Mechanism Data Report: Air Traffic Control Beacon Interrogator Model 6
Mechanism Hierarchy
Systems
Air Traffic Control Systems
Air Traffic Control Surveillance
Cooperative Surveillance
Air Traffic Control Beacon Interrogator Model 6
Legend: Hierarchy Element - Mechanism

Mechanism Data
Name (acro/abbrev) Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)
Description The Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6) is a ground-based system that interrogates transponders, receives, and processes replies from transponders, determines the range and azimuth to the aircraft, and forwards the information to appropriate air traffic control (ATC) automation systems.  Replies provide identification and altitude data of the transponder.  The ATCBI-6 Replacement Program will procure about 140 Monopulse Secondary Surveillance Radar (MSSR) with Selective Interrogation (SI) to replace existing operational beacons, which includes four support systems (not shown in the quantities below) for training, testing, logistics, and operational support.

As of December 2008, 137 ATCBI-6 systems had been delivered, 137  delivered to sites and 111 commissioned.  Ninety-six (96) legacy ATCBI systems have been removed.

The ATCBI-6 will replace all ATCBI-4 and ATCBI-5 systems at NAS en route facilities. All ATCBI-4 systems will be out of the NAS by the end of 2007.  ATCBI-5 systems will be moved to terminal or beacon only site (BOS) facilities.
Mechanism Type System
NAS Domain Surveillance
Last Certified 03-Nov-2008
 
Related Location Types Surveillance
Flight Domain none
Initiatives none
 

Mechanism Schedule 
Concept StartInitial OperationFull OperationBegin DecommissionEnd of Service
ATCBI-601-Aug-199802-Apr-200230-May-201030-Oct-202930-Oct-2030

Attachments
No attachments found for this mechanism.

Programmatic Information
Mechanism Air Traffic Control Beacon Interrogator Model 6
Mechanism Air Traffic Control Beacon Interrogator Model 6
Mechanism Air Traffic Control Beacon Interrogator Model 6
Mechanism Air Traffic Control Beacon Interrogator Model 6
Mechanism Air Traffic Control Beacon Interrogator Model 6
Mechanism Air Traffic Control Beacon Interrogator Model 6
Legend: Program Program, Project Project, Segment Segment, Mechanism Mechanism

Mechanism Predecessor/Successor ScheduleText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
Air Traffic Control Beacon Interrogator Models 4/5Air Traffic Control Beacon Interrogator Models 4/5Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC)01-May-1961 to 17-Nov-2010Air Traffic Control Beacon Interrogator Models 4/5
Installation Phase
Initial Operational Capability (IOC) to Full Operational Capability (FOC)
01-May-1961 to 17-Nov-2010
Air Traffic Control Beacon Interrogator Models 4/5Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD)17-Nov-2010 to 17-Jan-2018Air Traffic Control Beacon Interrogator Models 4/5
Daily Operations
Full Operational Capability (FOC) to Begin Decommission (BD)
17-Nov-2010 to 17-Jan-2018
Air Traffic Control Beacon Interrogator Models 4/5DecommissionBegin Decommission (BD) to End of Service (EOS)17-Jan-2018 to 01-Jun-2024Air Traffic Control Beacon Interrogator Models 4/5
Decommission
Begin Decommission (BD) to End of Service (EOS)
17-Jan-2018 to 01-Jun-2024
---predecessors above---
Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC)02-Apr-2002 to 30-May-2010Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)
Installation Phase
Initial Operational Capability (IOC) to Full Operational Capability (FOC)
02-Apr-2002 to 30-May-2010
Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD)30-May-2010 to 30-Oct-2029Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)
Daily Operations
Full Operational Capability (FOC) to Begin Decommission (BD)
30-May-2010 to 30-Oct-2029
Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)DecommissionBegin Decommission (BD) to End of Service (EOS)30-Oct-2029 to 30-Oct-2030Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)
Decommission
Begin Decommission (BD) to End of Service (EOS)
30-Oct-2029 to 30-Oct-2030
---successors below---
New En Route Surveillance SystemNo data points in this rangeNew En Route Surveillance SystemDesign PhaseConcept Start to Initial Operational Capability (IOC)01-Jan-2015 to 01-Jan-2022New En Route Surveillance System
Design Phase
Concept Start to Initial Operational Capability (IOC)
01-Jan-2015 to 01-Jan-2022
New En Route Surveillance SystemInstallation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC)01-Jan-2022 to 01-Jan-2027New En Route Surveillance System
Installation Phase
Initial Operational Capability (IOC) to Full Operational Capability (FOC)
01-Jan-2022 to 01-Jan-2027
New En Route Surveillance SystemDaily OperationsFull Operational Capability (FOC) to Begin Decommission (BD)01-Jan-2027 to 01-Jan-2042New En Route Surveillance System
Daily Operations
Full Operational Capability (FOC) to Begin Decommission (BD)
01-Jan-2027 to 01-Jan-2042
New En Route Surveillance SystemDecommissionBegin Decommission (BD) to End of Service (EOS)01-Jan-2042 to 01-Jan-2047New En Route Surveillance System
Decommission
Begin Decommission (BD) to End of Service (EOS)
01-Jan-2042 to 01-Jan-2047
Surveillance Data ASTERIX and IP UpgradeSurveillance Data ASTERIX and IP UpgradeDesign PhaseConcept Start to Initial Operational Capability (IOC)01-Jan-1995 to 01-Jan-2012Surveillance Data ASTERIX and IP Upgrade
Design Phase
Concept Start to Initial Operational Capability (IOC)
01-Jan-1995 to 01-Jan-2012
Surveillance Data ASTERIX and IP UpgradeInstallation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC)01-Jan-2012 to 01-Jan-2015Surveillance Data ASTERIX and IP Upgrade
Installation Phase
Initial Operational Capability (IOC) to Full Operational Capability (FOC)
01-Jan-2012 to 01-Jan-2015
Surveillance Data ASTERIX and IP UpgradeDaily OperationsFull Operational Capability (FOC) to Begin Decommission (BD)01-Jan-2015 to 01-Jan-2022Surveillance Data ASTERIX and IP Upgrade
Daily Operations
Full Operational Capability (FOC) to Begin Decommission (BD)
01-Jan-2015 to 01-Jan-2022
Surveillance Data ASTERIX and IP UpgradeDecommissionBegin Decommission (BD) to End of Service (EOS)01-Jan-2022 to 01-Jan-2027Surveillance Data ASTERIX and IP Upgrade
Decommission
Begin Decommission (BD) to End of Service (EOS)
01-Jan-2022 to 01-Jan-2027
Legend:   Design PhaseConcept Start to Initial Operational Capability (IOC) - Design Phase   Installation PhaseInitial Operational Capability (IOC) to Full Operational Capability (FOC) - Installation Phase   Daily OperationsFull Operational Capability (FOC) to Begin Decommission (BD) - Daily Operations   DecommissionBegin Decommission (BD) to End of Service (EOS) - Decommission

