Wright Special - User Selected MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 DEFICIENCIES REPORT - DETAILED Report Date: 02/25/04 Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 1 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== E003N 06/11/02 MSWW MRG00 2605-34712-001 2605 10/19/03 06/11/02 03 04-03-A-02 20 $133000.00 $0.00 SP 09/30/03 DESCRIPTION: PORT AND STBD ANCHOR WINDLASS MG SET Provide labor, material and equipment to replace the exiting MG Sets with Solid State Control Units. E005N 08/03/02 MSWW EGD20 6105-19899-002 6105 10/01/03 08/03/02 03 04-03-B-02 22 $7400.00 $7400.00 SP 06/24/04 39AOMWRT04S406 DESCRIPTION: No.1 SSTG Tachometer/Frequency Meter. Provide labor, equipment and material to renew the Tachometer on No.1 SSTG local meter panel. Provide and renew Frequency Meter on engine control stand, Generator meter section. E011A 02/10/03 MSWW NAV00 - - 6701 10/01/03 10/01/03 03 04-03-A-02 22 $20000.00 $1.00 SP 03/31/04 39AOMWRT04S324 DESCRIPTION: AUTOMATIC IDENTIFICATION SYSTEM (AIS) Provide labor, material and equipment to install new Universal Shipborne Automatic Identification System (AIS) on board the vessel.The new AIS installation shall meet the USCG Class A meeting the requirement of IMO AIS carriage. Upon the installation is completed, test the system and obtain USCG Certificate. E144C 05/05/99 SMDW EGD90 - - 6101 10/30/03 / / 03 04-03-B-02 20 $137500.00 $0.00 SP / / DESCRIPTION: MOORING WINCHES MG SET CHANGOUT TO SOLID STATE Provide labor and materials to change three mooring winches from the current MG sets to solid state deveices. The contractor shall coincide with the SS Curtiss plans and approvals. E158C 05/22/00 SMDW AUT00 9505-WRNEI-00D 9505 12/31/03 / / 03 04-03-B-00 20 $10000.00 $0.00 SP / / DESCRIPTION: FY04 APACS/BURNER MNGEMNT TUNE UP Conduct an annual apacs and boiler mangement survey and calibration. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 2 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== E165C 07/11/01 IAEMS EGD10 - - 6105 10/15/03 10/01/03 03 04-03-A-02 22 $2500.00 $2500.00 SP 06/30/04 39AOMWRT04S406 DESCRIPTION: S.S.D.G. HEATER WIRING BREAKDOWN. As per EMS survey done on EMD diesel generator during recent yard period the following condition was found: 1) Insulation on the heater wiring found to be defective. G011N 01/27/00 MSWW REG00 - - 0701 10/01/03 01/27/00 03 04-03-A-01 20 $18000.00 $0.00 SP / / DESCRIPTION: BI-ANNUAL REG REQUIREMENTS FY04 Issue purchase orders to conduct required bi-annual Regulatory Body surveys and inspections. A. American Bureau of Shipping.................$ 2000 A.01 Port Boiler Inspection.............$ 1000 A.02 Starboard Boiler Inspections.......$ 1000 A.03 Safety Construction Certificate....$ XX,XXX A.04 Drydock (ABS)......................$ XX,XXX A.05 Other (identify).MTS OFF ........$ 1000 B. U. S. Coast Guard...........................$ 7000 B.01 Boiler Inspections.(SURVEY/HYDRO)..$ 7000 B.02 Unfired Pressure Vessels...........$ XX,XXX B.03 Certificate of Inspection..........$ XX,XXX B.04 Safety Equipment Certificate.......$ XX,XXX B.05 Drydock (USCG).....................$ XX,XXX B.06 Other (identify)...................$ XX,XXX C. Regulatory Body Fees........................$ 9000 C.01 American Bureau of Shipping........$ 2000 C.02 U.S. Coast Guard...................$ XX,XXX C.03 Other (identify).IND ASSIST........$ 7000 Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 3 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G056A 05/11/98 MSFH MNT10 - - 0105 10/01/03 12/29/03 03 04-03-A-00 23 $100000.00 $80000.00 SP 12/31/04 39AOMWRT04S403 DESCRIPTION: ROS PHASE IV SUPPORT (FY04) Issue purchase orders in support of Reduced Operating Status (ROS) operations. Costs shown are ABOVE or IN LIEU OF those costs which ARE currently included as part of the Ship Manager contract and/or Outport contract. See Note 1 and Reference. A. Vessel Support Services...................$ 7,000 B. Security/Guard Service....................$ 00 Note: If shared by more than one vessel, divide amongst vessels. C. Material Handling.........................$ 00 D. Warehousing/Storage.......................$ 00 E. Crew Support..............................$ 2,000 (Medical/Travel/Training) F. Overtime..................................$ 12,000 G. Consummables (Deck/Engine)................$ 8,500 Note: Replacement of consumable supplies currently listed on vessels outfitting inventory; i.e., flashlights, wrenches, dinnerware, glassware, charts, publications, etc. H. Phase IV Emerging Repairs (See Note 2)....$ 10,000 Note: To correct minor deficiencies found during routine tests/inspections. I. Phase IV Supplies.........................$ 7,000 (Lubricants, greases, rags, etc.) J. Containment Boom Servicing/Maintenance....$ 3,500 Notes: (1) This DSN supplants the former ROS Crew Incidentials and Pphase IV Emerging Repairs standard DSNs. (2) MARAD HQ shall be notified of any urgent need for additional funds for emergent repairs when the amount within this line item is insufficient to cover the requirement. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 4 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G059A 12/10/97 MSGM REG00 - - 0701 10/01/03 / / 03 04-03-A-01 20 $55000.00 $0.00 SP / / DESCRIPTION: ANNUAL REGULATORY SURVEYS FY 04 Issue purchase orders to conduct the following annual Regulatory Body surveys and inspections. See Reference. A. American Bureau of Shipping (ABS)........$ XXX,XXX A.01 Reefer Plant Survey.............$ XX,XXX A.02 Cargo Gear Survey...............$ XX,XXX A.03 Hull Survey.....................$ XX,XXX A.04 Load Line.......................$ XX,XXX A.05 Machinery and Electrical........$ XX,XXX A.06 Special Survey (RRF)............$ XX,XXX A.07 Mandatory Survey (Annual).......$ XX,XXX A.08 Other...........................$ XX,XXX A.09 Other...........................$ XX,XXX B. United States Coast Guard (USCG).........$ XXX,XXX B.01 Radiotelegraph Certificate......$ XX,XXX B.02 Bridge to Bridge Certificate....$ XX,XXX B.03 Life Rafts......................$ XX,XXX B.04 Certificate of Documentation....$ XX,XXX B.05 Firefighting Equipment Inspect..$ XX,XXX B.06 Mid-Term COI....................$ XX,XXX B.07 Financial Responsibility Cert...$ XX,XXX B.08 Other...........................$ XX,XXX B.09 Other...........................$ XX,XXX C. Regulatory Body Fees.....................$ XXX,XXX C.01 American Bureau of Shipping.....$ XX,XXX C.02 U. S. Coast Guard...............$ XX,XXX C.03 Other...........................$ XX,XXX C.04 Other...........................$ XX,XXX D. Industrial Assistance....................$ XXX,XXX D.01 Labor (XXX MH @ $XX/MH).........$ XX,XXX D.02 Materials.......................$ XX,XXX D.03 Fee.............................$ XX,XXX D.04 Other...........................$ XX,XXX REFERENCE: Check MARTS SRV File Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 5 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G136A 04/28/00 MSWW HAB00 - - 9900 10/30/03 05/11/00 04 04-03-C-02 23 $23000.00 $23000.00 SP 06/24/04 39AOMWRT04S406 DESCRIPTION: FURNITURE FOR CREWS QUARTERS Most the desks and all chairs installed in Officers, Crews and Marine quarters were damaged or missing. The chairs are originally from the ship builder wood furniture. Purchase and replace approximately 150 chairs in the state rooms and repair the damaged writing desks. REFERENCE: Work spec in COTR office. SS WRIGHT FY-2002 MARTS DSN spec diskette. G141A 06/11/02 MSWW - - 1108 10/30/03 06/11/02 03 04-03-B-01 22 $8200.00 $8200.00 SP 06/24/04 39AOMWRT04S406 DESCRIPTION: TANK TOP AND E.R. BILGE PLATING Provide labor, material, and equipment to check and inspect the machinery space bilge and cargo hold tank top steel plating condition. Provide services of qualified ultrasonic technicians to take ultrasonic thickness gaugings on machinery spaces bilge steel plating and cargo hold tank top steel plating. Approximately 380 reading shall be taking. Prepare condition reports with the ultrasonic gauging readings in three (3) copies to the Port Engineer. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 6 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G160R 12/18/97 MSGMM STM10 - - 5101 08/15/04 / / 03 04-03-B-03 20 $3200.00 $0.00 SP / / DESCRIPTION: ANNUAL AUX BOILER INSPECTION 04 AUX PIERSIDE BOILER DOES NOT FALL UNDER JURISDICTION OF REGULATORY BODIES AND THE LOCAL GOVT. MARAD MUST CONDUCT ANNUAL INSPECTIONS IAW NATIONAL BOARD RULES AND INFO REPORTS TO NATIONAL BOARD. A CERTIFICATE OF INSPECTION AND INSPECTION RECORD MUST BE MAINTAINED WITH THE BOILER. OPEN OUT AUX BOILER FOR INTERNAL INSPECTION. OPEN THE FIRESIDES BOTH ENDS. OPEN THE MANWAY FOR WATERSIDE EXAMINATION. HYDRO BOILER TO 100% MAWP. TEST SAFETY VALVES. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 7 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G168R 08/11/03 MSTB MNT15 - - 0109 10/31/03 08/11/03 03 04-03-A-00 20 $100000.00 $0.00 SP / / DESCRIPTION: SUPPLEMENTAL/EMERGENT REPAIRS This Standard DSN Is intended to provid a vehicle for the SOMO/SSR to authorize funding of requirements (DSNs) of a supplemental/emergent repair nature WITHOUT requesting a SLAP and/or without MAR-611 approval. (1) Supplemental/emergent repair requirements (DSNs) are herein defined STRICKLY (limited to) as follows: (a) Supplemental - additional work, NOT OUTSIDE the scope of the original requirement/DSN, necessary to complete the defined original requirement: and/or (b) Emergent Repair - additiornal work/repairs, considered NECESSARY (Mandatory/Essential) to accomplish as part of of on-going existing work, that cannot be deferred. (2) Each specific requirement requiring funding from this Standard DSN must have its own RRF-MARTS DSN. (3) This standard DSN SHALL, NOT be issued as a task order to the Ship Manager. The funds available within this standard DSN shall be treated as a draw account for funding requirments (DSN's) of a supplemental/emergent repair nature ONLY as defined above. Note: For the purpose of RRF-MARTYS tracking and accounting, the letters "ZZZ" shall be assigned in the funding/to reference field of this Standard DSN. The following ststus codes apply to this DSN: Status: 01/20/21/99 MEI...: 0109 SAC...: MNT15 (4) Requirements (DSN's) for additional work/funding using RRF funds allocated (Estimated Coast) to this standard DSN MUST: (a) be approved by the Region SOMO/SSR - Status Code "26"; (b) be issued as a mod to the Task Order by the ACO; and (c) be assigned the Task Order number of the parent DSN; or if necessary, assigned a new Task Order number. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 8 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== H008N 06/11/02 MSWW SAF00 - - 0115 10/01/03 07/20/02 03 04-03-B-00 20 $10000.00 $0.00 SK 09/30/03 DESCRIPTION: INTRUSION ALARM SYSTEM Provide labor, material, equipment and engineering services to modify the existing General Alarm System to be used also as an Intrusion Alarm System when the ship is at layberth or anchorage. Provide and install two (2) additional alarm contact makers and connect with the existing General Alarm System. One (1) each on Port and Stbd side gangway area. H009A 12/12/97 MSGM SAF10 - - 8215 01/31/04 / / 03 04-03-A-01 20 $28000.00 $0.00 SP / / DESCRIPTION: ANNUAL INSPECT OF LIFE RAFTS FY04. H102C 03/22/00 SMDW CGO50 2422-79605-009 2422 09/30/04 / / 03 04-03-B-02 20 $50000.00 $0.00 SP / / DESCRIPTION: RENEW GASKETS ON #5 HATCH COVER The gaskets on the hatch covers are so compressed that the hatch cover now rests on the coaming. This is causing corosion on the cover and coaming as well as leaks into the holds. Remove the #4 port, starboard and centerline hatch cover gaskets in their entirey. The old gasket to be removed, the channels mechanically cleaned, primed and painted. The new gasket to be installed shimming where required to allow for proper compression. Clearances to be taken to verify proper thickness of gaskets. All work to be completed under the supervision of the Tech Rep (Hamworthy). Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 9 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== M337C 05/05/00 SCCE STM50 - - 4825 01/15/04 05/05/00 03 04-03-B-02 22 $15000.00 $15000.00 SP 06/24/04 39AOMWRT04S406 DESCRIPTION: 850/135# REDUCING STATION VALVE. Reducing station regulating valve that is presently installed does not control on the low end thus causing continuous flucuations of the 135# system - most notably the atom. steam system. Present valve has been removed and repaired/tested but still proves unsuitable for current application. REFERENCE: Work spec in COTR office, SS WRIGHT FY-2002 MARTS DSN spec diskette. M369C 08/10/02 SCCE FLD10 - - 4801 10/01/03 10/01/03 04 04-03-C-02 22 $3200.00 $3200.00 SP 06/24/04 39AOMWRT04S406 DESCRIPTION: F.O.SERV.PUMP DISCH. TO D.B. TK. Provide piping connection for removing water from fuel at boiler burner fronts. Tee into recirc. piping- with isolation valves -and discharge into E.R.D.B. Port tank sounding tube piping. M371C 08/11/02 SCCE FLD40 - - 4820 10/01/03 10/01/03 04 04-03-C-02 22 $3200.00 $3200.00 SP 06/24/04 39AOMWRT04S406 DESCRIPTION: S.W. SERVICE PUMP VALVES. All (4) S.W. service pump suction and discharge valves leak by so excessively that neither pump can be totally isolated when the need arises. Replace - with (4) - new valves. M373C 08/12/02 SCCE FLD80 - - 4801 10/01/03 / / 03 04-03-B-02 20 $3000.00 $0.00 SK / / DESCRIPTION: #6 PORT OUTBD. D.B. BALLAST TANK. Unable to pump water in or out of ballast tank. Suspect either valve gate seperation or foreign material blockage of suction/discharge piping. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 10 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== M378C 08/08/02 SCCE CGO50 - - 2423 10/31/03 / / 03 04-03-A-02 20 $145000.00 $0.00 SP / / DESCRIPTION: RO-RO DECK HATCH COVERS. The following ro-ro deck hatch covers have failed during recent USMC exercise: #5 center/#4 port aft/#6 port aft. Following info: The #5 fwd. center hatch cover does not actuate in the raise position. Have changed out flow-control valve in control stand cabinet and cover still does not function. The #4 port aft cover sequence valve plunger setting has to be changed depending on raising/lowering. The #6 port aft cover indicates a defective sequence valve and/or defective cylinder(s). Cover does not raise correctly and when lowering the cover will rack to one side because of improper cylinder actuation. Upon completion of the indicated repairs, conduct a full phase IV proceedure on all hatch covers. Document any emergent additional repair requirements and, if authorized by COTR, complete additional repairs with any remaining funding. M382C 08/01/02 SCCE FLD10 - - 4820 10/01/03 10/01/03 03 04-03-B-02 22 $1800.00 $1800.00 SP 06/24/04 39AOMWRT04S406 DESCRIPTION: F.O.SETT.MANUAL AND DRAIN VALVES. Due to water in the fuel oil during previous (2) exercises and it's subsequent effect on plant operations, recommend following: (1) Remove and- replace with manual operated valves- low f.o. service pump suction valves on all (4) settlers. Valves are presently hydraullically operated and are either fully open or fully close. (2) Install low-point drain valves on all (4) settlers to enable locating and draining off any water contamination. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 11 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== M383C 10/04/02 SCCE CGO50 - - 2423 10/10/03 / / 03 04-03-B-02 20 $45000.00 $0.00 SP / / DESCRIPTION: RO-RO DECK HATCH COVERS: PART #2 Upon just completed extensive operation and testing of all 2nd deck hatch covers two pages of misc. repair items have been generated. Recommend request assistance and expertise of Joe Connely - Hamworthy-Kvearner - to assist and support repair completions. M384C 10/04/02 SCCE CGO50 - - 2423 10/10/03 / / 03 04-03-B-02 20 $8500.00 $0.00 SK / / DESCRIPTION: #2 HOLD CENTER AFT 2ND DECK HATCH. The port aft pivot block needs to be shimmed and welded on fwd. end and sides of the block. This pivot block recieves the hatch cover leaf clevis to ensure proper opening of the entire hatch cover. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 12 02/25/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Wright C-Rating: C5 - Major Repairs Underway/R-Status AFFECTED Location: O-BAL - Baltimore, MD R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: TJB - Timothy J. Baka SM/GA...: AOM - American Overseas Marine Corp. COTR....: NTB - Norwood T. Bailey ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== Total of Estimated Costs...: $ 930,500.00 Total of OBLG/ACT Costs......: $ 0.00 Total Cost of Printed Items: $ 930,500.00 **** End of Report ****