ACCESSION #: 9507210328 Limitorque Corporation July 12, 1995 U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk REFERENCE: 1) Potential 10CFR 21 Condition 2) TVA Adverse Condition Report, Tracking No. WBPER950295 SUBJECT: Clutch Tripper Jam-up in SMB-00 Housing Please be advised that Limitorque Corporation has discovered, through the above notification from TVA, the possibility of the outside clutch tripper (one of two trippers per assembly) becoming wedged against the actuator housing and preventing the actuator shifting to electrical from manual operation when the motor is energized. This condition could potentially be reportable depending on the operating practices of the licensee, i.e.: o a reportable condition does not exist if the individual licensee's practices ensure actuator electrical (motor) operation verification after being in the manual (handwheel) mode. o the potential for a reportable condition exists if the individual licensee's practices do not ensure actuator electrical (motor) operation verification after being in the manual (handwheel) mode. Limitorque Corporation P. O. Box 11318 5114 Woodall Road Lynchburg, VA 24506-1318 Tel. (804) 528-4400 FAX (804) 845-9736 Page 2 July 12, 1995 Clutch Tripper Jam-up in SMB-00 Housing Identification of Basic Component The affected component is the housing of an SMB/SB/SBD-00 actuator that may cause the outside clutch tripper to become wedged and prevent the actuator from automatically shifting to the "motor operation position" from the "handwheel operation position" when the motor is energized - Exhibit F. Discovery Date Limitorque was notified by TVA of this condition on 05-26-95 and we Completed Our evaluation of affected equipment on July 6, 1995. Description of the Event When the actuator is in motor operation the two tripper cams continuously rotate - Exhibit F. If the actuator was previously in manual, operation, rotation of these cams will displace both tripper fingers from the tripper adjustment arm allowing the actuator to return to motor operation. The distance that the outside tripper will advance is a function of the rotary velocity of its respective cam at impact. This event may result in the outside tripper becoming wedged in the housing and preventing a return to motor operation. Nature of the Defect Our investigation of dos condition shows: - a 1979 or earlier "cast date" housing may cause the outside clutch tripper to become wedged in the housing, thus preventing the actuator from automatically shifting to electrical (motor) operation - Exhibit A - during the 1979 or earlier time period, while performing the "routine bench testing" of actuators, Limitorque would occasionally experience similar occurrences to that reported by TVA on 05-26-95. When this condition occurred during the "routine beach test," Limitorque would hand grind the affected area of " housing to eliminate the material which was causing the wedging of the outside clutch tripper. - since this condition was discovered during the "routine bench test" and the affected housings were being hand ground to remove material to prevent wedging of the outside clutch tripper, it was presumed this condition had been Page 3 July 12, 1995 Clutch Tripper Jam-up in SMB-00 Housing corrected on the affected actuators prior to shipping from our facility. Limitorque Corporation Corrective Action The following is a ha of modifications implemented by Limitorque to correct this condition: o prior to April 1979 - when the condition occurred during "routine bench test," material was removed by hand grinding the affected area of housing to prevent wedging. o April 1979 - instructions given for potential installation of tripper stop, 60-505-0057-1 in the existing inventory of SMB/SB/SBD-00 housings - Exhibits B and G. Note: Our investigation was unable to produce records to show the number of units that had the tripper stops installed. o April 1979 - simultaneously a housing casting modification was implemented which added material to the housing casting. This modification inherently provided a positive stop for the "side clutch tripper to prevent potential wedging. This modification was made to subsequent orders of housing castings and eliminated