Location ScheduleText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
OKLAHOMA CITY   LRR (SURVEILLANCE)OKLAHOMA CITY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)01-Jul-2002 to 10-Nov-2029OKLAHOMA CITY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
01-Jul-2002 to 10-Nov-2029
KLAMATH FALLS   LRR (SURVEILLANCE)KLAMATH FALLS   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)20-Oct-2003 to 07-Jan-2030KLAMATH FALLS   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
20-Oct-2003 to 07-Jan-2030
BIORKA ISLAND-SITKA LRR (SURVEILLANCE)BIORKA ISLAND-SITKA LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)12-Nov-2003 to 10-Jan-2030BIORKA ISLAND-SITKA LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
12-Nov-2003 to 10-Jan-2030
PUU NIANIAU-PUKALANI LRR (SURVEILLANCE)PUU NIANIAU-PUKALANI LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)17-Nov-2003 to 10-Jan-2030PUU NIANIAU-PUKALANI LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
17-Nov-2003 to 10-Jan-2030
DEADHORSE   LRR (SURVEILLANCE)DEADHORSE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)20-Nov-2003 to 11-Jan-2030DEADHORSE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
20-Nov-2003 to 11-Jan-2030
MONROE LRR (SURVEILLANCE)MONROE LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)26-Nov-2003 to 11-Jan-2030MONROE LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
26-Nov-2003 to 11-Jan-2030
RED TABLE MOUNTAIN-EAGLE LRR (SURVEILLANCE)RED TABLE MOUNTAIN-EAGLE LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)03-Feb-2004 to 20-Jan-2030RED TABLE MOUNTAIN-EAGLE LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
03-Feb-2004 to 20-Jan-2030
PUTNAM LRR (SURVEILLANCE)PUTNAM LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)31-Mar-2004 to 27-Jan-2030PUTNAM LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
31-Mar-2004 to 27-Jan-2030
BYHALIA   LRR (SURVEILLANCE)BYHALIA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)06-Apr-2004 to 28-Jan-2030BYHALIA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
06-Apr-2004 to 28-Jan-2030
PAHOA-HILO   LRR (SURVEILLANCE)PAHOA-HILO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)10-May-2004 to 01-Feb-2030PAHOA-HILO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
10-May-2004 to 01-Feb-2030
SEATTLE   LRR (SURVEILLANCE)SEATTLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)10-Jun-2004 to 04-Feb-2030SEATTLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
10-Jun-2004 to 04-Feb-2030
MIDDLETON ISLAND   LRR (SURVEILLANCE)MIDDLETON ISLAND   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)21-Jun-2004 to 06-Feb-2030MIDDLETON ISLAND   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
21-Jun-2004 to 06-Feb-2030
CUMMINGTON   LRR (SURVEILLANCE)CUMMINGTON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)28-Jun-2004 to 07-Feb-2030CUMMINGTON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
28-Jun-2004 to 07-Feb-2030
HIGBY-HARMONY LRR (SURVEILLANCE)HIGBY-HARMONY LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)28-Jun-2004 to 07-Feb-2030HIGBY-HARMONY LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
28-Jun-2004 to 07-Feb-2030
MARIETTA   LRR (SURVEILLANCE)MARIETTA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)30-Jun-2004 to 07-Feb-2030MARIETTA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
30-Jun-2004 to 07-Feb-2030
SACRAMENTO   LRR (SURVEILLANCE)SACRAMENTO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)19-Jul-2004 to 09-Feb-2030SACRAMENTO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
19-Jul-2004 to 09-Feb-2030
CHELSEA LRR (SURVEILLANCE)CHELSEA LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)10-Aug-2004 to 12-Feb-2030CHELSEA LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
10-Aug-2004 to 12-Feb-2030
EAGLE RIVER   LRR (SURVEILLANCE)EAGLE RIVER   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)12-Aug-2004 to 12-Feb-2030EAGLE RIVER   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
12-Aug-2004 to 12-Feb-2030
BORON   LRR (SURVEILLANCE)BORON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)26-Aug-2004 to 14-Feb-2030BORON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
26-Aug-2004 to 14-Feb-2030
CROSSVILLE LRR (SURVEILLANCE)CROSSVILLE LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)27-Aug-2004 to 14-Feb-2030CROSSVILLE LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
27-Aug-2004 to 14-Feb-2030
WEST MESA-ALBUQUERQUE   LRR (SURVEILLANCE)WEST MESA-ALBUQUERQUE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)01-Sep-2004 to 15-Feb-2030WEST MESA-ALBUQUERQUE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
01-Sep-2004 to 15-Feb-2030
HUNTINGBURG LRR (SURVEILLANCE)HUNTINGBURG LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)02-Sep-2004 to 15-Feb-2030HUNTINGBURG LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
02-Sep-2004 to 15-Feb-2030
ASHBURN   LRR (SURVEILLANCE)ASHBURN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)13-Oct-2004 to 20-Feb-2030ASHBURN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
13-Oct-2004 to 20-Feb-2030
BRECKSVILLE-CLEVELAND   LRR (SURVEILLANCE)BRECKSVILLE-CLEVELAND   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)14-Oct-2004 to 20-Feb-2030BRECKSVILLE-CLEVELAND   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
14-Oct-2004 to 20-Feb-2030
ANSON LRR (SURVEILLANCE)ANSON LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)28-Oct-2004 to 22-Feb-2030ANSON LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
28-Oct-2004 to 22-Feb-2030
ST PAUL ISLAND   LRR (SURVEILLANCE)ST PAUL ISLAND   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)01-Nov-2004 to 22-Feb-2030ST PAUL ISLAND   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
01-Nov-2004 to 22-Feb-2030
OAKDALE-PITTSBURGH   LRR (SURVEILLANCE)OAKDALE-PITTSBURGH   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)17-Nov-2004 to 24-Feb-2030OAKDALE-PITTSBURGH   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
17-Nov-2004 to 24-Feb-2030
TEXARKANA   LRR (SURVEILLANCE)TEXARKANA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)01-Dec-2004 to 26-Feb-2030TEXARKANA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
01-Dec-2004 to 26-Feb-2030
MONTGOMERY   LRR (SURVEILLANCE)MONTGOMERY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)21-Dec-2004 to 28-Feb-2030MONTGOMERY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
21-Dec-2004 to 28-Feb-2030
SILVER CITY-MULE CREEK   LRR (SURVEILLANCE)SILVER CITY-MULE CREEK   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)14-Jan-2005 to 03-Mar-2030SILVER CITY-MULE CREEK   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
