~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 40 Operator Entries 6 October 1995 7 Instrument and Other Entries 47 Total Log Entries ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ************ OPERATOR ENTRIES - CHRONOLOGICALLY ************* TIME: 04:36:14 FROM: J. Bowling SUBJECT: Site General 0433GMT. 10-6-95. All BF's and CF are in condition GREEN. Vici BF's 2330 GMT launch first package would not tune in and would not give ground check data. Launched the second package at 2336GMT. All launches exceeded 10 Km. No other problems to report. ------------------------- TIME: 06:20:50 FROM: Z. Waddell SUBJECT: Facility 06:10 GMT the Morris site operator called and reported the his 05:30 GMT launch only made it to 9671 meters and that their was not enough time for a relaunch. ------------------------- TIME: 09:28:50 FROM: Z. Waddell SUBJECT: Facility The 05:30 GMT launch at the Vici site only made it to 9064 meters. Due to time restrictions no relaunch was attempted. ------------------------- TIME: 09:31:17 FROM: Z. Waddell SUBJECT: Facility The 05:30 GMT launch at the Hillsboro site only made it to 6393 meters. Due to time restrictions no relaunch was attempted. ------------------------- TIME: 12:25:10 FROM: Z. Waddell SUBJECT: Instrument 12:19 GMT 10-06-95 Performed Condensation Inspection of C.F. EBBR:SIROS EBBR Net Radiometer Dome - (No Condensation) SIROS PSP - (No Condensation) PIR - (No Condensation) ------------------------- TIME: 13:35:36 FROM: Martin SUBJECT: Facility SGP CART SITE REMOTE FACILITY GROUNDS CONDITION REPORT SITE: Byron, OK DATE: 10-02-95 TIME: 1630 GMT WEATHER CONDITIONS: Ovc, St, Sc, light rain. TEMP 15.5 C, HUM 100 %, PRESS 972.3 mb, WND DIR 325 deg, WND SPD 1.8 m/s. ACCESS CONDITIONS: ROADS: Muddy PATHS/TRAILS: Extremely wet and muddy FENCES: Good. SITE GROUNDS: CONDITION: Wet and muddy. VEGETATION: Grass 0.25m to 0.75m. UTILITIES CONDITION: PHONE: O.K. ELECTRIC: O.K. ------------------------- TIME: 13:37:52 FROM: Martin SUBJECT: Instrument SMOS E11, Byron, OK 10-02-95, 1630 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Unable to perform 6 month calibration tests due to inclement weather. 3. SMOS E11 RTS status O.K. at 1700 GMT. ------------------------- TIME: 13:39:07 FROM: Martin SUBJECT: Instrument SIROS E11, Byron, OK 10-02-95, 1630 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. SIROS RTS status O.K. at 1650 GMT. ------------------------- TIME: 13:43:21 FROM: Martin SUBJECT: Facility SGP CART SITE REMOTE FACILITY GROUNDS CONDITION REPORT SITE: Coldwater, KS DATE: 10-02-95 TIME: 1900 GMT WEATHER CONDITIONS: Brkn, Sc, Cu, Ac, TEMP 18.5 C, HUM 65 %, PRESS 939.1 mb, WND DIR 018 deg, WND SPD 6.0 m/s. ACCESS CONDITIONS: ROADS: Good PATHS/TRAILS: Good FENCES: Good. SITE GROUNDS: CONDITION: Dry VEGETATION: Grass 0.1m to 0.5m. UTILITIES CONDITION: PHONE: O.K. ELECTRIC: O.K. but meter continues to read 00000. COMMENTS: On site 1900 GMT to 2215 GMT. ------------------------- TIME: 13:46:28 FROM: Martin SUBJECT: Instrument EBBR E8, Coldwater, KS 10-02-95, 1900 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Top net radiometer dome cracked. R/R domes. 