ups their funding was "zeroed out" for '08 & '09. They have prepared a RPD for FY10 funding and are on JRC 'Wait List'; they hope to get to an EC for a 2B decision in 2008. For now, their management is telling them to "sit tight". 30-Jan-2009
13  Deleted  Y Weather Investment Decision to move TWIP to SWIM Air Segment (Or remain as a vendor provided service) The Investment Decision would be to transition TWIP capability (resident in ITWS) into SWIM as part of SWIM Air Segment (SWIM Segment 3) 2015FY15 Q2 - FY16 Q1No No Status 14-Oct-2008
Y14  Active  Y Weather Investment Decision for WMSCR TR; Sustained to reach SWIM Segmt. 3 (Re-Org expect transition to Comm.) WMSCR TR needed to establish Comms with ADAS rehosting; replace hardware platform; replace database and operating system to sustain until reaching SWIM Seg 2 2009 Q4FY10 Q1No Strongly likely that WMSCR unable to achieve milestone (EC/JRC Decision within CY 2008). WMSCR Lead Cathy Krupa indicates:(1) WMSCR Tech Refresh is not needed until 2011, so funding decision in 2008 is not necessary; therefore, the team is not going through the JRC process at this time; (2) WMSCR is now under Steve Dash (Comms) and are trying to establish if JRC needed to seek funding, or alternatives available.   30-Jan-2009
Y15  Active  Y Facilities Investment Analysis Readiness Decision (IARD) for NextGen Facilities Development and approval of the Concept & Requirements Definition and other documents required for IARD approval.  This becomes the AMS entrance decision point for the NextGen Facilties Program. 2009 Q1FY09 Q2Yes The Concept and Requirements Definition (CRD) for NextGen Facilties is proceding, but the original schedule will not be met for a Nov 08 IARD.  The Program Manager received approval for a 3 month slip in the CRD date to Feb 09.  The 2008 B/L status remains Yellow, but will be rebaselined Green to Feb 09 for the 2009 Facilties Roadmap.  This Milestone will be renamed Investment Analysis Readiness Decision (IARD) in the 2009 Roadmap.  No change in current status.  30-Jan-2009
G16  Completed  N Aircraft Decision to develop avionics policy, standards and equipage strategy for Enhanced/Synthetic Vision Systems (EVS/SVS) to support low and zero visibility surface operations. Development of standards to support virtual tower operations and visual flight rules (VFR) operational rates in instrument flight rules (IFR) conditions capability. 2007FY07 Q2 - FY08 Q1No01-Jul-2007 Completed in July 2007 30-Jan-2009
G17  Deleted  Y Air / Ground TCAS Research Analysis to improve interoperabitiy of a changing environment. Traffic Alert and Collision Avoidance System (TCAS) and Automatic Dependent Surveillance-Broadcast (ADS-B) conflict management applications, TCAS algorithms in Next Generation Air Transportation System (NextGen) super-density operations, and TCAS Resolution Advisory (RA) monitoring 2009FY09 Q2 - FY10 Q1No Analysis activity is on going.  On schedule to meet 2009 target date. 05-Nov-2008
G18  Deleted  Y Automation Approve requirements for Post ERAM R3 work package initial investment Baseline requirements for En Route Automation Release 4 and approve initial requirements for Post ERAM R3 work package.  Candidates for the Mid-Term En Route Automation include: Transition surveillance sources to Internet Protocol (IP), exchange data with Terminal and Traffic Flow Management System (TFMS) automation via System Wide Information Management (SWIM) services. - DataComm - Enhanced trajectory integration with: TFM, TMA - Conflict Probe modifications for Required Navigation Performance (RNP)-based separation - Processing of ADS-B aircraft track vector and intent data - Trajectory/Conflict Alert/Probe use of aircraft intent data - Improved Conflict Resolution Aids - Flexible Airspace - Separation Automation enhancements - High Density Arrival/Departure Terminals and Airports - Conflict Detection and Resolution Enhancements - CATM Constraint Exchange - Dynamic Airspace - Execution of Flow Strategies - Trajectory Based Airspace 2009FY09 Q2 - FY10 Q1No Green status: Very dependent on SWIM Segment 2, ADS-B, and a few other ongoing programs. 02-Oct-2008
G19  Completed  Y Automation Approve CATMT work package 2 (mid-term package content) Integrated Departure Arrival Capability (Formerly Departure Flow Management)
- Airborne reroute execution/go button
- Traffic Flow Management (TFM) Suite Integration
- Weather Integration
- display of CIWS and research products 
2008 Q3FY08 Q4Yes26-Sep-2008 GREEN. Met with ATO-F and the concern over NextGen scope overlap has been alleviated. On track to complete by Sep 2008. 30-Jan-2009
G20  Active  Y Automation Approve EFS final investment to migrate towards TFDM functional capability. Automate Tower flight data functions to absorb Flight Data Input/Output (FDIO) and replace EFSTS - Assumes System Wide Information Management (SWIM) Segment 1 implements the Terminal Data Distribution System (TDDS) function for this application to utilize. - Provides a common terminal electronic flightstrip (EFS) capability.  This capability will enable an electronic transfer of flight data and amendment of flight data in support of NextGen capabilities. 2010 Q2FY10 Q3Yes "DP 20, FID for EFS, has been moved at the request of ATO-T to 2010. The IARD is now expected in 2009.

The EFS didn't get an IARD decision; however, it will be demonstrated at one (or more) operational site(s) in order to gather benefits.  Upon resubmitting a JRC decision it is high risk that EFS will delay a migration towards TFDM. " 
30-Jan-2009
G21  Completed  N Automation SAIDS near-term sustainment/replacement final investment decision A final investment decision (FID) for Systems Atlanta Information Display System (SAIDS) near-term sustainment/replacement. 2008 Q3FY08 Q4No23-Sep-2008 COMPLETED 09/23/08.  FID granted to replace all existing workstations in FY09 - FY2015. 30-Jan-2009
G22  Completed  Y Automation Approve NextGen Staff Tower ConOps Automation will be required to support the goal of staffing Next Generation Air Transportation System (NextGen) towers.  Assume this ConOps will need approval from ATO-P organization. 2008 Q3FY08 Q4Yes30-Sep-2008 COMPLETED.  Directors from ATO-P and ATO-T approved and signed the NextGen Towers (NT) Operational Concept (ConOps) (previously entitld Staff Virtual Tower (SVT) Operational Concept).  Approval of the NT ConOps was an Enterprise Architecture milestone that was completed on time (green). The NT concept will meet projected future traffic demands while improving operational efficiency and enabling cost-effective expansion of air traffic services to significantly larger number of airports than possible with traditional methods of service delivery. The approved ConOps develops the NT concept as a first step in the process to determine its operational feasibility. The NT concept depicted in the ConOps will be used as a foundation for future analyses (e.g. functional, technical, safety) and development efforts needed to determine its operational feasibility. 30-Jan-2009
Y23  Active  Y Navigation Decision on next generation CAT I Landing System. Decisions on Category I (CAT I) Instrument Landing System (ILS) divestment will be made on a case-by-case basis, taking into consideration the alternatives for providing equivalent levels of vertically-guided approach-to-landing service and the level of instrument flight rules (IFR) activity at a given airport. LAAS Cat I service will be available under non-federal procurement in Q1 2009.  ILS divestments at selected airports are not expected to begin before 2012, based on the availability of LAAS-based Cat I services under non-federal procurement or on substitution of Wide Area Augmentation System (WAAS) localizer performance with vertical guidance (LPV) services for ILS.  See related DP24. 2008 Q3FY08 Q4No Awaiting Agency approval of the replacement of CAT I ILS with WAAS based on evaluation of the work in WAAS certification that appeared viable for most U.S. locations. Approval may involve determination of ILS divestments at selected airports that may not begin before 2012, based on the substitution of Wide Area Augmentation System (WAAS) localizer performance with vertical guidance (LPV) services for ILS. Approval may require analysis of a policy and mitigation strategy, for a loss of Global Navigation Satellite System (GNSS) must be determined. In addition, LAAS was originally intended to provide CAT I where WAAS coverage was not available. If LAAS is not used for this purpose, ILSs in areas where WAAS coverage is insufficient will need to be retained. The status will stay yellow until receipt of Agency approval regarding these decisions. No further update at this time.  30-Jan-2009
Y24  Active  Y Navigation Decision to proceed with research & development work for Category-II/III GBAS By early 2009, the FAA will have completed certification work for the Category-I LAAS system design approval (SDA).  This acheivement is a precursor to proceeding with the R&D work for a Category-II/III LAAS prototype by 2010 and a regulatory approval for a Category-II/III LAAS by 2012. 2009 Q1FY09 Q2Yes Awaiting Agency approval of what FAA's responsibilities should be regarding provision of Category (CAT) II/III precision approach service. Approval may involve determining whether or not to continue with Ground-Based Augmentation System (GBAS) technologies to support CAT II/III operations. Approval may also involve decisions with the aviation community, including definitions of the standard services provided by FAA, of the public-use special services, and of the nonpublic services provide by the airport operator/user. Furthermore, the potential value of LAAS would be to reduce FAA costs by allowing for more divestiture of ILS units and for the expansion of CAT II/III services to more airports that may need the support of a feasibility decision of CAT II/III LAAS. If CAT II/III Instrument Landing Systems (ILS) are not divested, they will require sustainment/replacement. The status will stay yellow until receipt of Agency approval. No update from the agency yet.  30-Jan-2009
G25  Completed  Y Weather Investment Decision to baseline NEXRAD and fund science evolution on NEXRAD, including Dual Pol This decision is to fund science (algorithm development) to exploit dual polarization (DP) capability of the Next Generation Weather Radar (NEXRAD) sometimes denoted as Model WSR-88D. 2008 Q4FY09 Q1No01-Aug-2008 Status Green: The investment decision for NEXRAD is in actuality a Baseline Investment Decision to fund new algorithm development to detect weather hazards more effectively. Product Team completed a requirements document (fRD) that is undergoing signature process and a draft ISP for which review comments are being worked into final draft. They've been approved for a tailored JRC for a Final Investment Decision in Aug/Sep 2008 timeframe. 30-Jan-2009
G26  Active  Y Weather EC Strategy Decision to outsource existing ASOS maintenance contract [with NWS] Preliminary activity underway (i.e., market survey) conducted to determine if outsourcing the maintenance [O&M costs] of Automated Surface Observing System (ASOS), Automated Weather Observing System (AWOS), Automated Weather Sensor System (AWSS), and Standalone Weather Sensor (SAWS) is cost effective. RFI likely issued soon 2008 Q4FY09 Q1No OES issues an RFI to vendors regarding taking on ASOS.  They are evaluating responses now and will amend their BCA after working out the comment/issues with ATO-T; then they will go to the EC regarding the decision to rebaseline.   30-Jan-2009
G27  Replaced  Y Weather Investment Decision for ITWS This entails an Investment Decision for an Integrated Terminal Weather System (ITWS) Technological Refresh in the 2007-2012 timeframe, fielding of remaining 12 systems, and new NAS requirements. 2008FY08 Q2 - FY09 Q1No Archived 30-Jan-2009
G28  Completed  Y Aircraft NextGen. Equipage Strategy Develop Next Generation Air Transportation System (NextGen) Equipage Strategy consisting of avionics packages and installation timelines to support a comprehensive and coordinated equipage effort based on operations and airspace access. The strategy may consist of rulemaking, incentives and/or voluntary equipage schema. Equipage may include ADS-B (in), GNSS, Beacon Transponder, TCAS, TAWS, navigation requirements, Data link, Weather Sensors (temp, wind, humidity, turbulence, icing, and wake), and TIS-B/FIS-B. 2008 Q2FY08 Q3Yes30-Jun-2008 Comments from the NextGen Review Board were incorporated.  The document was finalized on June 30. Approved by JRC on July 25, 2008 30-Jan-2009
Y29  Active  Y Air / Ground Submit Airborne data integrity requirements to Automation mid-term work package to support exchange of Air-Ground data  En Route Automation Modernization (ERAM) mid-term work package will address System Wide Information Management (SWIM) Air (Segment 3) needs to support Data Communications and trajectory-based operations (TBO).  2009 Q1FY09 Q2No Data requirements have not been defined at this time. There will be a discussion with CSE regarding the role AVS shall take in the ERAM mid-term work package team. No update at this time.  30-Jan-2009
30  Active  Y Automation Approve migration of ARMT, DFM and TMA Tower displays to TFDM and/or TFMS WP 2 This decision is to approve migration of Airport Resource Management Tool (ARMT), Departure Flow Management (DFM), and Traffic Management Advisor (TMA) Tower displays to Tower Flight Data Manager (TFDM) and/or TFMS Work Package (WP) 2. 2010FY10 Q2 - FY11 Q1No No Status 30-Jan-2009
31  Active  Y Automation Final Investment Decision for Post ERAM R3 Work Package An investment decision is needed to proceed with the Post ERAM R3 work package encompassing requirements for En Route objectives supporting early NextGen. 2010FY10 Q2 - FY11 Q1Yes No Statu 30-Jan-2009
32  Active  Y Automation NextGen Staff Tower initial investment decision Automation will be required to support the goal of staffing Next Generation Air Traffic Control System towers 2011FY11 Q2 - FY12 Q1Yes Included in the "TBD JRC Subordinate Board/JRC Listing" in the JRC Readiness Review Meeting Minutes, 18 October 2007, p. 7. 30-Jan-2009
G33  Active  N Automation Investment pursuit decision for Security Integrated Tool Set (SITS) Air Domain Security alternative architectures Identify and plan integration of the specific applications along with the future for the prototype activities. Identify the mission requirements and proper allocation across the applications. Candidate applications include; Airspace Access, Special Use Airspace (MADE), TFR Builder, Flight Object attributes, and Skywatch. 2011 Q1FY11 Q2Yes "They presently in the early stages of the CRD phase of the program.  Working date for IARD is 31 Mar 09.  Entirely dependent on the availability of NextGen funding.

