Mechanism Data Report: Power Systems
Mechanism Hierarchy
Systems
Air Traffic Control Systems
Air Traffic Control Facility
Facility - Operational
Power Systems
Legend: Hierarchy Element - Mechanism

Mechanism Data
Name (acro/abbrev) Power Systems (Pwr Sys)
Description The Power Systems (Pwr Sys) mechanism provides for the conditioning of commercial power, including uninterruptible power systems (UPS), to eliminate voltage dropouts, surges, and voltage sags caused by sources outside the facility.  Power distribution, grounding, bonding, and shielding of electrical system within the facility is also part of the Power Systems mechanism.

The Power Systems mechanism provides the following: Air Route Traffic Control Center (ARTCC) Critical/Essential Power Systems (ACEPS) busway replacements; ACEPS emergency generator (EG) maintenance; ACEPS monitoring and diagnostics; ACEPS fuel system upgrade; ACEPS training; battery monitoring; training facility; critical power distribution system (CPDS); battery replacements; direct current (DC) systems; emergency generators (EG); lightning protection, grounding, bonding, and shielding (LPGBS); power cables; uninterruptible power systems (UPS); and contract support.


Power Systems Sustained Support (Power Systems, Mechanism 1425) and Power Systems Technology Refresh (Mechanism 6353) are both funded out of single NAS project F11.00-00, Power Systems, currently funded through FY-2021.
Mechanism Type System
NAS Domain Facility
Last Certified 17-Dec-2008
 
Related Location Types Air Route Traffic Control Center, Airport Traffic Control Tower, Command Center, Terminal Radar Approach Control
Flight Domain En Route, Surface, TFM, Terminal
Initiatives
 

Mechanism Schedule 
Concept StartInitial OperationFull OperationBegin DecommissionEnd of Service
Pwr Sys01-Oct-199601-Oct-199830-Sep-202101-Jan-203001-Jan-2035

Attachments
No attachments found for this mechanism.

Programmatic Information
Mechanism Power Systems
Mechanism Power Systems
Legend: Program Program, Project Project, Segment Segment, Mechanism Mechanism

Mechanism Predecessor/Successor ScheduleText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
no data found.
---predecessors above---
Power Systems (Pwr Sys)Power Systems (Pwr Sys)Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC)01-Oct-1998 to 30-Sep-2021Power Systems (Pwr Sys)
Installation Phase
Initial Operational Capability (IOC) to Full Operational Capability (FOC)
01-Oct-1998 to 30-Sep-2021
Power Systems (Pwr Sys)Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD)30-Sep-2021 to 01-Jan-2030Power Systems (Pwr Sys)
Daily Operations
Full Operational Capability (FOC) to Begin Decommission (BD)
30-Sep-2021 to 01-Jan-2030
Power Systems (Pwr Sys)DecommissionBegin Decommission (BD) to End of Service (EOS)01-Jan-2030 to 01-Jan-2035Power Systems (Pwr Sys)
Decommission
Begin Decommission (BD) to End of Service (EOS)
01-Jan-2030 to 01-Jan-2035
---successors below---
Power Systems  (Technology Refresh) (Pwr Sys Tech Refresh)Power Systems  (Technology Refresh) (Pwr Sys Tech Refresh)Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC)01-Oct-2006 to 30-Sep-2021Power Systems  (Technology Refresh) (Pwr Sys Tech Refresh)
Installation Phase
Initial Operational Capability (IOC) to Full Operational Capability (FOC)
01-Oct-2006 to 30-Sep-2021
Power Systems  (Technology Refresh) (Pwr Sys Tech Refresh)Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD)30-Sep-2021 to 01-Oct-2030Power Systems  (Technology Refresh) (Pwr Sys Tech Refresh)
Daily Operations
Full Operational Capability (FOC) to Begin Decommission (BD)
30-Sep-2021 to 01-Oct-2030
Power Systems  (Technology Refresh) (Pwr Sys Tech Refresh)DecommissionBegin Decommission (BD) to End of Service (EOS)01-Oct-2030 to 30-Sep-2035Power Systems  (Technology Refresh) (Pwr Sys Tech Refresh)
Decommission
Begin Decommission (BD) to End of Service (EOS)
01-Oct-2030 to 30-Sep-2035
Legend:   Design PhaseConcept Start to Initial Operational Capability (IOC) - Design Phase   Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC) - Installation Phase   Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD) - Daily Operations   DecommissionBegin Decommission (BD) to End of Service (EOS) - Decommission

Location ScheduleText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
no data found.