14-Jan-2005 to 03-Mar-2030
BENTON   LRR (SURVEILLANCE)BENTON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)10-Feb-2005 to 06-Mar-2030BENTON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
10-Feb-2005 to 06-Mar-2030
HALEYVILLE-RUSSELLVILLE   LRR (SURVEILLANCE)HALEYVILLE-RUSSELLVILLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)23-Feb-2005 to 08-Mar-2030HALEYVILLE-RUSSELLVILLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
23-Feb-2005 to 08-Mar-2030
HOUSTON-ELLINGTON   LRR (SURVEILLANCE)HOUSTON-ELLINGTON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)23-Feb-2005 to 08-Mar-2030HOUSTON-ELLINGTON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
23-Feb-2005 to 08-Mar-2030
CROCKER   LRR (SURVEILLANCE)CROCKER   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)18-Mar-2005 to 11-Mar-2030CROCKER   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
18-Mar-2005 to 11-Mar-2030
SKOWHEGAN   LRR (SURVEILLANCE)SKOWHEGAN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)28-Mar-2005 to 12-Mar-2030SKOWHEGAN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
28-Mar-2005 to 12-Mar-2030
LINCOLNTON   LRR (SURVEILLANCE)LINCOLNTON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)29-Mar-2005 to 12-Mar-2030LINCOLNTON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
29-Mar-2005 to 12-Mar-2030
APPLE VALLEY   LRR (SURVEILLANCE)APPLE VALLEY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)31-Mar-2005 to 12-Mar-2030APPLE VALLEY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
31-Mar-2005 to 12-Mar-2030
ODESSA-SEMINOLE   LRR (SURVEILLANCE)ODESSA-SEMINOLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)05-Apr-2005 to 13-Mar-2030ODESSA-SEMINOLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
05-Apr-2005 to 13-Mar-2030
JOELTON   LRR (SURVEILLANCE)JOELTON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)20-Apr-2005 to 15-Mar-2030JOELTON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
20-Apr-2005 to 15-Mar-2030
LAGRANGE   LRR (SURVEILLANCE)LAGRANGE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)12-May-2005 to 18-Mar-2030LAGRANGE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
12-May-2005 to 18-Mar-2030
ROGERS   LRR (SURVEILLANCE)ROGERS   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)24-May-2005 to 19-Mar-2030ROGERS   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
24-May-2005 to 19-Mar-2030
LONDON   LRR (SURVEILLANCE)LONDON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)17-Jun-2005 to 22-Mar-2030LONDON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
17-Jun-2005 to 22-Mar-2030
SAN PEDRO   LRR (SURVEILLANCE)SAN PEDRO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)17-Jun-2005 to 22-Mar-2030SAN PEDRO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
17-Jun-2005 to 22-Mar-2030
SHEMYA   LRR (SURVEILLANCE)SHEMYA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)17-Jun-2005 to 22-Mar-2030SHEMYA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
17-Jun-2005 to 22-Mar-2030
MAIDEN   LRR (SURVEILLANCE)MAIDEN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)23-Jun-2005 to 23-Mar-2030MAIDEN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
23-Jun-2005 to 23-Mar-2030
FOSSIL   LRR (SURVEILLANCE)FOSSIL   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)07-Jul-2005 to 25-Mar-2030FOSSIL   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
07-Jul-2005 to 25-Mar-2030
HUTCHINSON   LRR (SURVEILLANCE)HUTCHINSON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)14-Jul-2005 to 25-Mar-2030HUTCHINSON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
14-Jul-2005 to 25-Mar-2030
EDWARDS AFB   LRR (SURVEILLANCE)EDWARDS AFB   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)24-Jul-2005 to 27-Mar-2030EDWARDS AFB   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
24-Jul-2005 to 27-Mar-2030
BATTLE MOUNTAIN   LRR (SURVEILLANCE)BATTLE MOUNTAIN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)02-Aug-2005 to 28-Mar-2030BATTLE MOUNTAIN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
02-Aug-2005 to 28-Mar-2030
HANNA CITY   LRR (SURVEILLANCE)HANNA CITY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)10-Aug-2005 to 29-Mar-2030HANNA CITY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
10-Aug-2005 to 29-Mar-2030
PHOENIX WxRR (SURVEILLANCE)PHOENIX WxRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)17-Aug-2005 to 30-Mar-2030PHOENIX WxRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
17-Aug-2005 to 30-Mar-2030
RUSSELLVILLE   LRR (SURVEILLANCE)RUSSELLVILLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)07-Sep-2005 to 01-Apr-2030RUSSELLVILLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
07-Sep-2005 to 01-Apr-2030
ST LOUIS-OVERLAND   LRR (SURVEILLANCE)ST LOUIS-OVERLAND   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)12-Oct-2005 to 05-Apr-2030ST LOUIS-OVERLAND   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
12-Oct-2005 to 05-Apr-2030
THE PLAINS   LRR (SURVEILLANCE)THE PLAINS   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)26-Oct-2005 to 07-Apr-2030THE PLAINS   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
26-Oct-2005 to 07-Apr-2030
ALEXANDRIA   LRR (SURVEILLANCE)ALEXANDRIA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)11-Nov-2005 to 09-Apr-2030ALEXANDRIA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
11-Nov-2005 to 09-Apr-2030
DANSVILLE   LRR (SURVEILLANCE)DANSVILLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)30-Nov-2005 to 11-Apr-2030DANSVILLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
30-Nov-2005 to 11-Apr-2030
OSKALOOSA   LRR (SURVEILLANCE)OSKALOOSA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)13-Feb-2006 to 21-Apr-2030OSKALOOSA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
13-Feb-2006 to 21-Apr-2030
SAMBURG   LRR (SURVEILLANCE)SAMBURG   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)13-Feb-2006 to 21-Apr-2030SAMBURG   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
13-Feb-2006 to 21-Apr-2030
BINNS HALL-RUTHVILLE   LRR (SURVEILLANCE)BINNS HALL-RUTHVILLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)27-Feb-2006 to 22-Apr-2030BINNS HALL-RUTHVILLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
27-Feb-2006 to 22-Apr-2030
CITRONELLE   LRR (SURVEILLANCE)CITRONELLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)27-Mar-2006 to 26-Apr-2030CITRONELLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
27-Mar-2006 to 26-Apr-2030
BEDFORD   LRR (SURVEILLANCE)BEDFORD   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)28-Mar-2006 to 26-Apr-2030BEDFORD   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
28-Mar-2006 to 26-Apr-2030
COOPERSVILLE   LRR (SURVEILLANCE)COOPERSVILLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)14-Apr-2006 to 28-Apr-2030COOPERSVILLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
14-Apr-2006 to 28-Apr-2030
LYNCH   LRR (SURVEILLANCE)LYNCH   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)20-Apr-2006 to 29-Apr-2030LYNCH   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
20-Apr-2006 to 29-Apr-2030
HORICON   LRR (SURVEILLANCE)HORICON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)27-Apr-2006 to 30-Apr-2030HORICON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
27-Apr-2006 to 30-Apr-2030
KELLER-FT WORTH   LRR (SURVEILLANCE)KELLER-FT WORTH   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)16-May-2006 to 02-May-2030KELLER-FT WORTH   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
16-May-2006 to 02-May-2030
DETROIT-CANTON   LRR (SURVEILLANCE)DETROIT-CANTON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)26-May-2006 to 03-May-2030DETROIT-CANTON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
26-May-2006 to 03-May-2030
PANAMA CITY-TYNDALL AFB   LRR (SURVEILLANCE)PANAMA CITY-TYNDALL AFB   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)06-Jun-2006 to 04-May-2030PANAMA CITY-TYNDALL AFB   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
06-Jun-2006 to 04-May-2030
ARLINGTON   LRR (SURVEILLANCE)ARLINGTON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)07-Jun-2006 to 05-May-2030ARLINGTON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
07-Jun-2006 to 05-May-2030
INDIANAPOLIS   LRR (SURVEILLANCE)INDIANAPOLIS   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)29-Jun-2006 to 07-May-2030INDIANAPOLIS   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
29-Jun-2006 to 07-May-2030
OMAHA   LRR (SURVEILLANCE)OMAHA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)12-Jul-2006 to 09-May-2030OMAHA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
12-Jul-2006 to 09-May-2030
BENSON   LRR (SURVEILLANCE)BENSON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)13-Jul-2006 to 09-May-2030BENSON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
13-Jul-2006 to 09-May-2030
CLEARFIELD   LRR (SURVEILLANCE)CLEARFIELD   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)17-Jul-2006 to 09-May-2030CLEARFIELD   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
17-Jul-2006 to 09-May-2030
SELIGMAN   LRR (SURVEILLANCE)SELIGMAN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)25-Jul-2006 to 10-May-2030SELIGMAN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
25-Jul-2006 to 10-May-2030
OCEANA   LRR (SURVEILLANCE)OCEANA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)22-Aug-2006 to 14-May-2030OCEANA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
22-Aug-2006 to 14-May-2030
ROCKSPRINGS   LRR (SURVEILLANCE)ROCKSPRINGS   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)22-Aug-2006 to 14-May-2030ROCKSPRINGS   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
22-Aug-2006 to 14-May-2030
ELWOOD-JOLIET   LRR (SURVEILLANCE)ELWOOD-JOLIET   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)16-Sep-2006 to 17-May-2030ELWOOD-JOLIET   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
16-Sep-2006 to 17-May-2030
NEWPORT   LRR (SURVEILLANCE)NEWPORT   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)25-Sep-2006 to 18-May-2030NEWPORT   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
25-Sep-2006 to 18-May-2030
MAKAH-NEAH BAY   LRR (SURVEILLANCE)MAKAH-NEAH BAY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)29-Sep-2006 to 18-May-2030MAKAH-NEAH BAY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
29-Sep-2006 to 18-May-2030
KENAI   LRR (SURVEILLANCE)KENAI   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)31-Oct-2006 to 22-May-2030KENAI   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
31-Oct-2006 to 22-May-2030
MILL VALLEY   LRR (SURVEILLANCE)MILL VALLEY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)07-Nov-2006 to 23-May-2030MILL VALLEY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
07-Nov-2006 to 23-May-2030
GIBBSBORO   LRR (SURVEILLANCE)GIBBSBORO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)27-Nov-2006 to 26-May-2030GIBBSBORO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
27-Nov-2006 to 26-May-2030
KIRKSVILLE   LRR (SURVEILLANCE)KIRKSVILLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)11-Jan-2007 to 31-May-2030KIRKSVILLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
11-Jan-2007 to 31-May-2030
OILTON   LRR (SURVEILLANCE)OILTON   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)06-Mar-2007 to 07-Jun-2030OILTON   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
06-Mar-2007 to 07-Jun-2030
MT SANTA ROSA-YIGO   LRR (SURVEILLANCE)MT SANTA ROSA-YIGO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)03-Apr-2007 to 10-Jun-2030MT SANTA ROSA-YIGO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
03-Apr-2007 to 10-Jun-2030
LAKE CHARLES   LRR (SURVEILLANCE)LAKE CHARLES   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)05-Apr-2007 to 11-Jun-2030LAKE CHARLES   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
05-Apr-2007 to 11-Jun-2030
BOZEMAN   LRR (SURVEILLANCE)BOZEMAN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)26-Apr-2007 to 13-Jun-2030BOZEMAN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
26-Apr-2007 to 13-Jun-2030
FINLEY   LRR (SURVEILLANCE)FINLEY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)25-May-2007 to 17-Jun-2030FINLEY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
25-May-2007 to 17-Jun-2030
CARIBOU   LRR (SURVEILLANCE)CARIBOU   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)16-Jun-2007 to 19-Jun-2030CARIBOU   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
16-Jun-2007 to 19-Jun-2030
EAGLE COUNTY LRR (SURVEILLANCE)EAGLE COUNTY LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)06-Jul-2007 to 22-Jun-2030EAGLE COUNTY LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
06-Jul-2007 to 22-Jun-2030
FT GREEN   LRR (SURVEILLANCE)FT GREEN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)14-Aug-2007 to 27-Jun-2030FT GREEN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
14-Aug-2007 to 27-Jun-2030
DEMING-LAS CRUCES   LRR (SURVEILLANCE)DEMING-LAS CRUCES   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)02-Oct-2007 to 03-Jul-2030DEMING-LAS CRUCES   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
02-Oct-2007 to 03-Jul-2030
LAKESIDE   LRR (SURVEILLANCE)LAKESIDE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)30-Oct-2007 to 06-Jul-2030LAKESIDE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
30-Oct-2007 to 06-Jul-2030
KING MOUNTAIN-MCCAMEY   LRR (SURVEILLANCE)KING MOUNTAIN-MCCAMEY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)06-Nov-2007 to 07-Jul-2030KING MOUNTAIN-MCCAMEY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
06-Nov-2007 to 07-Jul-2030
CROSS CITY   LRR (SURVEILLANCE)CROSS CITY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)07-Nov-2007 to 07-Jul-2030CROSS CITY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
07-Nov-2007 to 07-Jul-2030
GEORGETOWN   LRR (SURVEILLANCE)GEORGETOWN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)08-Nov-2007 to 07-Jul-2030GEORGETOWN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
08-Nov-2007 to 07-Jul-2030
PASO ROBLES-SAN LUIS OBISPO   LRR (SURVEILLANCE)PASO ROBLES-SAN LUIS OBISPO   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)07-Nov-2006 to 04-Dec-2007PASO ROBLES-SAN LUIS OBISPO   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
07-Nov-2006 to 04-Dec-2007
PASO ROBLES-SAN LUIS OBISPO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)04-Dec-2007 to 10-Jul-2030PASO ROBLES-SAN LUIS OBISPO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
04-Dec-2007 to 10-Jul-2030
RIVERHEAD   LRR (SURVEILLANCE)RIVERHEAD   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)09-Jan-2007 to 25-Dec-2007RIVERHEAD   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
09-Jan-2007 to 25-Dec-2007
RIVERHEAD   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)25-Dec-2007 to 13-Jul-2030RIVERHEAD   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
25-Dec-2007 to 13-Jul-2030
FT FISHER-KURE BEACH   LRR (SURVEILLANCE)FT FISHER-KURE BEACH   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)29-Jan-2007 to 15-Jan-2008FT FISHER-KURE BEACH   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
29-Jan-2007 to 15-Jan-2008
FT FISHER-KURE BEACH   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)15-Jan-2008 to 15-Jul-2030FT FISHER-KURE BEACH   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
15-Jan-2008 to 15-Jul-2030
JEDBURG   LRR (SURVEILLANCE)JEDBURG   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)05-Dec-2006 to 14-Feb-2008JEDBURG   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
05-Dec-2006 to 14-Feb-2008
JEDBURG   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)14-Feb-2008 to 19-Jul-2030JEDBURG   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
14-Feb-2008 to 19-Jul-2030
EAGLE PEAK-VAN HORN   LRR (SURVEILLANCE)EAGLE PEAK-VAN HORN   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)21-Feb-2007 to 22-Apr-2008EAGLE PEAK-VAN HORN   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
21-Feb-2007 to 22-Apr-2008
EAGLE PEAK-VAN HORN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)22-Apr-2008 to 27-Jul-2030EAGLE PEAK-VAN HORN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
22-Apr-2008 to 27-Jul-2030
KEY WEST   LRR (SURVEILLANCE)KEY WEST   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)08-Aug-2007 to 20-May-2008KEY WEST   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
08-Aug-2007 to 20-May-2008
KEY WEST   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)20-May-2008 to 31-Jul-2030KEY WEST   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
20-May-2008 to 31-Jul-2030
REDMOND LRR (SURVEILLANCE)No data points in this rangeREDMOND LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)25-Nov-2007 to 30-May-2008REDMOND LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
25-Nov-2007 to 30-May-2008
REDMOND LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)30-May-2008 to 01-Aug-2030REDMOND LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
30-May-2008 to 01-Aug-2030
NASSAU   LRR (SURVEILLANCE)No data points in this rangeNASSAU   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)12-Dec-2007 to 12-Jun-2008NASSAU   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
12-Dec-2007 to 12-Jun-2008
NASSAU   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)12-Jun-2008 to 03-Aug-2030NASSAU   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
12-Jun-2008 to 03-Aug-2030
AJO   LRR (SURVEILLANCE)AJO   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)15-Feb-2007 to 17-Jun-2008AJO   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
15-Feb-2007 to 17-Jun-2008
AJO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)17-Jun-2008 to 03-Aug-2030AJO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
17-Jun-2008 to 03-Aug-2030
SLIDELL-NEW ORLEANS   LRR (SURVEILLANCE)SLIDELL-NEW ORLEANS   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)26-Mar-2007 to 15-Jul-2008SLIDELL-NEW ORLEANS   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
26-Mar-2007 to 15-Jul-2008
SLIDELL-NEW ORLEANS   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)15-Jul-2008 to 07-Aug-2030SLIDELL-NEW ORLEANS   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
15-Jul-2008 to 07-Aug-2030
TAMIAMI   LRR (SURVEILLANCE)TAMIAMI   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)09-Apr-2007 to 22-Jul-2008TAMIAMI   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
09-Apr-2007 to 22-Jul-2008
TAMIAMI   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)22-Jul-2008 to 08-Aug-2030TAMIAMI   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
22-Jul-2008 to 08-Aug-2030
MELBOURNE   LRR (SURVEILLANCE)MELBOURNE   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)23-Sep-2007 to 07-Aug-2008MELBOURNE   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
23-Sep-2007 to 07-Aug-2008
MELBOURNE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)07-Aug-2008 to 10-Aug-2030MELBOURNE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
07-Aug-2008 to 10-Aug-2030
NORTH TRURO   LRR (SURVEILLANCE)NORTH TRURO   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)24-Jan-2007 to 22-Aug-2008NORTH TRURO   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
24-Jan-2007 to 22-Aug-2008
NORTH TRURO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)22-Aug-2008 to 11-Aug-2030NORTH TRURO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
22-Aug-2008 to 11-Aug-2030
EMPIRE   LRR (SURVEILLANCE)EMPIRE   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)24-Oct-2006 to 26-Aug-2008EMPIRE   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
24-Oct-2006 to 26-Aug-2008
EMPIRE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)26-Aug-2008 to 12-Aug-2030EMPIRE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
26-Aug-2008 to 12-Aug-2030
BUCKS HARBOR   LRR (SURVEILLANCE)BUCKS HARBOR   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)22-Aug-2007 to 29-Aug-2008BUCKS HARBOR   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