Program is building the EA Products. " 
30-Jan-2009
G34  Active  N Communications Approve Terminal Voice Switch Bridge Contract Ensures short term availibility of Terminal Voice Swithes prior to NVS.  May be enacted through extension of IVSR contract 2009 Q3FY09 Q4No The Voice Switch Program in under the assumption that a JRC decision is not required for extending the IVSR contract for two years.  TVSR maybe removed from the JRC watch-list.  The Voice Switch Program is currently researching this issue.  They are still researching the issue and have no updates at this time.  Status is being researched.  30-Jan-2009
G35  Completed  Y Communications Determine FAA's initial investment strategy for the data communications program and the concomitant rulemaking strategy for airborne equipment. Ensures synchronized Government and User investments to provide data communications capabilities to support NextGen. 2008 Q3FY08 Q4Yes25-Jul-2008 COMPLETE.  Equipage Strategy Plan reviewed by AVS, and signed by Director, ATC Communications Services.  Plan forwarded to NextGen Integration and Implementation office for use in the NextGen equipage plan. Approved by JRC on July 25, 2008 30-Jan-2009
36  Active  Y Surveillance Decision for migration of PRM to PRM-A, based on multilateration Since Precision Runway Monitor (PRM) systems are relatively expensive to procure and maintain multilateration (MLAT) technology is being looked at as an alternative. This is the first step toward the decision for migration of PRM to PRM-Alternate (PRM-A), based on multilateration technology. For FY 2008, funding was requested to support parallel runway operations at Detroit International Airport (KDTW) using a MLAT sensor with PRM capability. This funding will be utilized: to complete the design, testing, and commissioning of the KDTW system and to complete the construction, infrastructure support, and installation for the MLAT system at KDTW. The funding was approved with a combined JRC 2A and 2B decision by the ATO EC on/about 30 May 2007 for NAS CIP Project S08.01-01 Precision Runway Monitor (PRM)-Multilateration Technology. 2011FY11 Q2 - FY12 Q1No The first phase of testing PRM-A at an airport (KDTW) has been started. 30-Jan-2009
G37  Active  Y Weather Investment Decision on wind shear detection services capability with Tech Refresh/SLEP (to address wind shear study and technologies) Tech Refresh to extend service life of various NAS wind shear systems, LLWAS, TDWR, and WSP by conducting a study looking at cost benefit of maintaining status quo (sustain) as well as new technologies. 2010FY10 Q2 - FY11 Q1No09-Jan-2009 "ATO-T Wx broadened scope of this DP to include a Tech Refresh of all LLWAS configurations (LLWAS-2, LLWAS-RS & LLWAS-NE, WME) as well as new technology for a LIDAR as an alternative to LLWAS integration w/TDWR at new, dry climate airports that may qualify for wind shear service. FY08 activities to support business case development for FY09 Final Investment decision include 1) RPD for FY10 Wind Shear detection services, 2) Diminishing Mfr's Supply study for LLWAS, and 3) Update of the 1994/95 Integrated Wind Shear Study.

Status is unchanged. " 
30-Jan-2009
38  Active  Y Weather Executive Level Decision to transition WMSCR Comms functionality to web access via SWIM Seg 3 & ADAS Comms functionality to NNEW WP2 Communications functionality of AWOS Data Acquisition System (ADAS) and the Weather Message Switching Center Replacement (WMSCR) system are candidates for inclusion into the System Wide Information Management (SWIM) program after Segment 1. AWOS stands for the Automated Weather Observing System. 2011FY11 Q2 - FY12 Q1No No Status 30-Jan-2009
G39  Active  N Weather Executive Level Decision to Deploy End State JAWS Deploy operational End-State Juneau Airport Wind System (JAWS) in Alaska. 2008 Q4FY09 Q1No NCAR refining JAWS algorithm while ATO-T Wx validates alternatives.  JAWS Program Office will likely recommend to ATO-T VP to proceed with full Wind information and Turbulence alerting service for Juneau airport after acceptable test results in summer/fall 2008 and after having obtained favorable EC/JRC Investment Decision is scheduled for November '08; paper work for JRC RR process is done; in process of scheduling financial reviews.   30-Jan-2009
G40  Active  Y Weather Final Investment Decision to acquire & deploy initial Wake Turbulence (WT) capability for Mitigation for Departures (WTMD) from Closely Spaced Parallel Runways (CSPR) Begins the process of reducing aircraft separation during take offs on CSPR Runways to mitigate decreased airport acceptance rates (AAR) due to increased separation for trailing aircraft from large aircraft.  Called Wake Turbulence Mitigation for Departure (WTMD). 2009 Q2FY09 Q3No Wake Turbulence Team had a successful IARD that was completed on March 4th. During that meeting they were also approved for tailoring into a combined IID/FID.  Wake Team has begun work on EA products and is scheduled for an FID in 2009 Q3.  30-Jan-2009
Y41  Active  Y Facilities Initial Investment Decision (IID) for NextGen Facilties Approve initial investment decision for NextGen Facilities. 2010 Q2FY10 Q3Yes This DP remains Yellow and will slip to May 2010 (FY10 Q3).   DP 41 is dependent on DP 15.  For the FY09 Roadmap, DP 41 will be renamed Initial Investment Decision (IID) Approval, for the transition from candidate ARTCCs and/or TRACONs to the first set of NextGen Facilities.  The date will be rebaselined to FY10 Q3 (Green) for the 2009 Facilties Roadmap.  30-Jan-2009
G42  Replaced  N Aircraft Decision to mandate weather sensor (MDCRS/TAMDAR) equipage on aircraft (Jetliners first, then Taxi/Commuter, small aircraft later) [NAS EA Roadmap (Wx)] This is in concert with the Next Generation Air Transportation System (NextGen) concept of avionics performance dictates in which airspace it can be used. Weather sensors include Meteorological Data Collection and Reporting System (MDCRS) and Tropospheric Airborne Meteorological Data Report (TAMDAR). 2009FY09 Q2 - FY10 Q1No 48 is to be archived in version 2.0 and is combined with Decision 28. 30-Jan-2009
G43  Active  Y Automation Concurrence on ERAM Release 3 package contents Obtain concurrence on planned build content for ERAM Release 2009 Q2FY09 Q3No This decision is green dependent on the completion of decision point #1.  However because DP 1 has been shifted past its anticipated date DP43 will also be shifted in the upcoming roadmap review cycle.  30-Jan-2009
44  Active  Y Automation Time Based Flow Management (TBFM)/Integrated Enterprise Solution (IES) initial investment decision TBFM is to be enhanced with greater integration with TFM and ATC capabilities. 2012FY12 Q2 - FY13 Q1Yes No Status 30-Jan-2009
Y45  Active  Y Automation Terminal Automation Modernization and Replace (TAMR) Phase 3 Initial Investment Decision TAMR Phase 3 business case development for an IID, including identification of performance gaps and alternatives to address gaps, with preliminary cost, schedule and benefit estimates for alternatives. 2009 Q3FY09 Q4Yes "TAMR Phase 3 is developing alternative solutions in support of a FY 2009 JRC II Decision.

TAMR 2 was JRC was recinded and will be adjusted using a BMN.

TAMR Phase 1 JRC was recinded and will be adjusted using a BMN. Updated." 
30-Jan-2009
46  Active  Y Automation Approve Tower Flight Data Manager 2 final investment Consolidate several Terminal flight data processor functions (EFSTS, SMA, ARMT, FDIO, etc.) into one Terminal Flight Data Manager and limited Decision Support Tools (DST) 2012FY12 Q2 - FY13 Q1Yes No Status 30-Jan-2009
G47  Active  Y Communications Approve Final Investment Decision for NAS Voice Switch Provides air/ground and ground/ground voice communications services for controllers, at new and existing facilities, including GSDFs, ARTCCs, TRACONs and Towers. 2012FY12 Q2 - FY13 Q1Yes The Initial Investment Decision (IID) is planned for June of 2010 and the Final Investment Decision (FID) is planned for January 2012. 30-Jan-2009
G48  Active  Y Weather Investment Decision to fund FAA portion of NextGen 4-D weather cube This Investment Decision is to fund the FAA portion of the 4-D Wx Cube 2010FY10 Q2 - FY11 Q1No JPDO Strategy document indicates that initial stages of 4D Wx DB (called the 4-D Wx Cube) to "stand up" around 2011 or so. Func'l Wx Reqm'ts completed; Performance Wx Reqm'ts underway and will support 'business case' for NNEW/RWI team. 30-Jan-2009
G49  Active  Y Weather Investment Decision to obtain Total Lightning data Acquiring of Total Lightning data adds cloud lightning data (only ground strokes currently provided to ASOS, AWOS & AWSS).  Earlier detection of thunder-storm activity in vicinity provided via cloud lightning for ATC and airport ramp operators (e.g., refueling Ops, etc). 2010FY10 Q2 - FY11 Q1No Wx Functional Reqm'ts analysis completed; awaiting agency review.  Wx Performance Reqm'ts work just underway; will provide better definition of NG lightning Reqm'ts by late '08. 30-Jan-2009
50  Active  Y Facilities Final Investment Decision (FID) - Approve Transition for Candidate ARTCCs and TRACONS to 1st Set of NextGen Facilties Analyses to support EC/JRC decision Final Investment Decision (2B) for the first NextGen Facilities segment. Include information on 80% design and location. 2011 Q2FY11 Q3Yes No information available. 30-Jan-2009
51  Replaced  Y Aircraft Final Decision published for Rulemaking of new air/ground comm. System (DATACOM) [NAS EA Roadmap (Comm)] This assumes that the transition to a new air/ground comm system will require rulemaking to force users to equip in order to make the business case cost beneficial. If so, it is expected that a decision on the rule and the issuance of the final rule will need to take place in this timeframe. 2010FY10 Q2 - FY11 Q1No NONE 30-Jan-2009
52  Active  Y Surveillance Final Decision for Avionics Mandate/Rulemaking for ADS-B (out)/MODE-S/UAT Rulemaking to support mid and long-term ADS-B applications (final rule) for A-G and advanced applications. 2010FY10 Q2 - FY11 Q1No RTCA DO-260A has been approved, but TSO-C166A has been put on hold (Not sure if standard is sufficient to meet mid and long-term application and operations).  Changes to Do-260A have been incorporated and submitted to RTCA PMC.  If PMC approved then TSO-C-166A will be released. 30-Jan-2009
53  Active  Y Aircraft Agency policy published on Navigation future configuration to be GNSS-based Agency decision for GNSS-based, removal of certain GA VOR requirement. 2010FY10 Q2 - FY11 Q1No NONE 30-Jan-2009
54  Active  Y Aircraft Decision to develop avionics policy and standards for Enhanced Aircraft Flight Management Systems to support 4D super density operations. (DP 171. DP 172 must be completed) Determine FMS needs for 4D superdensity operations. 2012FY12 Q2 - FY13 Q1No NONE 30-Jan-2009
G55  Active  N Automation Assess common front end display components for Radar Display (i.e., R-side) monitor Decision to purchase the same radar console for multiple systems, in lieu of independent technical refreshes. Initiate RDT&E assessment of common ATC front end display components. 2009 Q2FY09 Q3No Analysis to define requirements is on going. No updates regarding requirements. Activity is still on going.  30-Jan-2009
56  Replaced  Y Automation Approve En Route Automation Release 4 package contents NONE 2011FY11 Q2 - FY12 Q1No NONE 30-Jan-2009
57  Active  Y Automation TBFM/IES final investment decision TBFM is to be enhanced with greater integration with TFM and ATC capabilities. 2013FY13 Q2 - FY14 Q1Yes NONE 30-Jan-2009
58  Active  Y Automation Staffed NextGenTower final investment decision Automation will be required to support the goal of staffing Next Generation Air Traffic Control System towers 2013FY13 Q2 - FY14 Q1Yes NONE 30-Jan-2009
G59  Active  Y Air / Ground Evaluate SWIM Air Capability Provides access of information to commercial providers through SWIM mechanisms for distribution to aircraft.  Decision closely connected to NextGen Network Enabled Weather (NNEW) decision.  Could also enable future Oceanic data links. 2010FY10 Q2 - FY11 Q1No No JRC activities required for SWIM Airborne Segments.  According to research, the IOC for SWIM Air Segments is during 2015.  Standards identification and program planning continues.

This decision is to evaluate SWIM Airborne Segment not an approval.  The upcoming roadmap review will make that change from "approve" to "evaluate". 
30-Jan-2009
60  Active  Y Weather Final Investment Decision for TDWR SLEP 2 This decision is to fund a 2nd SLEP (TDWR SLEP 2) to sustain the TDWR 2012FY12 Q2 - FY13 Q1No09-Jan-2009 TBD 30-Jan-2009
61  Active  Y Weather Investment Decision to add WT for Mitigation for Arrivals (WTMA) from Closely Spaced Parallel Runways (CSPR) This initial capability entails a procurement package & program baseline to determine when to allow dependent ILS approaches for all aircraft pairs on Closely Spaced Parallel Runways (CSPR) 2013FY13 Q2 - FY14 Q1No Activity to start after JRC decision, airport environment and runways analyzed, and systems in place plus certification, training & procedures in place  30-Jan-2009
G62  Active  N Weather Investment Decision to SLEP (or replace) F-420 wind sensor/display F-420's encountering supportability problems 2009 Q2FY09 Q3No "There is no formal discussion regarding the replacement of the F-420's yet. However, outcome of DP 26 (outsourcing ASOS maintainence) would likely determine if FAA to replace, sustain or no longer continue maintaining F-420s. DP 26 activity is still on going and status will stay green until further update.

