General Decision Number: MO080001 02/06/2009 MO1 Superseded General Decision Number: MO20070001 State: Missouri Construction Types: Heavy and Highway Counties: Missouri Statewide. HEAVY AND HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 03/21/2008 4 04/04/2008 5 05/02/2008 6 05/09/2008 7 05/30/2008 8 06/06/2008 9 06/13/2008 10 06/20/2008 11 07/04/2008 12 08/08/2008 13 08/22/2008 14 09/05/2008 15 09/26/2008 16 10/10/2008 17 11/07/2008 18 12/05/2008 19 12/19/2008 20 01/02/2009 21 01/16/2009 22 02/06/2009 ASBE0001-002 10/01/2007 Rates Fringes Asbestos Worker/Heat and Frost Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 31.24 14.61 ---------------------------------------------------------------- CARP0007-008 04/01/2008 CASS (Richards-Gebauer AFB ONLY), CLAY, JACKSON, PLATTE AND RAY COUNTIES Rates Fringes Carpenters: CARPENTERS & LATHERS........$ 33.00 12.03 MILLWRIGHTS & PILEDRIVERS...$ 33.00 12.03 ---------------------------------------------------------------- CARP0008-003 05/02/2007 ST. LOUIS COUNTY AND CITY Rates Fringes Carpenters.......................$ 31.27 9.67 ---------------------------------------------------------------- CARP0011-001 05/02/2007 Rates Fringes Carpenter and Piledriver ADAIR, AUDRAIN (West of Hwy 19), BOONE, CALLAWAY, CHARITON, COLE, COOPER, HOWARD, KNOX,LINN, MACON, MILLER, MONITEAU,MONROE, OSAGE, PUTNAM, RANDOLPH, SCHUYLER, SHELBY AND SULLIVAN COUNTIES...........$ 27.21 9.76+b ATCHISON, ANDREW, BATES, CALDWELL, CARROLL,DAVIESS, DEKALB,GENTRY, GRUNDY, HARRISON, HENRY, HOLT, LIVINGSTON, MERCER, NODAWAY,ST. CLAIR, SALINE AND WORTH COUNTIES..........$ 26.26 9.36 AUDRAIN (East of Hwy.19), RALLS, MARION, LEWIS, CLARK AND SCOTLAND COUNTIES.$ 27.09 9.57 BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HICKORY,JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON, OZARK, POLK, STONE, TANEY, VERNON, WEBSTER AND WRIGHT COUNTIES.$ 25.91 9.36 BENTON, MORGAN AND PETTIS...$ 25.91 9.76 BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MISSISSIPPI, NEW MADRID, PEMISCOT, PERRY, SCOTT, STODDARD AND WAYNE COUNTIES.$ 24.56 7.18 BUCHANAN, CLINTON, JOHNSON AND LAFAYETTE COUNTIES......$ 26.91 9.36 CARTER, HOWELL,OREGON AND RIPLEY COUNTIES.............$ 23.64 7.18 CRAWFORD, DENT, GASCONADE, IRON, MADISON, MARIES, MONTGOMERY, PHELPS, PULASKI, REYNOLDS, SHANNON AND TEXAS COUNTIES..........$ 26.94 9.57+a FRANKLIN AND WARREN COUNTIES....................$ 28.99 9.57 JEFFERSON AND ST. CHARLES COUNTIES....................$ 31.32 9.57 LINCOLN COUNTY..............$ 28.60 9.57 PIKE, ST. FRANCOIS AND WASHINGTON COUNTIES.........$ 27.65 9.57 STE.GENEVIEVE COUNTY........$ 27.06 9.57 a. PHELPS & PULASKI COUNTIES: Mining projects, dams, power plants and miliitary installations (Fort Leonard Wood) will be paid at current St. Louis Commercial wage scale - $31.27 per hour and $9.67 fringe benefits. b. Millwight & Piledriver rate $23.18 plus $9.71. ---------------------------------------------------------------- ELEC0001-002 06/01/2007 BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, FRANKLIN, IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW MADRID, PEMISCOT, PERRY,REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS, ST. LOUIS (City and County), STE. GENEVIEVE, SCOTT, STODDARD, WARREN, WASHINGTON AND WAYNE COUNTIES Rates Fringes Electricians.....................$ 32.60 20.039 ---------------------------------------------------------------- ELEC0002-001 09/01/2008 ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE, HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCON, LINN, MACON, MARIES, MARION, MILLER, MONITEAU, MONROE, MONTGOMERY, MORGAN, OREGON, OSAGE, PERRY, PHELPS, PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS, ST. LOUIS (City and County), STE. GENEVIEVE, SCHUYLER, SCOTLAND, SHANNON, SHELBY, SULLIVAN, TEXAS, WARREN AND WASHINGTON COUNTIES Rates Fringes Line Construction: Groundman and Groundman- Driver......................$ 22.48 43.25%+4.75 Groundman Equipment Operator....................$ 29.08 43.25%+4.75 Groundman-Winch Driver......$ 23.59 43.25%+4.75 Lineman or Cable Splicer....$ 33.68 43.25%+4.75 ---------------------------------------------------------------- ELEC0053-004 09/01/2006 Rates Fringes Line Construction: (ANDREW, ATCHINSON, BARRY, BARTON, BUCHANAN, CALDWELL, CEDAR, CHRISTIAN, CLINTON, DADE, DALLAS, DAVIES,, DEKALB, DOUGLAS, GENTRY, GREENE, GRUNDY, HARRISON, HICKORY, HOLT, JASPER, LACLEDE, LAWRENCE, LIVINGSTON, MCDONALD, MERCER, NEWTON, NODAWAY, OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER, WORTH AND WRIGHT COUNTIES) Groundman Powderman.........$ 22.84 4.75+34% Groundman...................$ 21.15 4.75+34% Lineman Operator............$ 31.01 4.75+34% Lineman.....................$ 32.72 4.75+34% Line Construction; (BATES, BENTON, CARROLL, CASS, CLAY, HENRY, JACKSON, JOHNSON, LAFAYETTE, PETTIS, PLATTE, RAY AND SALINE COUNTIES) Groundman Powderman.........$ 23.71 4.75+34% Groundman...................$ 22.49 4.75+34% Lineman Operator............$ 31.65 4.75+34% Lineman.....................$ 33.91 4.75+34% ---------------------------------------------------------------- ELEC0095-001 06/01/2006 BARRY, BARTON, CEDAR, CRAWFORD, DADE, JASPER, LAWRENCE, MCDONALD, NEWTON, ST CLAIR, AND VERNON COUNTIES Rates Fringes Electricians: Cable Splicers..............$ 21.35 9.71+8% Electricians................$ 21.00 9.71+8% ---------------------------------------------------------------- ELEC0124-007 09/01/2008 BATES, BENTON, CARROLL, CASS, CLAY, COOPER, HENRY, JACKSON, JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY AND SALINE COUNTIES: Rates Fringes Electricians.....................$ 33.68 17.22 ---------------------------------------------------------------- ELEC0257-003 03/01/2008 AUDRAIN (Except Cuivre Township), BOONE, CALLAWAY, CAMDEN, CHARITON, COLE, CRAWFORD, DENT, GASCONADE, HOWARD, MARIES, MILLER, MONITEAU, OSAGE, PHELPS AND RANDOLPH COUNTIES Rates Fringes Electricians: Cable Splicers..............$ 29.18 14.573 Electricians................$ 28.18 14.573 ---------------------------------------------------------------- ELEC0350-002 12/01/2008 ADAIR, AUDRAIN (East of Highway 19), CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, MONTGOMERY, PIKE, PUTNAM, RALLS, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES Rates Fringes Electricians.....................$ 27.33 35%+4.85 ---------------------------------------------------------------- ELEC0453-001 09/01/2007 Rates Fringes Electricians: CHRISTIAN, DALLAS, DOUGLAS, GREENE, HICKORY, HOWELL, LACLEDE, OREGON, OZARK, POLK, SHANNON, WEBSTER and WRIGHT COUNTIES.$ 23.11 11.88 PULASKI and TEXAS COUNTIES..$ 27.76 12.34 STONE and TANEY COUNTIES....$ 17.44 11.36 ---------------------------------------------------------------- ELEC0545-003 06/01/2003 ANDREW, BUCHANAN, CLINTON, DEKALB, ATCHISON, HOLT, MERCER, GENTRY, HARRISON, DAVIESS, GRUNDY, WORTH, LIVINGSTON, NODAWAY, AND CALDWELL COUNTIES Rates Fringes Electricians:....................$ 27.66 9.93 ---------------------------------------------------------------- ELEC0702-004 06/30/2008 BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON, MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE COUNTIES Rates Fringes Line Construction: Groundman - Class A.........$ 21.64 4.75+28.75% Groundman-Equipment Operator (all crawler type equipment D-4 and larger)...$ 31.16 4.75+28.75% Lineman.....................$ 37.89 4.75+28.75% ---------------------------------------------------------------- ENGI0101-001 05/01/2008 ANDREW, ATCHISON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL, CHARITON, CLINTON, COOPER, DAVIESS, DEKALB, GENTRY, GRUNDY, HARRISON, HENRY, HOLT, HOWARD, JOHNSON, LAFAYETTE, LINN, LIVINGSTON, MERCER, NODAWAY, PETTIS, SALINE, SULLIVAN AND WORTH COUNITES Rates Fringes Power equipment operators: GROUP 1.....................