Ground Validation Peer Review
Time: beginning at 10:00 AM
Date: June 19, 2008
Location: Building 16W, Room N76/N80
Driving Directions
The Peer Review will focus on the following documents: the GPM GV Science Implementation Plan; Operations Concept; two requirements documents, the Ground Validation Level 3 Requirements, and the Level 3 Requirements for a Mobile Ka-/Ku-band Radar; and preliminary GVS Test Plan. Access to these documents is provided below.
GPM GV Science Implementation Plan
GPM GVS Operations Concept
GVP GVS Level 3 Requirements
GPM GVS Mobile Ka-/Ku-band Level 3 Requirements
GPM GVS Preliminary Test Plan
GPM GVS Peer Review presentation charts (draft)
|