Status is unchanged. " 
30-Jan-2009
G63  Active  N Weather Investment Decision to SLEP (or replace) DASI DASI encountering supportability problems 2009 Q2FY09 Q3No "There is no formal discussion regarding the replacement of the DASI. However, outcome of DP 26 (outsourcing ASOS maintainence) would likely determine if FAA to Replace, Sustain or no longer continue maintaining DASIs. DP 26 activity is still on going and status will stay green until further update.

Status is unchanged. " 
30-Jan-2009
64  Deleted  Y Automation Approve En Route Automation Release 5 package contents NONE 2012FY12 Q2 - FY13 Q1No NONE 08-Sep-2008
65  Active  N Automation Final Investment Decision of common Information Display Systems (IDS) capability in EnRoute and Terminal Plan for procurement or development of a common display for IDS in Terminal and EnRoute. 2012FY12 Q2 - FY13 Q1No IDS Replacement (DP21) project is coordinating requirements with ERIDS to determine feasibility of meeting both Terminal and En Route information display needs. 30-Jan-2009
66  Deleted  Y Automation Executive approval to integrate DOTS+ functionality into TFMS WP2 DOTS+ uses weather (e.g., winds aloft, etc.) and alternative routes to recommend changes in international flight plans. DOTS+ is currently installed at Oceanic and Command Center facilities, and the DOTS+ algorithms potentially could be integrated into TFMS. 2012FY12 Q2 - FY13 Q1No NONE 22-Aug-2008
67  Active  Y Automation Approval of offshore implementation long term plan CERAP automation systems are reaching EOSL and require replacement of the both the FDP and SDP processors. Both ATOP and ERAM represent candidate replacements as they contain both FDP and SDP capabilities. 2010FY10 Q2 - FY11 Q1No OFDPS is currently being replaced with FDP2K, after which the Anchorage and CERAP configurations will be identical (FDP2K and MEARTS). Therefore, CERAP automation replacement is applicable to Anchorage automation (non-ATOP) as well. 30-Jan-2009
68  Active  N Automation Decision to support NASE integration with AIM Continuing on the AIM Modernization and Consolidation efforts 2012FY12 Q2 - FY13 Q1No NONE 30-Jan-2009
69  Active  N Navigation Begin ILS CAT I drawdown - limited backup at OEP airports The strategy is to support CAT I precision approach capability from space using GPS/WAAS. Based on that, we need to decide when and how to begin drawing down ILSs that we no longer need. The drawdown could take the form of decommissioning or divestment. Rulemaking may be required. 2012FY12 Q2 - FY13 Q1No Work on WAAS LPV approaches is ongoing.  ATO-W and the NEWG anticipate developing a more detailed analysis of ILS divestment by 2008. 30-Jan-2009
70  Active  Y Navigation Acquisition Decision on Federal Procurement of CAT II/III GBAS This issue is what FAA's responsibilities should be regarding the provision of Category (CAT) II and CAT III precision approach services.  The FAA's GBAS system is called the Local Area Augmentation System (LAAS).  Development work for CAT II and III GBAS-based services should be completed in 2012.  The decision whether there will be a federal procurement of the LAAS will be made at that time. 2012 Q4FY13 Q1Yes Future Work 30-Jan-2009
71  Deleted  Y Weather Investment Decision to transfer remaining ALDARS functionality to WMSCR or H/W Tech Refresh for ALDARS ADAS TR needed to sustain its processing functionality after SWIM subsumes its Comms functionality 2012FY12 Q2 - FY13 Q1No No Status 13-Oct-2008
72  Active  Y Weather Investment Decision for ASR-WSP Tech Refresh This would be a Phase 2 TR for WSP 2010FY10 Q2 - FY11 Q1No09-Jan-2009 No Status 30-Jan-2009
73  Deleted  N Automation Approve En Route Automation Release 6 package contents TO BE DELETED 2013FY13 Q2 - FY14 Q1No TO BE DELETED 22-Aug-2008
74  Active  Y Communications Approve FTI Re-Compete Decision Mandatory re-compete of the FAA Teleco services contract 2013FY13 Q2 - FY14 Q1Yes Make a decision to determine if ASTI and FTI-2 will be a combined contract. 30-Jan-2009
75  Active  Y Automation Approve En Route Automation NextGen Mid-Term Workpackage initial investment Business case and requirements developed for an En Route automation IID including identification of performance gaps and alternatives to address gaps, with preliminary cost, schedule and benefit estimates for alternatives. 2014FY14 Q2 - FY15 Q1Yes NONE 30-Jan-2009
76  Active  Y Surveillance Decision for removal or SLEP/replace of ASDE surface primary radars, evolving requirements for safety and security may impact decision  Airport Surface Detection Equipment (ASDE) primary radars have significant technical shortcomings and are costly to maintain. Replacement with multilateration (MLAT) in combination with Automatic Dependent Surveillance-Broadcast (ADS-B) is being investigated. 2014 Q4FY15 Q1No Decision to expand pending decision on ADS-B and multilateration replacing surface radars.  30-Jan-2009
77  Active  N Surveillance JRC IID Decision to implement the NEXTGEN primary radar systems which includes weather surveillance  Decision on implementing the Next Generation primary radar systems for en route and terminal areas, which includes weather surveillance. This decision is dependent on the decision for the ADS-B backup strategy and air traffic surveillance security and weather requirements. 2014FY14 Q2 - FY15 Q1No09-Jan-2009 None. 30-Jan-2009
78  Active  Y Surveillance JRC IID Decision to implement the Next Generation Air Transportation System (NextGen) En Route and Terminal beacon radar systems and whether to delay a decision to implement the NextGen En Route and Terminal beacon radar systems to coincide with DP #77. Decision on implementing the Next Generation beacon systems for en route and terminal areas.  This implementation will be impacted by the decision on the ADS-B backup strategy and beacon surveillance requirements after an ADS-B rule takes effect. 2011FY11 Q2 - FY12 Q1No Air Traffic Control Beacon Interrogator Model 4 (ATCBI-4) is to be replaced; plans to sustain ATCBI-5 and Mode S pending decision on sustainment.  30-Jan-2009
G79  Completed  Y Weather Investment Analysis Readiness Decision (IARD) for NextGen Wx Processor WP1 and NNEW WP1 to enter IA First of several Investment Decisions leading up to implementation of the NextGen Wx Processor Work Package 1 (WP1) 2008 Q4FY09 Q1Yes30-Sep-2008 COMPLETED.  Documentation required for the Concept and Requirement Definition (CRD) process and the Investment Analysis Readiness Decision (IARD) has been completed, signed and delivered to the Joint Resources Council (JRC) Secretariat. 30-Jan-2009
80  Deleted  Y Automation Decision supporting AIM integration Continuing on the AIM Modernization and Consolidation efforts 2015FY15 Q2 - FY16 Q1No No Status 23-Sep-2008
81  Active  N Navigation VOR decision on complete drawdown Based on the initial drawdown decision and the continued evolution toward a GNSS-based navigation infrastructure, decide whether we should completely remove VORs from the inventory. 2015FY15 Q2 - FY16 Q1Yes Future Work  30-Jan-2009
82  Active  Y Weather Investment Decision for NextGen Wx Processor WP2 to accept enhanced Aircraft Obs (Turbulence & Humidity ) Enhanced MDCRS data to include new parameters for humidity & turbulence 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
83  Active  Y Automation Approve transition to NextGen Far Term automation platforms and display subsystem through convergence initial investment Reduce the number and types of automation systems and displays in the NAS by integrating functionalities. 2017FY17 Q2 - FY18 Q1Yes No Status 30-Jan-2009
84  Active  Y Weather Decision to 1) decommission all ground-based wind shear capability (TDWR, ASR-WSP & LLWAS) but replace TDWR w/less expensive Wx radar and SLEP ASR-9/11 Wx Channel; or 2) SLEP ground-based wind shear except replace LLWAS w/LIDAR for dry MB Detect & SLEP NE Decision to 1) decommission all ground-based wind shear capability (TDWR, ASR-WSP & LLWAS) but replace TDWR w/less expensive Wx radar and SLEP ASR-9/11 Wx Channel; or 2) SLEP ground-based wind shear except replace LLWAS w/LIDAR for dry MB Detect & SLEP NEXRAD, or 3) Replace Terminal Wx Surveillance, Wind Shear capability & NEXRAD with NextGen Wx Surveillance capability


Decision based on systems engineering study & evaluation to determine if ground-based wind shear systems still needed in NextGen era; possibely replace TDWR less expansive 
2016FY16 Q2 - FY17 Q1No No Status 30-Jan-2009
85  Active  Y Weather If Decision Point 141 is to "not outsource", then Investment Decision needed to consolidate & replace automated surface observing systems Decision to consolidate functionality of ASOS, AWOS, AWSS & SAWS into single system that is to be obtained and implemented 2014FY14 Q2 - FY15 Q1No No Status 30-Jan-2009
G86  Active  Y Weather Investment Decision JRC-2A for NextGen Wx Processor WP1 (includes baseline CIWS functionality, NG WARP functionality & NNEW WP1 functionality (includes WARP WINS & FBWTG)) This will involve JRC-2A activity to incorporate the functionality of WARP and the functionality to ingest surface-based observing data that is needed. 2010 Q3FY10 Q4Yes "This decision is dependent on DP #79. DP #79 is working an aggressive schedule and hopes to get to anticipated IID in 2009.  Will continue status as ""green"" until update reflects otherwise. NextGen Weather Processor WP 1 is on the JRC readiness review minutes.

Status is unchanged. " 
30-Jan-2009
87  Active  Y Weather Investment Decision to add WTMSR (WT Mitigation for Single Runway) decision support capability This capability allows reduced WT spacing for aircraft directly following another aircraft (during arrivals/departures) with CSP Runways 2016FY16 Q2 - FY17 Q1No Activity to start after JRC decision, airport environment and runways analyzed, and systems in place plus certification, training & procedures in place  30-Jan-2009
88  Active  Y Weather Investment Decision to move ADAS/ALDARS functionality to NWP WP2 With this decision, all ADAS functionality would be completely subsumed [including lightning processing] into NWP WP2 2017FY17 Q2 - FY18 Q1No No Status 30-Jan-2009
89  Active  N Weather Final Investment Decision for NextGen Wx Processor WP1 This will involve more rigorous analysis activity for JRC-2B to for NextGen Wx Processor WP1 to describe necessary functions/requirements for the NextGen Wx Processor WP1 2011 Q3FY11 Q4Yes No Status 30-Jan-2009
90  Replaced  N Automation Approve ARTS IIE system migration to either ARTS IIIE and/or STARS final investment Maximize efficency by integrating functionalities and reducing the types of automation systems in the NAS. 2018FY18 Q2 - FY19 Q1No NONE 30-Jan-2009
91  Replaced  Y Weather Investment Decision to SLEP following: 1) Wind Shear systems, 2) ASR-9/11 Wx Channel and 3) NEXRAD; or replace them with a NextGen Wx Surveillance Capability Decision to SLEP ground-based wind shear systems, ASR-9 Wx Channel  as well as NEXRAD Network -- if still warranted -- or replace them with cost-effective weather radars 2018FY18 Q2 - FY19 Q1No No Status 30-Jan-2009
92  Replaced  N Weather Investment Decision for NEXRAD - SLEP or replacement Decision to extend (or replace) NEXRAD Wx surveillance radar network 2018FY18 Q2 - FY19 Q1No TBD 30-Jan-2009
93  Active  N Aircraft Rulemaking decision for equipage of Weather Sensors and Wake Turbulence implementation This capability allows aircrew to "visualize" in all Wx conditions the WT hazard zones associated with adjacent and approaching aircraft and to self separate from that hazard zone. 2018FY18 Q2 - FY19 Q1No Research starts in 2008 30-Jan-2009
94  Active  N Navigation Decision on complete ILS CAT I drawdown Based on the initial drawdown decision and the continued evolution toward a GNSS-based navigation infrastructure, decide whether we should completely remove ILS from the inventory. 2020FY20 Q2 - FY21 Q1No Future Work 30-Jan-2009
95  Active  Y Surveillance Decision for replacement of terminal primary radars (ASR-11 PSR) and removal of terminal beacons (ASR-11 MSSR)  A decision will be made as to replacement of ASR-11 system primamry and secondary radar components with a New Primary Radar system if an earlier decision is made to procure a New Primary or NextGen radar system. Future aviation security and ADS-B Backup Strategies will impact this decision. 2024 Q2FY24 Q3No No Status 30-Jan-2009
96  Active  Y Surveillance Decision for replacement of en route beacons (ATCBI-6) Based on the ADS-B backup strategy, limited secondary and all terminal radar systems will be retained. A SLEP will be required for the ASR-9. 2024FY24 Q2 - FY25 Q1No No Status 30-Jan-2009
G97  Active  Y Surveillance Decision for legacy radar (ASR-9) Service Life Extension Program (SLEP) through 2027 Based on the ADS-B backup strategy, limited secondary and all terminal radar systems will be retained. A SLEP will be required for the ASR-9. 2009 Q1FY09 Q2No The ASR-9 SLEP Phase 2 is scheduled for a JRC/EC IID in February 2009 and FID projected by September 2009.  AMS tailoring allowed waiver of the IARD to proceed into the Initial Analysis process and pursue an initial investment decision which has been delegated to the ATO EC by the JRC. The JRC Program is on schedule per new JRC dates. Initial Requirements and Safety Risk Management have been completed. Program requirements are approved.  The program is continuing to work on the business case development.  AV-1 is in ATO-P review.  30-Jan-2009
G98  Active  Y Surveillance Decision for legacy radar (ASR-8) SLEP, including a weather channel, through 2025  This SLEP is required to sustain the ASR-8 until 2025 or until a decision is made to replace the ASR-8 with a New Primary Radar.  Based on the ADS-B backup strategy all terminal radar systems will be retained. 2009 Q3FY09 Q4No The ASR-8 SLEP is rescheduled for a JRC IID in 2009 Q3.  No change in status.  30-Jan-2009
G99  Completed  Y Surveillance Decision for ASR-11 Technology Refresh Segment 1 Final Investment Decision  Based on the ADS-B backup strategy, limited secondary and all terminal radar systems will be retained. The ASR-11 will require a technology refresh. 2008 Q2FY08 Q3No01-Oct-2008 Completed; approved by the JRC in October 2008.