the need for the installation of the tripper stop - Exhibit C. o September 1994 - re-designed the clutch end of the housing casting to eliminate a requirement for a machining operation in this area, which was required by the above modification, and still maintain the positive stop for the outside clutch tripper to prevent potential wedging - Exhibit D. Our investigation of this condition shows: o SMB/SB/SBD-00 housings having a "cast date" of 1979 or earlier may have the potential for this wedging and installation of the "tripper stop" will provide a positive stop for the outside clutch tripper and prevent the tripper from potentially becoming wedged against the actuator housing. o SMB/SB/SBD-00 housings having a "cast date" of 1980 or later will not have the potential for this wedging of the outside clutch tripper since it has had material added to the pad in the housing which will inherently prevent the tripper from becoming wedged against the actuator housing. Page 4 July 12, 1995 Clutch Tripper Jam-up in SMB-00 Housing Notes: Housings having a "cast date" of 1980 or later will have a Limitorque unit serial number of approximately 308000 or higher, also any serial number having an L-prefix followed by six digits will be in this category - example L365340. The serial number should not be the determining factor without "cast date," verification. The "casting date" is located on the top side of the housing between the two conduit entries - Exhibit E. If "cast date" of housing cannot be determined, the geometry of the access hole on the clutch side of the housing will allow determination of pre and post 1980 housing castings. Refer to the following Exhibits for die geometrical difference of the access holes in the housing: 1979 or earlier - Exhibit A or B 1980 or later - Exhibit C or D Licensee/Customer Corrective Action o Review internal practices to verify if your individual operating practices ensure actuator electrical (motor) operation after being in the handwheel operation position prior to placing the motor operated valve into safety related service. If your internal practices do not ensure the above, then the verification of the return to actuator electrical (motor) operation is required. If this verification shows that the actuator has not automatically shifted to the motor operation after being in the handwheel operation position; an instantaneous tap on the declutch lever should free the outside clutch tripper from the wedged condition and the actuator will then automatically shift to motor operation. Note: Do not fully depress the declutch lever when performing this process, just tap the declutch lever each time to free the outside clutch tripper from the wedged condition. Verification of the return to the electrical operating mode may be accomplished by rotating the handwheel and verifying that the handwheel is no longer in engagement with the clutch keys. It is not necessary to reposition the valve to accomplish this verification. Page 5 July 12, 1995 Clutch Tripper Jam-up in SMB-00 Housing It should be noted that Limitorque Corporation is not aware of other field reports relative to this issue. This would indicate that the likelihood of recurrence is minimal or that operation's personnel have been rectifying this problem. The potential for occurrence however, exists on an actuator that previously did not demonstrate this phenomenon, but has had the rotary speed of the worm shaft increased via a motor or motor gear set changeout. Limitorque Corporation obtained an SMB-00 actuator of pre 1980 housing design. This actuator was subjected to testing in an attempt to duplicate the reported problem. The actuator equipped with 37T motor pinion and 28T worm shaft gear and driven by an 1800 rpm 3 phase motor (nearly equal to 2300 rpm @ worm shaft) was placed in manual mode and then electrically opened with no malfunction. This operational sequence was repeated over several cycles with no malfunction. The actuator was then fitted with a 3600 rpm 3 phase motor and a 43T motor pinion/22T worm shaft gear set (this gear set results in the highest worm shaft speed nearly equal 6600 rpm). The previously mentioned operational sequence was duplicated and resulted