FL0302 1. AERIAL VIEW, SHOWING MOBILE LAUNCHER. BASE IS CALLED LAUNCH PLATFORM AND TOWER ON RIGHT IS CALLED LAUNCH UMBILICAL TOWER, (LUT). 2. AERIAL VIEW SHOWING SIDES 3 AND 4 OF MOBILE LAUNCHER. 3. AERIAL VIEW OF MOBILE LAUNCHER. ON TOP OF LUT SITS A 25 TON HAMMERHEAD CRANE. STRUCTURE ON LEFT SIDE OF LAUNCH PLATFORM IS KNOWN AS A "MILK STOOL" AND ALLOWS A SATURN 1B ROCKET TO BE USED IN PLACE OF THE SATURN V ROCKET. 4. AERIAL VIEW SHOWING SIDES 3 AND 4 OF MOBILE LAUNCHER. 5. MOBILE LAUNCHER, SIDE 3, SHOWING LAUNCH PLATFORM AND LUT. 6. MOBILE LAUNCHER SIDE 4, SHOWING MILK STOOL AND LUT. PROTRUSION ON UPPER RIGHT HAND SIDE OF LUT IS SWING ARM NINE WHICH PROVIDED ACCESS TO CAPSULE OF LAUNCH VEHICLE WHILE ON LAUNCHER. 7. LAUNCHER SIDES 1 AND 2. BUILDING IN BACKGROUND IS VEHICLE ASSEMBLY BUILDING (VAB) WHERE ROCKET WAS ASSEMBLED ON LAUNCHER. 8. 320 FOOT LEVEL, SWING ARM NINE SHOWING BACK SIDE OF ENVIRONMENTAL CHAMBER (WHITE ROOM). WHITE ROOM MADE CONNECTION WITH CAPSULE ON LAUNCH VEHICLE. 9. 320 FOOT LEVEL, WALKWAY LEADING TO WHITE ROOM ON SWING ARM 9. 10. 340 FOOT LEVEL, LOOKING DOWN ON SWING ARM 9 AND HINGE ASSEMBLY. 11. 340 FOOT LEVEL, LOOKING DOWN ON TOP OF SWING ARM 9, SHOWING WALKWAY AND WHITE ROOM. 12. SWING ARM 9, SHOCK ABSORBER ON SIDE 4. 13. 320 FOOT LEVEL, FRONT VIEW OF DELUGE PURGE PANEL. 14. 320 FOOT LEVEL, REAR VIEW OF DELUGE PURGE PANEL. 15. 320 FOOT LEVEL, HYDRO-PNEUMATIC CONTROL CONSOLE NO. 1. 16. 360 FOOT LEVEL, ELEVATOR MACHINE ROOM (RIGHT) AND DRRS HOIST WINCH (FOREGROUND LEFT). 17. 360 FOOT LEVEL, ENTRANCE TO ELEVATOR MACHINE ROOM. 18. 380 FOOT LEVEL, HAMMERHEAD CRANE BOOM. LOOKING FROM END OF BOOM TOWARDS SIDE 1 AND CRANE MACHINE ROOM. 19. 380 FOOT LEVEL, LOOKING DOWN AT SIDE 1 OF LUT. 20. 380 FOOT LEVEL, INTERIOR OF HAMMERHEAD CRANE MACHINE ROOM. 21. AERIAL VIEW OF ML-1 DURING REMOVAL OF HAMMERHEAD CRANE. 22. VIEW OF HAMMERHEAD CRANE PRIOR TO REMOVAL. 23. WORKMEN ATTACHING CABLES FOR REMOVAL OF HAMMERHEAD CRANE. 24. REMOVAL OF HAMMERHEAD CRANE. 25. REMOVAL OF HAMMERHEAD CRANE. 26. ML-1 WITHOUT BOOM OF HAMMERHEAD CRANE. TOWER CRANE (RIGHT) IS PREPARING FOR REMOVAL OF SWING ARM 9. 27. REMOVAL OF SWING ARM 9. 27. SWING ARM 9 AND CABLE ATTACHMENT FORM TOWER CRANE. 29. TOWER CRANE LOWERING SWING ARM 9. 30. TOWER CRANE LOWERING SWING ARM 9. 31. TOWER CRANE LOWERING SWING ARM 9. 32. TOWER CRANE LOWERING SWING ARM 9. 33. TOWER CRANE LOWERING SWING ARM 9. 34. GENERAL VIEW OF ML-9. TOP OF "MILK STOOL" HAS BEEN REMOVED (LEFT) AND MACHINE ROOM OF HAMMERHEAD CRANE IS VISIBLE ON GROUND AT RIGHT. 35. CRANE PREPARING TO REMOVE STEEL STRUCTURE OF LEVEL 380. 36. LEVEL 380 PRIOR TO REMOVAL. 37. REMOVAL OF LEVEL 380 38. REMOVAL OF LEVEL 380 39. REMOVAL OF LEVEL 380 40. REMOVAL OF LEVEL 380 41. REMOVAL OF LEVEL 380 42. REMOVAL OF LEVEL 380 43. REMOVAL OF LEVEL 380 44. REMOVAL OF LEVEL 380 45. 360 FOOT LEVEL, SHOWING SALVAGE AT CORNER OF SIDES 1 & 4. 46. 360 FOOT LEVEL, LOOKING TOWARDS SIDE 3 SHOWING SALVAGE OUTSIDE OF ELEVATOR MACHINERY ROOM.