United States Department of Transportation (USDOT) TRIS Online small green bullet TRT small green bullet NTL Catalogs
NTL Integrated Search
National Transportation Library
Transportation Research Board
Transportation Research Board
Of the National Academies
New Search Browse Advanced Search Search History Marked Records TRT Help

TRIS Online Record

Printable View
Title GVT 170/250 MPH DEMONSTRATOR COST AND TIMESCALE
Accession No 00242139
Authors EDWARDS, L K; Skov, B E
Corp. Authors
/ Publisher
Tube Transit Corporation information
Publication Date   19700800
Abstract THE GENERAL CONCEPT OF THE DEMONSTRATOR IS TO SIMULATE A SINGLE STAGE OF GRAVITY VACUUM TRANSIT (GVT), WITHOUT INCURRING THE TIME AND EXPENSE TO BUILD A TUNNEL. THE DEMONSTRATOR WOULD CAUSE A TRAIN TO PASS FROM ONE STATION TO THE OTHER WITH INSTRUMENTS AND/OR A LIMITED NUMBER OF "PASSENGERS". THE TRACKS AND TUBE WOULD BE INSTALLED IN A REPRESENTATIVE MANNER, AND THERE WOULD BE REPRESENTATIVE VALVES AT BOTH ENDS. ONLY ONE OF THE TWO TUBES WOULD BE EQUIPPED TO CARRY A TRAIN; THE OTHER WOULD BE PRESENT TO ASSURE DYNAMIC SIMILARITY TO THE OPERATIONAL INSTALLATION. SIZE OF THE TUBES, TRAIN, AND VALVES FOR THIS PURPOSE WAS SELECTED TO BE A FULL-SCALE REPRESENTATION OF THE MARK 3B OPERATIONAL SYSTEM. THIS SAVES COST AS COMPARED TO THE MARK 4B SYSTEM, WHICH IS SIMILAR IN VIRTUALLY ALL RESPECTS BUT APPROXIMATELY 16% LARGER. SYRACUSE UNIVERSITY RESEARCH CORPORATION SELECTED A SITE IDENTIFIED AS "TULLY 1" FOR ITS TOPOGRAPHY, ITS ACCESSIBILITY, AND PROSPECTIVE AVAILABILITY OF ELECTRICAL POWER. ESTIMATED COST TO CONSTRUCT THE DEMONSTRATOR AND CONDUCT A TEST PROGRAM AT 170 MPH IS $26 MILLION. THIS ESTIMATE IS PREDICATED ON CONSTRUCTION IN THE TIME PERIOD 1971-72. IT INCLUDES A TEN PERCENT CONTINGENCY FACTOR TO ACCOUNT FOR CERTAIN TECHNICAL UNKNOWNS. THE TIMESCALE FOR THIS DEMONSTRATION IS ESTIMATED AT 25-27 MONTHS AFTER GO-AHEAD, ASSUMING THAT THE REFERENCE (3) PROGRAM IS LAUNCHED SOME EIGHT MONTHS EARLIER. UPGRADING THE FACILITY AND CONDUCTING ENGINEERING TESTS AT 250 MPH IS ESTIMATED TO REQUIRE AN ADDITIONAL $1.0 MILLION AND WILL TAKE FOUR MONTHS, IF NO SERIOUS PROBLEMS ARE ENCOUNTERED. /UMTA/
Supplemental
Information
PROJ NO TRD-85
TRT Terms Costs information; Demonstration projects information; Location information; Pneumatic conveyors information
Other Terms Gravity vacuum transit; Sites
Subject Areas H12 PLANNING
Availability
National Technical Information Service information
Order Number: PB 196 785
Document Source Urban Mass Transportation Administration information
TRIS Files HRIS
Database TRIS Online
TRIS is a bibliographic database funded by sponsors of the Transportation Research Board (TRB), primarily the state departments of transportation and selected federal transportation agencies. TRIS Online is hosted by the National Transportation Library under a cooperative agreement between the Bureau of Transportation Statistics and TRB.
Privacy Policy | Accessibility
Plug-ins: PDF Reader | Flash Player | Excel Viewer | PowerPoint Viewer | Word Viewer | WinZip