$ 27.65 12.20 GROUP 2.....................$ 27.25 12.20 GROUP 3.....................$ 25.25 12.20 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers - 2; booster pump on dredge; bulldozer operator; boring machine (truck or crane mounted); clamshell operator; concrete mixer paver; concrete plant operator; concrete pump operator; crane operator; derrick or derrick trucks; ditching machine; dragline operator; dredge engineman; dredge operator; drill cat with compressor mounted (self-contained) or similar type self- propelled rotary drill (not air tract); drilling or boring machine (rotary-self-propelled); finishing machine operator; greaser; high loader-fork lift-skid loader (all types); hoisting engineer (2 active drums); locomotive operator (standard guage); mechanics and welders (field and plants); mucking machine operator; pile drive operator; pitman crane or boom truck (all types); push cat; quad track; scraper operators (all types); shovel operator; sideboom cats; side discharge spreader; skimmer scoop operators; slip form paver operator (CMI, Rex, Gomeco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane; wood and log chippers (all types). GROUP 2: A-frame truck operator; articulated dump truck; back filler operator; boilers (1); chip spreader; churn drill operator; compressor; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator; crusher operator; distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig; float operator; form grade operator; hoisting engine (one drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra-hammer (or similar type); paymill operator; power shield; pumps; roller operator (with or without blades); screening and washing plant; self-propelled street broom or sweeper; siphons and jets; straw blower; stump cutting machine; siphons and jets; tank car heater operator (combination boiler and booster); welding machine; vibrating machine operator (not hand held); welding machine. GROUP 3: (a) Oiler; (b) Oiiler driver (c) Mechanic. HOURLY PREMIUMS: THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .25) ABOVE GROUP 1 RATE: Dragline operator - 3 yds. & over; shovel 3 yds. & over; clamshell 3 yds. & over; Crane, rigs or piledrivers, 100' of boom or over (incl. jib.), hoist - each additional active drum over 2 drums THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .50) ABOVE GROUP 1 RATE: Tandem scoop operator; crane, rigs or piledrivers 150' to 200' of boom (incl. jib.) THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .75) ABOVE GROUP 1 RATE: Crane rigs, or piledrivers 200 ft. of boom or over (including jib.) ---------------------------------------------------------------- ENGI0101-005 04/01/2008 CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES Rates Fringes Power equipment operators: GROUP 1.....................$ 29.79 12.52 GROUP 2.....................$ 28.75 12.52 GROUP 3.....................$ 24.28 12.52 GROUP 4.....................$ 27.63 12.52 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers-2; booster pump on dredge; boring machine (truck or crane mounted); bulldozer operator; clamshell operator; concrete cleaning decontamination machine operator; concrete mixer paver; concrete plant operator; concrete pump operator; crane operator; derrick or derrick trucks; ditching machine; dragline operator; dredge engineman; dredge operator; drillcat with compressor mounted (self-contained) or similar type self propelled rotary drill (not air tract); drilling or boring machine (rotary - self-propelled); finishing machine operator; greaser; heavy equipment robotics operator/mechanic; horizontal directional drill operator; horizontal directional drill locator; loader-forklift - skid loader (all types); hoisting engineer (2 active drums); locomotive operator (standard guage); master environmental maintenance mechanic; mechanics and welders (field and plants); mucking machine operator; piledrive operator; pitman crane or boom truck (all types); push cat; quad-track; scraper operators (all types); shovel operator; side discharge spreader; sideboom cats; skimmer scoop operator; slip-form paver (CMI, REX, Gomaco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane; ultra high perssure waterjet cutting tool system operator/mechanic; vacuum blasting machine operator/mechanic; wood and log chippers (all types) GROUP 2: "A" Frame truck operator; articulated dump truck; back filler operator; boilers (1); chip spreader;churn drill operator; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator; crusher operator; distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig; float operator; form grader operator; hoisting engine (1 drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra- hammer (or similar type); power shield; paymill operator; pumps; siphons and jets; stump cutting machine; tank car heater operator (combination boiler and booster); compressor; roller operator (with or without blades); screening and washing plant; self-propelled street broom or sweeper; straw blower; tank car heater operator (combination boiler and booster); vibrating machine operator (not hand held) GROUP 3: Oilers GROUP 4: Oiler Driver (All Types) FOOTNOTE: HOURLY PREMIUMS FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($1.00) ABOVE GROUP 1 RATE: Clamshells - 3 yd. capacity or over; Cranes or rigs, 80 ft. of boom or over (including jib); Draglines, 3 yd. capacity or over; Piledrivers 80 ft. of boom or over (including jib); Shovels & backhoes, 3 yd. capacity or over. ---------------------------------------------------------------- ENGI0101-022 05/01/2008 BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HICKORY, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON, OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER AND WRIGHT COUNTIES and CITY OF SPRINGFIELD Rates Fringes Power equipment operators: GROUP 1.....................$ 23.87 11.00 GROUP 2.....................$ 23.52 11.00 GROUP 3.....................$ 23.32 11.00 GROUP 4.....................$ 21.27 11.00 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Asphalt finishing machine & trench widening spreader; asphalt plant console operator; autograder; automatic slipform paver; backhoe; blade operator - all types; boat operator - tow; boilers-2; central mix concrete plant operator; clamshell operator; concrete mixer paver; crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine - 2 active drums; launch hammer wheel; locomotive operator; - standard guage; mechanic and welders; mucking machine; off-road trucks; piledriver operator; pitman crane operator; push cat operator; quad trac; scoop operator - all types; shovel operator; sideboom cats; skimmer scoop operators; trenching machine operator; truck crane. GROUP 2: A-frame; asphalt hot-mix silo; asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant man; asphalt plant mixer operator; asphalt roller operator; backfiller operator; barber-greene loader; boat operator (bridges and dams); chip spreader; concrete mixer operator - skip loader; concrete plant operator; concrete pump operator; crusher operator; dredge oiler; elevating grader operator; fork lift; greaser-fleet; hoisting engine - 1; locomotive operator - narrow gauge; multiple compactor; pavement breaker; powerbroom - self-propelled; power shield; rooter; side discharge concrete spreader; slip form finishing machine; stumpcutter machine; throttle man; tractor operator (over 50 h.p.); winch truck. GROUP 3: Boilers - 1; chip spreader (front man); churn drill operator; clef plane operator; concrete saw operator (self- propelled); curb finishing machine; distributor operator; finishing machine operator; flex plane operator; float