10 Feb 1998 Daily Meeting Minutes Announcements ------------- * The H-alpha and Calcium-K images from the Observatoire de Paris in Meudon have been peculiar lately, with the Sun split into two parts. Bill Thompson contacted Jean-Marie Malherbe about it, and he has found and corrected the problem. These files are available again to be used for planning. We'll also be replacing older files, from 7-Jan to 3-Feb, with the corrected versions. * PDU-16 maintenance will be Thursday, February 12 from 5:00 am to 10:00 am, local time (10- 15 UT). Instrument teams may want to shut down computers hooked up to PDU-16. Also, this means the network (EOF/EAF) will also be down during this time. * There may be TV camera crew conducting interviews in the EOF tomorrow. Will not interfere with daily meeting, will be after 11:00 am (or prior to meeting). FOT Briefing ------------ Spacecraft Status: Nominal Spacecraft Anomalies: None Accomplished Activities: RSL, VIRGO, New tracking star, mag 6.85 Planned Activities: RSL, VIRGO, SWAN Upcoming Operations: April maneuver activities Ground Anomalies: 040/1421 Lost lock on receiver 2, 6 min command loss 040/1428 Prime string crashed 040/2129 Commanding anomalies, 16 min delay in NRT, 9 CDS commands retransmitted successfully Instrument Status ------------------ CDS -- JOP067, Intercal001 today. JOP067 and JOP018 tomorrow. SUMER -- Discovered some bad times in their high rate data that they are trying to understand (also occurred last time had submode #4). However, these are minor. Data looks good. JOP067, Intercal001 today and JOP18 tomorrow. UVCS -- Today, ICAL001. Tomorrow and for next several days flat field calibration. LASCO -- No small streamer blobs detected. Will do some C3 subfields on the East limb at 10 minute cadence. Saw partial halo CME EIT -- Some emerging flux regions (3 of them) appeared overnight. Saw CME in the NE at 06:20 (event seen by LASCO). Synoptic and 195 CME watch. Will discuss what is desired for JOP018 tomorrow after daily meeting. MDI -- Continuous contact continues. Nominal. TRACE -- Start of TRACE Simulation. Filament study for tomorrow. At 2:00 pm today will prepare paper plan file for 24 hours beginning noon GMT Wednesday.