Schedule and Deliverables ------------------------------------------------------------------------------- Item Date ------------------------------------------------------------------------------- Prototype: Finish sub-circuit layouts and simulations 08/96 completed Complete Elefant IC global layout 08/96 completed Finish chip level simulations 11/96 completed Complete layout verification procedures 11/96 completed Submit Elefant IC to MOSIS 11/96 completed Receive bare die from MOSIS 1/97 completed Complete tests of prototype 4/97 completed Preproduction: Complete rework of SRAM, analog rcvr. 3/97 completed Reintegrate sub-circuits 4/97 completed Finish chip-level simulations 4/97 completed Complete layout verification procedures 4/97 completed Submit Elefant IC to MOSIS 4/97 completed Receive bare die from MOSIS 6/97 completed Start testing of front end assembly (w/ prepro Elefant IC) 7/97 completed Complete tests of preproduction 9/97 completed Production: Complete rework of analog rcvr. 9/97 completed Reintegrate sub-circuits 9/97 completed Finish chip-level simulations 9/97 completed Complete layout verification procedures 9/97 completed MOSIS production submission of Elefant IC 10/97 Wafer fabrication completed 12/97 Wafer diceing 12/97 Packaging at ASAT 1/98 Complete testing of first batch of chips 3/98 Complete testing of 2000 chips 4/98 Deliverables ------------ Mar. 98 928 Tested Functional, packaged Elefant Digitizer ICs. Apr. 98 Remaining spares.