operator; form grader operator; pugmill operator; roller operator, other than high type asphalt; screening & washing plant operator; siphons & jets; sub-grading machine operator; spreader box operator, self-propelled (not asphalt); tank car heater operator (combination boiler & booster); tractor operator (50 h.p. or less); Ulmac, Ulric or similar spreader; vibrating machine operator, not hand; GROUP 4: Grade checker; Oiler; Oiler-Driver HOURLY PREMIUMS: The following classifications shall receive $ .25 above GROUP 1 rate: Clamshells - 3 yds. or over; Cranes - Rigs or Piledrivers, 100 ft. of boom or over (including jib); Draglines - 3 yds. or over; Hoists - each additional active drum over 2 drums; Shovels - 3 yds. or over; The following classifications shall receive $ .50 above GROUP 1 rate: Tandem scoop operator; Cranes - Rigs or Piledrivers, 150 ft. to 200 ft. of boom (including jib); Tandem scoop. The following classifications shall receive $ .75 above GROUP 1 rate: Cranes - Rigs or Piledrivers, 200 ft. of boom or over (including jib.). ---------------------------------------------------------------- ENGI0513-004 05/07/2008 FRANKLIN, JEFFERSON, LINCOLN, ST CHARLES, AND WARREN COUNTIES Rates Fringes Power equipment operators: GROUP 1.....................$ 28.17 17.29 GROUP 2.....................$ 28.17 17.29 GROUP 3.....................$ 26.27 17.29 GROUP 4.....................$ 22.81 17.29 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Backhoe, Cable; Backhoe, Hydraulic (2 cu yds bucket and under regardless of attachment, one oiler for 2 or 3, two oilers for 4 through 6); Backhoe, Hydraulic over 2 cu yds; Cableway; Crane, Crawler or Truck; Crane, Hydraulic - Truck or Cruiser mounted, 16 tons and over; Crane, Locomotive; crane with boom including jib over 100 ft from pin to pin; Crane using rock socket tool; Derrick, Steam; Derrick Car and Derrick Boat; Dragline, 7 cu yds and over; Dredge; Gradall, Crawler or tire mounted; Locomotive, Gas, Steam & other powers; Pile Driver, Land or Floating; Scoop, Skimmer; Shovel, Power (Electric, Gas, Steam or other powers); Shovel, Power (7 cu yds and over); Switch Boat; Whirley; Air Tugger with air compressor; Anchor Placing Barge; Asphalt Spreaker; Athey Force Feeder Loader, self-propelled; Backfilling Machine; Boat Operator - Push Boat or Tow Boat (job site); Boiler, High Pressure Breaking in Period; Boom Truck, Placing or Erecting; Boring Machine, Footing Foundation; Bullfloat; Cherry Picker; Combination Concrete Hoist and Mixer (such as Mixermobile); Compressor, Two 125 CFM and under; Compressor, Two through Four over 125 CFM; Compressor when operator runs throttle; Concrete Breaker (Truck or Tractor mounted); Concrete Pump (such as Pumpcrete machine); Concrete Saw (self-propelled); Concrete Spreader; Conveyor, Large (not selfpropelled) hoisting or moving brick and concrete into, or into and on floor level, one or both; Crane, Cimbing (such as Linden); Crane, Hydraulic - Rough Terrain, self-propelled; Crane, Hydraulic - Truck or Cruiser mounted - under 16 tons; Drilling machine - Self-powered, used for earth or rock drilling or boring (wagon drills and any hand drills obtaining power from other souces including concrete breakers, jackhammers and Barco equipmnet no engineer required); Elevating Grader; Engine Man, Dredge; Excavator or Powerbelt Machine; Finishing Machine, self- propelled oscillating screed; Forklift; Generators, Two through Six 30 KW or over; Grader, Road with power blade; Greaser; Highlift; Hoist, Concrete and Brick (Brick cages or concrete skips operating or on tower, Towermobile, or similar equipment); Hoist, Three or more drums in use; Hoist, Stack; Hydro-Hammer; Lad-A-Vator, hoisting brick or concrete; Loading Machine such as Barber-Greene; Mechanic on job site GROUP 2: Air Tugger with plant air; Boiler (for power or heating shell of building or temporary enclosures in connection with construction work); Boiler, Temporary; Compressor, One over 125 CFM; Compressor, truck mounted; Conveyor, Large (not self- propelled); Conveyor, Large (not self- propelled) moving brick and concrete (distributing) on floor level; Curb Finishing Machine; Ditch Paving Machine; Elevator (outside); Endless Chain Hoist; Fireman (as required); Form Grader; Hoist, One Drum regardless of size (except brick or concrete); Lad-A-Vator, other hoisting; Manlift; Mixer, Asphalt, over 8 cu ft capacity; Mixer, one bag capacity or less; Mixer, without side loader, two bag capacity or more; Mixer, with side loader, regardless of size, not Paver; Mud Jack (where mud jack is used in conjenction with an air compressor, operator shall be paid $ .55 per hour in addition to his basic hourly rate for covering both operations); Pug Mill operator; Pump, Sump - self powered, automatic controlled over 2"; Scissor Lift (used for hoisting); Skid Steer Loader; Sweeper, Street; Tractor, small wheel type 50 HP and under with grader blade and similar equipment; Welding Machine, One over 400 amp; Winch, operating from truck GROUP 3: Boat operator - outboard motor, job site; Conveyors (such as Con-Vay-It) regardless of how used; Elevator (inside); Heater operator, 2 through 6; Sweeper, Floor GROUP 4: Crane type HOURLY PREMIUMS: Backhoe, Hydraulic 2 cu yds or less without oiler - $2.00; Certified Crane Operator - $1.50; Certified Hazardous Material Operator $1.50; Crane,climbing (such as Linden) - $.50; Crane, Pile Driving and Extracting - $ .50 Crane with boom (including job) over 100 ft from pin to pin - add $.01 per foot to maximum of $4.00); Crane, using rock socket tool - $ .50; Derrick, diesel, gas or electric hoisting material and erecting steel (150 ft or more above ground) - $ .50; Dragline, 7 cu yds and over - $ .50; Hoist, Three or more drums in use - $ .50; Scoop, Tandem - $.50; Shovel, Power - 7 cu yds and over - $ .50; Tractor, Tandem Crawler - $ .50; Tunnel, man assigned to work in tunnel or tunnel shaft - $ .50; Wrecking, when machines are working on second floor or higher - $ .50 ---------------------------------------------------------------- ENGI0513-006 05/01/2008 ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY, CAPE GIRARDEAU, CARTER, CLARK, COLE, CRAWFORD, DENT, DUNKLIN, GASCONADE, HOWELL, IRON, KNOX, LEWIS, MACON, MADISON, MARIES, MARION, MILLER, MISSISSIPPI, MONITEAU, MONROE, MONTGOMERY, MORGAN, NEW MADRID, OREGON, OSAGE, PEMISCOT, PERRY, PHELPS, PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. FRANCOIS, STE. GENEVIEVE, SCHUYLER, SCOTLAND, SCOTT, SHANNON, SHELBY, STODDARD, TEXAS, WASHINGTON, AND WAYNE COUNTIES Rates Fringes Power equipment operators: GROUP 1.....................$ 24.60 17.25 GROUP 2.....................$ 24.25 17.25 GROUP 3.....................$ 24.05 17.25 GROUP 4.....................