61--Uninterruptible Power Systems (UPS ).

Solicitation Number: W911S8-06-Q-0031
Agency: Department of the Army
Office: Army Contracting Agency, North Region
Location: MICC Fort Lewis
  • Print
:
W911S8-06-Q-0031
:
Combined Synopsis/Solicitation
:
Added: September 8, 2006
This is a combined synopsis/solicitation for the purchase of commercial items, prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only so licitation. Quotes are being requested and a written solicitation will not be issued. Solicitation number W911S8-06-Q-0031 is applicable and is issued as a request for quotations. The solicitation and incorporated provisions and clauses are those in eff ect through Federal Acquisition Circular 2005-12 and DCN 20060814. This requirement is UNRESTRICTED with a NAICS Code of 335999 and a corresponding size standard of 500 employees. The description of the commercial item is Uninterruptible Power Systems (U PS ). Delivery shall be no later than November 10, 2006. A copy of the award document shall be distributed to to the DOL Central Receiving Point, Fort Lewis, WA 98433-9500. Acceptance will be at the destination. FOB point is destination. The selection resul ting from this request for quotations will be made on the basis of the lowest priced, technically acceptable quote from a responsible quoter. Once the Contracting Officer has decided to whom an order will be issued, a unilateral order will be issued using a SF 1449. A purchase order will be in existence once the Contracting Officer has signed the order. Provision 52.212-1, Instructions to Offerors-Commercial Items, applies to this acquisition. An addendum to this provision is applicable, in which paragr aphs (g) and (h) of FAR 52.212-1 are deleted. Wherever the words offer, proposal, offerors, or similar terms are used in this solicitation or any provision, they shall be read to mean quote, quotation, quoter, vendor or similar corresponding term to refle ct that this solicitation is a Request for Quotations, not a Request for Proposals or an Invitation for Bids. Local Fort Lewis clauses 52.111-4131, Commercial Vehicle Access to Fort Lewis  Fast Access Gate Program, 52.111-4132, Identification of Contract ors Employees  Fast Access Gate Program, and 52.111-4004, Electronic Commerce, apply to this acquisition. Local clause 52.111-4131 states: Procedures for commercial vehicle access to Fort Lewis are subject to change without prior notice. Current acces s information may be obtained by calling 1-877-RAPIDGATE (1-877-727-4342). (a) Unless the contractor voluntarily participates in the Fast Access Gate Program (see the clause entitled Identification Of Contractor's Employees  Fast Access Gate Program), co mmercial vehicle access to Fort Lewis will be allowed only at the Logistics Center Gate (Exit 123 from I-5) and through the D St. Commercial Vehicle Inspection Point on North Fort. Both gates are open Monday through Friday, excluding federal holidays. The se gates will be open for inbound commercial vehicle access and inspection between 0530 hours and 2100 hours. These gates may be closed on weekends (Saturdays and Sundays) and federal holidays. On Saturdays, Sundays, federal holidays, and on other days o n which these gates are closed, commercial vehicles must use the Main Gate (Exit 120 from I-5). Main Gate is open 24 hours per day everyday. A visitor pass must be obtained. All commercial vehicles will be searched. The Contractor should anticipate dela ys in getting commercial vehicles on post. The Contractor must also allow additional time for commercial vehicles to reach their destination by driving through Fort Lewis. If the commercial vehicle is carrying a load of cement concrete or hot asphalt con crete for delivery, the driver shall notify the gate guard as soon as possible and request that the vehicle be given priority for being searched; however, the Government does not guarantee that the vehicle will be given priority. On weekends large vehicle s (needing greater than 12'-5 inch clearance) will require a time stamped searched label to gain access to North Fort Lewis. Searched labels will be issued at the Main Gate, as appropriate. Drivers needing access to North Fort Lewis must inform the gate guard that their vehicle is over 12'-5 inch in height and that they will require access to North Fort Lewis. The driver will receive a briefing on pr oper procedures and a searched label. The Contractor shall ensure that its drivers, including drivers of subcontractors at any tier, comply with the procedures as explained to them for access to North Fort Lewis. (b) If the contractor participates in the Fast Access Gate Program, contractor vehicles may enter the installation through any fast access gate lane except at Force Protection Level Charlie or Delta. During Force Protection Level Charlie or Delta, all contractor vehicles must enter through the L ogistics Center gate