3. R/R net radiometer desiccant. 4. Centered AEM and pulled fuse at 1923 GMT for 3 month sensor calibration checks. AEM RTS at 2104 GMT. 5. EBBR E8 RTS at 2210 GMT. ------------------------- TIME: 13:54:59 FROM: Martin SUBJECT: Instrument SMOS E8, Coldwater, KS 10-02-95, 1900 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Set F7 flag and lowered tower from 1940 GMT to 2215 GMT for 6 month sensor calibration checks. 3. WND SPD was off by 0.7 m/s on the high end. Found that the wrong program version was in the CR10. Downloaded site2a.dld to CR10 at 2157 GMT and WND SPD now checks O.K. Suspect that the old version was mistakenly loaded when the site was moved on 5-10-95. The following changes were noted: Old multiplier: .09966 Old offset: .30 New multiplier: .09958 New offset: .32 4. SMOS E8 RTS status O.K. at 2215 GMT ------------------------- TIME: 13:58:49 FROM: Martin SUBJECT: Instrument SIROS E8, Coldwater, KS 10-02-95, 1900 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. Status was O.K. at 1900 GMT but at 2100 GMT it was noticed that shadow band had stopped rotating. Check of instrument status found that it had locked up at 1912 GMT. Power cycled logger and Slater restarted SIROS at 2115 GMT. 3. 10 meter tower was lowered from 1940 to 2215 GMT for SMOS PM. 4. SIROS E8 RTS status O.K. at 2115 GMT. ------------------------- TIME: 14:02:58 FROM: Martin SUBJECT: Facility SGP CART SITE REMOTE FACILITY GROUNDS CONDITION REPORT SITE: Larned, KS DATE: 10-03-95 TIME: 1315 GMT WEATHER CONDITIONS: Clr, TEMP 8.8 C, HUM 89 %, PRESS 943 mb, WND DIR 265 deg, WND SPD 2.7 m/s. ACCESS CONDITIONS: ROADS: Good PATHS/TRAILS: Good FENCES: Good. SITE GROUNDS: Dry VEGETATION: Grass 0.01m to 0.54m. UTILITIES CONDITION: PHONE: O.K. ELECTRIC: O.K. Meter reading 00178. ------------------------- TIME: 14:05:13 FROM: Martin SUBJECT: Instrument SMOS E1, Larned, KS 10-03-95, 1315 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Set F7 flag and lowered tower from 1403 GMT to 1502 GMT for 6 month sensor calibration checks. 3. SMOS E1 RTS status O.K. at 1502 GMT. ------------------------- TIME: 14:09:03 FROM: Martin SUBJECT: Instrument SIROS E1, Larned, KS 10-03-95, 1315 GMT SIROS E1 is incomplete at this time and will not be brought on line until after the IOP. Missing components are MFR, datalogger, and preamp cables. ------------------------- TIME: 14:15:42 FROM: Martin SUBJECT: Instrument ECOR E1, Larned, KS 10-03-95, 1325 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. No response from Hygrometer. T/S indicates sensor bad. R/R Hygrometer at 1355 GMT. Old SN 940215. New SN 940208. 3. Bernoulli disk changed out at 1358 GMT. 4. ECOR E1 RTS status O.K. at 1406 GMT. ------------------------- TIME: 14:19:16 FROM: Martin SUBJECT: Facility SGP CART SITE REMOTE FACILITY GROUNDS CONDITION REPORT SITE: Plevna, KS DATE: 10-03-95 TIME: 1718 GMT WEATHER CONDITIONS: Clr, TEMP 23.6 C, HUM 33 %, PRESS 953.4 mb, WND DIR 209 deg, WND SPD 2.2 m/s. ACCESS CONDITIONS: ROADS: Good PATHS/TRAILS: Good FENCES: Good. SITE GROUNDS: CONDITION: Dry VEGETATION: Natural grass 0.3m to 1.0m. COMMENTS: On site 1718 to 2110 GMT. ------------------------- TIME: 14:21:23 FROM: Martin SUBJECT: Instrument SMOS E4, Plevna, KS 10-03-95, 1730 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Set F7 flag and lowered tower from 1800 GMT to 2100 GMT for 6 month sensor calibration checks and SIROS maintenance. 3. SMOS E4 RTS status O.K. at 2100 GMT. ------------------------- TIME: 14:23:31 FROM: Martin SUBJECT: Instrument EBBR E4, Plevna, KS 10-03-95, 1730 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Centered AEM and pulled fuse at 1745 GMT for 3 month sensor calibration checks. AEM RTS at 1832 GMT. 3. R/R net radiometer domes. 4. EBBR E4 RTS status O.K. at 1835 GMT. ------------------------- TIME: 14:31:19 FROM: Martin SUBJECT: Instrument SIROS E4, Plevna, KS 10-03-95, 1835 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. US reporting constant 3934 mV. T/S found blown fuse on interface card. R/R fuse and US RTS status O.K. 3. UIR reporting -4095 mV. T/S found blown preamp cable. All preamps on hand are currently on reserve for critical IOP sites. For this reason UIR was disconnected from logger board and preamp will be replaced after the IOP. 4. Suntracker was found to be inop and pointing east. Will not respond to any commands. Shorted out Y2 crystal and forced a cold start. Fine tuned tracker and RTS status O.K. at 2039 GMT. 5. 10 meter tower was lowered from 1900 GMT to 2100 GMT for SMOS PM. 6. SIROS RTS without UIR at 2030 GMT. ------------------------- TIME: 14:35:13 FROM: Martin SUBJECT: Facility SGP CART SITE REMOTE FACILITY GROUNDS CONDITION REPORT SITE: Elk Falls, KS DATE: 10-04-95 TIME: 1510 GMT WEATHER CONDITIONS: Clr, TEMP 20.4 C, HUM 58 %, PRESS 972.5 mb, WND DIR 121 deg, WND SPD 6.9 m/s. ACCESS CONDITIONS: ROADS: Good PATHS/TRAILS:Good FENCES: Good. SITE GROUNDS: CONDITION: Dry VEGETATION: Grass 0.15m to 0.50m. UTILITIES CONDITION: PHONE: O.K. ELECTRIC: O.K. Meter reading 00931. ------------------------- TIME: 14:38:44 FROM: Martin SUBJECT: Instrument SMOS E7, Elk Falls, KS 10-04-95, 1520 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Set F7 flag and lowered tower from 1553 GMT to 1654 GMT for 6 month sensor calibration checks. 3. SMOS E7 RTS status O.K. at 1654 GMT. ------------------------- TIME: 14:42:52 FROM: Martin SUBJECT: Instrument EBBR E7, Elk Falls, KS 10-04-95, 1520 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Centered AEM and pulled fuse at 1656 GMT for 3 month sensor calibration checks. AEM RTS at 1732 GMT. 3. R/R net radiometer domes and desiccant. 4. EBBR E7 RTS at 1733 GMT. ------------------------- TIME: 14:48:45 FROM: Martin SUBJECT: Instrument SIROS E7, Elk Falls, KS 10-04-95, 1517 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. Fine tuned suntracker +1 degree Azimuth and +1 degree Zenith. 3. MFR detector #5 reading constant 0 mV. T/S found sensor bad. R/R MFR sensor head at 1745 GMT. Old SN 241. New SN 235. Notified Slater of change and he restarted SIROS at 1750 GMT. 4. R/R DIR, UIR, DD and DS desiccant. 5. 10 meter lowered from 1553 GMT to 1654 GMT for SMOS PM. 6. SIROS E7 RTS status O.K. at 1750 GMT. ------------------------- TIME: 15:22:29 FROM: Martin SUBJECT: Facility SGP CART SITE REMOTE FACILITY GROUNDS CONDITION REPORT SITE: Tyro, KS DATE: 10-04-95 TIME: 1945 GMT WEATHER CONDITIONS: Clr, TEMP 24.7 C, PRESS 965 mb, WND DIR 170 deg, WND SPD 5.4 m/s. ACCESS CONDITIONS: ROADS: Good PATHS/TRAILS: Good FENCES: Good. UTILITIES CONDITION: PHONE: O.K. ELECTRIC: O.K. Meter reading 00429. ------------------------- TIME: 15:37:07 FROM: Martin SUBJECT: Instrument SIROS E10, Tyro, KS 10-04-95, 1953 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. Fine tuned suntracker +.3 degrees Azimuth and -.7 degrees Zenith. 3. R/R DIR and DD desiccant at 2040 GMT. 4. SIROS E10 RTS status O.K. at 2055 GMT. ------------------------- TIME: 15:42:13 FROM: Martin SUBJECT: Instrument ECOR E10, Tyro, KS 10-04-95, 1953 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. Bernoulli disk changed out at 2029 GMT. 3. Checked Hygrometer calibration coefficients as per work order #974. Found the coefficients to be correct and Hygrometer status O.K. with Q value of 22.67. 4. ECOR E10 RTS status O.K. at 2032 GMT. ------------------------- TIME: 15:45:34 FROM: Martin SUBJECT: Facility SGP CART SITE REMOTE FACILITY GROUNDS CONDITION REPORT SITE: Ashton, KS DATE: 10-05-95 TIME: 1515 GMT WEATHER CONDITIONS: Brkn, Sc, Cu, TEMP 15.0 C, HUM 57 %, PRESS 959.5 mb, WND DIR 300 deg, WND SPD 8.7 m/s. ACCESS CONDITIONS: ROADS: Good PATHS/TRAILS: Good FENCES: Good. SITE GROUNDS: CONDITION: Dry VEGETATION: Grass 0.18m to 0.85m. UTILITIES CONDITION: PHONE: O.K. ELECTRIC: O.K. Meter reading 04010. COMMENTS: On site 1515 to 1805 GMT. ------------------------- TIME: 15:48:23 FROM: Martin SUBJECT: Instrument EBBR E9, Ashton, KS 10-05-95, 1530 GMT Made a scheduled maintenance run to the site today and performed: 1. PM and data extract. 2. Centered AEM and pulled fuse at 1700 GMT for 3 month sensor calibration checks. AEM RTS at 1803 GMT. 3. Tightened WND SPD sensor set screws. 4. Moisture in upper net radiometer dome. R/R domes. 5. EBBR E9 RTS at 1803 GMT. ------------------------- TIME: 15:51:19 FROM: Martin SUBJECT: Instrument SMOS E9, Ashton, KS 10-05-95, 1520 GMT Made a scheduled maintenance run to the site today and performed: 1. PM and data extract. 2. Set F7 flag and lowered tower from 1558 GMT to 1700 GMT for 6 month sensor calibration checks. 3. Humidity sensor reading 6 % high. R/R Temp/Hum sensor. Old SN 569265. New SN 569291. 4. SMOS E9 RTS status O.K. at 1703 GMT. ------------------------- TIME: 15:53:04 FROM: Martin SUBJECT: Instrument SIROS E9, Ashton, KS 10-05-95, 1520 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. R/R US and UIR desiccant at 1630 GMT. 3. 10 meter tower lowered from 1558 GMT to 1700 GMT for SMOS PM. 4. SIROS E9 RTS status O.K. at 1700 GMT. ------------------------- TIME: 17:17:47 FROM: Ward SUBJECT: Instrument CF DAILY INSTRUMENT CHECKLIST 10-06-95 @ 1330 GMT. Ceilometer - Status O.K. WSI - Status O.K. Tape change out. AERI 01 - Status O.K. SORTI - Down due to laser problems. MPL 01 - Status O.K. MPL 02 - Status O.K. MWR - Status O.K. (No IRT) SMOS - Status O.K. EBBR - Status O.K. MFRSR - Status O.K. BSRN - Adjusted the DD/PSP and the DIR/PIR occultor arms. The ventilator ffor the DS/PSP is rotating slower than normal. SIROS - Status O.K. 915 WP - Status O.K. 50 WP - Down while interface module recieves repairs. BBSS - Status O.K. Lidar - Not operational as of this date. ------------------------- TIME: 19:41:21 FROM: Glahn SUBJECT: Site General MWR/ SDS Daily Time Chcek, 10-6-95 BF Site CF SDS Time BF SDS Time Mwr Time Hillsborro 15:05 15:05 15:05 Purcell 15:11 15:11 15:11 Vici 15:20 15:19 15:18 ------------------------- TIME: 21:19:54 FROM: Sawyer SUBJECT: Instrument SIROS E11, Byron, OK, 10-06-95 While at the site performing a retrofit to the new radiometer stands it was noticed that the MFRSR shadow band was out of alignment. Aligned the shadow band for proper sensor coverage at 1527 GMT. RTS ------------------------- TIME: 21:26:09 FROM: Martin SUBJECT: Facility SGP CART SITE REMOTE FACILITY GROUNDS CONDITION REPORT SITE: CF, Lamont, OK DATE: 10-06-95 TIME: 1800 GMT WEATHER CONDITIONS: Sctd, Sc, Cu, TEMP 16.8 C, HUM 46 %, PRESS 981.7 mb, WND DIR 312 deg, WND SPD 8.5 m/s. ACCESS CONDITIONS: ROADS: Good PATHS/TRAILS: Good FENCES: Good. SITE GROUNDS: CONDITION: Dry VEGETATION: Grass and weeds 0.3m to 1.1m. UTILITIES CONDITIONS: PHONE: O.K. ELECTRIC: O.K. ------------------------- TIME: 21:28:15 FROM: Martin SUBJECT: Instrument SMOS E13, CF, Lamont, OK 10-06-95, 1800 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Set F7 flag and lowered tower from 1800 GMT to 1858 GMT for 6 month sensor calibration checks. 3. SMOS E13 RTS status O.K. at 1858 GMT. ------------------------- TIME: 21:29:05 FROM: Martin SUBJECT: Instrument SIROS E13, CF, Lamont, OK 10-06-95, 1803 GMT Made a scheduled maintenance run to the site and performed: 1. PM. 2. SIROS E13 RTS status O.K. at 1810 GMT. ------------------------- TIME: 21:34:19 FROM: Martin SUBJECT: Instrument EBBR E13, CF, Lamont, OK 10-06-95, 1800 GMT Made a scheduled maintenance run to the site and performed: 1. PM and data extract. 2. Centered AEM and pulled fuse at 1847 GMT for 3 month sensor calibration checks. AEM RTS at 1933 GMT. 3. R/R net radiometer domes and desiccant for 3 month PM. 4. Noted that barometric pressure sensor was approximately 1.5 mb higher than PA11. Will check with mentor to see if we should replace. 5. EBBR E13 RTS status O.K. at 1933 GMT. ------------------------- TIME: 21:36:07 FROM: Sawyer SUBJECT: Instrument SIROS E15, Ringwood, OK, 10-06-95 While at the site performing a retrofit to the new radiometer stands and usuing AC power from the MFRSR we blew a fuse at 1740 GMT. T/S the UPS. Power cycled the UPS which power cycled the SIROS. This did not correct the no power problem to the MFRSR. Found a blown fuse to the MFRSR power. Replaced the fuse and restored power at 1820 GMT. SDS initialized the MFRSR at 1824 GMT. RTS ------------------------- TIME: 21:42:48 FROM: Martin SUBJECT: Instrument BSRN E13, CF, Lamont, OK 10-06-95, 1950 GMT PSP2 ventilator was found to be inop. Powered BSRN off and R/R ventilator. New ventilator SN V6-86. BSRN RTS status O.K. at 2100 GMT. ------------------------- **** INSTRUMENT AND OTHER LOG ENTRIES - CHRONOLOGICALLY **** **** THE FOLLOWING ENTRY WAS GENERATED ON 3 October 1995 **** **** BUT WAS RECEIVED TODAY, 6 October 1995 **** TIME: 04:32:20 FROM: MWR.B5@sgp.arm.gov SUBJECT: Quality_Control Time: Tue Oct 3 04:32:20 1995 MWRLOS.B5, liq: Value above Maximum. Time: Tue Oct 3 04:34:20 1995 MWRLOS.B5, 31tbsky: Value above Maximum. Time: Tue Oct 3 04:34:40 1995 MWRLOS.B5, 23tbsky: Value above Maximum. Time: Tue Oct 3 04:35:20 1995 MWRLOS.B5, vap: Value above Maximum. Time: Tue Oct 3 04:37:00 1995 MWRLOS.B5, 31tbsky: Value now within expected range. MWRLOS.B5, vap: Value now within expected range. Time: Tue Oct 3 04:37:40 1995 MWRLOS.B5, 23tbsky: Value now within expected range. Time: Tue Oct 3 04:38:40 1995 MWRLOS.B5, liq: Value now within expected range. ------------------------- **** THE FOLLOWING ENTRY WAS GENERATED ON 3 October 1995 **** **** BUT WAS RECEIVED TODAY, 6 October 1995 **** TIME: 11:35:40 FROM: MWR.B4@sgp.arm.gov SUBJECT: Quality_Control **** This entry exceeded 2000 characters. **** **** A portion of it has been included in this report. **** **** The complete entry was entered in the database. **** Time: Tue Oct 3 11:35:40 1995 MWRLOS.B4, liq: Value below Minimum. Time: Tue Oct 3 11:36:00 1995 MWRLOS.B4, liq: Value now within expected range. Time: Tue Oct 3 11:36:20 1995 MWRLOS.B4, liq: Value below Minimum. Time: Tue Oct 3 11:36:40 1995 MWRLOS.B4, liq: Value now within expected range. Time: Tue Oct 3 14:05:00 1995 MWRLOS.B4, liq: Value below Minimum. . . . ------------------------- **** THE FOLLOWING ENTRY WAS GENERATED ON 3 October 1995 **** **** BUT WAS RECEIVED TODAY, 6 October 1995 **** TIME: 13:45:00 FROM: MWR.B6@sgp.arm.gov SUBJECT: Quality_Control Time: Tue Oct 3 13:45:00 1995 MWRLOS.B6, tkbb: Delta exceeded. Time: Tue Oct 3 13:45:20 1995 MWRLOS.B6, tkbb: Value now within expected range. ------------------------- TIME: 00:35:48 FROM: d3e502@bigbird.pnl.gov (KR Yates) SUBJECT: Data System At 00:25 noted that modem "uds10" could not be initialized. Called CF and walked Operator Janet Bowling thru resetting this modem. (Thanks to her. This saved the loss of probably 12 hours of data from 5 SIROS instruments.) -- Ken Yates ------------------------- TIME: 03:44:24 FROM: SMOS.E9@sgp.arm.gov SUBJECT: Collection smos9: CDL was 4 seconds ahead of SDS. CDL time was reset at 95:279:03:42:01C ------------------------- TIME: 09:00:00 FROM: SMOS.E8@sgp.arm.gov SUBJECT: Quality_Control Time: Fri Oct 6 09:00:00 1995 30SMOS.E8, snow: Value below Minimum. ------------------------- TIME: 14:30:00 FROM: SMOS.E8@sgp.arm.gov SUBJECT: Quality_Control Time: Fri Oct 6 14:30:00 1995 30SMOS.E8, snow: Value now within expected range. ------------------------- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Central Facility Weather Observations on 6 October 1995 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Winds Total Time Spd/Dir Press Temp RH Cloud Weather (GMT) (mps/deg) (mb) (C) (%) Coverage Type ________________________________________________________________________________ 0000 7.2/300 985.2 16.0 46 Scattered 