The Program is awaiting ATO-P review of the Architectural Impact Assessment and Final Requirements Document and in providing financial data to ATO-F. The ASR-11 Technology Refresh is on schedule for a JRC FID in March 2008.  ASR-11 the investment document is in review.  Target for JRC moved to June 2008. 
30-Jan-2009
G100  Active  Y Surveillance Decision for legacy beacon (Mode S) SLEP through 2025  Based on the ADS-B backup strategy, limited secondary and all terminal radar systems will be retained. A SLEP will be required for the Mode S. 2009 Q3FY09 Q4No ATO-P has started AV-1 development.  SLEP alternatives are not mature at this time.  The Mode S SLEP is scheduled for JRC IID in February 2009; will be delayed to CY 2009 Q3 with the 2009 Roadmap.  30-Jan-2009
G101  Completed  Y Surveillance Decision for acquisition of (JRC 2a decision) of RWSL systems JRC decision on acquisition and deployment for the RWSL systems. 2007 Q4FY08 Q1No29-Nov-2007 Complete 30-Jan-2009
G102  Active  Y Surveillance Decision on Implementing IP including ASTERIX data format for surface, terminal, and en route radar systems IP address capability is required at radar facilities to distribute data through SWIM.. Modification of the radar site to support IP addressing is required.  Decision to include on implementing ASTERIX data format for surface, terminal and en route radar system output.  All radar target position data will be reported in "Latitude/Longitude" format. 2009 Q4FY10 Q1No "This decision will be implemented in Surveillance systems through DPs 97,98,99,100 and status given those 4 are green.

Automation system impacts are being reviewed.  STARS and SBS programs are negotiating an implementation. " 
30-Jan-2009
103  Active  Y Surveillance Decision for technology refresh of  beacons (ATCBI-6) This decision will determine whether a technology refresh program will be implemented to extend the service life of the ATCBI-6 systems. 2014 Q1FY14 Q2No No Status 30-Jan-2009
104  Active  Y Surveillance JRC FID Decision for replacement of legacy primary radars (ASR-8, ASR-9), based on air traffic safety, security and weather surveillance requirements  Primary radars are costly to maintain. However, air traffic control (ATC) requires these systems as a safety backup in high density terminal areas. Weather surveillance requirements relative to the remaining sites are unclear - some of the radars may be able to be removed. 2017FY17 Q2 - FY18 Q1No Program developing business case to provide ASR-8 service life extension and digitized outputs. 30-Jan-2009
105  Active  Y Surveillance JRC FID Decision for limited en route and terminal replacement of legacy beacons (Mode S), and removal of remaining systems (Mode S)  Backup surveillance requirements may not be as stringent as for primary means, and so a complete inventory of beacons may not be necessary to provide a backup capability. Also, depending on the outcome of the Automatic Dependent Surveillance-Broadcast (ADS-B) backup analysis, an alternate backup strategy may be implemented, and in this case some beacon systems could be removed once an ADS-B rule takes effect. 2014FY14 Q2 - FY15 Q1No Air Traffic Control Beacon Interrogator Model 4 (ATCBI-4) is to be replaced; plans to sustain ATCBI-5 and Mode S pending decision on sustainment. 30-Jan-2009
106  Deleted  Y Automation ARTS 1E/IIE: Investment decision to sustain & upgrade hardware and software until full migration is completed ARTS 1E/IIE: Investment decision to sustain & upgrade hardware and software until full migration to CARTS IIIE or STARS is complete 2010FY10 Q2 - FY11 Q1No No Status 22-Aug-2008
107  Active  Y Automation TAMR Phase 3 Final Investment Decision Completion of business case for a FID including validation and update of cost, schedule and benefits of alternatives. 2010FY10 Q2 - FY11 Q1Yes No Status 30-Jan-2009
R108  Deleted  Y Automation Decision to award a follow on contract for TMA Upgrades Replaced by decision point 195 TMA Point in Space Metering enhancements have been identified to support NextGen and include:  TMA scheduling to Dynamic Metering Points with manual input, TMA scheduling to Dynamic Metering Points with automated input; and end-to-end metering. 2008 Q4FY09 Q1No The real problem is the lack of a contract vehicle for near-term enhancements to legacy TMA. TMA project is in the process of being transferred from ATO-E to ATO-R.  ATO-R reports there is no way a decision to award a new contract in fy08 as Roadmap now prescribes.  The program needs to be authorized, an RFP needs to be generated, source selection completed and then the award can be made.  This process is estimated to take 18-24 months.  These planned near term enhancements to the legacy TMA system will be required to support key NEXGEN capabilities, and until a new contract vehicle can be awarded, a contract extension is in the works to allow for additional TMA sites and activities in the New York area.  RED, with existing contract being extended and new one unlikely until 2009. 13-Oct-2008
G109  Active  Y Automation Assessment of common Information Display Systems (IDS) capability in EnRoute and Terminal Plan for procurement or development of a common display for IDS in Terminal and EnRoute. 2010FY10 Q2 - FY11 Q1No ATO-T and ATO-E are just beginning discussions/coordination of IDS capabilities required in both domains.  Since ATO-T is expected to receive a final investment decision in the near future for replacement of IDS-4 workstations (DP #21 above), we are working with the ERIDS Program Office to expand the scope of the IDS-4 Replacement contract (not program baseline) to allow for the ordering of additional quantities of IDS workstations should it be determined that the Terminal solution also meets the En Route needs. 30-Jan-2009
110  Active  Y Automation Approve final investment for transition to NextGen automation platforms and display subsystem through convergence Reduce the number and types of automation systems and displays in the NAS by integrating functionalities. 2018FY18 Q2 - FY19 Q1Yes No Status 30-Jan-2009
111  Active  Y Automation Approve requirements for En Route Automation NextGen Workpackage final investment Approval of business case and requirements for an En Route Automation FID including validation and update of cost, schedule and benefits. 2015FY15 Q2 - FY16 Q1Yes No Status 30-Jan-2009
112  Active  Y Automation Assessment for common Terminal and En Route R-side display (e.g., hardware and software) None 2011FY11 Q2 - FY12 Q1No No Status 30-Jan-2009
113  Active  Y Automation Access common Surveillance Data Processing for Terminal and En Route automation (e.g., 3 mile separation, fusion). None 2011FY11 Q2 - FY12 Q1No No Status 30-Jan-2009
114  Active  Y Automation Assessment for common display (e.g., H/W and S/W platforms) of electronic flight data for En Route and Terminal automation. Decision for common display (e.g., H/W and S/W platforms) of electronic flight data for En Route and Terminal automation, including EFSTS. 2011FY11 Q2 - FY12 Q1No No Status 30-Jan-2009
115  Active  Y Automation Approve Tower Flight Data Manager 2 initial investment Consolidate several Terminal flight data processor functions (EFSTS, SMA, ARMT, FDIO, etc.) into one Terminal Flight Data Manager and limited Decision Support Tools (DST) 2011FY11 Q2 - FY12 Q1Yes No Status 30-Jan-2009
R116  Deleted  Y Automation TDLS near-term sustainment final investment decision A final investment decision (FID) for TDLS near term sustainment. 2010FY10 Q2 - FY11 Q1No No F&E sustainment project is being pursued; no funding request submitted for FY10.   Component end-of-life issues being addressed as part of OPS Maintenance activities.          RECOMMEND REMOVAL OF THIS ACTIVITY FROM ROADMAP. 26-Sep-2008
117  Active  N Automation Decision to decommission FDIO systems Decision to decommission remaining FDIO systems. 2015FY15 Q2 - FY16 Q1No No status 30-Jan-2009
Y118  Active  Y Automation Define and approve En Route pre-implementation acquisition strategy Plan and submit for approval the En Route implementation strategy. 2008 Q4FY09 Q1No "Finance and Planning, Program Operations, and AJE are internally reviewing ideas related to the Mid-term ERAM acquisition.

Status is unchanged. " 
30-Jan-2009
119  Active  Y Automation Final Investment Decision for CATMT Work Package 3 contents The Collaborative Air Traffic Management Technologies Work Package 3 (CATMT WP3) segment will accommodate the development of Integrated Departure/Arrival Capability (IDAC), Collaborative Information Exchange (CIX), TFMS remote site re-engineering, and other functions needed for NextGen. 2009 Q2FY09 Q3Yes Plans and JRC preparation on the way 30-Jan-2009
G120  Active  Y Automation AIM Modernization Segment 1 Initial Investment Decision Initial Investment Decision to create an AIM Modernization program that supports current and future aeronautical information service needs. Plan the evolution of Aeronautical Information Management (AIM) by allocating functionalities and assuring data integrity of systems that make up AIM. 2008 Q4FY09 Q1Yes Their CONUSE and Requirements Document is complete and is in its review stage. The AIA has been signed off on, and the EA products have been reviewed and signed off on by the Chief Architect. Draft X300 is being reviewed by ATO-F.  Coordination on benefits, costs and system engineering requirements took more time than expected in the late spring 2008, leading to a few months of delay as we tried to complete check list items. It is schedueld for December JRC per Readiness meeting held on October 30, 2008.  30-Jan-2009
121  Active  Y Automation AIM Modernization Segment 2 Final Investment Decision Segment 2 Final investment decision supporting AI Services and NOTAM integration with SWIM, FIS-B and SDAT. 2011FY11 Q2 - FY12 Q1Yes No Status 30-Jan-2009
122  Active  Y Automation AIM Modernization Segment 3 Final Investment Decision Segment 3 Final investment decision supporting world wide AIM availability.  AI Services and graphical NOTAM to aircraft via SWIM. 2017FY17 Q2 - FY18 Q1Yes No Status 30-Jan-2009
G123  Completed  N Automation Continuation of DUATS Services Continue as a stand alone service OR incorporate into FS21 and AFSM 2008 Q3FY08 Q4No06-Aug-2008 Completed 30-Jan-2009
G124  Completed  N Automation Continuation of pre-flight and in-flight Requesting through FAA Legal a sole source contract to Harris Corp to continue flight services in Alaska until AFSM accelerated program 2007FY07 Q2 - FY08 Q1No21-Dec-2007 The FAA has received approval for a single source extension to the OASIS. 30-Jan-2009
G125  Active  N Automation Alaska Flight Service Modernization (AFSM) Segment 1 Final Investment Decision The primary role of Alaska FAA Flight Services is to supply timely weather, aeronautical information and (both pre-flight & in-flight) flight planning services to general aviation pilots and other users to minimize the impact of adverse weather on flight operations 2009 Q2FY09 Q3No13-Nov-2007 The decision received on November 13, 2007, for the Alaska Flight Service Modernization (AFSM) program was an Investment Analysis Readiness Decision.
The decision approved by the Executive Council was for Segment 1-Automation.  Subsequently, the AFSM program asked the Federal Acquisition Executive to tailor the Investment Analysis phase to combine initial Investment Analysis with final Investment Analysis and proceed to Final Investment Decision which is scheduled for 1st quarter FY2009.  The tailoring request to combine initial and final Investment Analysis and proceed to Final Investment Decision was approved January 3, 2008. 
30-Jan-2009
126  Active  Y Facilities JRC/EC Initial Investment Decision (IID) Flight Services Facilities Continuation of Flight Services in CONUS and Alaska - Concept of Operations meets NextGen 2012 Q3FY12 Q4No No Status 30-Jan-2009
127  Active  Y Facilities JRC/EC Final Investment Decision (FID) Flight Services Facilities Continuation of Flight Services in CONUS and Alaska - Concept of Operations meets NextGen 2014 Q3FY14 Q4No No Status 30-Jan-2009
G128  Active  Y Enterprise Services Final Investment Decision for SWIM Segment 1B (Baseline for FY 11 - 13) Establish baseline for SWIM Segment 1B for the publication of SWIM content during FY11 - FY13. 2009 Q2FY09 Q3No On schedule for 2009 date. SWIM Implementation Programs (SIPs) are providing cost estimates no later than FY09 1st quarter (QTR1). [12/03/08] 30-Jan-2009
Y129  Active  N Communications Final Investment Decision for ANICS Technical Refresh The ANICS satellite network is an integrated voice and data transmission system providing the Federal Aviation Administration's (FAA) Alaskan Region with reliable and cost-effective interfacility communications. The ANICS program uses FAA-owned satellite earth stations and leased satellites to provide reliable telecommunication services. 2009 Q2FY09 Q3Yes "Anticipated Target Date will be shifted to a new date during the upcoming roadmap review cycle. Description and Title will also be changed during the update.  No updates.

Status indicated target date shift. Tailoring was approved for The Final Investment Decision (FID) for the ASTI Program, which is planned for May 2009, Q2. The ATO-F informed the ASTI Program Office that ""negotiated cost numbers"" will be required for the FID. According to the ASTI Program, meeting the ""negotiated cost numbers"" requires additional time to solicit bids and evaluate the responses for equipment purchases. " 
30-Jan-2009
G130  Active  Y Enterprise Services Selection of SWIM Segment 2 candidates. Decision for down selection of SWIM Segment 2 core services and SWIM Implementation Programs (SIPs) content implementation.  Decision will also consider incorporation of FTI Enhanced Data Services (ED-X). 2009 Q2FY09 Q3No24-Sep-2008 SWIM Segmen 2 down selection process is actively continuing analysis to determine content and capabilities to be incorporated into the baseline.  As previously, SWIM Segment 2 is listed for JRC June 2010.  The decision is to identify capabilities to be implemented as part of SWIM Segment 2 implementation.
The initial definition document will be delivered Jan 30, 2009 and finalized June 2009.