$ 20.40 17.25 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Asphalt finishing machine & trench widening spreader, asphalt plant console operator; autograder; automatic slipform paver; back hoe; blade operator - all types; boat operator tow; boiler two; central mix concrete plant operator; clam shell operator; concrete mixer paver; crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine 2 active drums; launchhammer wheel; locomotive operator standrad guage; mechanics and welders; mucking machine; piledriver operator; pitman crane operator; push cat operator; guad-trac; scoop operator; sideboom cats; skimmer scoop operator; trenching machine operator; truck crane, shovel operator. GROUP 2: A-Frame; asphalt hot-mix silo; asphalt roller operator asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant mixer operator; backfiller operator; barber-greene loader; boat operator (bridge & dams); chip spreader; concrete mixer operator skip loader; concrete plant operator; concrete pump operator; dredge oiler; elevating graded operator; fork lift; grease fleet; hoisting engine one; locomotive operator narrow guage; multiple compactor; pavement breaker; powerbroom self-propelled; power shield; rooter; slip-form finishing machine; stumpcutter machine; side discharge concrete spreader; throttleman; tractor operator (over 50 hp); winch truck; asphalt roller operator; crusher operator. GROUP 3: Spreader box operator, self-propelled not asphalt; tractor operator (50 h.p. or less); boilers one; chip spreader (front man); churn drill operator; compressor over 105 CFM 2-3 pumps 4" & over; 2-3 light plant 7.5 KWA or any combination thereof; clef plane operator; compressor maintenance operator 2 or 3; concrete saw operator (self-propelled); curb finishing mancine; distributor operator; finishing machine operator; flex plane operator; float operator; form grader operator; pugmill operator; riller operator other than high type asphalt; screening & washing plant operator; siphons & jets; subgrading machine operator; tank car heater (combination boiler & booster); ulmac, ulric or similar spreader; vibrating machine operator; hydrobroom. GROUP 4: Oiler; grout machine; oiler driver; compressor over 105 CFM one; conveyor operator one; maintenance operator; pump 4" & over one. FOOTNOTE: HOURLY PREMIUMS Backhoe hydraulic, 2 cu. yds. or under Without oiler - $2.00 Certified Crane Operator - $1.50; Certified Hazardous Material Operator $1.50; Crane, climbing (such as Linden) - $0.50; Crane, pile driving and extracting - $0.50; Crane, with boom (including jib) over 100' from pin to pin add $0.01 per foot to maximum of $4.00; Crane, using rock socket tool - $0.50; Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above the ground) - $0.50; Dragline, 7 cu. yds, and over - $0.50; Hoist, three or more drums in use - $0.50; Scoop, Tandem - $0.50; Shovel, power - 7 cu. yds. or more - $0.50; Tractor, tandem crawler - $0.50; Tunnel, man assigned to work in tunnel or tunnel shaft - $0.50; Wrecking, when machine is working on second floor or higher - $0.50; ---------------------------------------------------------------- ENGI0513-007 05/07/2008 ST. LOUIS CITY AND COUNTY Rates Fringes Power equipment operators: GROUP 1.....................$ 28.17 17.29 GROUP 2.....................$ 28.17 17.29 GROUP 3.....................$ 26.27 17.29 GROUP 4.....................$ 22.81 17.29 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Backhoe, cable or hydraulic; cableway; crane crawler or truck; crane, hydraulic-truck or cruiser mounted 16 tons & over; crane locomotive; derrick, steam; derrick car & derrick boat; dragline; dredge; gradall, crawler or tire mounted; locomotive, gas, steam & other powers; pile driver, land or floating; scoop, skimmer; shovel, power (steam, gas, electric or other powers); switch boat; whirley. GROUP 2: Air tugger w/air compressor; anchor-placing barge; asphalt spreader; athey force feeder loader (self- propelled); backfilling machine; backhoe-loader; boat operator-push boat or tow boat (job site); boiler, high pressure breaking in period; boom truck, placing or erecting; boring machine, footing foundation; bull- float; cherry picker; combination concrete hoist & mixer (such as mixer mobile); compressor (when operator runs throttle); concrete breaker (truck or tractor mounted); concrete pump, such as pump-crete machine; concrete saw (self-propelled), concrete spreader; conveyor, large (not self-propelled), hoisting or moving brick and concrete into, or into and on floor level, one or both; crane, hydraulic-rough terrain, self-propelled; crane hydraulic-truck or cruiser mounted-under 16 tons; drilling machines, self-powered use for earth or rock drilling or boring (wagon drills nd any hand drills obtaining power from other sources including concrete breakers, jackhammers and barco equipment-no engineer required); elevating grader; engineman, dredge; excavator or powerbelt machine; finishing machine, self-propelled oscillating screed; forklift; grader, road with power blade; highlift. greaser; hoist, stack, hydro-hammer; loading machine (such as barber-greene); machanic, on job site; mixer, pipe wrapping machines; plant asphalt; plant, concrete producing or ready-mix job site; plant heating-job site; plant mixing-job site; plant power, generating-job site; pumps, two through six self-powered over 2"; pumps, electric submersible, two through six, over 4"; quad-track; roller, asphalt, top or sub-grade; scoop, tractor drawn; spreader box; sub-grader; tie tamper; tractor-crawler, or wheel type with or without power unit, power take-offs and attachments regardless of size; trenching machine; tunnel boring machine; vibrating machine automatic, automatic propelled; welding machines (gasoline or diesel) two through six; well drilling machine GROUP 3: Conveyor, large (not self-propelled); conveyor, large (not self-propelled) moving brick and concrete distributing) on floor level; mixer two or more mixers of one bag capacity or less; air tugger w/plant air; boiler, for power or heating on construction projects; boiler, temporary; compressor (mounted on truck; curb finishing machine; ditch paving machine; elevator; endless chain hoist; form grader; hoist, one drum regardless of size; lad-a-vator; manlift; mixer, asphalt, over 8 cu. ft. capacity, without side loader, 2 bag capacity or more; mixer, with side loader, regardless of size; pug mill operator; pump, sump-self-powered, automatic controlled over 2" during use in connection with construction work; sweeper, street; welding machine, one over 400 amp.; winch operating from truck; scissor lift (used for hoisting); tractor, small wheel type 50 h.p. & under with grader blade & similar equipment; Oiler on dredge and on truck crane. GROUP 4: Boat operator-outboard motor (job site); conveyor (such as con-vay-it) regardless of how used; sweeper, floor HOURLY PREMIUMS: Backhoe, hydraulic 2 cu. yds. or under without oiler $2.00 Certified Crane Operator 1.50 Certified Hazardous Material Operator 1.50 Crane, climbing (such as Linden) .50 Crane, pile driving and extracting .50 Crane, with boom (including jib) over 100' (from pin to pin) add $.01 per foot to maximum of 4.00 Crane, using rock socket tool .50 Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above ground) .50 Dragline, 7 cu. yds. and over .50 Hoist, three (3) or more drums in use .50 Scoop, Tandem .50 Shovel, power - 7 cu. yds. or more .50 Tractor, tandem crawler .50 Tunnel, man assigned to work in tunnel or tunnel shaft .50 Wrecking, when machine is working on second floor or higher .50 ---------------------------------------------------------------- IRON0010-012 04/01/2008 Rates Fringes Ironworkers: ANDREW, ATCHISON, BARTON, BATES, BENTON, CALDWELL, CAMDEN, CARROLL, CEDAR, CHARITON, CHRISTIAN, CLINTON, COOPER, DADE, DALLAS, DAVIESS, DE KALB, GENTRY, GREENE, GRUNDY, HARRISON, HENRY, HICKORY, HOLT, HOWARD, LACLEDE, LINN, LIVINGSTON, MERCER, MONITEAU, MORGAN, NODAWAY, PETTIS, POLK, PUTNAM, RANDOLPH, ST. CLAIR, SALINE, SULLIVAN, TANEY, VERNON, WEBSTER, WRIGHT and WORTH Counties; and portions of ADAIR, BOONE, MACON, MILLER and RANDOLPH Counties....................$ 23.75 20.30 BUCHANAN, CASS, CLAY, JACKSON, JOHNSON, LAFAYETTE, PLATTE AND RAY Counties....................$ 26.75 20.30 ---------------------------------------------------------------- IRON0321-002 05/01/2008 DOUGLAS, HOWELL and OZARK COUNTIES Rates Fringes Ironworker.......................$ 18.10 11.64 ---------------------------------------------------------------- IRON0396-004 12/31/2008 ST. LOUIS (City and County), ST. CHARLES, JEFFERSON, IRON, FRANKLIN, LINCOLN, WARREN, WASHINGTON, ST. FRANCOIS, STE. GENEVIEVE, and REYNOLDS Counties; and portions of MADISON, PERRY, BOLLINGER, WAYNE, and CARTER Counties Rates Fringes Ironworker.......................