in an instantaneous malfunction. The operational sequence was repeated and produced several subsequent malfunctions and eventually resulted in trouble fee operation. This was the result of the tripper duplicating the hand grinding of the casting material and eliminating the mechanical interference which prevented any additional testing. A visual verification of the potential problem may be accomplished by the following method: #1 - Remove the motor from the actuator. #2 - Remove the grease from the tripper area. #3 - Place the actuator in manual operation. #4 - Depress the declutch lever to maintain the actuator in manual mode and move the outer tripper through its full travel while checking for interference with the housing. If interference exists, install tripper stop #60-505-0057-1. If interference does not exist, no action is required. o Contact Ms. Evelyn Crain, Nuclear Parts for the required number of tripper stops, #60-505-0057-1 for SMB/SB/SBD-00 housing having a "cast date" prior to 1980. These components will be furnished at no charge by Limitorque. Ms. Evelyn Crain can be contacted by phone (804) 528-4400, Ext. 9847, or fax (804) 845-9736. Page 6 July 12, 1995 Clutch Tripper Jam-up in SMB-00 Housing The no charge order will include a Certificate of Compliance dating: o Parts supplied are provided in accordance with Limitorque 's Management Quality System Manual. o Proper installation of these parts will not adversely affect any existing qualification of the actuators involved. Note: If additional statements are required on the Certificate of Compliance, then charges would be assessed to the order by Limitorque. Also, attached is Limitorque Drawing, #60-505-0057-1 and Installation Instructions if the licensee/customer decides to fabricate the tripper stop. Any questions or clarifications regarding the above notification may be directed to Mr. Pat McQuillan, Nuclear/Special Projects Manager at (804) 528-4400, Ext. 9714, or fax (804) 845-9736. Signed, Charles L. Hylton Vice President - Engineering WJM/kls/lab Attachment(s) cc: Mr. J. J. Brennan Part 21 Notification File **The vertical line in the right margin on page 5 indicates a revision to the original letter submitted by fax. Figures "Exhibits Pre April 1979 A, B, C, D, E, F, and G [TRIPPER ADJUSTMENT SCREW AND WASHER]" omitted. INSTALLATION INSTRUCTIONS FOR TRIPPER STOP, 60-505-0057-1 References: L/C Bulletin SMBI-82 EXHIBITS A & B 1) Remove the electric Motor in accordance with Limitorque instructions and Maintenance Manual, Bulletin SMBI-82. 2) If necessary, remove grease from the clutch cavity. 3) Remove the socket head screw and lockwasher that secures the tripper adjustment arm - see Exhibit A. 4) Install, the tripper stop with the 'L' toward the tripper fingers, the socket head screw and lockwasher removed in step (3). 5) The tripper stop should be positioned against the housing - see Exhibit B. Note: If necessary readjust clutch tripper adjustment arm per instructions outlined in Bulletin SMBI-82. 6) Move the outer tripper finger toward the tripper stop to ensure that it hits the short leg of the 'L'. 7) Replace the grease and Motor 8) Declutch and verify that actuator automatically shifts to electrical (motor) operation. *** END OF DOCUMENT *** ACCESSION #: 9507210322 Limitorque Corporation July 12, 1995 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Pursuant to the requirements of Title 10 of the Code of Federal Regulations Part 21, herein provided is notification of a potential defect in Limitorque SMB/SB/SBD-00 actuators. As detailed in the attached letter, this condition is dependent on the individual Licensee's internal operating practices that are used when declaring a motor operated valve operable for safety related services Limitorque is making written notice to both the Commission and the affected Nuclear Utilities shown on the attached mailing list Signed: Charles L. Hylton Vice President - Engineering WJM/lab Attachment cc: Part 21 Committee Members 10 CFR Part 21 - #55 Evaluation File Limitorque Corporation P. O. Box 11318 5114 Woodall Road Lynchburg, VA 24506-1318 Tel. (804) 528-4400 FAX (804) 846-9736 PART 21 NOTIFICTION MAILING LIST Issued by: Wm. J. Miluszusky, Quality