Dependent on DP 128 SWIM Segment 1 requirements definition.
[12/03/08] 
30-Jan-2009
131  Active  Y Facilities Final Investment Decision (FID) - Approve Transition for Candidate ARTCCs and TRACONS to 2st Set of NextGen Facilities Analyses to support EC/JRC decision (2B) for second segment of the NextGen Facilities. Include information on 80% design and location 2013 Q2FY13 Q3Yes No Status 30-Jan-2009
132  Active  Y Facilities Final Investment Decision (FID) - Approve Transition for Candidate ARTCCs and TRACONS to 3rd Set of NextGen Facilties Analyses to support EC/JRC decision (2B) for third segment of NextGen Facilities. Include information on 80% design and location 2015 Q2FY15 Q3Yes No Status 30-Jan-2009
133  Active  Y Facilities Final Investment Decision (FID) - Approve Transition for Candidate ARTCCs and TRACONS to 4th Set of NextGen Facilties Analyses to support EC/JRC decision (2B) for fourth segment of NextGen Facilties. Include information on 80% design and location 2017 Q2FY17 Q3Yes No Status 30-Jan-2009
134  Active  Y Facilities Final Investment Decision (FID) - Approve Transition for Candidate ARTCCs and TRACONS to 5th Set of NextGen Facilties Analyses to support EC/JRC decision (2B) for the 5th segment of NextGen Facilities. Include information on 80% design and location 2019 Q2FY19 Q3Yes No Status 30-Jan-2009
135  Active  Y Facilities Final Investment Decision (FID) - Approve Transition for Candidate ARTCCs and TRACONS to 6th Set of NextGen Facilties Analyses to support EC/JRC decision (2B) for the 6th segment of NextGen Facilties. Include information on 80% design and location. 2021 Q2FY21 Q3Yes No Status 30-Jan-2009
G136  Active  Y Navigation NCIME Executive Decision The EC will make a decision on NCIME in 2008.  This decision will be to support or not going forward with the 2009 JRC 2B investment decision. 2008 Q3FY08 Q4Yes """Ongoing activities include continuing planning and preparing AMS documentation for a FID decision; developing ILS modifications to standardize interlock interface and control issues; and conducting systems engineering. It needs money to fix identified hazards and to conduct investment analysis.

The Program Manager needs to brief/talk to Gene Juba due to some questions about their busisness case."" " 
30-Jan-2009
G137  Deleted  Y Navigation Phase 1 - Decision to start GPS Signal Monitoring Acquisition During this phase, the program management and infrastructure will be ramped up.  Requirements will be consolidated and finalized.  An RFP will be finalized, prime contract competed, and contract award accomplished.  Technical engineering and program support will be ramped up. Prime contract effort will be initiated with PDR complete with respect to system, hardware, and software design.  Prototype reference station and master station hardware will be instantiated in the lab and checked out.  Receiver hardware modifications will be identified and subcontracted out.  Specific software code units will be identified for reuse.  The software development environment will be established. The base configuration will consist of a minimum of 18 references sites with accommodation for 3 more.  Each site will include existing military receivers as well as civil receivers suitable for safety-critical applications.  Two master stations are anticipated.  Data format and rates from existing military receivers will be identified. Work on a GPS III avionics MOPS will be initiated.  Prototype avionics development activity will be initiated. 2009FY09 Q2 - FY10 Q1Yes Mission needs definition.  Status is green.  On going activities include defining Mission Needs; continued planning and preparing AMS documentation; and conducting systems engineering. 14-Oct-2008
138  Deleted  Y Navigation Phase 2 - Decision for Signal Monitoring Integration with GPS This phase initiates the process for integrating Signal Monitoring with the modernized GPS space and ground segments. Monitoring capabilities developed during Phase 1 will output L5 integrity and performance messages to the GPS ground segment for broadcast to users. External interfaces developed during Phase 1 will be activated to provide trusted integrity and performance information for external dissemination by GPS and other network-centric media. Dual-frequency GPS equipped users will be capable of conducting LPV equivalent flight operations on a world-wide basis. 2014FY14 Q2 - FY15 Q1Yes Future Work 14-Oct-2008
139  Deleted  Y Navigation Phase 3 - Transition and Operational Evaluation During this phase the GPS space and ground segments will evolve to a complete constellation of third-generation satellites. The constellation size will grow from 24 slots to 30 primary orbit slots, and user range accuracy will improve to the sub-meter level. In addition, cross-linking capabilities will be implemented enabling users to receive integrity and performance messages without the use of WAAS geo-stationery satellites. User equipment will begin to transition from single-frequency WAAS/GPS to dual-frequency GPS stand-alone avionics. After a nine-to-ten-year transition period, a decision will be made on decommissioning WAAS GEOs. 2019FY19 Q2 - FY20 Q1Yes Future Work 14-Oct-2008
140  Active  Y Aircraft Decision on Enhanced Weather Sensors to support enhanced wx observations and forecasting Enhanced wx sensors may include Humidity, Turbulence, Icing, and Wake. 2010FY10 Q2 - FY11 Q1No No Status 30-Jan-2009
141  Active  Y Weather Evaluate alternatives for system outsourcing or Technical Refresh for sustainment until replaced with NextGen surfacing observing capability This evaluation would examine alternatives for outsourcing automated surface observing systems to meet FAA & NWS requirements for NextGen 2011FY11 Q2 - FY12 Q1No No Status 30-Jan-2009
G142  Completed  Y Weather Final Investment Decision for ITWS to add 12 systems & provide Wx support (remote displays) to 25 satellite/reliever airports This entails an Investment Decision to the Integrated Terminal Weather System (ITWS) - add 12 systems that were part of original baseline) plus support add'l 25 satellite/reliever airports w/remote displays 2007FY07 Q2 - FY08 Q1No28-Nov-2007 11 of the 12 sites have been approved along with 16 of the 25 reliever sites were also approved.  Completed on November 28, 2007. 30-Jan-2009
143  Active  Y Weather Investment Decision to provide inflight icing obs from airborne aircraft to NG Wx Processor WP3 NextGen Wx (WP 3) will be modified to ingest icing data from airborne aircraft. 2022FY22 Q2 - FY23 Q1No No Status 30-Jan-2009
144  Active  Y Weather Final Investment Decision to Tech Refresh ITWS systems (includes improved data quality, upgraded TWINDS & path-based wind shear), or transfer all functionality (TWINDS & path-based wind shear) to NWP WP1 or NWP WP2 Final Investment Decision to Tech Refresh ITWS systems (includes improved data quality, upgraded TWINDS and path-based wind shear) or transfer all functionality (TWINDS & Path-based Wind Shear) to NWP WP1, or transfer all functionality (except safety (MB PREDICT)) to NWP WP2.  

This TR will update all ITWS systems 
2013FY13 Q2 - FY14 Q1No No Status 30-Jan-2009
145  Active  Y Weather Final Investment Decision for TDWR SLEP 3 (made in conjunction with Decision 84) This decision is to fund a 3rd SLEP for TDWR in the event that ground-based wind shear/microburst systems are to be continued 2016FY16 Q2 - FY17 Q1No ATO-T Wx to complete updating Integrated Wind Shear study by end of CY 07 30-Jan-2009
Y146  Active  Y Weather Final Investment Decision to baseline CIWS prototype  as NWP WP1 This investment decision (2B) baselines the CIWS prototype system into the NAS. Baselined system will be operated and maintained at FAA Tech Center. 2009 Q4FY10 Q1No To date CIWS unable to obtain EC decision re deployment strategy (possibly forthcoming Nov/Dec 08). Thus, high likelihood that next JRC milestone (IID or FID) will be in late '09/early CY2010 pending if next milestone is IID or FID. Outcome of  EC decision likely delayed due to ongoing Weather Working Group deliberations (ATO-P Wx & ATO-F (OES) Co-chair this group with Wx Reps from ATO-T, ATO-E, ATO-W, ATO-P).   30-Jan-2009
147  Active  Y Weather Executive Level Decision to transfer ITWS' functionality to NWS WP3 (if not done in DP 144)  and safety functionality (Microburst Predict) to NextGen Far Term WP (NG FT WP) In view of latency concerns for wind shear & microburst products, portion of ITWS transitioned NWP WP1 while safety function (MB Predict) likely transferred to a Terminal Processor or NG FT WP (site TBD, possibly local) 2018FY18 Q2 - FY19 Q1No No Status 30-Jan-2009
148  Active  Y Weather Final Investment Decision to integrate CIWS functionality into NWP WP2.  Also includes decision to implement Convective 8-hour forecast & enhanced aircraft Obs (Turb/Humdity) into NWP WP2. Consolidates Wx processing functionality onto single platform and also adds algorithms from Wx R&D since WP1 was baselined 2015FY15 Q2 - FY16 Q1No Costs reflect incorporating CIWS Alt 1 from earlier cost studies done by finance 30-Jan-2009
149  Active  Y Aircraft NextGen Equipage Implementation Plan (not realistic for single equipage for all capabilities) Implementation of NextGen Equipage Strategy. 2010FY10 Q2 - FY11 Q1No No Status 30-Jan-2009
G150  Active  Y Aircraft Airborne Communications Infrastructure, evaluate and establish standards for low cost handheld devices for general aviation (GA) advisories.  Develop and encourage use of commercial data services for digital messaging to and from GA pilots. Develop Airborne Communications Infrastructure address ATC/AOC/ APC Concept and performance requirements 2010FY10 Q2 - FY11 Q1No "Concept of operations and performance requirements are being developed to address capabilities, such as accessing information through SWIM mechanisms for distribution to aircraft. Decision connected to SWIM mechanisms, NextGen Network Enabled Weather (NNEW), etc. Ongoing activities are on schedule to meet target date.

"Decision moved to 2009 AVS met with Flight Services 9/08. changed name to Airborne Comm Infrastructure for low-cost devices in AK." 
30-Jan-2009
G151  Active  Y Aircraft Airborne Navigation Backup (eLoran, IRU, other backup) (must complete NAV DP 23, 24 2009Q1, likely FY09Q3, New Administration) Define Policy and Guidance for Airborne Navigation backup based on ADS-B backup Study, JPDO SatNav Backup study, and PNT Architecture recommendations. 2009 Q3FY09 Q4No A draft Navigation Backup Strategic Case has been developed in cooperation with Navigation Services and will be submitted to TRB/EAB for review in July 08. The decision has been moved to 2009 as a result of the 2008 Roadmap updates.  30-Jan-2009
G152  Active  Y Aircraft Cooperative Surveillance Concept (SC-218, including TCAS concept) Develop Policy and guidance for new beacon radars. 2010FY10 Q2 - FY11 Q1No Status Green: There has been no formal discussion regarding policy development.  It is still viable to meet 2009 target date. 30-Jan-2009
G153  Deleted  Y Communications A/C IP architecture to Support Ground IP Architecture Develop Naming and Addressing plan that integrates aircraft 2008 Q3FY08 Q4No Status is green.  This decision is owned by AVS.  The development of Aircraft IP Architecture supporting ground IP Architecture involving the plan of naming and addressing that integrate aircraft with considerations of security and certification.  This development is dependent on SWIM services and the decisions of implementing IP to include radars' data formatting for various domains.  The development of naming and addressing activity is on going. 14-Oct-2008
154  Active  Y Aircraft Determine are TAWS algorithms sufficient for NextGen (Terrain) Interaction of new RNAV routes, TERPs, and lower-visibility approaches. 2010FY10 Q2 - FY11 Q1No ETC 30-Jan-2009
155  Active  Y Aircraft First operationally approved GBAS Cat III through proof-of-concept (non-Fed) Completion of certification and operational approval for GBAS Cat III. 2012FY12 Q2 - FY13 Q1No In progress 30-Jan-2009
156  Active  Y Aircraft Initial new GNSS capabilities expected to become operational New GNSS capabilities such as L3/L5 mature. 2018FY18 Q2 - FY19 Q1No In progress 30-Jan-2009
157  Deleted  Y Aircraft New standards for GNSS/IRU integration (including low-cost inertial systems) Development of requirements for GNSS/IRU integration 2012FY12 Q2 - FY13 Q1No No Status 14-Oct-2008
G158  Active  Y Communications Data Communications Segment 1 FID Datacomm decision to implement DataComm capabilities in ARTCCs and ATCTs. 2010FY10 Q2 - FY11 Q1Yes Heavily dependent on ERAM mid-term work package.  Status shall stay green until further update. 30-Jan-2009
159  Active  Y Aircraft Aircraft standards publication for Segment 1 linked to Datacomm Decision on possible Part 91 approaches to performance-based airspace.  2010FY10 Q2 - FY11 Q1No In progress 30-Jan-2009
160  Active  Y Aircraft Aircraft standards publication for Segment 2 linked to Datacomm Earliest effectivity date  on further Part 91 approaches to performance-based airspace.  2013FY13 Q2 - FY14 Q1No In Progress 30-Jan-2009
161  Active  Y Aircraft Datacomm Avionics development complete, Forward Fit begins. Limit of present datacomm approach.  2017FY17 Q2 - FY18 Q1No No Status 30-Jan-2009
G162  Completed  Y Communications Agency link decision for FCI Decision of far-term operational improvements to be supported over datacomm 2008 Q3FY08 Q4No25-Feb-2008 This decision is owned by AVS.  Decision is complete.  This was a link analysis performed by the Air-ground team to support the Data Comm decision #35 (initial investment strategy).