Operational ImprovementsText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
Current Flight Plan SupportCurrent Flight Plan SupportDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Oct-2005 to 30-Sep-2011Current Flight Plan Support
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Oct-2005 to 30-Sep-2011
Provide Full Flight Plan Constraint Evaluation with FeedbackNo data points in this rangeProvide Full Flight Plan Constraint Evaluation with FeedbackDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Provide Full Flight Plan Constraint Evaluation with Feedback
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Provide Interactive Flight Planning from AnywhereNo data points in this rangeProvide Interactive Flight Planning from AnywhereDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement31-Jan-2016 to 30-Mar-2022Provide Interactive Flight Planning from Anywhere
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
31-Jan-2016 to 30-Mar-2022
Current Flight Data ManagementCurrent Flight Data ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement04-Oct-2005 to 30-Sep-2023Current Flight Data Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
04-Oct-2005 to 30-Sep-2023
Trajectory Flight Data ManagementNo data points in this rangeTrajectory Flight Data ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jun-2011 to 30-Mar-2022Trajectory Flight Data Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jun-2011 to 30-Mar-2022
Current Oceanic SeparationCurrent Oceanic SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jun-2005 to 30-Sep-2011Current Oceanic Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jun-2005 to 30-Sep-2011
Oceanic In-trail Climb and DescentOceanic In-trail Climb and DescentDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jun-2004 to 30-Dec-2024Oceanic In-trail Climb and Descent
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jun-2004 to 30-Dec-2024
Current En Route SeparationCurrent En Route SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 30-Sep-2011Current En Route Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 30-Sep-2011
Initial Conflict Resolution AdvisoriesNo data points in this rangeInitial Conflict Resolution AdvisoriesDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Initial Conflict Resolution Advisories
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Reduce Horizontal Separation Standards -3 MilesNo data points in this rangeReduce Horizontal Separation Standards -3 MilesDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Nov-2015 to 01-Feb-2020Reduce Horizontal Separation Standards -3 Miles
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Nov-2015 to 01-Feb-2020
Delegated Responsibility for Horizontal SeparationNo data points in this rangeDelegated Responsibility for Horizontal SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Delegated Responsibility for Horizontal Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Use Aircraft Provided Intent Data to Improve ConflNo data points in this rangeUse Aircraft Provided Intent Data to Improve ConflDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Mar-2012 to 01-Feb-2020Use Aircraft Provided Intent Data to Improve Confl
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Mar-2012 to 01-Feb-2020
ADS-B SeparationNo data points in this rangeADS-B SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Feb-2020ADS-B Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Feb-2020
Current Terminal SeparationCurrent Terminal SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 31-Dec-2014Current Terminal Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 31-Dec-2014
NextGen Oceanic ProceduresNo data points in this rangeNextGen Oceanic ProceduresDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jan-2023 to 01-Jan-2024NextGen Oceanic Procedures
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jan-2023 to 01-Jan-2024
Current Aircraft To Terrain / Obstacle SeparationCurrent Aircraft To Terrain / Obstacle SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 30-Sep-2011Current Aircraft To Terrain / Obstacle Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 30-Sep-2011
Use Improved Terrain Information To Delegate RespoNo data points in this rangeUse Improved Terrain Information To Delegate RespoDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2016 to 30-Sep-2018Use Improved Terrain Information To Delegate Respo
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2016 to 30-Sep-2018