22-Aug-2007 to 29-Aug-2008
BUCKS HARBOR   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)29-Aug-2008 to 12-Aug-2030BUCKS HARBOR   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
29-Aug-2008 to 12-Aug-2030
UTICA-REMSEN   LRR (SURVEILLANCE)UTICA-REMSEN   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)11-Jul-2007 to 29-Aug-2008UTICA-REMSEN   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
11-Jul-2007 to 29-Aug-2008
UTICA-REMSEN   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)29-Aug-2008 to 12-Aug-2030UTICA-REMSEN   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
29-Aug-2008 to 12-Aug-2030
MT KAALA-WHEELER AAF   LRR (SURVEILLANCE)MT KAALA-WHEELER AAF   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)01-Jul-2007 to 30-Sep-2008MT KAALA-WHEELER AAF   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
01-Jul-2007 to 30-Sep-2008
MT KAALA-WHEELER AAF   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)30-Sep-2008 to 16-Aug-2030MT KAALA-WHEELER AAF   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
30-Sep-2008 to 16-Aug-2030
JACKSON HOLE LRR (SURVEILLANCE)No data points in this rangeJACKSON HOLE LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)18-Feb-2008 to 24-Oct-2008JACKSON HOLE LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
18-Feb-2008 to 24-Oct-2008
JACKSON HOLE LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)24-Oct-2008 to 19-Aug-2030JACKSON HOLE LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
24-Oct-2008 to 19-Aug-2030
LUFKIN LRR (SURVEILLANCE)LUFKIN LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)16-Sep-2007 to 07-Nov-2008LUFKIN LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
16-Sep-2007 to 07-Nov-2008
LUFKIN LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)07-Nov-2008 to 21-Aug-2030LUFKIN LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
07-Nov-2008 to 21-Aug-2030
SALEM   LRR (SURVEILLANCE)SALEM   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)07-Oct-2007 to 07-Nov-2008SALEM   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
07-Oct-2007 to 07-Nov-2008
SALEM   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)07-Nov-2008 to 21-Aug-2030SALEM   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
07-Nov-2008 to 21-Aug-2030
WATFORD CITY-ALEXANDER   LRR (SURVEILLANCE)WATFORD CITY-ALEXANDER   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)09-Sep-2007 to 02-Dec-2008WATFORD CITY-ALEXANDER   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
09-Sep-2007 to 02-Dec-2008
WATFORD CITY-ALEXANDER   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)02-Dec-2008 to 24-Aug-2030WATFORD CITY-ALEXANDER   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
02-Dec-2008 to 24-Aug-2030
NASHWAUK   LRR (SURVEILLANCE)NASHWAUK   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)21-Oct-2007 to 13-Jan-2009NASHWAUK   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
21-Oct-2007 to 13-Jan-2009
NASHWAUK   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)13-Jan-2009 to 29-Aug-2030NASHWAUK   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
13-Jan-2009 to 29-Aug-2030
GRAND TURK   LRR (SURVEILLANCE)No data points in this rangeGRAND TURK   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)30-Jun-2008 to 16-Jan-2009GRAND TURK   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
30-Jun-2008 to 16-Jan-2009
GRAND TURK   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)16-Jan-2009 to 29-Aug-2030GRAND TURK   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
16-Jan-2009 to 29-Aug-2030
PICO DEL ESTE-CEIBA   LRR (SURVEILLANCE)No data points in this rangePICO DEL ESTE-CEIBA   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)30-Nov-2008 to 16-Jan-2009PICO DEL ESTE-CEIBA   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
30-Nov-2008 to 16-Jan-2009
PICO DEL ESTE-CEIBA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)16-Jan-2009 to 29-Aug-2030PICO DEL ESTE-CEIBA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
16-Jan-2009 to 29-Aug-2030
SAN ANTONIO   LRR (SURVEILLANCE)No data points in this rangeSAN ANTONIO   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)30-May-2008 to 30-Jan-2009SAN ANTONIO   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
30-May-2008 to 30-Jan-2009
SAN ANTONIO   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)30-Jan-2009 to 31-Aug-2030SAN ANTONIO   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
30-Jan-2009 to 31-Aug-2030
MICA PEAK-SPOKANE   LRR (SURVEILLANCE)No data points in this rangeMICA PEAK-SPOKANE   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)23-Dec-2007 to 21-Apr-2009MICA PEAK-SPOKANE   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
23-Dec-2007 to 21-Apr-2009
MICA PEAK-SPOKANE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)21-Apr-2009 to 10-Sep-2030MICA PEAK-SPOKANE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
21-Apr-2009 to 10-Sep-2030
RAINBOW RIDGE-RIO DELL   LRR (SURVEILLANCE)RAINBOW RIDGE-RIO DELL   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)19-Nov-2007 to 19-May-2009RAINBOW RIDGE-RIO DELL   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
19-Nov-2007 to 19-May-2009
RAINBOW RIDGE-RIO DELL   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)19-May-2009 to 13-Sep-2030RAINBOW RIDGE-RIO DELL   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
19-May-2009 to 13-Sep-2030
JACKSONVILLE-WHITEHOUSE   LRR (SURVEILLANCE)No data points in this rangeJACKSONVILLE-WHITEHOUSE   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)09-Dec-2007 to 26-May-2009JACKSONVILLE-WHITEHOUSE   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
09-Dec-2007 to 26-May-2009
JACKSONVILLE-WHITEHOUSE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)26-May-2009 to 14-Sep-2030JACKSONVILLE-WHITEHOUSE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
26-May-2009 to 14-Sep-2030
GREAT FALLS-MALMSTROM AFB   LRR (SURVEILLANCE)GREAT FALLS-MALMSTROM AFB   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)04-Nov-2007 to 23-Jun-2009GREAT FALLS-MALMSTROM AFB   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
04-Nov-2007 to 23-Jun-2009
GREAT FALLS-MALMSTROM AFB   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)23-Jun-2009 to 18-Sep-2030GREAT FALLS-MALMSTROM AFB   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
23-Jun-2009 to 18-Sep-2030
MORALES-HALLETTSVILLE   LRR (SURVEILLANCE)No data points in this rangeMORALES-HALLETTSVILLE   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)06-Jan-2008 to 21-Jul-2009MORALES-HALLETTSVILLE   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
06-Jan-2008 to 21-Jul-2009
MORALES-HALLETTSVILLE   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)21-Jul-2009 to 21-Sep-2030MORALES-HALLETTSVILLE   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
21-Jul-2009 to 21-Sep-2030
FREEPORT   LRR (SURVEILLANCE)No data points in this rangeFREEPORT   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)30-Oct-2008 to 05-Aug-2009FREEPORT   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
30-Oct-2008 to 05-Aug-2009
FREEPORT   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)05-Aug-2009 to 23-Sep-2030FREEPORT   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
05-Aug-2009 to 23-Sep-2030
MT LAGUNA   LRR (SURVEILLANCE)No data points in this rangeMT LAGUNA   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)20-Jan-2008 to 25-Aug-2009MT LAGUNA   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
20-Jan-2008 to 25-Aug-2009
MT LAGUNA   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)25-Aug-2009 to 25-Sep-2030MT LAGUNA   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
25-Aug-2009 to 25-Sep-2030
GUANTANAMO BAY   LRR (SURVEILLANCE)No data points in this rangeGUANTANAMO BAY   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)10-Feb-2008 to 01-Sep-2009GUANTANAMO BAY   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
10-Feb-2008 to 01-Sep-2009
GUANTANAMO BAY   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)01-Sep-2009 to 26-Sep-2030GUANTANAMO BAY   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
01-Sep-2009 to 26-Sep-2030
SAN CLEMENTE ISLAND   LRR (SURVEILLANCE)No data points in this rangeSAN CLEMENTE ISLAND   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)09-Apr-2008 to 29-Sep-2009SAN CLEMENTE ISLAND   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
09-Apr-2008 to 29-Sep-2009
SAN CLEMENTE ISLAND   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)29-Sep-2009 to 30-Sep-2030SAN CLEMENTE ISLAND   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
29-Sep-2009 to 30-Sep-2030
YAKUTAT   LRR (SURVEILLANCE)No data points in this rangeYAKUTAT   LRR (SURVEILLANCE)Delivery PhaseDelivery Date to Operational Rediness Date (ORD)14-Jul-2009 to 21-Oct-2009YAKUTAT   LRR (SURVEILLANCE)
Delivery Phase
Delivery Date to Operational Rediness Date (ORD)
14-Jul-2009 to 21-Oct-2009
YAKUTAT   LRR (SURVEILLANCE)Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS)21-Oct-2009 to 02-Oct-2030YAKUTAT   LRR (SURVEILLANCE)
Daily Operations
Operational Rediness Date (ORD) to End of Service (EOS)
21-Oct-2009 to 02-Oct-2030
Legend:   Delivery PhaseDelivery Date to Operational Rediness Date (ORD) - Delivery Phase   Daily OperationsOperational Rediness Date (ORD) to End of Service (EOS) - Daily Operations

Operational ImprovementsText ModeZoom in
show fewer years
Zoom out
show more years
Move graph 8 years
to the left
Move graph 8 years
to the right
  2008200920102011201220132014201520162017201820192020202120222023
Current Flight Plan SupportCurrent Flight Plan SupportDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Oct-2005 to 30-Sep-2011Current Flight Plan Support
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Oct-2005 to 30-Sep-2011
Current Oceanic SeparationCurrent Oceanic SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jun-2005 to 30-Sep-2011Current Oceanic Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jun-2005 to 30-Sep-2011
Oceanic In-trail Climb and DescentOceanic In-trail Climb and DescentDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jun-2004 to 30-Dec-2024Oceanic In-trail Climb and Descent
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jun-2004 to 30-Dec-2024
Current En Route SeparationCurrent En Route SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 30-Sep-2011Current En Route Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 30-Sep-2011
Initial Conflict Resolution AdvisoriesNo data points in this rangeInitial Conflict Resolution AdvisoriesDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Initial Conflict Resolution Advisories
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Reduce Horizontal Separation Standards -3 MilesNo data points in this rangeReduce Horizontal Separation Standards -3 MilesDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Nov-2015 to 01-Feb-2020Reduce Horizontal Separation Standards -3 Miles
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Nov-2015 to 01-Feb-2020
Delegated Responsibility for Horizontal SeparationNo data points in this rangeDelegated Responsibility for Horizontal SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Delegated Responsibility for Horizontal Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Use Aircraft Provided Intent Data to Improve ConflNo data points in this rangeUse Aircraft Provided Intent Data to Improve ConflDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Mar-2012 to 01-Feb-2020Use Aircraft Provided Intent Data to Improve Confl
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Mar-2012 to 01-Feb-2020
ADS-B SeparationNo data points in this rangeADS-B SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Feb-2020ADS-B Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Feb-2020
Current Terminal SeparationCurrent Terminal SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 31-Dec-2014Current Terminal Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 31-Dec-2014
NextGen Oceanic ProceduresNo data points in this rangeNextGen Oceanic ProceduresDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jan-2023 to 01-Jan-2024NextGen Oceanic Procedures
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jan-2023 to 01-Jan-2024
ADS-B Services to Secondary AirportsNo data points in this rangeADS-B Services to Secondary AirportsDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Dec-2009 to 01-Feb-2020ADS-B Services to Secondary Airports
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Dec-2009 to 01-Feb-2020
Use Aircraft Provided Intent Data to Improve FlowNo data points in this rangeUse Aircraft Provided Intent Data to Improve FlowDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement31-Jan-2016 to 30-Mar-2022Use Aircraft Provided Intent Data to Improve Flow
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
31-Jan-2016 to 30-Mar-2022
Improved Operations to CSPRNo data points in this rangeImproved Operations to CSPRDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Jan-2035Improved Operations to CSPR
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Jan-2035