This is not a JRC FID decision but an AVS decision. 
30-Jan-2009
163  Deleted  Y Aircraft VDLM-2/AOC performance to support Datacom Segment 2 and 3 Certifcation requirements for use of AOC messages in weather, flight planning decisions 2015FY15 Q2 - FY16 Q1No In Progress 14-Oct-2008
164  Deleted  Y Aircraft FCI Airspace prescription (policy effectivity  date – timeframe TBD) Effectiviity of NextGen datacomm deployment approach 2021FY21 Q2 - FY22 Q1No No Status 14-Oct-2008
165  Active  Y Aircraft SWIM Air Policy Decision on role of SWIM in net-centric architecture. 2010FY10 Q2 - FY11 Q1No No Status 30-Jan-2009
166  Active  Y Aircraft Decision on enhanced FIS-B services Decision on next-generation weather reporting and integration into decisionmaking 2010FY10 Q2 - FY11 Q1No In progress 30-Jan-2009
G167  Active  Y Aircraft Decision on Enhanced Vision System (EVS) architectures to support low and zero visibility approach and surface operations  (IR signature) (SC-213 MASPS, MOPS, TSO, AC) Decision on EVS to support low-visibility operations for approach and surface. 2009 Q4FY10 Q1No "Decision on EVS is green.  There is no formal discussion regarding the requirements but 2009 target date is a viable time frame for completion.

Status is unchanged. " 
30-Jan-2009
G168  Deleted  Y Aircraft Decision on VNAV implementation (eg, as component of advanced RNP 1) Decision  on vertical guidance for RNP RNAV-enabled aircraft 2008 Q3FY08 Q4No Determined to be complete in the 3rd Quarter.  On schedule to meet 3rd Quarter target date. 14-Oct-2008
169  Deleted  Y Aircraft Vertical requirements for 4DT (MASPS – Baro) 4DT requirements expressed in terms  of vertical gradient for RVSM , CDA. 2011FY11 Q2 - FY12 Q1No In progress 24-Oct-2008
G170  Active  Y Aircraft Decision on implementation of required time of arrival (without full 4DT) Requirements for RTA in near-term. 2009 Q3FY09 Q4No "Currently, there is no money/budget for this activity. Currently participating and following the ground-based 3D path to arrival demonstration that will be followed by FY 2009 planned airborne-based 3D RNAV for RTA.

"Decision moved to 2009 -- working with Aircraft Working Group to define single RTA requirements in context of ATO-P ops concept." 
30-Jan-2009
171  Active  Y Aircraft Define role of aircraft vs AOC vs ATS in trajectory optimization (defining requested trajectory) Operational concept for integration of flight-planning from dispatch and ATC in aircraft decision. 2010FY10 Q2 - FY11 Q1No No Status 30-Jan-2009
172  Active  Y Aircraft 4DT concept complete, including common definition of Flight Object path and constraints.  Major agency decision on constrained trajectory, negotiated trajectory, delegated trajectory) Common model of flight plan, flight plan update, trajectory change. 2011FY11 Q2 - FY12 Q1No In progress 30-Jan-2009
G173  Active  Y Aircraft Strategy for use of EFVS/SVS (Enhanced Flight Vision System/Synthetic Vision System) in future operations (90 series AC) Hybrid approach to EFVS/SVS for operational credit. 2009 Q2FY09 Q3No On going activity.  Status shall stay green until further update. 30-Jan-2009
174  Active  Y Aircraft Agency policy to add ABWTS (Aircraft Based WT Separation) decision support capability to the flight deck This capability allows aircrew to "visualize" in all Wx conditions the WT hazard zones associated with adjacent and approaching aircraft and to self separate from that hazard zone. 2012FY12 Q2 - FY13 Q1No Research starts in 2008 30-Jan-2009
G175  Deleted  Y Aircraft Integrated Display Integrated display requirements from EVS, Datacom, Navigation, Dependant surveillance (in), and weather are to be defined to support TBO, CSPA, Self-separation, etc. 2010FY10 Q2 - FY11 Q1No No Formal discussion has been made but Status will stay green until further update. 14-Oct-2008
G176  Active  Y Navigation DME NextGen Strategy Plan Develop phased approach for DME service to support RNAV/RNP. 2009 Q3FY09 Q4Yes Status is green until further update.  On going activities include development of a phased approach for DME service to support RNAV/RNP; obtaining consensus within the FAA for the required level of service; development of funding profile & acquisition strategy; and resolving all assumptions & issues.  No further update at this time. 30-Jan-2009
G177  Active  Y Automation Initial Investment Decision for SITS Air Domain Security Architectures Determination of best SITS alternative architecture incorporating allocation across the Air Domain applications. Candidate applications include; Airspace Access, Special Use Airspace (MADE), TFR Builder, Flight Object attributes, and Skywatch. 2012FY12 Q2 - FY13 Q1Yes Status is Green. Anticipate the FID in 2010 dependent on the status of DP 33. 30-Jan-2009
G178  Active  Y Surveillance JRC Initial Investment Decision for Low Cost Ground Surveillance (LCGS) System JRC Initial Investment Decision for Low Cost Ground Surveillance (LCGS) System 2009 Q4FY10 Q1No "DP#178 is replaced by DP#258 which is an IARD decision type.  The DP#178 is deferred to 2009 Q4.
The LCGS Program is working to obtain concurrence of its procurement strategy, an Investment analysis Plan (IAP), and Preliminary Requirements Document (PRD) for an Investment Analysis readiness Decision (IARD) in November of 2008.  The IARD decision is expected by December, 2008.  A new DP will be added for the LCGS IARD.  The LCGS Program requested tailoring for a combined Initial Investment (IID) and Final Investment Decision (FID) in September 2009.  Decision 178 is scheduled for 2009 Q4, while DP #179, which is the FID, is scheduled for late 2010 in the next Roadmap update.  NASEA Products are completed. " 
30-Jan-2009
G179  Active  Y Surveillance JRC Final Investment Decision for  LCGS JRC Final Investment Decision and deployment of LCGS. 2010FY10 Q2 - FY11 Q1No Status is green dependent on JRC approval for tailoring to complete an Investment Analysis Readiness Decision (IARD) in the last quarter of 2008 and a combined Initial Investment (IID) and Final Investment Decision (FID) in September 2009.  The text for Decisions 178 and 179 needs to be revised in the next Roadmap update.  This DP is deferred to 2010.  30-Jan-2009
180  Active  Y Surveillance Decision on whether to remove LCGS and have the function assumed by ADS-B  or approve a Technology Refresh for LCGS Decision on whether to remove LCGS and have its functions assumed by ADS-B. 2018FY18 Q2 - FY19 Q1No No Status 30-Jan-2009
181  Active  Y Aircraft TBO Conformance Monitoring TBD 2011FY11 Q2 - FY12 Q1No TBD 30-Jan-2009
182  Active  N Aircraft Closely Spaced Parallel Offset (CSPO) TBD 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
G183  Active  N Air / Ground Research Transition Decision—Air-Ground Data Exchange Framework Develop an A-G Data Exchange framework to support data sharing in the NextGen environment. 2009 Q4FY10 Q1No In Progress.  A/G Data Exchange Framework "draft" developed by ATO-P. Comments by 10/3: review and adjudication-TBD 30-Jan-2009
G184  Active  Y Air / Ground Policy Decision—Global Information Exchange Assurance Coordinate internationally to develop a Global information exchange assurance for those Air-Ground systems with international scope. 2010FY10 Q2 - FY11 Q1No In progress 30-Jan-2009
G185  Active  Y Air / Ground Policy Decision—Develop ATO/AVS Partnership guidance The Agencies AVS and ATO Lines of Business are the two owners that complement and compete with each other.  The complexity of this environment will demand that AVS and ATO work together in a coordinated fashion to ensure all elements bring together policy, guidance, engineering, development, and operations at the right time. 2009 Q2FY09 Q3No In progress 30-Jan-2009
G186  Active  N Air / Ground Policy Decision—Synchronize aircraft equipage with ground infrastructure and acquisition Ensure synchronization of implementation schedule for Air-Ground systems. 2010FY10 Q2 - FY11 Q1No In progress 30-Jan-2009
G187  Active  Y Air / Ground Policy Decision—Incorporate Air/Ground aspects into NextGen Concepts Ensure that base-lined concepts expecting to exchange data across the airborne and ground domains are coordinated effectively, ensuring that all perspectives and Air-Ground assumptions are correct and risk identified. 2009 Q2FY09 Q3No In progress 30-Jan-2009
188  Active  Y Air / Ground Research Transition Decision—Integrated and base-lined Air-Ground Concepts Ensure that research projects and maturity are aligned with operational integration of NextGen Air-Ground concepts and capabilities. 2012FY12 Q2 - FY13 Q1No None 30-Jan-2009
G189  Active  Y Air / Ground Policy Decision—Develop a means to manage standards bodies to efficiently and effectively utilize resources and meet needs of NextGen Today's standards bodies needs to be aligned with advancing NextGen capabilities and infrastructure. New capabilities that require new standards needs to be integrated into the work of standards bodies. 2009 Q2FY09 Q3No None 30-Jan-2009
G190  Active  Y Air / Ground Implementation Decision—Move standards bodies to develop standards that are sufficient to support NextGen. Establish a model to support Air-Ground standards bodies to develop end-to-end performance-based standards 2010FY10 Q2 - FY11 Q1No None 30-Jan-2009
G191  Active  Y Air / Ground Policy Decision—Develop strategic business case exploring benefits of an interoperable Air-Ground Safety Network. Today's airborne (TCAS, TAWS, EGPWS, GPWS) and ground (STCA, MSAW, Windshear) safety technologies were developed based on 1970/1980 operations, airspace characteristics, and aircraft performance.  The effectiveness and interaction of these technologies will change as we evolve toward the NextGen environment. 2009 Q2FY09 Q3No None 30-Jan-2009
192  Active  Y Air / Ground Research Transition Decision—Incorporate expected changes to TCAS, Conflict Probe, and Conflict Management into coordinated Air-Ground Safety Network Develop an A-G Safety Network Interoperability model to support a comprehensive separation assurance and conflict management environment. 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
193  Active  Y Air / Ground Policy Decision—Develop Human/Automation design principles to support NextGen infrastructure Human factors must consider the collaborative interactions between air traffic controllers and air crews and focus on the change in their operational roles and interaction with advanced technologies (display capabilities, data communications, and automation). 2013FY13 Q2 - FY14 Q1No None 30-Jan-2009
194  Active  Y Air / Ground Research Transition Decision—Incorporate results into future NextGen technology and Human/Automation intensive operations. Human factors must consider the collaborative interactions between air traffic controllers and air crews and focus on the change in their operational roles and interaction with advanced technologies (display capabilities, data communications, and automation). 2017FY17 Q2 - FY18 Q1No None 30-Jan-2009
195  Active  Y Automation Time Based Flow Management (TBFM ) Final Investment Decision This decision baselines the TBFM Program to award a contract to expand and enhance the legacy traffic management advisor.  TBFM will allow development across several NextGen Operational Improvement (OI) Solution Set capability areas; such as initiate TBO, Increase arrivals and departures at high density airports. 2009 Q3FY09 Q4Yes TBD 30-Jan-2009
197  Active  N Automation Approve Tower Flight Data Manager 3 Initial Investment Decision Full Decision Support Tools (DST)with TDLS and SAIDS Integration. 2013FY13 Q2 - FY14 Q1Yes TBD 30-Jan-2009
198  Active  N Automation Approve Tower Flight Data Manager 3 Final Investment Decision Full Decision Support Tools (DST)with TDLS and SAIDS Integration. 2014FY14 Q2 - FY15 Q1Yes TBD 30-Jan-2009
199  Active  N Automation DOTS Sustainment/Integration Decision Decision to sustain DOTS+ or integrate DOTS+ functionality into TFM and/or EnRoute Automation System. 2009 Q4FY10 Q1No TBD 30-Jan-2009
200  Active  N Automation En Route/Oceanic Integration Assessment An En Route/Oceanic integration assessment is needed to support development of the business case for En Route/Oceanic NextGen WP IID and as part of the larger automation convergence effort. 2017FY17 Q2 - FY18 Q1No TBD 30-Jan-2009
201  Active  Y Automation En Route /Oceanic IES NextGen WP Initial Investment Decision Business case and requirements developed for an En Route/Oceanic IES IID including identification of performance gaps and alternatives to address gaps, with preliminary cost, schedule and benefit estimates for alternatives. 2017FY17 Q2 - FY18 Q1Yes TBD 30-Jan-2009
202  Active  N Automation En Route /Oceanic IES NextGen WP Final Investment Decision Approval of business case and requirements for an En Route/Oceanic IES FID including validation and update of cost, schedule and benefits. 2018FY18 Q2 - FY19 Q1Yes TBD 30-Jan-2009
203  Active  Y Communications Flight Service, AFSM Interim Voice Switch Initial Investment Decision (New for Communications Roadmap) Initial Investment Decision for purchase of Voice Switches (and network infrastructure) for the Alaskan AFSSs 2010FY10 Q2 - FY11 Q1No NONE 30-Jan-2009
204  Active  Y Communications Flight Service, AFSM Interim Voice Switch Final Investment Decision (New for Communications Roadmap) Final Investment Decision for Purchase of Voice Switches (and network infrastructure) for the Alaskan AFSSs 2011FY11 Q2 - FY12 Q1No NONE 30-Jan-2009
206  Active  N Automation Final Investment Decision for SITS Air Domain Security Architecture Decide the sufficent functional details of the SITS chosen architecture solution. 2013FY13 Q2 - FY14 Q1Yes NONE 30-Jan-2009
207  Active  Y Automation DUAT Service Acquisition Decision to re-compete the DUAT Service and continue through CY-17 or to integrate into another function/capability. 2012FY12 Q2 - FY13 Q1No NONE 30-Jan-2009
208  Active  Y Automation Flight Services Evolution Integrated Services and Capabilities Final Investment Decision Decision to integrate discrete Flight Service Automation Systems into a singular composite system 2016FY16 Q2 - FY17 Q1Yes NONE 30-Jan-2009
209  Active  N Weather Executive Level Decision to fund FAA portion of NextGen 4-D Weather Single Authorative Source (4-D Wx SAS) The 4-D Wx SAS will source crucial weather Obs & forecasts to TFM & dispatchers for their collaboration and decision making; as single source of decision making forecast weather ambiguity should be reduced. 2014FY14 Q2 - FY15 Q1Yes TBD 30-Jan-2009
Y210  Active  N Weather Final Investment Decision to fund WARP contract maintenance until subsumed into NextGen Wx Processor Work Package 1 ( NWP WP1)  WARP maintenance contract expires 2009; funding decision needed to sustain WARP until its functionality fully subsumed within NWP WP1. 2008 Q4FY09 Q1No "WARP Product Team unable to meet milestone of Dec 2007 EC/FID decision. RPD prepared and working with Brandy to schedule JRC, likely in Nov '08. Some funding obtained from ATO-E for FY 2008 & FY 2009. Existing contract expires Aug/Sep 09. Team currently on the JRC TBD list for IA Readiness and delegated to ATO EC and trying for a tailoring decision that allows the program to skip IARD and IID). 

Is now DP 210 on Wx Roadmap. WARP currently on the JRC for Nov '08, working with Brandy and hoping for tailored JRC FID. " 
30-Jan-2009
211  Active  N Weather Investment Decision to deploy additional LIDAR for dry microburst detection ATO-T Wx conducting analysis and examining requirements for LIDAR to enhance detection of 'dry microbursts' at selected sites (mostly in Rockies). 2009 Q3FY09 Q4No TBD 30-Jan-2009
212  Active  Y Weather Investment Decision (IARD) to add WT Mitigation for Single Runway (WTSR) decision support capability TBD 2019FY19 Q2 - FY20 Q1No TBD 30-Jan-2009
213  Active  N Weather Executive Level Decision to fund FAA portion 4-D Wx SAS Tech Refresh Adds capabilities to store more weather information, handle transactions more efficiently with 4-D Wx Cube & SWIM, and receive udpates from new protocols and/or standards established for SOA/enterprise services to interface with other agencies' systems. 2020FY20 Q2 - FY21 Q1No TBD 30-Jan-2009
214  Active  N Communications Determine to Sustain or Decommission LDRCL Low Density Radio Communications Link (LDRCL) is a microwave system that provides tail circuits for RCAGs and Radars. It is approaching End-of-Life. A decision needs to be made whether to sustain it or to decommission it and transfer its users to FTI-2 services. 2013FY13 Q2 - FY14 Q1No TBD 30-Jan-2009
215  Active  N Communications Determine to Sustain or Decommission RCL The Radio Communications Link (RCL) is backbone microwave system. It is approaching End-of-Life. A decision needs to be made whether to sustain it or to decommission it and transfer its users to FTI-1 services. 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
216  Active  Y Communications Determine to Sustain NMR or incorporate it into FTI-2 NADIN MSN Rehost(NMR) is the United States AFTN switch. It is currently owned and operated by the FAA. A decision will need to be made whether it should remain an FAA owned and operated system or whether this functionality should be provided by FTI-2 (a leased service). 2016FY16 Q2 - FY17 Q1No TBD 30-Jan-2009
217  Active  N Communications Approve Airport Wireless Communication System Airport Wireles Communication System will consist of an airport LAN that will provide service primarily to mobile users and secondarily to fixed users. 2011FY11 Q2 - FY12 Q1No TBD 30-Jan-2009
218  Active  Y Communications Approve migration to L-band for DataComm The transport infrastructure for DataComm Segments 1 and 2 will be VHF Datalink Mode 2 (VDL-2). This DP will determine whether DataComm transitions from VDL-2 to L-Band. (L-band will enable a much higher data rate than the 31.5 kbps provide by VDL-2.) 2021FY21 Q2 - FY22 Q1No TBD 30-Jan-2009
219  Active  N Navigation Completion of planned LP non-precision approach availability Completion of currently planned LP non-precision approach availability in the NAS 2018FY18 Q2 - FY19 Q1Yes TBD 30-Jan-2009
220  Active  N Navigation Completion of planned LPV precision approach availability Completion of currently planned LPV precision approach availability in the NAS 2018FY18 Q2 - FY19 Q1Yes TBD 30-Jan-2009
222  Active  N Navigation L5 FOC 24 satellites transmitting L5 from primary slots 2018FY18 Q2 - FY19 Q1Yes TBD 30-Jan-2009
G224  Active  N Navigation Decision to develop dual frequency multi-constellation GNSS avionics FAA decision to pursue research & development of dual-frequency multi-constellation GNSS avionics. 2009 Q2FY09 Q3No None. 30-Jan-2009
225  Active  N Navigation GNSS core constellation standards and ICDs ready Additional GNSS core constellations such as Galileo may become available with standards and interface control documents by this time. 2014FY14 Q2 - FY15 Q1No TBD 30-Jan-2009
226  Active  N Navigation Dual frequency multi-constellation GNSS avionics Dual frequency multi-constellation GNSS avionics available 2018FY18 Q2 - FY19 Q1No TBD 30-Jan-2009
227  Active  N Navigation Decision to develop dual frequency SBAS/WAAS avionics FAA decision to pursue research & development of dual-frequency SBAS/WAAS avionics. 2009 Q2FY09 Q3Yes TBD 30-Jan-2009
228  Active  N Navigation GPS dual-frequency L1/L5 standards and ICDs ready Standards and ICDs ready for SBAS/WAAS dual frequency (GPS L1/L5) 2014FY14 Q2 - FY15 Q1Yes TBD 30-Jan-2009
229  Active  N Navigation Avionics available  for use of dual frequency (GPS L1/L5) SBAS/WAAS Avionics available  for use of dual frequency (GPS L1/L5) SBAS/WAAS 2018FY18 Q2 - FY19 Q1Yes TBD 30-Jan-2009
230  Active  N Navigation WAAS reference station cut-over from GPS L1/L2 to L1/L5 WAAS reference stations require dual frequency operations.  Currently, this is provided using semi-codeless receivers.  DoD issued a Federal Register notice discontinuing support of semicodeless operations in 2020.  WAAS must transition to GPS L1/L5 to avoid a total loss of LPV and LNAV/VNAV service. 2020FY20 Q2 - FY21 Q1Yes TBD 30-Jan-2009
231  Active  N Navigation Decision to use eLoran in the NAS Decision to use eLoran in the NAS 2008 Q2FY08 Q3No TBD 30-Jan-2009
232  Active  N Navigation eLoran standards ready; decision to support non-precision approaches eLoran standards ready; decision to support non-precision approaches 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
233  Active  N Navigation eLoran is capable of supporting en route and terminal operations and non-precision eLoran is capable of supporting en route and terminal operations and non-precision 2014FY14 Q2 - FY15 Q1No TBD 30-Jan-2009
G234  Active  N Navigation Decision to buy ILSs to replace aging systems Decision to buy ILSs to replace aging systems 2009 Q4FY10 Q1Yes Maintenance decision pending 30-Jan-2009
235  Active  N Navigation Replacement Cat I ILSs operating in the NAS Replacement Cat I ILSs operating in the NAS 2014FY14 Q2 - FY15 Q1No TBD 30-Jan-2009
236  Active  N Navigation Decision to buy systems to replace Cat II/III ILSs where necessary Decision to buy systems to replace Cat II/III ILSs where necessary 2013FY13 Q2 - FY14 Q1Yes TBD 30-Jan-2009
237  Active  N Navigation Replacement Cat II/III ILSs operating in the NAS Replacement Cat II/III ILSs operating in the NAS 2018FY18 Q2 - FY19 Q1Yes TBD 30-Jan-2009
Y238  Active  N Navigation ALS (I) - Decision to develop and implement replacements for PAR 38 & 56 lamps Decision to design and develop replacement LED PAR 38 (lightbars) and PAR 56 (threshold) lamps.  This is per the Department of Energy decision to discontinue the use of incandescent lamps by 2012. 2008 Q4FY09 Q1Yes Evaluation of "LED" lamps is in progress. 30-Jan-2009
239  Active  N Navigation ALS (I) - Design and development of PAR 38 LED replacement lamps is completed Production of PAR 38 LED lamps will commence upon completion of development of LED replacement lamps. 2010FY10 Q2 - FY11 Q1Yes TBD 30-Jan-2009
G240  Active  N Navigation ALS (II/III) - Decision to improve energy efficiency of lighting systems Decision to improve energy efficiency of lighting systems 2009 Q4FY10 Q1Yes Implementation pending selection of LED lighting. 30-Jan-2009
241  Active  N Navigation ALS (II/III) - Improved components and system design are available Improved components and system design are available 2014FY14 Q2 - FY15 Q1Yes TBD 30-Jan-2009
242  Active  N Navigation Decision to enhance RVR capability to support visibility predictions on airport surface and rate of snowfall on surface Decision to enhance capability to support visibility predictions on airport surface and rate of snowfall on surface 2009 Q3FY09 Q4No TBD 30-Jan-2009
243  Active  N Navigation RVRs capable of predicting near term runway visibility changes and runway snowfall accumulation Capability to predict near term runway visibility changes and runway snowfall accumulation achieved 2015FY15 Q2 - FY16 Q1No TBD 30-Jan-2009
244  Active  N Navigation Next generation of DMEs available to support RNAV throughout the NAS Next generation of DMEs available to support RNAV throughout the NAS 2015FY15 Q2 - FY16 Q1Yes TBD 30-Jan-2009
245  Active  N Navigation Decision to procure replacement VORs to support the minimum operating network Decision to procure replacement VORs to support the minimum operating network 2010FY10 Q2 - FY11 Q1Yes TBD 30-Jan-2009
246  Active  N Navigation Next generation of VORs available Next generation of VORs available 2015FY15 Q2 - FY16 Q1Yes TBD 30-Jan-2009
247  Active  N Navigation Decision to develop and implement replacements for PAPI lamps with LEDs Decision to develop and implement replacements for PAPI lamps with LEDs 2008 Q4FY09 Q1Yes TBD 30-Jan-2009
248  Active  N Navigation Next generation of lamps available for PAPI Next generation of lamps available for PAPI 2010FY10 Q2 - FY11 Q1Yes TBD 30-Jan-2009
249  Active  N Navigation Decision to develop and implement replacements for REIL lamps with LEDs Decision to develop and implement replacements for REIL lamps with LEDs 2008 Q4FY09 Q1Yes TBD 30-Jan-2009
250  Active  N Navigation Next generation of REIL LED lamps available Next generation of REIL LED lamps available 2010FY10 Q2 - FY11 Q1Yes TBD 30-Jan-2009
Y251  Active  N Navigation Decision to deploy semiflush fixtures for existing sites and new establishments Decision to deploy and implement replacements for semiflush lamps with LEDs 2008 Q4FY09 Q1Yes Evaluation of LED lamps is in progress. 30-Jan-2009
252  Active  N Navigation Next generation of semiflush fixtures using LEDs is available Next generation of LED semiflush fixtures is available 2012FY12 Q2 - FY13 Q1Yes TBD 30-Jan-2009
G253  Active  Y Surveillance In-Service Decision for SBS Essential Services (TIS-B/FIS-B) NAS wide implementation In-Service Decision for limited operations for Traffic Information Service - Broadcast (TIS-B) / Flight Information Service - Broadcast (FIS-B) as part of the ADS-B essential services for NAS ATC operations. 2008 Q4FY09 Q1No ISD has been made in September 2008 for limited used of TIS-B and FIS-B as part of Automatic Dependent Surveillance - Broadcast (ADS-B) essential services system for southern Florida, achieving Initial Operational Capability (IOC 30-Jan-2009
G254  Active  Y Surveillance In-Service Decision for SBS Critical Services (ADS-B) NAS wide implementation, including backup strategy The SBS Program will develop connectivity and validate ADS-B suitability for ATC services through integration to the five primary automation platforms and establish an In-Service Decision (ISD) on ADS-B, ADS-R,TIS-B and FIS-B in Segment 1 by 2010. 2010 Q3FY10 Q4No None.  In-Service Decision for SBS Critical Services (ADS-B) NAS wide implementation, including backup strategy in 2010. 30-Jan-2009
G255  Active  N Surveillance Decision for the FAA to assume WM/LAT radar operations in Colorado.  The FAA ATO-E and Air Traffic Organizations validate acceptable operation of Wide Area Multi-lateration (WM/LAT) systems in Colorado.  FAA will make a deciosn as to assuming WM/LAT operations from the Colorado Transportion Authority. 2010FY10 Q2 - FY11 Q1No Decision on FAA assuming operations from Colorado DOT in 2010. 30-Jan-2009
256  Active  N Surveillance Decision for ASR-11 Technology Refresh Segment 2 to sustain the system through 2025 This decision provides a Final Investment Decision (FID) on a technology refresh implementation to sustain the ASR-11 functional and performance to 2025.  DP #256 provides a follow-on to the ASR-11 Technology Refresh Segment 1 addressed in DP #99. 2013FY13 Q2 - FY14 Q1No None 30-Jan-2009
G257  Completed  Y Surveillance JRC FID (JRC 2B) Decision for acquisition of RWSL systems  A JRC FID (JRC 2B) Decision was made to approve acquisition of twenty-two RWSL systems. 2008FY08 Q2 - FY09 Q1No01-Jun-2008 Completed.  RWSL FID was approved by the JRC in June 2008. 30-Jan-2009
Y258  Active  N Surveillance JRC Investment Analysis Readiness Decision (IARD) for LCGS Decision to implement a Pilot Evaluation Program to evaluate LCGS operation at small to medium capacity airports. 2008 Q4FY09 Q1No LCGS Program was not approved by the JRC in October 2008. CIT concerns need to be resolved. 30-Jan-2009
259  Active  Y Surveillance JRC Decision for RWSL Technology Refresh  This is a decision to implement a Technology Refresh Program to sustain the Runway Status Lights (RWSL) system through 2025. 2018FY18 Q2 - FY19 Q1No None 30-Jan-2009
260  Active  N Surveillance Decision on ADS-B Rule Compliance Decision for minumum ADS-B avionics equippage for aircraft operating in designated airspace. 2020FY20 Q2 - FY21 Q1No None 30-Jan-2009
261  Active  N Airspace and Procedures Candidate site(s) selected Results of R&D will determine the candidate areas for the Big Airspace Program. 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
262  Active  N Airspace and Procedures Decision to implement Big Airspace at candidate areas This shall be an Executive Council decision to implement Big Airspace across the determined candidate areas resulting from favorable field tests. 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
263  Active  N Airspace and Procedures Review airspace evolution and determine future phases if any Through the results of the FACES R&D and NASA R&D will determine future Airspace projects along with other demand constraints that exist in Airspace. 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