Current Aircraft To Airspace SeparationCurrent Aircraft To Airspace SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 30-Sep-2011Current Aircraft To Airspace Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 30-Sep-2011
Current Surface SeparationCurrent Surface SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 30-Jan-2020Current Surface Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 30-Jan-2020
Provide Full Surface Situation InformationNo data points in this rangeProvide Full Surface Situation InformationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Jan-2035Provide Full Surface Situation Information
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Jan-2035
Provide Surface SituationNo data points in this rangeProvide Surface SituationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 30-Dec-2022Provide Surface Situation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 30-Dec-2022
Current Terminal Advisory - WeatherCurrent Terminal Advisory - WeatherDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Apr-2003 to 30-Nov-2015Current Terminal Advisory - Weather
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Apr-2003 to 30-Nov-2015
Deploy FIS-B NationallyNo data points in this rangeDeploy FIS-B NationallyDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Jan-2035Deploy FIS-B Nationally
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Jan-2035
Current En Route Advisory - WeatherNo data points in this rangeCurrent En Route Advisory - WeatherDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2010 to 30-Jan-2014Current En Route Advisory - Weather
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2010 to 30-Jan-2014
Support CDM with Simultaneous Hazardous Weather NotificationNo data points in this rangeSupport CDM with Simultaneous Hazardous Weather NotificationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2012 to 30-Jan-2014Support CDM with Simultaneous Hazardous Weather Notification
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2012 to 30-Jan-2014
Current Oceanic Advisory - WeatherCurrent Oceanic Advisory - WeatherDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Sep-2002 to 30-Jan-2014Current Oceanic Advisory - Weather
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Sep-2002 to 30-Jan-2014
MDCRSMDCRSDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jan-2005 to 01-Jan-2025MDCRS
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jan-2005 to 01-Jan-2025
Automatic Hazardous Weather Alert NotificationNo data points in this rangeAutomatic Hazardous Weather Alert NotificationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2011 to 02-Mar-2017Automatic Hazardous Weather Alert Notification
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2011 to 02-Mar-2017
Current Traffic AdvisoryCurrent Traffic AdvisoryDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Dec-2003 to 31-Dec-2014Current Traffic Advisory
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Dec-2003 to 31-Dec-2014
Expanded Traffic Advisory Services Using Digital TNo data points in this rangeExpanded Traffic Advisory Services Using Digital TDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Jan-2030Expanded Traffic Advisory Services Using Digital T
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Jan-2030
Current NAS Status AdvisoryCurrent NAS Status AdvisoryDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2002 to 31-Dec-2018Current NAS Status Advisory
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2002 to 31-Dec-2018
On-Demand NAS InformationNo data points in this rangeOn-Demand NAS InformationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2012 to 30-Mar-2022On-Demand NAS Information
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2012 to 30-Mar-2022
Current Oceanic Conflict Probe<<<Current Oceanic Conflict Probe ends
before the earliest date on this graph
Flexible Entry Times for Oceanic TracksNo data points in this rangeFlexible Entry Times for Oceanic TracksDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement31-Jan-2014 to 01-Jan-2041Flexible Entry Times for Oceanic Tracks
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
31-Jan-2014 to 01-Jan-2041
Current Conflict Probe<<<Current Conflict Probe ends
before the earliest date on this graph
Expanded Conflict Resolution via Data CommunicationNo data points in this rangeExpanded Conflict Resolution via Data CommunicationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jun-2015 to 30-Mar-2022Expanded Conflict Resolution via Data Communication
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jun-2015 to 30-Mar-2022