$ 29.98 16.81 ---------------------------------------------------------------- IRON0396-009 12/31/2008 AUDRAIN, CALLAWAY, COLE, CRAWFORD, DENT, GASCONADE, MARIES, MONTGOMERY, OSAGE, PHELPS, PIKE, PULASKI, TEXAS and WRIGHT Counties; and portions of BOONE, CAMDEN, DOUGLAS, HOWELL, LACLEDE, MILLER, MONROE, OREGON, SHANNON and RALLS Counties Rates Fringes Ironworker.......................$ 25.53 16.61 ---------------------------------------------------------------- IRON0577-005 06/01/2008 ADAIR, CLARK, KNOX, LEWIS, MACON, MARION, MONROE, RALLS, SCHUYLER, SCOTLAND, AND SHELBY COUNTIES Rates Fringes Ironworker.......................$ 23.00 14.31 ---------------------------------------------------------------- IRON0584-004 06/01/2008 BARRY, JASPER, LAWRENCE, MCDONALD, NEWTON AND STONE Counties Rates Fringes Ironworkers:.....................$ 22.10 10.01 ---------------------------------------------------------------- IRON0782-003 05/01/2008 CAPE GIRARDEAU, MISSISSIPPI, NEW MADRID, SCOTT, & STODDARD Counties; and portions of BOLLINGER, BUTLER, CARTER, DUNKLIN, MADISON, PEMISCOT, PERRY, RIPLEY, and WAYNE Counties Rates Fringes Ironworkers: Locks, Dams, Bridges and other major work on the Mississippi and Ohio River only........................$ 23.94 13.59 All Other Work..............$ 22.64 13.98 ---------------------------------------------------------------- LABO0042-003 03/03/2008 ST. LOUIS (City and County) Rates Fringes Laborers: Plumber Laborers............$ 27.12 9.73 ---------------------------------------------------------------- LABO0042-005 03/05/2008 ST. LOUIS (City and County) Rates Fringes Laborers: Dynamiter, Powderman........$ 27.48 9.73 Laborers, Flagperson........$ 26.98 9.73 Wrecking....................$ 26.86 9.73 ---------------------------------------------------------------- LABO0424-002 05/01/2008 Rates Fringes Laborers: ADAIR, AUDRAIN, BOONE, CALLAWAY, CHARITON, CLARK, COLE, COOPER, HOWARD, IRON, KNOX, LEWIS, LINN, MACON, MADISON, MARION, MILLER, MONITEAU, MONROE, PERRY, PIKE, PUTNAM, RALLS, RANDOLPH, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES GROUP 1....................$ 23.97 8.88 GROUP 2....................$ 24.57 8.88 BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, CRAWFORD, DENT, DUNKLIN, GASCONADE, HOWELL, MARIES, MISSISSIPPI, NEW MADRID, OREGON, OSAGE, PEMISCOT, PHELPS, PULASKI, RIPLEY, SCOTT, SHANNON, STODDARD, TEXAS, WASHINGTON AND WAYNE COUNTIES GROUP 1....................$ 23.97 8.88 GROUP 2....................$ 24.57 8.88 FRANKLIN COUNTY GROUP 1....................$ 25.42 8.88 GROUP 2....................$ 26.02 8.88 JEFFERSON COUNTY GROUP 1....................$ 25.47 8.88 GROUP 2....................$ 26.07 8.88 LINCOLN, MONTGOMERY AND WARREN COUNTIES GROUP 1....................$ 24.22 8.88 GROUP 2....................$ 24.82 8.88 LABORERS CLASSIFICATIONS GROUP 1 - General laborer-flagman, carpenter tenders; salamander Tenders; Dump Man; Ticket Takers; loading trucks under bins, hoppers, and conveyors; track man; cement handler; dump man on earth fill; georgie buggie man; material batch hopper man; spreader on asphalt machine; material mixer man (except on manholes); coffer dams; riprap pavers rock, block or brick; scaffolds over ten feet not self-supported from ground up; skip man on concrete paving; wire mesh setters on concrete paving; all work in connection with sewer, water, gas, gasoling, oil, drainage pipe, conduit pipe, tile and duct lines and all other pipe lines; power tool operator; all work in connection with hydraulic or general dredging operations; form setters, puddlers (paving only); straw blower nozzleman; asphalt plant platform man; chuck tender; crusher feeder; men handling creosote ties or creosote materials; men working with and handling epoxy material; topper of standing trees; feeder man on wood pulverizers, board and willow mat weavers and cabelee tiers on river work; deck hands; pile dike and revetment work; all laborers working on underground tunnels less than 25 ft. where compressed air is not used; abutement and pier hole men working six (6) ft. or more below ground; men working in coffer dams for bridge piers and footing in the river; barco tamper; jackson or any other similar tamp; cutting torch man; liners, curb, gutters, ditch lines; hot mastic kettlemen; hot tar applicator; hand blade operator; mortar men or brick or block manholes; rubbing concrete, air tool operator under 65 lbs.; caulker and lead man; chain or concrete saw under 15 h.p.; signal Gan; Guard rail and sign erectors. GROUP 2 - Skilled laborers - Vibrator man; asphalt raker; head pipe layer on sewer work; batterboard man on pipe and ditch work; cliff scalers working from bosun's chairs; scaffolds or platforms on dams or power plants over 10 ft. high; air tool operator over 65 lbs.; stringline man on concrete paving; sandblast man; laser beam man; wagon drill; churn drill; air track drill and all other similar type drills, gunite nozzle man; pressure grout man; screed man on asphalt; concrete saw 15 h.p. and over; grade checker; strigline man on electronic grade control; manhole builder; dynamite man; powder man; welder; tunnel man; waterblaster - 1000 psi or over; asbestos and/or hazardous waste removal and/or disposal ---------------------------------------------------------------- LABO0579-005 05/01/2008 Rates Fringes Laborers: (ANDREW, ATCHISON, BUCHANAN, CALDWELL, CLINTON, DAVIESS, DEKALB, GENTRY, GRUNDY, HARRISON, HOLT, LIVINGSTON, MERCER, NODAWAY and WORTH COUNTIES.) GROUP 1.....................$ 22.14 9.44 GROUP 2.....................$ 22.49 9.44 Laborers: (BARRY, BARTON, BATES, BENTON, CAMDEN, CARROLL, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HENRY. HICKORY, JASPER, JOHNSON, LACLEDE, LAWRENCE, MCDONALD, MORGAN, NEWTON, OZARK, PETTIS, POLK, ST.CLAIR, SALINE, STONE, TANEY, VERNON, WEBSTER and WRIGHT COUNTIES) GROUP 1.....................$ 20.64 9.14 GROUP 2.....................$ 21.19 9.14 Laborers: (LAFAYETTE COUNTY) GROUP 1.....................$ 22.19 9.39 GROUP 2.....................$ 22.54 9.39 LABORERS CLASSIFICATIONS GROUP 1: General Laborers - Carpenter tenders; salamander tenders; loading trucks under bins; hoppers & conveyors; track men & all other general laborers; air tool operator; cement handler-bulk or sack; dump man on earth fill; georgie buggie man; material batch hopper man; material mixer man (except on manholes); coffer dams; riprap pavers - rock, block or brick; signal man; scaffolds over ten feet not self-supported from ground up; skipman on concrete paving; wire mesh setters on concrete paving; all work in connection with sewer, water, gas, gasoline, oil drainage pipe, conduit pipe, tile and duct lines and all other pipe lines; power tool operator, all work in connection with hydraulic or general dredging operations; puddlers (paving only); straw blower nozzleman; asphalt plant platform man; chuck tender; crusher feeder; men handling creosote ties or creosote materials; men working with and handling epoxy material or materials (where special protection is required); rubbing concrete; topper of standing trees; batter board man on pipe and ditch work; feeder man on wood pulverizers; board and willow mat weavers and cable tiers on river work; deck hands; pile dike and revetment work; all laborers working on underground tunnels less than 25 feet where compressed air is not used; abutment and pier hole men working six (6) feet or more below ground; men working in coffer dams for bridge piers and footings in the river; ditchliners; pressure groutmen; caulker; chain or concrete saw; cliffscalers working from scaffolds, bosuns' chairs or platforms on dams or power plants over (10) feet above ground; mortarmen on brick or block manholes; toxic and hazardous waste work. GROUP 2: Skilled Laborers - Head pipe layer on sewer work; laser beam man; Jackson or any other similar tamp; cutting torch man; form setters; liners and stringline men on concrete paving, curb, gutters; hot mastic kettleman; hot tar applicator; sandblasting and gunite nozzlemen; air tool operator in tunnels; screed man on asphalt machine; asphalt raker; barco tamper; churn drills; air track drills and all similar drills; vibrator man; stringline man for electronic grade control; manhole builders-brick or block; dynamite and powder men; grade checker. ---------------------------------------------------------------- LABO0660-006 03/03/2008 ST. CHARLES COUNTY Rates Fringes Laborers:........................