264  Active  N Airspace and Procedures Decision to re-design Western Corridor With completion of SNSA airspace design and analysis effort this decision is to implement the initial airspace changes to Western Corridor.  Western Corridor Airspace redesign includes:
   1. Southern Nevada Increments
   2. Southern California and phoenix increments
   3. Overlying en route airspace
   4. Connectivity to Bay-to-basin 
2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
265  Active  N Airspace and Procedures Develop concept for RNAV-2 and RNP-2 airspace Performance based navigation program to continue to develop RNAV and RNP airspace.  This is the Phase 1 research for performance-based access airspace (RNAV-2 at FL180+ and RNP-2 at FL290+). 2009 Q3FY09 Q4No TBD 30-Jan-2009
266  Active  N Airspace and Procedures Identify procedures for handling mutiple situations with aicraft Identify procedures for handling the following situations (e.g. aircraft that lose required capability in flight, aircraft climbing into and descending out of performance-based access airspace, implementing flow management that penetrates performance-based access airspace) 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
267  Active  N Airspace and Procedures Decision to proceed with  High Altitude Generic Airspace Concept Phase 1 TBD - Working with Generic High Conops groups for details of the description. 2017FY17 Q2 - FY18 Q1No TBD 30-Jan-2009
268  Active  N Airspace and Procedures Identify locations for SIDs & STARs Phase 2 Determine locations for SIDs & STARs with non-overlay RNAV or RNP SIDs and STARs.  Joined to Q-routes where appropriate. 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
269  Active  N Airspace and Procedures Identify locations (e.g. additional TRACONS and previously re-designed facilities) Determine locations for SIDs & STARs with non-overlay RNAV or RNP SIDs and STARs and evaluate previously re-designed facilities for update/improvements. 2014FY14 Q2 - FY15 Q1No TBD 30-Jan-2009
270  Active  N Airspace and Procedures Determine SIDs & STARs Vertical Implementation Decision to provide SIDs & STARs with operationally viable vertical profiles without sacrificing throughput but improving efficiency. 2014FY14 Q2 - FY15 Q1No TBD 30-Jan-2009
271  Active  N Airspace and Procedures Wake Turbulence Procedures Develop Wake based procedures for controllers utilizing the Wake Turbulence Mitigation for Departure (WTMD) system. 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
272  Active  N Airspace and Procedures Recommend 1 or 2 test field locations and define automation requirements Recommend the first two test fields that will initiate the Big Airspace operational prototype and will provide result to feed future development of the Big Airspace Project. 2009 Q3FY09 Q4No TBD 30-Jan-2009
273  Active  N Airspace and Procedures FMS Offset TBD TBD 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
274  Active  Y Airspace and Procedures Decision to continue funding Future Airspace Capacity and Efficiency Research This decision is the continue the FACES research at the end of 2010. 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
275  Active  N Automation Approve Terminal Automation NextGen Mid-Term Work Package Initial investment  Post TAMR Phase 3 functionality - cross domain coordinated TBO 2014FY14 Q2 - FY15 Q1Yes TBD 30-Jan-2009
276  Active  N Automation Approve Terminal Automation NextGen Mid-Term Workpackage Final investment Post TAMR Phase 3 functionality - cross domain coordinated TBO 2015FY15 Q2 - FY16 Q1Yes TBD 30-Jan-2009
G277  Active  Y Enterprise Services Final Investment Decision for SWIM Segment 2 (Baseline FY12 – 16) Final Investment Decision (FID) for SWIM Segment 2 Implementation of an Enterprise Service Bus (ESB) infrastructure functionality and core services. 2010 Q2FY10 Q3No24-Sep-2008 On-track for decision.[12/03/08]
ESB selection projected for November 2010. 
30-Jan-2009
278  Active  N Human Systems Integration Terminal/En Route procedural changes required for Optimized Profile Decent (OPD) are determined TBD 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
279  Active  N Human Systems Integration ATCT CHI enhancements required to minimize controller workload associated with additional aircraft and ground vehicle information are determined TBD 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
280  Active  N Human Systems Integration Determine controller decision support requirements for surface safety logic algorithms TBD 2013FY13 Q2 - FY14 Q1No TBD 30-Jan-2009
281  Active  N Human Systems Integration Controller training and procedures for providing radar-like services to non-towered airports are determined TBD 2009 Q3FY09 Q4No TBD 30-Jan-2009
282  Active  N Human Systems Integration Validate surface Data Comm message process is equivalent or better than current voice-based surface communications TBD 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
283  Active  N Human Systems Integration Identify and train ATCT departure procedures and decision support tools to support WTMD TBD 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
284  Active  N Human Systems Integration Develop effective training, decision support tools and job aids ensure equivalent ANSP operations for airspace not requiring local ATC knowledge TBD 2009 Q2FY09 Q3No TBD 30-Jan-2009
286  Active  N Human Systems Integration New terminal and en route controllers are developed and trained TBD 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
287  Active  N Human Systems Integration ANSP procedures for delegation of new oceanic climb and descent maneuvers are development TBD 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
288  Active  N Human Systems Integration Determine appropriate ANSP decision support tool requirements for TBM and develop training so that ANSPs can manage trajectories to meet scheduled meter times TBD 2011FY11 Q2 - FY12 Q1No TBD 30-Jan-2009
289  Active  N Human Systems Integration ANSP information needs to support the delegation of responsibility for separation are determined TBD 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
290  Active  N Human Systems Integration Define automated tool requirements to support the assessment of alternate configurations; determine likely ANSP error modes associated with dynamic re-configurations TBD 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
291  Active  N Human Systems Integration Identify ANSP Decision support tool requirements which identify conflicts/complexity/density conditions and providing alternatives to resolve the conditions; determine appropriate alerting and feedback mechanisms for using Data Comm TBD 2015FY15 Q2 - FY16 Q1No TBD 30-Jan-2009
292  Active  N Human Systems Integration ANSP controller human performance issues associated with reduced separation are developed and mitigation plans created TBD 2015FY15 Q2 - FY16 Q1No TBD 30-Jan-2009
303  Active  Y Facilities Facility Policy Decision TBD 2009 Q2FY09 Q3No NONE 30-Jan-2009
304  Active  Y Communications DataComm Segment 2 FID DataComm Segment 2 extends CPDLC capability to TRACONs and provides ADS-C  and FIS capability. 2015FY15 Q2 - FY16 Q1Yes NONE 30-Jan-2009
306  Active  N Automation Acquisition Strategy for Automated Flight Service Stations - CONUS Decision to continue/discontinue AFSS support contract for CONUS 2014FY14 Q2 - FY15 Q1Yes No status 30-Jan-2009
309  Active  N Human Systems Integration Identify optimal human-automation functional allocation of resources for mixed environments TBD 2009 Q4FY10 Q1No TBD 30-Jan-2009
310  Active  N Human Systems Integration Metering roles and responsibilities between TFM and En Route are developed TBD 2010FY10 Q2 - FY11 Q1No TBD 30-Jan-2009
313  Active  N Human Systems Integration En Route controller procedures operating under Terminal separations standards are developed TBD 2009 Q2FY09 Q3No TBD 30-Jan-2009
314  Active  N Human Systems Integration ANSP human performance issues associated with delegated separation are defined (active vs. monitoring role) TBD 2012FY12 Q2 - FY13 Q1No TBD 30-Jan-2009
315  Active  N Human Systems Integration Negotiated procedures for pilot are developed and tested TBD 2011FY11 Q2 - FY12 Q1No TBD 30-Jan-2009
316  Active  Y Navigation Avionics available for use of dual frequency GBAS/LAAS Avionics available for use of dual frequency (GPS L1/L5) GBAS /LAAS 2018FY18 Q2 - FY19 Q1Yes No Status 30-Jan-2009
317  Active  N Navigation Decision on post-decommission use of NDB spectrum Decision regarding the use of NDB spectrum after NDBs are decommissioned. 2012FY12 Q2 - FY13 Q1No No status 30-Jan-2009
318  Active  N Navigation All federal NDBs decommissioned from the NAS All federal NDBs decommissioned from the NAS 2015FY15 Q2 - FY16 Q1No No status 30-Jan-2009
319  Active  N Navigation Completion of GBAS Cat III prototype and development Successful completion of GBAS Cat III prototype and development work initiates Cat III System Design Approval (SDA). 2010 Q4FY11 Q1Yes No status 30-Jan-2009
G320  Active  N Navigation Decision to implement RVR 1800 at OEP Airports Flight Standards is driving the requirement with the implementation of FAO 8400.13C and FAO 8260.3B, Change 20. 2008 Q4FY09 Q1Yes Decision pending requirement per FAO 8400.13C and FAO 8260.3B, Change 20. 30-Jan-2009
321  Active  Y Navigation Increased capacity at ILS/RVR equipped runways during IMC Support 1800/1200 RVR landing minimums on runways without touchdown zone lights and/or centerline lights provided the flight crew uses a flight director, autopilot, or Head-up Display to the decision altitude. 2009 Q1FY09 Q2Yes TBD 30-Jan-2009
322  Active  N Navigation RVR 1800 system implementation begins RVR 1800 system implementation begins 2012FY12 Q2 - FY13 Q1Yes TBD 30-Jan-2009
G323  Active  N Navigation NCIME Acquisition Decision Joint Resources Council (JRC) for a JRC 2B investment decision. 2009 Q2FY09 Q3Yes Not assigned 30-Jan-2009
324  Active  N Navigation ALS (I) - Design and development of PAR 56 LED replacement lamps is completed Production of PAR 56 LED lamps will commence upon completion of development of LED replacement lamps. 2013FY13 Q2 - FY14 Q1Yes TBD 30-Jan-2009
G325  Active  N Navigation Infrared minimum requirement defined for EFVS Determine the minimum infrared intensity requirement for EFVS to support  the design and development of replacement LED PAR 38 and PAR 56 lamps. 2008 Q4FY09 Q1Yes Evaluations are in process to determine the minimum infrared intensity requirement for EFVS to support LED lamps for airport and runway lighting for PAR, REIL, ALS, RWSL, etc. 30-Jan-2009
G326  Active  N Navigation EFVS Funding decision by AFS Funding decision by AFS to implement EFVS within the NAS 2009 Q4FY10 Q1Yes Not assigned 30-Jan-2009
329  Active  N Navigation RVR SLEP Production level RVR SLEP 2015FY15 Q2 - FY16 Q1Yes None 30-Jan-2009
338  Active  Y Automation ATOP NG ADS-B needed? 2009 Q1FY09 Q2No None 30-Jan-2009
G339  Active  Y Communications Initial Investment Decision for NAS Voice Switch Provides air/ground and ground/ground voice communications services for controllers, at new and existing facilities, including GSDFs, ARTCCs, TRACONs and Towers. 2010 Q3FY10 Q4No Program scheduled for a 2010 Initial Investement Decision (IID). 30-Jan-2009
341  Active  N Weather Final Investment Decision to transition WMSCR Comms functionality to web access via SWIM Seg 3 & ALDARS Comms to NNEW WP2 Begins transition of enabling web asccess to ASOS observations from ADAS and ADAS' ALDARS capability (lightning location identification with nearby ASOS/AWOS/AWSS) into NextGen era via NNEW WP2 2015FY15 Q2 - FY16 Q1No TBD 30-Jan-2009
342  Active  Y Weather Final Investment Decision for NextGen Weather Radar Capability This decision will be dependent on other decisions re how ground-based wind shear and ground-based terminal weather surveillance capabilities for both Terminal & En Route will be fielded in the future. There are inter-agency issues here as well as this decision likely involves the replacement of NEXRAD as well as FAA wind shear and Terminal Wx radars. 2020FY20 Q2 - FY21 Q1No TBD 30-Jan-2009
343  Active  N Weather Investment Decision (IARD) to baseline CIWS in NextGen Wx Processor WP2 CIWS to meet late 2008/early 2009 with ATO-EC re implmentation strategy. Subsequent incorporation of CIWS functionality into WP2 phase of the NextGen Wx Processor will become clearer at that point for its baseline. 2013FY13 Q2 - FY14 Q1No TBD 30-Jan-2009
G344  Active  N Enterprise Services Decide on GPS timing backup technology The technology that will be utilized to provide backup to the GPS timing in support of NAS operational systems and leased services will be determined. 2009 Q4FY10 Q1No Technology for operational and leased services is to be determined. 30-Jan-2009
345  Active  N Enterprise Services Implementation strategy decision for GPS timing backup The implementation strategy decision for GPS timing backup will determine of the chosen technology, how backup will be provided for both legacy NAS systems, and NextGen systems. 2011FY11 Q2 - FY12 Q1No TBD 30-Jan-2009
346  Active  Y Automation Final Investment Decision for CATMT Work Package 4 Final Investment Decision for contents of CATMT Work Package 4 2015FY15 Q2 - FY16 Q1Yes None 30-Jan-2009