Current Arrival/Departure SequencingCurrent Arrival/Departure SequencingDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2002 to 30-Dec-2008Current Arrival/Departure Sequencing
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2002 to 30-Dec-2008
Current Tactical Management Of Flow For Arrivals/Current Tactical Management Of Flow For Arrivals/Daily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Apr-2000 to 30-Sep-2011Current Tactical Management Of Flow For Arrivals/
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Apr-2000 to 30-Sep-2011
Optimize Runway AssignmentsNo data points in this rangeOptimize Runway AssignmentsDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2012 to 31-Dec-2015Optimize Runway Assignments
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2012 to 31-Dec-2015
Point-in-Space MeteringNo data points in this rangePoint-in-Space MeteringDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Apr-2011 to 30-Dec-2020Point-in-Space Metering
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Apr-2011 to 30-Dec-2020
Current Surface Traffic ManagementCurrent Surface Traffic ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement06-Jun-2001 to 30-Jan-2020Current Surface Traffic Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
06-Jun-2001 to 30-Jan-2020
Full Surface Traffic Management with Conformance MonitoringNo data points in this rangeFull Surface Traffic Management with Conformance MonitoringDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Oct-2017 to 30-Dec-2020Full Surface Traffic Management with Conformance Monitoring
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Oct-2017 to 30-Dec-2020
Initial Surface Traffic ManagementNo data points in this rangeInitial Surface Traffic ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Sep-2010 to 01-Jan-2031Initial Surface Traffic Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Sep-2010 to 01-Jan-2031
Current Long Term PlanningCurrent Long Term PlanningDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement04-Sep-1991 to 31-Dec-2018Current Long Term Planning
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
04-Sep-1991 to 31-Dec-2018
Resource PlanningNo data points in this rangeResource PlanningDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement03-Feb-2011 to 31-Dec-2016Resource Planning
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
03-Feb-2011 to 31-Dec-2016
NAS Wide Sector Demand Prediction and Resource PlanningNo data points in this rangeNAS Wide Sector Demand Prediction and Resource PlanningDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2016 to 01-Jun-2025NAS Wide Sector Demand Prediction and Resource Planning
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2016 to 01-Jun-2025
Current Flight Day ManagementCurrent Flight Day ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Sep-2002 to 30-Jan-2014Current Flight Day Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Sep-2002 to 30-Jan-2014
Enhance Collaborative Decision MakingNo data points in this rangeEnhance Collaborative Decision MakingDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement29-Sep-2009 to 31-Dec-2016Enhance Collaborative Decision Making
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
29-Sep-2009 to 31-Dec-2016
Full Collaborative Decision MakingNo data points in this rangeFull Collaborative Decision MakingDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Oct-2017 to 01-Jan-2024Full Collaborative Decision Making
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Oct-2017 to 01-Jan-2024
Current NAS Performance AssessmentCurrent NAS Performance AssessmentDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement29-May-2002 to 31-Dec-2016Current NAS Performance Assessment
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
29-May-2002 to 31-Dec-2016
Continuous Flight Day EvaluationNo data points in this rangeContinuous Flight Day EvaluationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2012 to 30-Mar-2022Continuous Flight Day Evaluation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2012 to 30-Mar-2022
Current Emergency AssistanceCurrent Emergency AssistanceDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 31-Dec-2014Current Emergency Assistance
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 31-Dec-2014
Current Emergency Alerting SupportCurrent Emergency Alerting SupportDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 31-Dec-2014Current Emergency Alerting Support
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 31-Dec-2014
Enhance Emergency AlertingNo data points in this rangeEnhance Emergency AlertingDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jan-2012 to 30-Sep-2038Enhance Emergency Alerting
