Draft Agendas for Upcoming DAQ Upgrade Meetings =============================================== Time: every Wednesday starting at 1:00pm (unless noted as a Workshop) Place: B0 video conference room Jan 6 EquipDB status John Yoh Global DAQ architecture Jim Patrick 1st iteration on B0 commissioning schedule Hans Jensen Jan 13 Sign off on the trigger raw data banks Jonathan & Co Status of TSI production Andrew Martin Status of SRC production Petar Maksimovic Status of TRACER production Terri Shaw Status of online software Steve Vejcik/Steve Nahn Jan 20 Summary report on wedge test Steve Hahn Status on Slow Control System Sam Segler DBANA prototype at B0 Jack Cranshaw Timing-in signals at B0 wedge test - calorimeter Hahn/Cordelli - shower max system Drake/Lindgren - muons Holloway Jan 27-29 *** Annual workshop *** at UCLA Feb 3 ** No meeting ** Recovering from workshop Feb 10 ** No meeting ** Special Topic's day Feb 17 B0 computing infrastructure Jim Patrick B0 network - Overview & status JJ Trigger Inhibit crate status John Elias COT calibration Kevin Pitts Muon calibration Steve Errede TDC online software Frank Chlebana/Aurore - overall architecture - task list, schedule, manpower Feb 24 Calorimeter calibration Mike Lindgren & Co CCal card status Michele Gallinaro SMX calibration Steve Kuhlmann SMX electronics status Lindgren/Drake Software in Calrometer Crate CPU Frank Chlebana - compile list of software to be reside - CPU run time needed by each board - program execution and run start up sequence during normal data taking - overall architecture and configuration - evaluation plan for MVME2300 Mar 3 Comments from Cable Review Committee Elias & Co Run Control Jim Patrick Status of calibration database access Jack Cranshaw B0 network - updates (PC & etc) JJ Report from TDC full crate test Orejudos/Wilson Mar 10 Electronics Infrastructure update Wilson/Roser power supply, crate, cooling power distribution rack monitoring, rack/cable installation, etc SVX electronics production status Slawak Tkaczyk Discussion on SVT track fitter Tsuyoshi Nakaya Status of Level2 processor prototype Stephen Miller/Myron Discussion on Level2 Software - sketch Myron Mar 17 ADMEM sign-off : performance summary Hahn, Budd, Wei, Niu DIRAC sign-off : performance summary Culbertson Mar 25-26 *** 2nd Workshop on Online Software *** Mar 31 TDC sign-off : performance summary Kelly, Myron, Wilson, Orejudos, Patrick Lv1 Decision integration test (including software) Lv1 Decision PreFRED + FRED Feild/Grosso-Pilcher Apr 7 Status of Lv2 Decision crate interface modules cal interface John Carlson muon interface Ron Moore track interfaces Jane Nachtman ReCES Karen Byrum Lv1/Lv2 interface Greg Feild Discussion on Level2 Software - THE PLAN Myron Apr 14 Run2 Log book - Online Web base Elog Vidal VRB sign-off : performance summary Nahn/Patrick TSI system in B0 Schmidt/Martin Clock system in B0 Chappa/Maeshima Apr 21 Calorimeter trigger integration test Amaral/Tecchio (including software) Lv1 cal + Lv2 cal DCAS sign-off : performance summary Monica Tecchio L2ISO sign-off : performance summary Bob Blair Wedge test progress report Steve Hahn Apr 28 Online-Offline common issues * Overview Patrick/Shapiro * Analysis tools Kennedy & Kennedy (histograming, event unpacking etc) * Event display D. Litvintsev * Database Cranshaw/Lancaster /Proudfoot/Vidal May 5 XFT sign-off : performance summary XFT group Online Monitoring packages - progress Steve Vejcik & Co May 12 XTRP status Holloway/Kasten Electronics Infrastructure update Wilson/Roser power supply, crate, cooling power distribution rack monitoring, rack/cable installation, etc May 19 Event Builder MIT Level 3 Trigger MIT/Rochester Consumer Server/Data Logger Tony Vaiciulis May 26 CLC status report & near term plan Andrei Nomerotski Jun 3 ADMEM production status