U.S. DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT
 
Nevada
Print Page
Ruby Pipeline, Proposed Natural Gas Pipeline

Public Scoping Meetings:
April 15 in Elko
April 24 in Winnemucca

The Federal Energy Regulatory Commission (FERC) intends to prepare an Environmental Impact Statement (EIS) for the proposed Ruby Pipeline Project, planned by Ruby Pipeline, L.L.C. (Ruby). Ruby proposes to construct and operate about 680 miles of 42-inch diameter natural gas pipeline, as well as two new compressor stations and related facilities in Wyoming, Utah, Nevada, and Oregon. The Bureau of Land Management (BLM) is participating as a cooperating agency in the preparation of the EIS because the project would cross federally administered lands in all four states.

Ruby Pipeline Project Final Notice of Intent (NOI)

Map of Ruby Pipeline Project

News Release

Federal Register Notice


 
Last updated: 04-08-2008