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jan-2012 to 30-Sep-2038
Current Enroute NavigationCurrent Enroute NavigationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement10-Jul-2003 to 01-Jan-2030Current Enroute Navigation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
10-Jul-2003 to 01-Jan-2030
RNAV SIDS, STARS and ApproachesRNAV SIDS, STARS and ApproachesDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement10-Jul-2003 to 30-Dec-2045RNAV SIDS, STARS and Approaches
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
10-Jul-2003 to 30-Dec-2045
Current Precision Approach, Landing and DepartureCurrent Precision Approach, Landing and DepartureDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Dec-1995 to 01-Jan-2030Current Precision Approach, Landing and Departure
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Dec-1995 to 01-Jan-2030
Cat I Precision Approach (GLS)No data points in this rangeCat I Precision Approach (GLS)Daily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Oct-2014 to 30-Dec-2045Cat I Precision Approach (GLS)
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Oct-2014 to 30-Dec-2045
Ground Based Augmentation System (GBAS) Precision ApproachesNo data points in this rangeGround Based Augmentation System (GBAS) Precision ApproachesDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jun-2016 to 30-Dec-2045Ground Based Augmentation System (GBAS) Precision Approaches
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jun-2016 to 30-Dec-2045
Current Non-precision Approach and DepartureCurrent Non-precision Approach and DepartureDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement10-Jul-2003 to 01-Jan-2030Current Non-precision Approach and Departure
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
10-Jul-2003 to 01-Jan-2030
Current Airport Surface GuidanceCurrent Airport Surface GuidanceDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Oct-1996 to 30-Dec-2028Current Airport Surface Guidance
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Oct-1996 to 30-Dec-2028
Low Visibility OperationsNo data points in this rangeLow Visibility OperationsDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jun-2016 to 01-Jan-2020Low Visibility Operations
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jun-2016 to 01-Jan-2020
Current Airspace ManagementCurrent Airspace ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement12-Jan-1998 to 01-Feb-2020Current Airspace Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
12-Jan-1998 to 01-Feb-2020
Expand use of RNAV/RNP ProceduresNo data points in this rangeExpand use of RNAV/RNP ProceduresDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement29-Sep-2009 to 02-Feb-2022Expand use of RNAV/RNP Procedures
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
29-Sep-2009 to 02-Feb-2022
Flexible Airspace ManagementNo data points in this rangeFlexible Airspace ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Flexible Airspace Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Manage Airspace to FlowNo data points in this rangeManage Airspace to FlowDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jan-2017 to 01-Jan-2024Manage Airspace to Flow
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jan-2017 to 01-Jan-2024
Initial Trajectory Based AirspaceNo data points in this rangeInitial Trajectory Based AirspaceDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2012 to 30-Dec-2020Initial Trajectory Based Airspace
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2012 to 30-Dec-2020
Current Monitoring And MaintenanceCurrent Monitoring And MaintenanceDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Feb-1994 to 30-Dec-2030Current Monitoring And Maintenance
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Feb-1994 to 30-Dec-2030
Increase Remote Monitoring and Maintenance<<<Increase Remote Monitoring and Maintenance ends
before the earliest date on this graph
Current Spectrum ManagementCurrent Spectrum ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Oct-1998 to 30-Sep-2035Current Spectrum Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Oct-1998 to 30-Sep-2035
Current Government/Agency SupportCurrent Government/Agency SupportDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2003 to 30-Sep-2025Current Government/Agency Support
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2003 to 30-Sep-2025
SITS<<<SITS ends
before the earliest date on this graph
Legend:   Daily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement - Daily Operations

