Jump to main content.


Funding Resources

Funding Resources
NM Net Metering Standards
Type of IncentiveNet Metering
Eligible StatesNM
Eligible TechnologyBackpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine
Eligible Fuel# 2 Fuel Oil, # 6 Fuel Oil, Biogas, Biomass, Coal, Hydrogen, LFG, Municipal Solid Waste, Natural Gas, Other, Tire-Derived Fuel, Waste Heat Recovery
Eligible Project Size0-80
Number of Awards

 

Size of AwardEligible Technologies: Solar Thermal Electric, Photovoltaics, Landfill Gas, Wind, Biomass, Hydroelectric, Geothermal Electric, Fuel Cells, Municipal Solid Waste, CHP/Cogeneration, Microturbines

Size Limitations: 80 MW

Overall Enrollment Restrictions: None

Net Excess: Credited to customer's next bill at utility's avoided-cost rate or purchased by utility at avoided-cost rate monthly.
Start Date3/30/2007
End Date

 

Minimum Efficiency(%)

 

Additional InformationThe New Mexico Public Regulatory Commission (PRC) approved expanding the state's net metering rule in January 2007. The ruling allows electric utility customers to use net metering on systems with a peak capacity of up to 80 MW. Under the old rule, NMPRC Rule 570 issued in 1999, net metering was limited to systems smaller than 10 kW.
Web Sitehttp://www.dsireusa.org/library/includes/
incentive2.cfm?Incentive_Code=NM01R&state=NM&CurrentPageID=1&RE=1&EE=1
Exit EPA
Primary ContactJim Brack
224 E. Palace Ave.
Marian Hall
Santa Fe, NM 87501
U.S.A.
Jim Brack (jim.brack@state.nm.us)
(505) 827-6982

Top of Page


Local Navigation


Jump to main content.