Assurance Manager LICENSEES Alabama Power Company Farley Nuclear Plant J. Woodward, Plant Manager Columbia, AL 36319 Alabama Power Company J. W. McGowen, Mgr. Safety Audit & Engr. Review P. O. Box 2641 Birmingham, AL 35291 American Electric Power Service Co. Section Mgr. Audits & Procurement P. O. Box 16631 Columbus, OH 43216 Arizona Public Service Company Manager of Compliance-Mail Station 7636 P. O. Box 52034 Phoenix, AZ 85072-2034 Arkansas Power & Light Company Arkansas Nuclear One Station Purchasing P. O. Box 551 Little Rock, AR 72203 Arkansas Power & Light Company Operations Assessment Superintendent Route 3, Box 137G Russellville, AK 72801 Revision: 6 Page 1 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Arkansas Power & Light Company Engineering Support Supervisor Route 3, Box 137G Russellville, AK 72801 Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant R. C. L Olson P. O. Box 1535 2-NOF Lusby, MD 20657 Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant Daniel L Geneva, Supervisor Vendor Audits Unit Nuclear Quality Assurance Department 1650 Calvert Cliffs Parkway-3rd Floor, NOF Lusby, MD 20657 Baltimore Gas & Electric Company Fort Smallwood Road Complex J. A. Tierman, V. P. Nuclear Energy Quality Assurance P. O. Box 1475 Baltimore, MD Boston Edison Company Pilgrim Nuclear Power Edward S. Kraft, Jr. 600 Racky Hill Rd.-PNPS Plymouth, MA 02360 Boston Edison Company R. G. Bird, V. P. Nuclear 800 Boylston Street Boston, MA 02199 Revision: 6 Page 2 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Boston Edison Company Pilgrim Station Frank N. Famulari, Jr., Manager Quality Assurance Department Rocky Hill Road Plymouth, MA 02360 Carolina Power & Light Company Ron Chenoweth, Manager Quality Assurance P. O. Box 1551 Raleigh, NC 27602 Carolina Power & Light Company Nuclear Generation R. A. Watson P. O. Box 1551 CPB-12 Raleigh, NC 27602 Carolina Power & Light Company Brunswick Nuclear Project Department Manager Box 10429 Southport, NC 28461 Carolina Power & Light Company Roy A. Anderson, VP Brunswick Nuclear P. O. Box 10429 Southport, NC 28461 Carolina Power & Light Company Harris Nuclear Project Department Manager Box 165 New Hill, NC 27562 Revision: 6 Page 3 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Carolina Power & Light Company Robinson Nuclear Project Department Manager Box 790 Hartsville, SC 29550 Cleveland Electric Illuminating Company E. Riley, Director Quality Assurance P. O. Box 97 Perry, OH 44081 Comision Federal De Electricidad S. De La Pena Ing. Benito Cuevas Rio Rodano No. 14 Col. Cvauhtemoc 06598 Mexico, DF Commonwealth Edison Walter J. Shewski, Manager Quality Assurance P. O. Box 767 Chicago, IL 60690 Connecticut Yankee Atomic Power Co. Haddem Neck Plant D. B. Miller, Station Superintendent P. O. Box 127E East Hampton, CT 06424 Connecticut Yankee Atomic Power Co. Haddem Neck Plant John P. Stetz, Vice President 362 Injun Hollow Rd. E. Hampton, CT 06424 Revision: 6 Page 4 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Consolidated Edison Company of New York, Inc. Indian Point Station #2 Mr. Stephen E. Quinn, Vice President, Nuclear Power Broadway and Bleakley Avenue Buchanan, NY 10511-1099 Consolidated Edison Company of New York, Inc. Regulatory Affairs Manager Broadway & Bleakley Avenues Buchanan, NY 10511 Consumers Power Company Palisades Nuclear Plant J. D. Alderink 27780 Blue Star Highway Covert, MI 49043 Crane-Aloyco, Inc. Jerry Kurowski P. O. Box 3339 Joliet, IL 60434 Detroit Edison S. E. Kremer, Nuclear Procurement Supv. 6400 North Dixie Highway Newport, MI 48166 Duke Power Company M. S. Tuckman, Station Manager Seneca, SC 29679 Duke Power Company Manager Safety Assurance - Mail Code EC05N P. O. Box 10069 Charlotte, NC 28201-1006 Revision: 6 Page 5 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Duke Power Company C. M. Ballard P. O. Box 1002 Charlotte, NC 28201-1015 Duke Power Company McGuire Station T. L. McConnell, Station Manager P. O. Box 488 Cornelius, NC 28013 Duke Power Company McGuire Nuclear Station E. M. Geddie, MGO1VP - Station Manager 12700 Hagers Ferry Road Huntersville, NC 28078 Duke Power Company Catawba Purchasing 4800 Concord Road York, SC 29745 Duke Power Company Oconee Purchasing