Interfaces
Show Legend
Data Providers Data Consumers
Power Systems (Pwr Sys)
Power Power
  ACD  
  ADS (Cap) Ground Station  
  ADS-B  
  ADS-B - Future Segments  
  AFSS Facility  
  AIM Modernization Segment 1  
  ALSF NexGen  
  ALSF-1  
  ALSF-2  
  ALSF-2 First Gen  
  ALSF-2 Tech Refresh  
  AMASS  
  ANICS  
  ARMS  
  ARSR-1E  
  ARSR-2  
  ARSR-3  
  ARSR-4  
  ARTCC Facilities  
  ARTS IIIA  
  ASDE-3  
  ASDE-3 SLEP  
  ASDE-3/AMASS Upgrade  
  ASDE-X  
  ASR-11  
  ASR-11 TR  
  ASR-7  
  ASR-8  
  ASR-8 SLEP  
  ASR-9  
  ASR-9 SLEP Phase 2  
  ASR-9/Mode S SLEP  
  ASR-WSP  
  ATCBI-4/5  
  ATCBI-6  
  ATN A/G Router  
  ATN G/G Router  
  ATOP  
  ATOP Controller WS  
  BUEC  
  BWM  
  C3  
  CAPER  
  CARTS IIE  
  CARTS IIIE  
  CATMT WP1  
  CATMT WP2  
  CDSS Phase 1  
  CDSS Phase 2  
  CDSS R Phase 1  
  CDSS-R Phase 2  
  CTAS Build 1  
  DASI  
  DASR  
  DF  
  DME  
  DME Replacement  
  DMN  
  DOTS  
  DSP  
  DSR  
  DSR - D-posit TR  
  DSR - R-posit TR  
  DSR-CRMR  
  DVRS Repl  
  DVRS/DVR2  
  E-ATOP  
  EBUS  
  ECG  
  ECG Tech Refresh  
  ERIDS  
  ETMS  
  ETVS/IVSR  
  EVCS  
  FANS 1/A  
  FDAD  
  FDIO  
  FDIO Mod (TR)  
  FDP2000  
  FIS  
  FISDL  
  FMA  
  FOMS - ER  
  FOMS - Term  
  FPS-117  
  FPS-20 Series  
  FTI  
  FTI-2  
  GPN-20  
  HAATS  
  HF ATN DL  
  HF Communications  
  HF Data Link  
  HID/NAS LAN  
  HOCSR  
  HVAC-BOS  
  ICSS I  
  ICSS II  
  ICSS III  
  ILS CAT I  
  ILS CAT I Rpl  
  ILS CAT II/III  
  ILS CAT II/III Rpl  
  ITWS  
  ITWS Display  
  ITWS Tech Refresh  
  JAWS  
  LAAS CAT I  
  LAAS CAT I TR  
  LAAS CAT II/III  
  LAAS CAT II/III TR  
  LDA  
  LDIN  
  LDRCL  
  LOC  
  LPDME  
  Loran-C  
  MALSR  
  MDR  
  MEARTS  
  MLS  
  Mode S  
  Mode S SLEP Phase 2  
  NADIN MSN  
  NADIN PSN  
  NDB  
  NDB Rpl  
  NVS  
  NWS Workstation  
  NYICC  
  New Beacon  
  New En Route Surveillance System  
  New Primary Surveillance System  
  ODALS  
  OFDPS  
  OIS  
  OX-60  
  PAPI  
  PRM  
  PRM SLEP  
  R-ACD  
  RAIL  
  RCE  
  RCL  
  RDVS I  
  RDVS II  
  RDVS IIA  
  REIL  
  REIL Nexgen  
  RL  
  RVR  
  RWCLL  
  RWSL  
  SALS  
  SALSF  
  SAMS  
  SATCOM  
  SATCOM DL  
  SDF  
  SMA (Atlanta)  
  SMA (Atlanta) Workstation  
  SMA (FFP1)  
  SMS Proto  
  SSALF  
  SSALR  
  SSALS  
  STARS  
  STARS EDC  
  STARS TDW  
  STMS  
  STMS WS  
  STVS  
  SWAP Enhancements  
  SWIM Segmt. 2  
  SWIM Segmt. 3  
  Shelters - Beacon-Only Site  
  TACAN  
  TDLS  
  TDWR  
  TDWR Display  
  TDWR SLEP  
  TDZL  
  TFMS - ETMS HW Up  
  TLS  
  TMA  
  TMA Display (FFP1)  
  TMA-MC Prototype  
  TPX-42  
  TSD  
  TWIP  
  UDMS  
  UHF Ground Radios  
  UHF Ground Radios - Repl  
  UPX-39  
  URET CCLD  
  URET National Deployment  
  USNS  
  VASI  
  VCSU  
  VHF Ground Radios  
  VOR  
  VOR Rpl  
  VSCS TR P1  
  VTABS  
  WAAS (SBAS)  
  WAAS Corrections Broadcast Service  
  WAAS Tech Refresh  
  WARP Stage 3  
  WARP TR  
  WM/LAT  
  WSP Display  
  WSP TR 1  
  WVS  

Mechanism Relative Quantities

Mechanism ID 1425
Last Update 12 / 17 / 2008
Last Certified: 12 / 17 / 2008


Data Last Updated On: 30-Jan-2009
NAS Toolset Version: 20090121 6.7.10
processing time: 1.25 seconds