Wake Vortex Incorporated into FlowNo data points in this rangeWake Vortex Incorporated into FlowDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jan-2017 to 01-Apr-2019Wake Vortex Incorporated into Flow
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jan-2017 to 01-Apr-2019
Current Aircraft To Terrain / Obstacle SeparationCurrent Aircraft To Terrain / Obstacle SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 30-Sep-2011Current Aircraft To Terrain / Obstacle Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 30-Sep-2011
Use Improved Terrain Information To Delegate RespoNo data points in this rangeUse Improved Terrain Information To Delegate RespoDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2016 to 30-Sep-2018Use Improved Terrain Information To Delegate Respo
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2016 to 30-Sep-2018
Current Aircraft To Airspace SeparationCurrent Aircraft To Airspace SeparationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 30-Sep-2011Current Aircraft To Airspace Separation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 30-Sep-2011
Provide Full Surface Situation InformationNo data points in this rangeProvide Full Surface Situation InformationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Jan-2035Provide Full Surface Situation Information
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Jan-2035
Provide Surface SituationNo data points in this rangeProvide Surface SituationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 30-Dec-2022Provide Surface Situation
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 30-Dec-2022
Current Traffic AdvisoryCurrent Traffic AdvisoryDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Dec-2003 to 31-Dec-2014Current Traffic Advisory
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Dec-2003 to 31-Dec-2014
Expanded Traffic Advisory Services Using Digital TNo data points in this rangeExpanded Traffic Advisory Services Using Digital TDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2009 to 01-Jan-2030Expanded Traffic Advisory Services Using Digital T
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2009 to 01-Jan-2030
Current Oceanic Conflict Probe<<<Current Oceanic Conflict Probe ends
before the earliest date on this graph
Flexible Entry Times for Oceanic TracksNo data points in this rangeFlexible Entry Times for Oceanic TracksDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement31-Jan-2014 to 01-Jan-2041Flexible Entry Times for Oceanic Tracks
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
31-Jan-2014 to 01-Jan-2041
Current Conflict Probe<<<Current Conflict Probe ends
before the earliest date on this graph
Expanded Conflict Resolution via Data CommunicationNo data points in this rangeExpanded Conflict Resolution via Data CommunicationDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jun-2015 to 30-Mar-2022Expanded Conflict Resolution via Data Communication
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jun-2015 to 30-Mar-2022
Current Arrival/Departure SequencingCurrent Arrival/Departure SequencingDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Oct-2002 to 30-Dec-2008Current Arrival/Departure Sequencing
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Oct-2002 to 30-Dec-2008
Optimize Runway AssignmentsNo data points in this rangeOptimize Runway AssignmentsDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2012 to 31-Dec-2015Optimize Runway Assignments
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2012 to 31-Dec-2015
Tactical Trajectory ManagementNo data points in this rangeTactical Trajectory ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Jun-2019 to 02-Jan-2026Tactical Trajectory Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Jun-2019 to 02-Jan-2026
Integrated Arrival/Departure Airspace ManagementNo data points in this rangeIntegrated Arrival/Departure Airspace ManagementDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Dec-2009 to 30-Dec-2020Integrated Arrival/Departure Airspace Management
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Dec-2009 to 30-Dec-2020
Time Based Metering Using RNAV and RNP Route AssignmentsNo data points in this rangeTime Based Metering Using RNAV and RNP Route AssignmentsDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement02-Oct-2013 to 30-Mar-2022Time Based Metering Using RNAV and RNP Route Assignments
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
02-Oct-2013 to 30-Mar-2022
Use Optimized Profile DescentNo data points in this rangeUse Optimized Profile DescentDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Dec-2009 to 30-Mar-2022Use Optimized Profile Descent
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Dec-2009 to 30-Mar-2022
Full Surface Traffic Management with Conformance MonitoringNo data points in this rangeFull Surface Traffic Management with Conformance MonitoringDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement01-Oct-2017 to 30-Dec-2020Full Surface Traffic Management with Conformance Monitoring
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
01-Oct-2017 to 30-Dec-2020
Current Emergency AssistanceCurrent Emergency AssistanceDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 31-Dec-2014Current Emergency Assistance
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 31-Dec-2014
Current Emergency Alerting SupportCurrent Emergency Alerting SupportDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement15-Jul-2004 to 31-Dec-2014Current Emergency Alerting Support
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
15-Jul-2004 to 31-Dec-2014
Enhance Emergency AlertingNo data points in this rangeEnhance Emergency AlertingDaily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement30-Jan-2012 to 30-Sep-2038Enhance Emergency Alerting
Daily Operations
Initial Operational Capability (IOC) to End of Operatioal Improvement
30-Jan-2012 to 30-Sep-2038
Legend:   Daily OperationsInitial Operational Capability (IOC) to End of Operatioal Improvement - Daily Operations

Interfaces
Show Legend
Data Providers Data Consumers
Air Traffic Control Beacon Interrogator Model 6 (ATCBI-6)
Power Power
Pwr Sys  
Surveillance Data Surveillance Data
  ADS-B  
  ADS-B - Future Segments  
ARSR-1E ARSR-1E
ARSR-2  
ARSR-3  
ARSR-4 ARSR-4
  ECG  
  ERAM R1  
  ERAM R2  
  ERAM R3  
  ERAM R4  
  ERAM R5  
  ERAM R6  
  ERAM R7  
  ERAM R8  
  ERAM R9  
FPS-20 Series  
  HOCSR  
  MEARTS  
Mode 3/AC XPNDR  
Mode S Transponder  
Weather Data Weather Data
ARSR-3  

Mechanism Relative Quantities

Mechanism ID 301
Last Update 12 / 17 / 2008
Last Certified: 11 / 03 / 2008


Data Last Updated On: 30-Jan-2009
NAS Toolset Version: 20090121 6.7.10