0100 9.4/290 986.0 14.0 53 Overcast 0200 10.7/290 986.4 14.0 53 Broken 0300 8.0/300 986.9 14.0 57 Broken 0400 7.6/300 987.6 13.0 59 Broken 0500 8.9/310 988.4 59.0 59 Overcast 0600 9.8/300 989.6 13.0 61 Scattered 0700 7.6/300 989.7 12.0 63 Overcast 0800 8.8/310 990.1 12.0 65 Broken 0900 8.0/310 990.3 12.0 66 Scattered 1000 4.0/300 990.9 11.0 69 Scattered 1100 5.4/300 991.8 10.0 71 Broken 1200 8.0/290 992.2 11.0 71 Scattered 1300 3.6/300 993.5 12.0 67 Scattered 1400 6.3/310 994.3 14.0 59 Scattered 1500 12.1/320 994.9 17.0 52 Scattered 1600 7.2/340 995.1 19.0 46 Scattered 1700 7.6/300 995.4 20.0 44 Scattered 1700 7.6/300 995.4 20.0 44 Scattered 1800 7.6/300 995.1 20.0 41 Scattered 1900 6.7/310 994.5 21.0 39 Scattered 2000 6.7/330 994.2 21.0 38 Scattered 2100 7.6/320 993.8 20.0 40 Scattered 2200 6.7/320 993.6 19.0 42 Scattered 2300 4.9/350 993.8 18.0 44 Scattered Cloud Observations Whole Sky Cloud Types: Time Quadrant Low Mid High Amt Ht(km/10) Type Amt Ht(km/10) Type Amt Ht(km/10) Type _____________________________________________________________________________ 0000 NE .1 015 1 .1 060 4 SW .1 015 1 NW .1 015 1 .1 060 4 0100 NE 1.0 012 8 SE 1.0 012 8 SW 1.0 012 8 NW 1.0 012 8 0200 NE .7 012 8 SE .6 012 8 SW .4 012 8 NW .8 012 8 0300 NE 1.0 012 8 SE .8 012 8 SW .9 012 8 NW 1.0 012 8 0400 NE .8 012 8 SE .5 012 8 SW .4 012 8 NW .7 012 8 0500 NE 1.0 012 8 SE 1.0 012 8 SW 1.0 012 8 NW 1.0 012 8 0600 NE .1 055 5 SE .2 055 5 SW .6 055 5 NW .6 055 5 0700 NE 1.0 055 5 SE 1.0 055 5 SW 1.0 055 5 NW 1.0 055 5 0800 NE 1.0 055 5 SE .6 055 5 SW .4 055 5 NW .9 055 5 0900 NE .3 055 5 SE .3 055 5 1000 NE .3 055 5 SE .2 055 5 1100 NE .6 055 5 SE .6 055 5 SW .5 055 5 NW .6 055 5 1200 NE .3 055 5 SE .2 055 5 SW .8 055 5 NW .6 055 5 1300 NE .1 010 5 SE .1 010 5 1400 NE .1 010 5 SE .1 010 5 1500 NE .1 010 5 SE .1 015 1 1600 NE .1 010 5 SE .1 015 1 SW .1 015 1 NW .1 015 1 1700 NE .1 010 5 SE .1 015 1 SW .1 015 1 NW .1 015 1 1700 NE .1 010 5 SE .1 015 1 SW .1 015 1 NW .1 015 1 1800 NE .2 010 5 SE .1 015 1 SW .1 015 1 NW .1 015 1 1900 NE .1 010 5 SE .1 015 1 SW .1 015 1 NW .1 015 1 2000 NE .1 010 5 SE .1 015 1 SW .1 015 1 NW .1 015 1 2100 NE .1 010 5 2200 NE .1 015 1 SE .1 015 1 SW .2 015 1 NW .1 015 1 2300 NE .1 015 1 SW .1 015 1 NW .1 015 1 Overhead Cloud Types (30 Degree Arc) Time Amt Ht(km/10) Type ________________________________________ 0100 1.0 012 8 0200 .5 012 8 0300 1.0 012 8 0400 .6 012 8 0500 1.0 012 8 0600 .1 055 5 0700 1.0 055 5 0800 1.0 055 5 Time Comments in Weather Observations ________________________________________________________________________________ 1500 Other clouds present: .1 015 1 NE. 1600 Other clouds present: .1 015 1 NE. 1700 framer wroking 60 m tower field or near it. Other clouds present: .1 015 1 NE. 1700 farmer working 60 m tower filed or near it. Other clouds presnet: .1 015 1 NE. reentered entry to correct spelling/etc. 1800 Other clouds present: .1 015 1 NE. farmer working field of 60m Tower. 1900 Other clouds present: .1 015 1 NE. 2000 Other clouds present: .1 015 1 NE. 2100 Other clouds present: .1 015 1 NE. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~