$ 26.34 9.26 LABORERS CLASSIFICATIONS General laborer; carpenter tender; salamander tender; dump man; ticket takers; flagman; loading trucks under bins, hoppers, and conveyors; track men; cement handler; dump man on earth fill; Georgie buggie man; material batch hopper man; spreader on asphalt machine; material mixer man (except on manholes); coffer dams; riprap paver - rock, block, or brick; signal man; scaffolds over 10 ft not self-supported from ground up; skipman on concrete paving; wire mech setters on concrete paving; all work in connection with sewer, water, gas, gasoline, oil, drainage pipe, conduit pipe, tile and duct lines and all other pipe lines; power tool operator; all work in connection with hydraulic or general dredging operations; form setters; puddlers (paving only); straw blower nozzleman; asphalt plant platform man; chuck tender; crusher feeder; men handling creosote ties or creosote materials; men working with and handling epoxy material; topper of standing trees; feeder man on wood pulverizer; board and willow mat weavers and cable tiers on river work; deck hands; pile dike and revetment work; all laborers working on underground tunnels less than 25 ft where compressed air is not used; abutment and pier hole men working 6 ft or more below ground; men working in coffer dams for bridge piers and footings in the river; Barco tamper, Jackson or any other similar tamp; cutting torch man; liners, curb, gutters, ditchliners; hot mastic kettleman; hot tar applicator; hand blade operators; mortar men on brick or block manholes; rubbing concrete; air tool operator under 65 pounds; caulker and lead man; chain saw under 15 hp; guard rail and sign erectors; Vibrator man; asphalt raker; hand pipe layer on sewer work; batterboard man on pipe and ditch work; cliff scalers working from Bosun's chairs, scaffolds or platforms on dams or power plants over 10 ft high; air tool operator over 65 pounds;stringline man on concrete paving etc.; sand blast man; laser beam man; wagon drill; churn drill; air track drill and all other similar type drills; gunnite nozzle man; pressure grout man; screed man on asphalt; concrete saw 15 hp and over; grade checker; stringline man on electronic grade control; manhole builder; dynamite man; powder man; welder; tunnel man; waterblaster - 1000 psi and over; asbestos and/or hazardous waste removal and or disposal; ---------------------------------------------------------------- LABO0663-002 04/01/2008 CASS, CLAY, JACKSON, PLATTE AND RAY COUNTIES Rates Fringes Laborers: GROUP 1.....................$ 25.23 10.44 GROUP 2.....................$ 26.44 10.44 LABORERS CLASSIFICATIONS GROUP 1: General laborers, Carpenter tenders, salamander tenders, loading trucks under bins, hoppers and conveyors, track men and all other general laborers, air tool operator, cement handler (bulk or sack), chain or concrete saw, deck hands, dump man on earth fill, Georgie Buggies man, material batch hopper man, scale man, material mixer man (except on manholes), coffer dams, abutments and pier hole men working below ground, riprap pavers rock, black or brick, signal man, scaffolds over ten feet not self-supported from ground up, skipman on concrete paving, wire mesh setters on concrete paving, all work in connection with sewer,water, gas, gasoling, oil, drainage pipe, conduit pipe, tile and duct lines and all other pipelines, power tool operator, all work in connection with hydraulic or general dredging operations, straw blower nozzleman,asphalt plant platform man, chuck tender, crusher feeder, men handling creosote ties on creosote materials, men working with and handling epoxy material or materials (where special protection is required), topper of standing trees, batter board man on pipe and ditch work, feeder man on wood pulverizers, board and willow mat weavers and cable tiers on river work, deck hands, pile dike and revetment work, all laborers working on underground tunnels less than 25 feet where compressed air is not used, abutment and pier hole men working six (6) feet or more below ground, men working in coffer dams for bridge piers and footings in the river, ditchliners, pressure groutmen, caulker and chain or concrete saw, cliffscalers working from scaffolds, bosuns' chairs or platforms on dams or power plants over (10) feet above ground, mortarmen on brick or block manholes, signal man. GROUP 2: Skilled Laborer - spreader or screed man on asphalt machine, asphalt raker, grade checker, vibrator man, concrete saw over 5 hp., laser beam man, barco tamper, jackson or any other similar tamp, wagon driller, churn drills, air track drills and other similar drills, cutting torch man, form setters, liners and stringline men on concrete paving, curb, gutters and etc., hot mastic kettleman, hot tar applicator, hand blade operators, mortar men on brick or block manholes, sand blasting and gunnite nozzle men, rubbing concrete, air tool operator in tunnels, head pipe layer on sewer work, manhole builder (brick or block), dynamite and powder men. ---------------------------------------------------------------- PAIN0002-002 09/01/2007 CLARK, FRANKLIN, JEFFERSON, LEWIS, LINCOLN, MARION, PIKE, RALLS, ST. CHARLES, ST. LOUIS (CITY & COUNTY), AND WARREN COUNTIES Rates Fringes Painters: Brush and Roller; Taper.....$ 28.61 10.24 High work over 60 feet......$ 29.11 10.24 Lead Abatement..............$ 29.36 10.24 Pressure Roller; High work under 60 ft.................$ 28.86 10.24 Spray & Abrasive Blasting; Water Blasting (Over 5000 PSI)........................$ 30.61 10.24 Taper (Ames Tools & Bazooka)....................$ 30.21 10.24 ---------------------------------------------------------------- PAIN0002-006 02/01/2008 ADAIR, AUDRAIN, BOONE, CALLAWAY, CHARITON, COLE, GASCONADE, HOWARD, KNOX, LINN, MACON, MONROE, MONTGOMERY, OSAGE, PUTNAM, RANDOLPH, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES and the City of Booneville. Rates Fringes Painters: Bridges, Dams, Locks or Powerhouses.................$ 22.40 8.77 Brush and Roll; Taping, Paperhanging................$ 20.40 8.77 Epoxy or Any Two Part Coating; Sandblasting; Stage or other Aerial Work - Platforms over 50 feet high; Lead Abatement........$ 21.40 8.77 Spray; Structural Steel (over 50 feet)..............$ 20.90 8.77 Tapers using Ames or Comparable Tools............$ 20.65 8.77 ---------------------------------------------------------------- PAIN0003-004 04/01/2008 BATES, BENTON, CALDWELL, CARROLL, CASS, CLAY, CLINTON, COOPER, DAVIESS, GRUNDY, HARRISON, HENRY, JACKSON, JOHNSON, LAFAYETTE, LIVINGSTON, MERCER, MONITEAU, MORGAN, PETTIS, PLATTE, RAY AND SALINE COUNTIES Rates Fringes Painters: Bazooka, Boxes & Power Sander......................$ 29.99 12.40 Brush & Roller..............$ 28.77 12.40 Drywall.....................$ 28.99 12.40 Lead Abatement; Sprayman....$ 29.77 12.40 Sandblast (Bridge, Stage, Erected Steel and Storage Bin and Tanks)..............