AZ0048 1. VIEW OF COMPLETED BRIDGE LOOKING TOWARD NORTH ABUTMENT 2. COMPLETED STRUCTURE SHOWING TUNNEL AT SOUTH APPROACH 3. VIEW LOOKING ALONG BRIDGE TOWARD TUNNEL OF SOUTH APPROACH. MAIN CABLE TUNNELS ALSO SHOWN 4. PACK TRAIN WAITING TO BE UNLOADED AT FOOT OF YAKI TRAIL. APPROXIMATELY TWO-AND-ONE-HALF TONS OF STEEL ON ANIMALS SHOWN. NOTE COIL OF 1-1/2" WIND CABLE IN FOREGROUND. 5. VIEW OF STORAGE YARD SHOWING PACK TRAIN BEING UNLOADED 6. COMPRESSOR AT SOUTH RIM OF TONTO PLATEAU BEING TAKEN DOWN TRAIL TO THE BRIDGE BY HAND 7. SHOWING METHOD OF SLEDDING WIND CABLE DOWN YAKI TRAIL TO THE BRIDGE, WEIGHT OF CABLE AND DRUM APPROXIMATELY 2200 POUNDS 8. VIEW SHOWING "GO-DEVIL" USED IN SLEDDING WIND CABLE TO BRIDGE 9. VIEW SHOWING OLD KAIBAB SUSPENSION BRIDGE 10. EXCAVATION IN ROSE GRANITE FOR NORTH UPSTREAM CABLE ANCHOR 11. SOUTH ANCHORAGES OF MAIN CABLE 12. DRILLING IN ROSE GRANITE FOR NORTH UPSTREAM CABLE ANCHOR 13. VIEW OF STORAGE YARD AND ASSEMBLING PLATFORM. BLACKSMITH SHOP UNDER CANVAS FLY IN RIGHT FOREGROUND 14. RIVETING TRANSOMS IN STORAGE YARD, SOUTH OF SOUTH PORTAL OF TUNNEL 15. TUNNEL WORKERS AT SOUTH PORTAL OF TUNNEL. NOTE RESPIRATORS AND GOGGLES. AIR LINE FROM COMPRESSOR IN FOREGROUND 16. RIGGER ASTRIDE 7/8" CABLE MAKING HITCH TO HAUL UP MAIN CABLE 17. PULLING UP NEW CABLE BY MEANS OF 30-TON STUMP PULLER 18. LAYING OFF MAIN CABLES FOR HANGERS 19. UNLOADING CONCRETE FROM SKIP INTO SOUTH CABLE ANCHOR FORM 20. VIEW AT SOUTH PORTAL OF TUNNEL SHOWING COMPRESSOR, AIR HOIST, CONCRETE SKIP, HIGH LINE TO SOUTH CABLE ANCHOR DEADMAN AND ROCK FILL FOR SOUTH APPROACH TRAIL 21. SHOWING TRANSOM AND HANGER ASSEMBLY. VIEW LOOKING NORTH 22. TRANSPORTING STEEL FLOOR PLATES ON HAND CART TO NORTH END OF BRIDGE. NOTE RETAINING ANGLE FOR SURFACING AT CUT-SIDE EDGE OF FLOOR PLATES. NOTE TUNNELS IN TOP OF ROCK FACE FOR MAIN CABLES 23. TRANSPORTING LAST STRINGER AND INTERMEDIATE FLOOR BEAM ASSEMBLY TO NORTH END OF BRIDGE ON HAND CART 24. SOUTH UPSTREAM WIND CABLE ANCHOR. NOTE METHOD OF REACHING ANCHORAGE 25. VIEW SHOWING RELATIVE LOCATION OF OLD AND NEW CABLE SYSTEMS AT NORTH CABLE SUPPORT 26. NEW STEEL BRIDGE COMPLETED ASSEMBLED. OLD BRIDGE BELOW. U.S.G.S. GAGING STATION IN RIGHT BACKGROUND. VIEW LOOKING NORTHEAST 27. PHOTOCOPY OF HISTORIC DRAWING, GENERAL ELEVATION INCLUDING TRUSS DETAILS. K.A. Kitterdge, Chief Engineer, February 1928 28. PHOTOCOPY OF HISTORIC DRAWING, DETAIL OF SUPPORT FOUNDATION. K. A. Kitterdge, Chief Engineer, February 1928 29. PHOTOCOPY OF HISTORIC DRAWING, DETAIL OF SEAT FOR CABLES. K. A. Kitterdge, Chief Engineer, February 1928 30. PHOTOCOPY OF HISTORIC DRAWING, DETAIL OF HANGER CONNECTIONS. K. A. Kitterdge, Chief Engineer, February 1928