Y--USFWS Creton Montana National Fish HatcheryConstruction Phase III

Solicitation Number: 982109R203
Agency: Department of the Interior
Office: Fish and Wildlife Service
Location: CGS-WO
  • Print
:
982109R203
:
Solicitation
:
Added: Dec 10, 2008 2:03 pm Modified: Jan 05, 2009 3:16 pmTrack Changes
Amendment 1: A request for proposal will be posted on www.fedbizopps.gov approximately on January 12, 2009 a change from the previously advertised date of December 30, 2008. Expected award date aprox. February 23, 2009. All other information remains unchanged:

The U. S. Fish and Wildlife Service (Service), located in Arlington, VA, is seeking eligible sources capable of completing construction as descried below:

Work will consist of providing and installing wastewater treatment equipment in an existing prefabricated metal building. The work will include providing and installing two 8' diameter x 12' long drum filters, a 12' x 3' polymer mixing system, and an 18' x 5' belt filter. Mechanical work will include providing and installing grating around the drum filters and grating to support the polymer mixing system and the belt filter, as well as stairs and handrails. Mechanical work also includes providing and installing two 3-hp drum filter backwash pumps, one 5-hp house water pump, three1-hp submersible pumps, a 1/8 hp chemical metering pump, and associated piping. Concrete work consists of placing of a 24' long x 5' high x 14" thick reinforced concrete wall. This wall shall be anchored to the existing concrete floor. Piping work includes two connections to buried 24" pipes and one connection to a buried 12" pipe.Electrical and controls work includes installing 4 variable frequency drive and wire and conduit to the previously mentioned pumps and installing and programming a programmable logic controller to control the system. The work will also include installing a 300 gpm vertical pump in an existing pump station and connecting the electrical power to it.

THIS SYNOPSIS IS NOT A REQUEST FOR PROPOSAL. A request for proposal will be posted on www.fedbizopps.gov approximately on January 12, 2009 with drawings and specifications available for download. Tentative award date - February 23, 2009. Estimated Price Range: $500,000 and $1,000,000. Construction must begin only after Phase II is complete summer of 2009.

For any inquiries concerning this project or to express interest, please contact Alina Sadoveanu at Alina_Sadoveanu@fws.gov.
Please consult the list of document viewers if you cannot open a file.

Solicitation 1

Type:
Solicitation
Posted Date:
January 15, 2009

Amendment 1

Type:
Mod/Amendment
Posted Date:
January 21, 2009

Amendment 2

Type:
Mod/Amendment
Posted Date:
February 13, 2009

Amendment 3

Type:
Mod/Amendment
Posted Date:
March 2, 2009
:
Contracting and Facilities Management - R9 U.S. Fish & Wildlife Service4401 N. Fairfax Drive Suite 7118-43 Arlington VA 22203
:
Creton Montana
599018239
USA
:
Alina Sadoveanu Contractor 7033582172 alina_sadoveanu@fws.gov;

Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance