SP-4012 NASA HISTORICAL DATA BOOK: VOLUME III
- PROGRAMS AND PROJECTS 1969-1978
-
Table 2-1. Three Phases of Manned
Spaceflight Management, NASA Headquarters
Phase 1
1969-1970
- Administrator/Deputy Administrator
- Associate Administrator, Manned
Spaceflight (George E. Mueller; Dale D. Myers, Jan.
1970)
- Deputy Associate Administrator, Manned
Spaceflight (Charles W. Mathews)
- Executive Secretary, Manned Spaceflight
Experiments Board (William 0. Armstrong; Douglas R. Lord,
mid-1969; Abram S. Bass, early 1970)
- Director, Manned Spaceflight Safety
(Jerome F. Lederer); moved to Office of Organization and
Management, March 1970)
- Deputy Associate Administrator, Manned
Spaceflight (Management) (Frank A. Bogart; Harry H. Gorman, June
1970).
- Director Manned Spaceflight Program
Control (Jerald R. Kubat; Bogart, acting, June 1969; Charles E.
Koenig, Nov. 1969); moved to Office of Institutional
Operations, early 1970 (see below)
- Director, Manned Spaceflight Field
Center Development (Robert F. Freitag)
- Director, Manned Spaceflight Management
Operations/Manned Spaceflight Institutional Operations (Maynard
E. White; Bogart, acting, fall 1969; Gorman, acting, early
1970)
- Deputy Associate Administrator, Manned
Spaceflight (Technical) (Charles J. Donlan)
- Director, Space Medicine (James W.
Humphreys, Jr.)
- Director, NASA Life Sciences
(Humphreys); added Dec. 1970
- Director, Mission Operations (John D.
Stevenson)
- Director, Technical and Management
Support (James Costantino, acting); added fall 1969
- Director, Advanced Manned Missions
Program (Donlan, acting; Philip E. Culbertson, Feb.
1970)
- Deputy Director, Advanced Manned
Missions Program (Lord); dropped early 1970
- Director, Program Control (Merle G.
Waugh); dropped early 1970
- Director, Manned Spacecraft (Robert L.
Lohman, acting); dropped early 1970
- Director, Systems Engineering (Brian T.
Howard; J. W. Timco, late 1970)
- Director, Mission Planning and
Operations/Program Studies (Jack W. Wild)
- Director, Payloads (Armstrong)
- Director, Transportation Systems
(Daniel Schnyer); dropped early 1970
- Director, Supporting
Development/Advanced Development (Eldon W. Hall)
- Director, Apollo Applications/Skylab
Program (William C. Schneider)
- Deputy Director, Apollo
Applications/Skylab Program (John H. Disher)
- Director, Project Integration
(Culbertson; Thomas E. Harris, Feb. 1970)
- Director, Program Control (J. Pemble
Field, Jr.)
- Director, Test (Melvyn Savage)
- Director, Reliability, Quality, and
Safety (Haggai Cohen)
- Director, Systems Engineering (Donald
R. Hagner)
- Director, Operations (John E. Edwards;
Wyendell B. Evans, July 1969)
- Director, Apollo Program (Samuel C.
Phillips; Rocco A. Petrone, Aug. 1969)
- Deputy Director, Apollo Program (George
H. Hage); dropped Aug. 1969
- Director, Engineering (William E.
Stoney)
- Director, Management (Thomas E. Jenkins;
John S. Potate, late 1969)
- Director, Missions (Hage; Chester M. Lee,
Aug. 1969)
- Director, Program Control (James B.
Skaggs; Potate, May 1970)
- Director, Test (LeRoy E. Day; Charles H.
King, Jr., April 1970)
- Director, Operations (John K.
Holcomb)
- Director, Quality and Reliability (George
C. White, Jr.)
- Director, Systems Engineering (Robert L.
Wagner)
- Director, Apollo Lunar Exploration (Lee R.
Scherer)
- Deputy Director, Apollo Lunar
Exploration (Donald U. Wise); added mid-1969
- Assistant Director, Automated
Spacecraft (Benjamin Milwitky)
- Assistant Director, Flight Systems
Development (William T. O'Bryant)
- Assistant Director, Lunar Science (R.
J. Allenby)
- Assistant Director, Lunar Sample
Program (Vert R. Wilmarth; John Pomeroy, early 1970)
- Director, Space Station Task Force
(Mathews, acting); added May 1969
- Deputy Director, Space Station Task
Force (Lord)
- Leader, Technical Integration Group
(Lohman)
- Leader, Operations Group (Robert O.