P. O. Box 219 Seneca, SC 29679 Duquesne Light Company Beaver Valley Power Station K. D. Grada, Manager Quality Assurance P. O. Box 4, BV-QA Shippingport, PA 15077 Duquesne Light Company Beaver Valley Power Station Manager of Nuclear Safety P. O. Box 4 Shippingport PA 15077 Revision: 6 Page 6 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Duquesne Light Company BVPS - 2 Document Control Supervisor P. O. Box 4 Shippingport, PA 15077 Entergy Operations, Inc. Arkansas Nuclear One Dwight Mims Director - Nuclear Licensensing 1448 SR 333 Russellville, AR 72801 Entergy Operations, Inc. Waterford 3 SES Vice President - Nuclear P. O. Box B Killona, LA 70066-0751 Entergy Operations, Inc. Director - Nuclear Licensing P. O. Box 220 St Francisville, LA 70775 Entergy Operations, Inc. Grand Gulf Nuclear Station M. J. Meisner - Director, Nuclear Safety and Regulatory Affairs P. O. Box 756 Port Gibson, MS 39150 Entergy Operations, Inc. Arkansas Nuclear One Supervisor - Engineering Databases 1448 SR 333 Russellville, AR 72801 Revision: 6 Page 7 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Entergy Operations, Inc. Arkansas Nuclear One Dale E. James, Supervision, Licensing Route 3, Box 137G Russellville, AR 72801 Entergy Operations, Inc. Licensing L. W. Laughlin, Manager P. O. Box B - Waterford 3 Killona, LA 70066 Florida Power & Light Turkey Point Station C. J. Baker, Plant Manager P. O. Box 4332 Princeton, FL 33032 Florida Power & Light St. Lucie Station G. J. Boissy, Plant Manager P. O. Box 128 Fort Pierce, FL 34954 Florida Power & Light R. A. Symes, V. P. Nuclear Operations P. O. Box 14000 Juno Beach, FL 33408 Florida Power & Light Ken Harris, Site Vice President P. O. Box 128 Ft. Pierce, FL 34954 Revision: 6 Page 8 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Florida Power & Light Co. St. Lucie Plt. Site Purchasing Supervisor P. O. Box 1200 Jensen Beach, FL 34958-1200 Florida Power & Light Co. Turkey Point Nuclear Plt P. O. Box 3088 Florida City, FL 33034 Florida Power and Light Company R. A. Symes, Manager of QA Services P. O. Box 14000 Juno Beach, FL 33408 Florida Power Corporation G. R. Westafer, Director Quality Programs P. O. Box 14042 St Petersburg, FL 33733 Florida Power Corporation Legal Department P. O. Box 14042 St. Petersburg, FL 33733 Florida Power Corporation George Oberndorfer-Manager, Procurement and Materials QA 15760 West Power Line Street MAC SA2D Crystal River, FL 34428-6708 Florida Power Corporation Crystal River Energy J. E. Colby, Manager, Procurement Engineering Services 15760 West Power Line Street MAC SA2G Crystal River, FL 34428-6708 Revision: 6 Page 9 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST GPU Nuclear Corporation Three Mile Island Nuclear Station Steve Devito, Vendor Document Control P. O. Box 480 Middletown, PA 17057 GPU Nuclear Corporation Three Mile Island Nuclear Station T. G. Broughton, VP & Director TMI-1 P. O. Box 480 Middletown, PA 17057 Georgia Power Company I. Otis Berkham, Vice President Procurement & Materials P. O. Box 4545 Atlanta, GA 30302 Georgia Power Company Vogtle Project Manager-Nuclear Engineering and Licensing P. O. Box 1295 Birmingham, AL 35201 Georgia Power Company General Manager, Nuclear Operations P. O. Box 1600 Waynesboro, GA 30830 Georgia Power Company Vogle Electric Generating Plant J. B. Beasley General Manager P. O. Box 1600 Waynesboro, GA 30830 Revision: 6 Page 10 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST GPU Nuclear Corporation Anthony A. Cavallo, Jr./VDC P. O. Box 388 - Trailer 300C Forked River, NJ 08731 GPU Nuclear Corporation G. W. Busch, Licensing Manager P. O. Box 388 Forked River, NJ 08731 Gulf States Utilities Company River Bend Station L. L. Dietrich P. O. Box 220 MA 3 St Francisville, LA 70775 Gulf States Utilities Company River Bend Station Philip D. Graham, Vice President - River Bend Nuclear Group P. O. Box 220 St Francisville, LA 70775 Houston Lighting & Power Company South Texas Plant Manager of Nuclear Licensing P. O. Box 289 Wadsworth, TX 77483 Houston Lighting and Power Company Project Manager P. O. Box 289 Wadsworth, TX 77483 Illinois Power Company Clinton Power Station R. E. Campbell, Director of Licensing - MC-V920 P. O. Box 678 Clinton, IL 61727 Revision: 6 Page 11 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Indiana/Michigan Power Company Donald C. Cook Nuclear Plant W. G. Smith, Jr., Plant Manager P. O. Box 458 Bridgman, MI 49106 Iowa Electric Light & Power Company General Office Ken Peveler, Manager Quality Assurance Cedar Rapids, IA 51406 Korea Electric Power Company Lee, Gil Gu Yongdong P. O. Box 40.167 Samsong-Dong Kangnam-Gu Seoul, Korea 135-791 Long Island Lighting Company Shoremam W. E. Steiger, Plant Manager P. O. Box 618 Wading River, NY 11792 Long Island Lighting Company Corporate Services John D. Leonard, Vice President - Nuclear Operations P. O. Box 618 - North Country Road Wading River, NY 11792 Louisiana Power & Light Company Waterford Nuclear Station N. S. Cams, Plant Manager P. O. Box B, Highway 18 Killona, LA 70066 Revision: 6 Page 12 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Maine Yankee Atomic Power Company C. D. Frizzle, Vice President Manager of Operations Edison Drive Augusta, ME 04336 Maine Yankee Atomic Power Company NUC Engineering & Licensing Steven E. Nichols, Manager Licensing & Engineering Support 83 Edison Drive Augusta, ME 04330 Metalka Commerce Ljubljana A. Mateljan 61000 Ljubljana Dalmatinova 2 Slovenia Nebraska Public Power District David A Whitman Div. Mgr. of Nuclear Suport 1414 15th Street Columbus, NE 68602 Nebraska Public Power District Cooper Power Plant G. R. Horn, Division Manager Nuclear Operations P. O. Box 98 Brownville, NE 68321 New Hampshire Yankee B. L. Drawbridge, Executive Director - Nuclear Production P. O. Box 300 Seabrook, NH 03874 Revision: 6 Page 13 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST New Hampshire Yankee R. J. DeLoach, Executive Director - Engineering and Licensing P. O. Box 300 Seabrook, NH 03874 North Atlantic Energy Service Corporation Bill Hinton, Materials Requirements Department Supervisor P. O. Box 300 Seabrook NH 03874 New York Power Authority James A. Fitzpatrick Plant Resident Manager P. O. Box 41 Lycoming, NY 13093 New York Power Authority Gerald C. Goldstein Assistant General Counsel 1633 Broadway New York, NY 10019 New York Power Authority Indian Point Unit #3 Resident Manager P. O. Box 215 Buchanan, NY 10511 New York Power Authority Indian Point 3NPS L. Guaquil, QA Superintendent P. O. Box 215 Buchanan,Y 10511 Revision: 6 Page 14 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Niagara Mohawk Power Corporation Gary D. Wilson, ESQ Managing Counsel 300 Erie Blvd. West Syracuse, NY 13202 Niagara Mohawk Power Corporation Ralph Sylvia Executive Vice President 301 Plainfield Road Syracuse, NY 13212 Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station, Unit 2 A. E. Winegard P. O. Box 63 Lycoming, NY 13093-0063 Niagara Mohawk Power Corporation J. Rivers Walsh, Vice-President Nuclear Engineering Salina Meadows - 302 Plainfield Road Syracuse, NY 13212 Niagara Mohawk Power Corporation Nine Mile Point T. J. Perkins, General Sup't Nuclear Generation P. O. Box 32 Lycoming, NY 13093 Northeast Utilities Service Company Nuclear Operations Executive Officer P. O. Box 270 Hartford, CT 06141 Revision: 6 Page 15 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Northeast Utilities Supervisor, Procurement QA P. O. Box 270 Hartford, CT 06140-0270 Northern States Power Company Monticello Nuclear Generating Plant Superintendent, Materials Engineering 2807 West County Road 75 Monticello, MN 55362 Northern States Power Company Prarie Island Nuclear Station E. Watzi Plant Manager 1717 Wakouada Drive, East Welch, MN 55089 Northern States Power Company Prairie Island NPS M. B. Sellman, Plant Manager 1717 Wakonade Drive East Welch, Mn 55089 Omaha Public Power District Manager, Nuclear Licensing and Industry Affairs Mail Stop FC-2-4 Administration Building Box 399 Highway 75 North of Fort Calhoun Fort Calhoun, NE 68023 Omaha Public Power District Manager, Nuclear Licensing & Industry Affairs, 8E/EP4 444 South 16th Street Mall Omaha, NE 68102-2247 Revision: 6 Page 16 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Omaha Public Power District Ft. Calhoun Nuclear Station L. T. Kusek, Supervisor Operation P. O. Box 399 Ft Calhoun, NE 68023 Omaha Public Power District Nuclear Operations T. L. Patterson P. O. Box 