or, if the Logistics Center Gate is closed, through the Main Gate. All passengers in the contractor vehicle must have a fast access identification card; otherwise, the contractor vehicle must enter through the Logistics Center Gate or the Main Gate, as appropriate and obtain visitor passes. Once the Fast Access Gate Program is fully implemented, fast access gate lanes will be at the Main (Liberty) Gate, the 41st Street Gate (North Fort Lewis), the East Gate, the DuPont Gate, the D Str eet Gate, the Logistics Center Gate, the Madigan Army Medical Center Gate, the Rainier Gate, the Transmission Line Gate, and the Scouts Out Gate. The contractor shall use only those lanes specifically marked as fast access lanes. (c) If the Fast Access G ate Program is terminated for any reason, the contractor will be allowed access only through the Logistics Center Gate or the D St. Gate or, when they are closed, the Main Gate unless the contractor is otherwise notified by the Contracting Officer. Local clause 52.111-4132 states: a. Each employee who requires access to Fort Lewis to perform work under any contract, at any tier, must obtain either a fast access identification badge or a visitors pass to obtain access to Fort Lewis. A fast access identi fication badge will only be issued to an employee, at any tier, if the employee requires access to Fort Lewis more than twice per week. Contractor employees, at any tier, who require access to Fort Lewis twice per week or less often or who do not particip ate in the Fast Access Gate Program shall obtain a visitors pass at the Main (Liberty) Gate or the Logistics Center Gate (or the DuPont Gate when the Logistics Center Gate is closed). The visitors pass will be issued for a maximum of 30 days at a time. A fast access identification badge will only be issued to contractor employees if the contractor participates in the Fast Access Gate Program. The Fast Access Gate Program is a voluntary program. b. The contractor shall provide information as required by the Fast Access Gate Program contractor (FAGPC), to enable the FAGPC to conduct a criminal history background check (CHBC) on contractor employees who are to have access to Fort Lewis. The contractor is responsible for paying the FAGPC any set-up fee a nd the fee per employee for conducting the CHBC and issuing the fast access identification card. If the CHBC is not adverse, a fast access identification badge will be issued by the FAGPC to the contractor employee. If the CHBC is adverse, the FAGPC is p rohibited from issuing a fast access identification badge to the contractor employee. If a fast access identification badge is denied for any reason, the contractor employee may only enter the installation by obtaining a visitors pass; however, if the co ntractor employee does not meet the criteria for being issued a fast access identification badge, the Government may, in its sole discretion, decide not to issue a visitors pass to the contractor employee. c. If an employee no longer needs an identifica tion badge for any reason (e.g., quits his/her job or no longer performs work under the contract), the contractor shall return the identification badge to the F AGPC within two (2) calendar days of such change. If the identification badge cannot be returned within the required time frame for any reason, the contractor shall immediately notify both the FAGPC and the Contracting Officer verbally, followed up in wri ting the next work day. An employees inability to obtain entrance to a Government installation because he/she does not have the required identification badge or visitors pass shall not excuse timely performance of the requirements of this contract. The FAGPC or the Government may change the location at which identification badges are issued or returned, with or without advance notice to the contractor. Any such changes shall not be a basis for adjusting the contract price under any clause of this contr act. d. Fast access identification badges shall not be reproduced or copied by the contractor, its subcontractors, or their employees. If an employees identification badge is lost, stolen, or reproduced, the contractor shall verbally report the loss, t heft, or reproduction to both the FAGPC and the Contracting Officer on the day such loss, theft, or reproduction is discovered, followed by a written report of the circumstances to both the FAGPC and the Contracting Officer within one (1) calendar day afte r the loss, theft, or reproduction is discovered. e. Each contractor employee shall wear the fast access identification badge while performing work under the contract. The identification badge shall be worn on the upper front of the outer garment unless precluded by OSHA regulation(s). The identification badge shall not be used for access to any Government installation except for performance of work under the contract for which it was issued. f. The contractor shall, upon expiration or termination of the contract, collect all identification badges and turn them in to the FAGPC. The final invoice will not be considered proper for purposes of the Prompt Payment Act (FAR 52.232-25 or FAR 52.212-4(i)) until all identification badges have been accounted for . g. If the Fast Access Gate Program is terminated for any reason, the contractor will be notified by the Contracting Officer as to whether the fast access identification cards will remain valid (and, if so, for how long) and which gate(s) may be used fo r access to the installation. Local clause 52.111-4004 states: In accordance with the FAR Part Two electronic commerce definition and FAR Subparagraph 4.502 (Electronic Commerce in Contracting Policy), the Contractor shall communicate with the Government utilizing electronic mail. Quoters are required to submit completed copies of the provisions at FAR 52.212-3 and its ALT I, Offeror Representations and Certifications-Commercial Items, and DFARS 252.212-7000, Offeror Representations and Certifications - Commercial Items with their quotes. FAR clause 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition and does not include any addenda. FAR clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Ex ecutive Orders, Commercial Items, applies to this acquisition. The following clauses within 52.212-5(b) are applicable to this acquisition: 52.222-3, 52.222-19, 52.222.21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, and 52.232-33. FAR Clause 52.211-6, B rand Name or Equal, is applicable. If quoting an equivalent item, please email the description with specifications of the item you are quoting. The Contracting Officer will evaluate equal products on the basis of information furnished by the quoter or id entified in the quote and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the quote. Unless the quoter clearly indicates in its quote that the product being offered is an equal product, the quoter shall provide the brand name product referenced in the solicitation. The following are the minimum salient charac teristics. CLIN 0001 Uninterruptible Power Systems (UPS ). Quantity 25 Each. IHT1500RM-DI-Isol-FC-PFC Bright UPS Global Input Double Conversion Rugged, High Temperature Isolated On Line UPS System with Frequency Conversion and Power Factor Conversion. Technical U PS Requirements: Operate on Japanese, Thai, Korean, Taiwan, and U.S. power as a minimum (voltages between 100 volts [V] and 240 V at 50 OR 60 Hertz [Hz]). Capable of plugging into a 15 amperes outlet (standard U.S.). Device will support at least 1000 wa tts (W) of equipment or 1500VA. Device will supply 120V of 60Hz power for at least 5 minutes with a 1000W load. Operate in high temperature environment. Replaceable batteries. Unit rack mounted and military/ruggedized. Conversion Rugged High Temperat ure Isolated On Line UPS System with Frequency Conversion and Power Factor Conversion. Rating: 1500VA, 1050W; Input Voltage: Autoselect, 120VAC or 230VAC (-25% +15%); Input Frequency: 50/60Hz; PFC Feature: Input Power Factor Correction (0.99); Isolati on: Galvanic Input Isolation Transformer; Output Voltage: 120VAC, ±3%; Output Frequency: 60Hz with Frequency Conversion; Operating Temp: -15C to +50C; Communications: RS232 port, Opto-isolated; Batteries: 5 each 12V7AH (60VDC); Run Time: Approximate ly 9-10 minutes with 1000W load. Manufacturer: IntelliPower, Inc. P/N: IHT1500RM-DI-Isol-FC-PFC UPS Global Input Double. Or Equal. DFARS 252.212-7001, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items is applicable, to include under paragraph (a) 52.203-3 and the following clauses in paragraph (b): 252.225.7001. The complete text of the Federal Acquisition Circulars, DFARS Change Notices, and FAR and DFARS clauses and provisions are available at the following internet site: http://farsite.hill.af.mil or http://www.arnet.gov/far. Telephonic inquire s will NOT be accepted. Quotes are due on September 14, 2006 at 06:00:00 A.M. Pacific Standard Time. Quotes must be sent electronically along with the completed representations and certifications, providing the business size, e-mail address, Dunn and Br adstreet number, CAGE code and Federal Tax ID number to Mrs. Darlene Anderson, darlene.anderson@us.army.mil. Quoters must be registered in the Central Contractor Registration database at www.ccr.gov to be considered for selection. The combined synopsis/so licitation will be available for download from the Fort Lewis Contracting Office web site at http://www.lewis.army.mil/doc. Federal Business Opportunities. No numbered notes apply to this combined synopsis/solicitation.
:
ACA, Fort Lewis, Directorate of Contracting, Building 2015, Box 339500, Fort Lewis, WA 98433-9500
:
ACA, Fort Lewis Directorate of Contracting, Building 2015, Box 339500 Fort Lewis WA
98433-9500
:
Darlene Anderson, 253-966-3474

ACA, Fort Lewis