Aller)
- Leader, Experiment Payloads Group
(Rodney W. Johnson)
- Director, Space Shuttle Task Force
(Mathews, acting; Donlan, acting, Nov. 1970).
- Deputy Director, Space Shuttle Task
Force (Day)
- Director, Vehicle Development (William
A. Summerfelt)
- Director, Systems Engineering (Clarence
C. Gay, Jr.)
- Director, Program Development (Joseph
M. Clemente, acting; Richard J. Allen, late 1970)
-
-
- Phase II
- 1971-mid-1975
-
-
- Administrator/ Deputy Administrator
- Associate Administrator, Manned
Spaceflight (Myers; Schneider, acting, March 1974; John F.
Yardley, May 1974)
- Deputy Associate Administrator,
Manned Spaceflight (Mathews; position temporarily dropped,
Dec. 1971; Schneider, July 1974)
- Executive Secretary, Manned
Spaceflight Experiments Board (Bass); moved to Office of
Mission and Payload Integration, late 1973
- Deputy Associate Administrator,
Manned Spaceflight (Management) (Gorman); dropped Sept.
1974
- Director, Resources
Management/Administration (James L. Vance)
- Director, Administration (M.
Keith Wible); moved to Office of Resources Management,
mid-1975 (see above)
- Director, Budget and Program
Analyses (Gorman, acting, early 1971; Schneider, acting,
late 1974)
- Deputy Associate Administrator,
Manned Spaceflight (Technical) (Donlan)
- Director, Engineering and
Operations (Robert N. Lindley); dropped late 1972
- Director, Mission and Payload
Integration (Culbertson); added April 1973
- Director, NASA Life Sciences
(Humphreys; Charles A. Berry, Sept. 1971; David Winter,
May 1974)
- Director, Advanced Missions
Programs (Culbertson; Disher, March 1974)
- Deputy Director, Advanced
Missions Programs (Freitag); added April 1973
- Director, Advanced Development
(Hall; Freitag, acting, fall 1973; Savage, early
1974)
- Director, Special Projects
(Lester K. Fero); added mid-1973
- Director, Payload Planning
(Armstrong); dropped late 1972
- Director, Program
Studies/Advanced Studies (Wild)
- Director, Systems Engineering
(Timco); dropped late 1972
- Director, Skylab Program (Schneider;
Hanes, July 1974)
- Deputy Director, Skylab Program
(Disher); dropped early 1974
- Director, Program Budget and
Control (Field); dropped early 1974
- Director, Project Integration
(Hanes); dropped early 1974
- Director, Engineering (Savage);
dropped early 1974
- Director, Operations (Evans;
Aller, 1973); dropped early 1974
- Director, Systems Engineering
(Hagner; George M. Anderson); dropped early 1974
- Director, Apollo Program (Petrone);
combined with Apollo-Soyuz Test Project late 1972; dropped
early 1973
- Director, Apollo-Soyuz Test Project
(Lee); independent office, Jan. 1973
- Deputy Director, ASTP (Aller); added
March 1974
- Director, Apollo Missions (Lee);
dropped Jan. 1973
- Director, Apollo/ASTP Program Budget
and Control (Potate; John J. Kelly, 1972); moved to Office
of Resources Management, mid-1975 (see above)
- Director, Apollo/ASTP Engineering
(Stoney; King, Jan. 1973)
- Director, Apollo/ASTP Operations
(Holcomb)
- Director, Apollo Lunar Exploration
(Scherer; O'Bryant, acting, late 1971); dropped 1973
- Assistant Director, Flight
Systems Development (O'Bryant); dropped 1973
- Assistant Director, Lunar Science
(Allenby); dropped 1973
- Assistant Director, Lunar Sample
Program (Pomeroy); dropped 1973
- Director, Apollo Systems Engineering
(Wagner); dropped 1972
- Director, Space Station Task
Force/Sortie Lab Task Force (Nov. 1972)/Spacelab Program (Oct.
1973) (Lord)
- Director, Program
Integration/Engineering and Operations (Lohman)
- Director, Program Budget and Control
(William J. Hamon; Lord, acting, April 1973; Anthony L .
Liccardi, mid-1973); moved to Office of Resources
Management, mid-1975 (see above)
- Leader, Operations Group (Aller);
dropped late 1971
- Director, Concept Verification Test
(William E. Miller, Jr.); added 1973
- Director, Experiment Accomodations
(Johnson); added 1973
- Director, Space Shuttle Program
(Donlan, acting; Myron S. Malkin, April 1973)
- Deputy Director, Space Shuttle Program
(Day)
- Director, Program Budget and Control
(Allen); moved to Office of Resources Management, mid-1975
(see above)
- Director, Vehicle
Development/Engineering (Summerfelt; R. L. Wetherington,
acting, mid-1974; James T. Rose, fall 1974)
- Director, Systems Operations (Gay;
Day, acting, late 1971; Edward P. Andrews, April
1972)
- Director, Environmental Effects (James
King); added July 1974
- Director, Payloads (Day, acting);
added mid-1971; dropped mid-1973
-
-
-
-
- Phase III
- Fall 1975-1978
-
-
- Administrator/Deputy Administrator
- Associate Administrator, Manned
Spaceflight /Spaceflight (Feb. 1976)/Space Transportation
Systems (Nov. 1977) (Yardley)
- Deputy Associate Administrator,
Manned Spaceflight /Spaceflight /Space Transportation
Systems (Schneider; Glynn S. Lunney, Nov. 1976; Schneider,
Aug. 1977; Richard G. Smith, Aug. 1978)
- Director, Resources
Administration (Vance; C. Ronald Hovell, Jan.
1978)
- Deputy Associate Administrator,
Manned Spaceflight /Spaceflight /Space Transportation
Systems (Technical) (Donlan; position temporarily dropped,
June 1976; Culbertson, Nov. 1977)
- Director, Mission and Payload
Integration (Culbertson); moved to Office of Planning and
Program Integration, Jan. 1976
- Director, Life Sciences (Winter);
moved to Office of Space Science, Oct. 1975
- Director, Reliability, Quality,
and Safety (Cohen)
- Deputy Associate Administrator,
Manned Spaceflight /Spaceflight (Operations) (Gerald D.
Griffin); dropped May 1976
- Director, Advanced Programs
(Disher)
- Deputy Director, Advanced
Programs (Freitag)
- Director, Advanced Development
(Savage)
- Director, Advanced Studies (Wild;
Freitag, acting, early 1976); Johnson, late 1976)
- Director, Advanced Concepts (Ivan
Bekey); added Nov. 1978
- Director, Spacelab Program
(Lord)
- Deputy Director, Spacelab Program
(James C. Harrington); added 1976
- Director, Experiment
Accommodations (Johnson); dropped 1976
- Director, Engineering and
Operations (Lohman)
- Director, Integration and Test
(Alfred L. Ryan); added 1976
- Director, Space Shuttle Program
(Malkin)
- Deputy Director, Space Shuttle
Program (Day)
- Director, Engineering (Rose; L.
K. Edwards, 1976; Malkin, acting, early 1978; Sidney C.
Jones, Jr., mid-1978)
- Director, Systems Operations (E.
W. Land)
- Director, Space Transportation
System Operations (Lee)
- Deputy Director, Space
Transportation Systems Operations (Aller; Andrews, Sept.
1977)
- Director, Mission Analysis and
Integration (Armstrong); added Jan. 1976
- Director, Systems Engineering and
Logistics (C. H. King); added early 1976
- Director, Planning and
Requirements/Pricing, Launch Agreements, and Customer
Service (Jon M. Smith); added early 1976
- Director, Flight Operations
(Aller, acting); added early 1976; combined with Ground
Operations to form Integrated Operations, early 1977 (see
below)
- Director, Integrated Operations
(Edgar L. Harkleroad; added early 1977
- Director, Expendable Launch Vehicles
Program (Joseph B. Mahon)
- Deputy Director, Expendable
Launch Vehicles Program (Aller)
- Chief, Program Review and
Resource Management (Edward J. Kunec)
- Director, Small and Medium Launch
Vehicles Program (Joseph E. McGolrick)
- Manager, Atlas-Centaur (F. R.
Schmidt)
- Manager, Titan III (B. C.
Lam)
- Manager, Delta (Peter
Eaton)
- Manager, Scout (Paul E.
Goozh)
- Manager, Atlas F (Jay A.
Salmanson)
- Director, Interim Upper
Stage/Upper Stages (Wild)
- Chief, Space Transportation
Systems Support Projects (Aller, acting; William D.
Goldsby, winter 1978); added mid-1978
-
- Back -