399 Omaha, NE 68023 Pacific Gas & Electric Company Richard F. Locke P. O. Box 7442 San Francisco, CA 94120 Pacific Gas & Electric Company Greg M. Rueger 77 Beale Street - Room F 14451800 San Francisco, CA 94106-94105 PECO Energy Company Manager Licensing Section Correspondence Control Desk P. O. Box 195 Wayne, PA 19087 Pennsylvania Power & Light Company NQA-Procurement A2-2 A. R. Sabel, Manager Nuclear Quality Assurance Two North Ninth Street Allentown, PA 18101 Revision: 6 Page 17 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Pennsylvania Power & Light Company Licensing T. G. Bannon Two North Ninth St A2-4 Allentown, PA 18101 Philadelphia Electric Company Limerick Station Brian Curry P. O. Box A, Sanatoga Branch Pottstown, PA 19464 Philadelphia Electric Company Director Quality Assurance 2301 Market Street Philadelphia, PA 19103 Portland General Electric Company General Manager, Nuclear Plant Engineering 71760 Columbia River Hwy. Ranier, OR 97048 Public Service Company of Colorado Ft. St. Wain Generating Station C. H. Fullers, Plant Manager 16805 Weld County Road - 19 1/2 Platteville, CO 80651 Public Service Company of Colorado P. O. Box 840 Denver, CO 80201 Public Service Company of Colorado Nuclear Licensing Department 16805 Weld County Road 19 1/2 Platteville, CO 80651 Revision: 6 Page 18 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Public Service Electric & Gas Company Procurement Quality Assurance Nuclear Department Manager-Mail Code N-14 P. O. Box 236 Hancocks Bridge, NJ 08038 Public Service Electric & Gas Company Nuclear Department R. Hovey, Vice President Chief Nuclear Officer P. O. Box 236 Hancocks Bridge, NJ 08038 Rochester Gas & Electric Corporation Nuclear Production Robert C. Mecredy Plant Manager 89 East Avenue Rochester, NY 14649 Rochester Gas & Electric Corporation Richard Morrill, Operations Assessment 89 East Avenue Rochester, NY 14649 Rochester Gas & Electric Corporation Robert E. Ginna Plant Michael P. Lilly, Manager Nuclear Assurance 1503 Lake Road Ontario, NY 14519 Sacramento Municipal Utility District Rancho Seco Nuclear Plant Director of Quality Assurance 14440 Twin Cities Road Herald, CA 95638-9799 Revision: 6 Page 19 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Southern California Edison San Onofre Nuclear Generating Station Brian Katz, Manager, Nuclear Oversight Division P. O. Box 128 San Clemente, CA 92674-0128 South Carolina Electric & Gas Company V. C. Summer Nuclear Station A. R. Koon, Manager Nuclear Licensing (830) P. O. Box 88 Jenkinsville, SC 29065 Southern Company Services, Inc. Nuclear Procurement Organization D. M. Varner P. O. Box 1295, Bldg. 40 Iverness Bin B001 Birmingham, AL 35201 System Energy Resources, Inc. Grand Gulf 1 & 2 W. E. Edge, Manager Programs Quality Assurance P. O. Box 756 Port Gibson, MS 39150 Tennessee Valley Authority - Nuclear Power Manager, Technical Licensing Services LP 5N 156B 1100 Market Street Chattanooga, TN 37402-2801 Tennessee Valley Authority Nuclear Power O. D. Kingsley 1101 Market Street Lookout Pl. 6N38A Chattanooga, TN 37402 Revision: 6 Page 20 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST TU Electric Nuclear Licensing Library Gayle Deck Licenensing Secretary 400 N. Olive St LB 81 Dallas, TX 75201 TU Electric Company - Production Division Skyway Tower Group Vice President Nuclear Engeering & Operations 400 N. Olive St, L.B. 81 Dallas, TX 75201 TU Electric Company Procurement QA Manager P. O. Box 1002 Glen Rose, TX 76043 Toledo Edison Company L. Ramsett, Director Quality Assurance 5501 N. State Rt. 2 Oak Harbor, OH 43449 Toledo Edison Company Davis-Besse Mail Stop 3043 Manager - Design Engineering 5501 N. State Route 2 Oak Harbor, OH 43449 Toledo Edison Company Davis-Besse Mail Stop 2101 Plant Manager 5501 N. State Route 2 Oak Harbor, OH 43449 Revision: 6 Page 21 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Toledo Edison Company Davis-Besse Mail Stop 3387 QA Director - Nuclear Assurance 5501 N. State Route 2 Oak Harbor, OH 43449 Union Electric Company D. F. Schnell Sr. Vice President - Nuclear P. O. Box 149 St Louis, MO 63166 Union Electric Company Callaway Plant VETIP Coordinator P. O. Box 620 Fulton, MO 65251 Union Electric Company A. P. Neuhalfen, Manager Quality Assurance P. O. Box 149 St Louis, MO 63166 Vermont Yankee Nuclear Power Corporation J. G. Weigand, President Route 5, Box 169 Brattleboro, VT 05301 Vermont Yankee Nuclear Power Corp. Rick McCullough, Operating Experience Coordinator P. O. Box 157 Vernon, VT 05354 Virginia Power W. L. Stewart, Vice President Nuclear Operations P. O. Box 26666 Richmond, VA 23261 Revision: 6 Page 22 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Virginia Power Innsbrook Technical Center M. L. Bowling, Manager of Nuclear Licensing and Programs 5000 Dominion Boulevard Glen Allen, VA 23060 Washington Public Power Supply System P. L. Ledford - Specialist, Nuclear Safety Engineering Mail Drop PE21 P. O. Box 968 Richland, WA 99342 Westinghouse Electric Corporation Energy System Business Unit Chris Delsignore P. O. Box 355 Pittsburgh, PA 15230 Westinghouse Electric Corporation Nuclear and Adv. Technology W. C. Gangloff Manager Strategic Marketing P. O. Box 355 Pittsburgh, PA 15230 Wisconsin Electric Power Company Point Beach Nuclear Plant G. J. Maxfield, Manager 6610 Nuclear Road Two Rivers, WI 54241 Wisconsin Public Service Corporation Superintendent, Nuclear Licensing and Systems P. O. Box 19002 Green Bay, WI 54307-9002 Revision: 6 Page 23 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Wolf Creek Nuclear Operating Corp. Manager Document Services (WC-DS) P. O. Box 411 Burlington, KS 66839 Wolf Creek Nuclear Operating Corporation Neil S. Carns President P. O. box 411 Burlington, KS 66839 Yankee Atomic Electric Company 580 Main Street Bolton, MA 01740 Revision: 6 Page 24 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST NON-LICENSEES Anchor Darling Valve Company George Knieser, Quality Assurance Manager 701 First Street Williamsport PA 17701 Anchor Darling Valve Company J. J. Chappell, Manager - Engineering P. O. Box 3428 Willimasport, PA 17701 B & W Nuclear Service Company Sub DasGupta, Quality Assurance Manager 3315 Old Forest Road - P. O. Box 10935 Lynchburg, VA 24506 BWR Owners' Group, GE Nuclear Energy George Levy M/C 753 175 Curtner Ave. San Jose, CA 95125 Contramatics Jim Sylvester, Quality Assurance Specialist 38 Power St Milford, NH 03055 Edwards Valve Inc. Rafiq Bandukwala, Quality Assurance Manager 1900 S. Saunders Street Raleigh, NC 27603 Henry Pratt Company Bruce Cummins, Quality Assurance Manager 401 S. Highland Avenue Aurora, IL 60507 Revision: 6 Page 25 of 29 Dated: January 19,1995 PART 21 NOTIFICTION MAILING LIST Velan Valve Edwary Francois, V.P. of Quality Assurance Avenue C - Griswold Industrial Park Williston, VT 05495 Westinghouse Electric Corporation Energy Systems Box 2728 Pittsburgh, PA 15230 Revision: 6 Page 26 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST LIMITORQUE REGIONAL SALES MANAGERS Limitorque Corporation Dave Culp 2600 E. Miroloma Way Anaheim, CA 92806 Limitorque Corporation Don Lindberg P. O. Box 430 Walnut Creek, CA 94597-0430 Limitorque of Canada Ltd. Jean Gratton 100 Alexis Nihon Blvd., Suite 208 St Laurent, Quebec H4M 2N7 Canada Limitorque of Canada Ltd. 2525 Dunwin Dr., Unit 1 Mississauga, Ontario L5L 1R9 Canada Limitorque Corporation Barry Moyer P. O. Box 671287 Marietta, GA 30066-0139 Limitorque Corporation Ed Harper 845 Midway Drive Willowbrook, IL 60521 Limitorque Corporation Bill Breitmayer P. O. Box 14007 Lenexa, KS 66215 Revision: 6 Page 27 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Limitorque Corporation Dave Odom 47 Harrington Way Shrewsbury, MA 01545 Limitorque Corporation Michael C. Balkun 432 Elwood Street Piscataway, NJ 08854 Limitorque Corporation Bob Derr 726 E. Main Street, Suite F Lebanon, OH 45036 Limitorque Corporation Walt Denkowski P. O. Box 507 Gilbertsville, PA 19525 Limitorque Corporation Sterling Adams 8901 Jameel Road, Suite 180 Houston, TX 77040 Limitorque Corporation Woody Lawman 1407 Huguenot Road Suite 105 Midlothian, VA 23113 Limitorque International Tom May Limitorque Asia Dan Warsing Revision: 6 Part 28 of 29 Dated: January 19, 1995 PART 21 NOTIFICTION MAILING LIST Control Engineering Pty. Ltd. Ian Kilpatrick P. O. Box 691 Pennant Hills, NSW 2120 108 Fallon Drive., Dural, NSW 2158 Australia Revision: 6 Page 29 of 29 Dated: January 19, 1995 *** END OF DOCUMENT ***