Nelson/Shaw (TBC) TDC production status Myron Report from PCB Review DeMaat Report from Cable Review Committee Elias & Co (TBC) Jun 10 DIRAC production status Ray Culberson CrateSum sign-off : performance summary Nancy Lai Discussion - What people need & want at B0 Wilson test equipment, computers, cabinets, desks, lockers, phones, sleeping carts, wake up calls... Jun 17 No Meeting - Lehman Review Jun 24 Slow Control system status Sam Segler/John Yoh Online DataBase Status Umesh Joshi Jul 1 Power Supply Sign-off Mike Kirk SMC sign-off: performance summary Drennan, Kuhlman/Proudfoot Jul 8 Cancelled Jul 15 Electronics Infrastructure - Status Wilson/Roser FRED & PreFRED sign-off : performance summary Feild/Grosso-Pilcher Run Control - Status Chlebana/Patrick TS system Status Andrew Martin Jul 22 SVT sign-off (Part I): performance summary SVT group Hit Finder, AM, AMS Aug 5 XTRP status Kasten/Holloway Muon Trigger status Eric James SVT sign-off (Part II): performance summary SVT group Track Fitter, Spy Control Aug 12 Cancelled Aug 19 DAQ and Clock Infrastructure cabling plan Lewis Including: Rack, Crate and CPU naming conventions Aug 26 Sep 2 Clock Installation Plan Chappa/Maeshima Wedge Test Status and Plans Calorimeter and HAD ASD Hahn/Gris Muon Eddy Shower Max Kuhlman Sep 9 Run Initialization Fest: Run Control Architecture Chlebana Front-end Needs and Implementation: Meyer ADMEM and TDC Front-end Needs and Implementation: SVX Nahn/Gay TSI Needs and Implmentation Martin L1 Trigger Needs Feild and Koehn L2 Trigger Needs Miller Database Issues Vidal Sep 16 XTRP Status Report Kasten Calorimeter Calibration Software Hahn Sep 23 No meeting - Silicon DAQ in CDF Commissioning Meeting Sep 30 LOCOS & CLIQUE sign-off: Monica Tecchio performance summary Oct 7 L1 Cal status and installation Plan Frisch/Culbertson How will this be used for cosmics? What Software and hardware resources are missing/kludged to get it working now vs during Run? What software teststand functionality will be needed in B0? Oct 14 CMU ASD and TDC Status Eddy Muon Trigger status and installation plan: James Does the chain work? How would it be used for Cosmics? What Software and hardware resources are missing/kludged to get it working now vs during Run? What software teststand functionality will be needed in B0? Oct 21 Collaboration Meeting Oct 28 TSI, EVB, and Partitions - Integration Status and plans (including Trigger & Scanner Managers) Zhaoou Yu/Frank Weurthein How will Partitioning be managed and operated now and later? Are TM-SM-EVB on same page? Nov 4 L1 calorimeter Trigger Software Discussion (on) Culbertson, Hahn, ... Nov 11 Calibration Issues Calibration Database Status Cranshaw 10 min Database Access Prototyping Vidal 20 min Interface of Calibrations with R-C - needs, existing code and plans: Calorimeter + Status of DBANA Vaia 20 min Showermax Proudfoot 10 min SVX Nahn/Gay 15 min COT Orejudos 10 min Muons Eddy 10 min Nov 18 DAQ error logging and messaging Patrick/Chlebana (on) SMXR sign-off: performance summary Kuhlmann/Proudfoot XTRP Status, XFT/XTRP Integration Tests Kasten/Koehn/Dittman XFT Installation Plans XFT Group Software and Hardware Needs Nov 25 Thanksgiving Dec 2 Calibration Fest 2 Calibration Operations StDenis/Cranshaw 30-40min Calibration Consumers Cranshaw 20 Database Fest (on) Online Databases Patrick Accessing Techniques Chlebana/Vidal Front-end Needs: SVX Nahn/Gay ADMEM/Showermax Gris/Proudfoot Muon and COT Miao/Pitts/Eddy L1 Trigger Needs Amaral and Dittman L2 Trigger Needs Miller Dec 9 DAQ Monitoring, Test/Diagnostic Software: Vejcik/Chlebana/? -Future of CDFVME -Rollover of Teststand software to use during Run -Management of test/diagnostic software during run -System (DAQ-nonConsumer) Monitoring Dec 16 COT Test Software (on) XFT Teststand Dec 23 Holidays Dec 30 Holidays