$ 30.27 12.40 Sprayman (Storage Bin & Tanks, Elevated Tanks); Stageman (Spray); Bridgeman (Spray); Steelman (Spray)............$ 30.52 12.40 Steeplejack - Spray or Sandblast...................$ 34.46 12.40 Steeplejack (other than Elevated Tanks).............$ 33.46 12.40 Storage Bin & Tanks (Roller or Brush); Elevated Tanks (Roller or Brush); Stageman; Beltman; Bridgeman; Steelman; Sandblast (Base); Elevator Shaft.......................$ 29.52 12.40 ---------------------------------------------------------------- PAIN0098-002 05/01/2007 ANDREW, ATCHISON, BUCHANAN, DE KALB, GENTRY, HOLT, NODAWAY & WORTH COUNTIES Rates Fringes Painters: Brush & Roller..............$ 23.40 9.20 Sandblaster.................$ 24.40 9.20 Steeplejack.................$ 26.40 9.20 ---------------------------------------------------------------- PAIN0203-001 04/01/2008 BARRY, BARTON, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HICKORY, HOWELL, JASPER, LAWRENCE, MCDONALD, NEWTON, OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER and WRIGHT COUNTIES Rates Fringes Painters: Finisher....................$ 19.15 9.30 Painters....................$ 18.40 10.05 Sandblaster, Highman, Spray Man, Vinyl Hanger, Tool Operator...............$ 19.40 10.05 ---------------------------------------------------------------- PAIN1265-003 07/01/2008 CAMDEN, CRAWFORD, DENT, LACLEDE, MARIES, MILLER, PHELPS, PULASKI AND TEXAS COUNTIES Rates Fringes Painters: Brush and Roller............$ 22.30 10.11 Floor Work..................$ 22.80 10.11 Lead Abatement..............$ 24.55 10.11 Spray.......................$ 23.80 10.11 Structural Steel, Sandblasting and All Tank Work........................$ 23.55 10.11 Taping, Paperhanging........$ 23.30 10.11 ---------------------------------------------------------------- PAIN1292-002 09/01/2008 BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, MISSISSIPPI, NEW MADRID, OREGON, PEMISCOT, PERRY, REYNOLDS, RIPLEY, SCOTT, SHANNON, STODDARD and WAYNE COUNTIES Rates Fringes Painters: Bridges, Stacks & Tanks.....$ 26.58 9.20 Commercial..................$ 19.13 9.20 Industrial..................$ 21.63 9.20 Spray & Abrasive Blasting...$ 21.13 9.20 Taper (Tools)...............$ 19.38 9.20 Waterblasting...............$ 21.13 9.20 Height Rates (All Areas): Over 60 ft. $0.50 per hour. Under 60 ft. $0.25 per hour. ---------------------------------------------------------------- PAIN1292-003 09/01/2008 IRON, MADISON, ST. FRANCOIS, STE. GENEVIEVE and WASHINGTON COUNTIES Rates Fringes Painters: Bridges, Stacks & Tanks.....$ 26.58 9.20 Commercial..................$ 21.23 9.20 Industrial..................$ 22.23 9.20 Lead Abatement..............$ 21.98 9.20 Spray & Abrasive Blasting...$ 23.23 9.20 Tapers (Tools)..............$ 21.48 9.20 Water Blasting..............$ 23.23 9.20 Height Rates (All Areas): 0ver 60 ft. $0.50 per hour Under 60 ft. $0.25 per hour. ---------------------------------------------------------------- PLAS0518-006 03/01/2008 BARRY, BARTON, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HOWELL, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON, OZARK, POLK, STONE, TANEY, VERNON, WEBSTER, AND WRIGHT COUNTIES Rates Fringes Cement Masons:...................$ 20.26 6.84 ---------------------------------------------------------------- PLAS0518-007 04/01/2008 CASS (Richards-Gebaur AFB only), CLAY, JACKSON, PLATTE AND RAY COUNTIES Rates Fringes Cement Masons:...................$ 27.20 11.65 ---------------------------------------------------------------- PLAS0518-011 05/01/2001 ANDREW, ATCHISON, BUCHANAN, BATES, CALDWELL, CARROLL, CLINTON, DAVIESS, DEKALB, GENTRY, GRUNDY, HARRISON, HOLT, LAFAYETTE, LIVINGSTON, MACON, MERCER, NODAWAY AND WORTH COUNTIES Rates Fringes Cement Masons:...................$ 23.13 7.15 ---------------------------------------------------------------- PLAS0527-001 05/07/2008 Rates Fringes Cement Masons: FRANKLIN, LINCOLN AND WARREN COUNTIES.............$ 28.21 12.45 JEFFERSON, ST. CHARLES COUNTIES AND ST.LOUIS (City and County)...........$ 29.38 12.45 ---------------------------------------------------------------- PLAS0527-004 06/01/2008 CRAWFORD, DENT, IRON, MADISON, MARION, PHELPS, PIKE, PULASKI, RALLS, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, SHANNON, TEXAS, WASHINGTON COUNTIES Rates Fringes Cement Masons:...................$ 26.45 12.37 ---------------------------------------------------------------- * PLAS0908-001 05/01/2008 BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, MISSISSIPPI, NEW MADRID, OREGON, PEMISCOT, PERRY, RIPLEY, SCOTT, STODDARD, AND WAYNE COUNTIES Rates Fringes CEMENT MASON.....................$ 19.45 13.45 ---------------------------------------------------------------- PLAS0908-005 03/01/2005 BENTON, CALLAWAY, CAMDEN, COLE, GASCONADE, HENRY, HICKORY, JOHNSON, MARIES, MILLER, MONTGOMERY, MORGAN, OSAGE, PETTIS, SALINE & ST. CLAIR COUNTIES Rates Fringes CEMENT MASON.....................$ 18.91 10.10 ---------------------------------------------------------------- PLUM0008-003 01/01/2009 Rates Fringes Plumbers BATES, BENTON, CARROLL, HENRY, LAFAYETTE, MORGAN, PETTIS, RAY, ST.CLAIR, SALINE and VERNON COUNTIES..$ 33.69 16.33 CASS, CLAY, JACKSON, JOHNSON and PLATTE COUNTIES.$ 36.13 16.33 ---------------------------------------------------------------- PLUM0035-002 01/01/2000 CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIES, MILLER, MONITEAU, OSAGE, PHELPS, PULASKI, ST. CHARLES, ST. LOUIS (City and County), WARREN and WASHINGTON COUNTIES Rates Fringes Plumbers.........................$ 26.105 9.74 ---------------------------------------------------------------- PLUM0045-003 09/01/2008 ANDREW, ATCHISON, BUCHANAN, CALDWELL, CLINTON, DAVIESS, DEKALB, GENTRY, HARRISON, HOLT, NODAWAY AND WORTH COUNTIES Rates Fringes Plumbers and Pipefitters.........$ 32.00 15.25 ---------------------------------------------------------------- PLUM0178-003 11/01/2008 BARRY, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HICKORY, LACLEDE, LAWRENCE, POLK, STONE, TANEY, WEBSTER AND WRIGHT COUNTIES Rates Fringes Plumbers and Pipefitters.........$ 25.59 12.48 ---------------------------------------------------------------- PLUM0178-006 11/01/2008 BARTON, JASPER, MCDONALD AND NEWTON COUNTIES Rates Fringes Plumbers and Pipefitters.........$ 23.12 11.98 ---------------------------------------------------------------- PLUM0533-004 06/01/2008 BATES, BENTON, CARROLL, CASS, CLAY, HENRY, HICKORY, JACKSON, JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY, SALINE, ST. CLAIR AND VERNON COUNTIES Rates Fringes Pipefitters......................$ 36.73 17.04 ---------------------------------------------------------------- PLUM0562-004 07/01/2007 ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY,CAMDEN, CAPE GIRARDEAU,CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD, DENT, DUNKLIN, FRANKLIN, GASCONADE, GRUNDY, HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCOLN, LINN, LIVINGSTON, MACON, MADISON, MARIES, MARION, MERCER, MILLER, MISSISSIPPI, MONITEAU, MONROE, MONTGOMERY, NEW MADRID, OREGON, OSAGE, PEMISCOTT, PERRY, PHELPS, PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST.FRANCOIS, STE. GENEVIEVE, ST. LOUIS, SCHUYLER, SCOTLAND, SCOTT, SHANNON, SHELBY, STODDARD, SULLIVAN, TEXAS, WARREN, WASHINGTON,AND WAYNE COUNTIES. Rates Fringes Plumbers and Pipefitters Projects $7.0 million and over........................$ 32.00 18.68 Projects under $7.0 million.$ 30.66 14.24 ---------------------------------------------------------------- TEAM0013-001 05/01/2008 Rates Fringes Truck drivers (ADAIR, BUTLER, CLARK, DUNKIN, HOWELL, KNOX, LEWIS, OREGON, PUTNAM, RIPLEY, SCHUYLER AND SCOTLAND COUNTIES) GROUP 1.....................$ 25.09 8.65 GROUP 2.....................$ 25.25 8.65 GROUP 3.....................$ 25.24 8.65 GROUP 4.....................$ 25.36 8.65 Truck drivers (AUDRAIN, BOLLINGER, BOONE, CALLAWAY, CAPE GIRARDEAU, CARTER, COLE, CRAWFORD, DENT, GASCONADE, IRON, MACON, MADISON, MARIES, MARION, MILLER, MISSISSIPPI, MONROE, MONTGOMERY, NEW MADRID, OSAGE, PEMISCOT, PERRY, PHELPS, PIKE, PULASKI, RALLS, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, SCOTT, SHANNON, SHELBY, STODDARD, TEXAS, WASHINGTON AND WAYNE COUNTIES) GROUP 1.....................$ 25.82 8.65 GROUP 2.....................$ 25.98 8.65 GROUP 3.....................$ 25.97 8.65 GROUP 4.....................$ 26.09 8.65 Truck drivers (FRANKLIN, JEFFERSON and ST. CHARLES COUNTIES) GROUP 1.....................$ 28.18 8.65 GROUP 2.....................$ 28.29 8.65 GROUP 3.....................$ 28.33 8.65 GROUP 4.....................$ 28.40 8.65 Truck drivers (LINCOLN and WARREN COUNTIES) GROUP 1.....................$ 26.83 8.65 GROUP 2.....................$ 26.94 8.65 GROUP 3.....................$ 26.98 8.65 GROUP 4.....................$ 27.05 8.65 TRUCK DRIVERS CLASSIFICATIONS: GROUP 1: Flat Bed Trucks, Single Axle; Station Wagons; Pickup Trucks; Material Trucks, Single Axle; Tank Wagon, Single Axle GROUP 2: Agitator and Transit Mix Trucks GROUP 3: Flat Bed Trucks, Tandem Axle; Articulated Dump Trucks; Material Trucks, Tandem Axle; Tank Wagon, Tandem Axle GROUP 4: Semi and/or Pole Trailers; Winch, Fork & Steel Trucks; Distributor Drivers and Operators; Tank Wagon, Semi-Trailer; Insley Wagons, Dumpsters, Half-Tracks, Speedace, Euclids and other similar equipment; A-Frame and Derrick Trucks; Float or Low Boy ---------------------------------------------------------------- TEAM0056-001 05/01/2006 Rates Fringes Truck drivers (ANDREW, BARTON, BATES, BENTON, CALDWELL, CAMDEN, CARROLL, CEDAR, CHARITON, CHRISTIAN, CLINTON, COOPER, DADE, DALLAS, DAVIESS, DEKALB, DOUGLAS, GREENE, HENRY, HICHKORY, HOWARD, JASPER, LACLEDE, LAWRENCE, LINN, LIVINGSTON, MONITEAU, MORGAN, NEWTON, PETTIS, POLK, RANDOLPH, ST. CLAIR, SALINE, VERNON, WEBSTER AND WRIGHT COUNTIES) GROUP 1.....................$ 23.97 8.00 GROUP 2.....................$ 24.13 8.00 GROUP 3.....................$ 24.12 8.00 GROUP 4.....................$ 24.24 8.00 GROUP 5.....................$ 23.87 8.00 Truck drivers: (ATCHISON, BARRY, GENTRY, GRUNDY, HARRISON, HOLT, MCDONALD, MERCER, NODAWAY, OZARK, STONE, SULLIVAN, TANEY AND WORTH COUNTIES) GROUP 1.....................$ 23.24 8.00 GROUP 2.....................$ 23.40 8.00 GROUP 3.....................$ 23.39 8.00 GROUP 4.....................$ 23.51 8.00 GROUP 5.....................$ 23.14 8.00 Truck drivers; (BUCHANAN, JOHNSON AND LAFAYETTE COUNTIES) GROUP 1.....................$ 25.33 8.00 GROUP 2.....................$ 25.29 8.00 GROUP 3.....................$ 25.33 8.00 GROUP 4.....................$ 25.40 8.00 GROUP 5.....................$ 25.08 8.00 TRUCK DRIVER CLASSIFICATIONS GROUP 1: Flat bed trucks single axle; station wagons; pickup trucks; material trucks single axle; tank wagons single axle. GROUP 2: Agitator and transit mix-trucks. GROUP 3: Flat bed trucks tandem axle; articulated dump trucks; material trucks tandem axle; tank wagons tandem axle. GROUP 4: Semi and/or pole trailers; winch, fork & steel trucks; distributor drivers & operators; tank wagons semi- trailer; insley wagons, dumpsters, half-tracks, speedace, euclids & other similar equipment; A-frames and derrick trucks; float or low boy. GROUP 5: Warehousemen. ---------------------------------------------------------------- TEAM0245-001 03/25/1998 BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DALLAS, DENT, DOUGLAS, GREENE, HICKORY, HOWELL, JASPER, LACLEDE, LAWRENCE, MCDONALD, MILLER, NEWTON, OZARK, PHELPS, POLK, PULASKI, SHANNON, STONE, TANEY, TEXAS, VERNON, WEBSTER AND WRIGHT COUNTIES Rates Fringes Truck drivers: Traffic Control Service Driver......................$ 12.90 3.56+a PAID HOLIDAYS: New Year's Day, Decoration Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day, employee's birthday and 2 personal days. ---------------------------------------------------------------- TEAM0541-001 04/01/2008 CASS, CLAY, JACKSON, PLATTE AND RAY COUNTIES Rates Fringes Truck drivers: GROUP 1.....................$ 28.03 9.90 GROUP 2.....................$ 27.46 9.90 GROUP 3.....................$ 26.94 9.90 TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Mechanics and Welders, Field; A-Frame Low Boy-Boom ruck Driver. GROUP 2: Articulated Dump Truck; Insley Wagons: Dump Trucks, Excavating, 5 cu yds and over; Dumpsters; Half-Tracks: Speedace: Euclids & similar excavating equipment Material trucks, Tandem Two teams; Semi-Trailers; Winch trucks-Fork trucks; Distributor Drivers and Operators; Agitator and Transit Mix; Tank Wagon Drivers, Tandem or Semi; One Team; Station Wagons; Pickup Trucks; Material Trucks, Single Axle; Tank Wagon Drivers, Single Axle GROUP 3: Oilers and Greasers - Field ---------------------------------------------------------------- TEAM0541-002 03/25/2000 BATES, CASS, CLAY, HENRY, JACKSON, JOHNSON, LAFAYETTE, PLATTE, AND RAY COUNTIES Rates Fringes Truck drivers: Traffic Control Service Driver......................$ 14.15 2.44+a a. PAID HOLIDAYS: New Year's Day, Decoration Day, July 4th,Labor Day, Thanksgiving Day, Christmas Day, Employee's birthday and 2 personal days. ---------------------------------------------------------------- TEAM0682-002 05/01/2008 ST LOUIS CITY AND COUNTY Rates Fringes Truck drivers: GROUP 1.....................$ 26.605 4.69+a+b+c+d GROUP 2.....................$ 26.805 4.69+a+b+c+d GROUP 3.....................$ 26.905 4.69+a+b+c+d GROUP 4.....................$ 26.905 4.69+a+b+c+d a. PENSION: $27.60 per day, $138.00 maximum per week. b. HAZMAT PREMIUM: If Hazmat certification on a job site is required by a state or federal agency or requested by project owner or by the employer, employees on that job site shall receive $1.50 premium pay. TRUCK DRIVERS CLASSIFICATIONS GROUP 1 - Pick-up trucks; forklift, single axle; flatbed trucks; job site ambulance, and trucks or trailers of a water level capacity of 11.99 cu. yds. or less GROUP 2 - Trucks or trailers of a water level capacity of 12.0 cu yds. up to 22.0 cu yds. including euclids, speedace and similar equipment of same capacity and compressors GROUP 3 - Trucks or trailers of a water level capacity of 22.0 cu. yds & over including euclids, speedace & all floats, flatbed trailers, boom trucks, winch trucks, including small trailers, farm wagons tilt-top trailers, field offices, tool trailers, concrete pumps, concrete conveyors & gasoline tank trailers and truck mounted mobile concrete mixers GROUP 4 - Warehousemen. FOOTNOTE FOR TRUCK DRIVERS: c. PAID HOLIDAYS: Christmas Day, Independence Day, Labor Day, Memorial Day, Veterans Day, New Years Day, Thanksgiving Day d. PAID VACATION: 3 days paid vacation for 600 hours of service in any one contract year; 4 days paid vacation for 800 hours of service in any one contract year; 5 days paid vacation for 1,000 hours of service in any one contract year. When such an employee has completed 3 years of continuous employment with the same employer and then works the above required number of hours, he shall receive double the number of days of vacation specified above. When such an employee has completed 10 years of continuous employment with the same employer and then works the above required number of hours, he shall receive triple the number of days of vacation specified above. When such an employee has completed 15 years of continuous employment with the same employer and then works the above required number of hours, he shall receive 4 times the number of days of vacation specified above. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION