ACCESSION #: 9507210328

Limitorque
Corporation

July 12, 1995

U.S. Nuclear Regulatory Commission
Washington, DC 20555

ATTENTION:     Document Control Desk

REFERENCE:     1)   Potential 10CFR 21 Condition
               2)   TVA Adverse Condition Report, Tracking No.
                    WBPER950295

SUBJECT:       Clutch Tripper Jam-up in SMB-00 Housing

Please be advised that Limitorque Corporation has discovered, through the
above notification from TVA, the possibility of the outside clutch
tripper (one of two trippers per assembly) becoming wedged against the
actuator housing and preventing the actuator shifting to electrical from
manual operation when the motor is energized.

This condition could potentially be reportable depending on the operating
practices of the licensee, i.e.:

     o    a reportable condition does not exist if the individual
          licensee's practices ensure actuator electrical (motor)
          operation verification after being in the manual (handwheel)
          mode.

     o    the potential for a reportable condition exists if the
          individual licensee's practices do not ensure actuator
          electrical (motor) operation verification after being in the
          manual (handwheel) mode.

Limitorque Corporation  P. O. Box 11318  5114 Woodall Road  Lynchburg, VA
24506-1318  Tel. (804) 528-4400  FAX (804) 845-9736

Page 2
July 12, 1995
Clutch Tripper Jam-up in SMB-00 Housing

Identification of Basic Component

The affected component is the housing of an SMB/SB/SBD-00 actuator that
may cause the outside clutch tripper to become wedged and prevent the
actuator from automatically shifting to the "motor operation position"
from the "handwheel operation position" when the motor is energized -
Exhibit F.

Discovery  Date

Limitorque was notified by TVA of this condition on 05-26-95 and we
Completed Our evaluation of affected equipment on July 6, 1995.

Description of the Event

When the actuator is in motor operation the two tripper cams continuously
rotate - Exhibit F.  If the actuator was previously in manual, operation,
rotation of these cams will displace both tripper fingers from the
tripper adjustment arm allowing the actuator to return to motor
operation.  The distance that the outside tripper will advance is a
function of the rotary velocity of its respective cam at impact.  This
event may result in the outside tripper becoming wedged in the housing
and preventing a return to motor operation.

Nature of the Defect

Our investigation of dos condition shows:

     -    a 1979 or earlier "cast date" housing may cause the outside
          clutch tripper to become wedged in the housing, thus preventing
          the actuator from automatically shifting to electrical (motor)
          operation - Exhibit A

     -    during the 1979 or earlier time period, while performing the
          "routine bench testing" of actuators, Limitorque would
          occasionally experience similar occurrences to that reported by
          TVA on 05-26-95.  When this condition occurred during the
          "routine beach test," Limitorque would hand grind the affected
          area of " housing to eliminate the material which was causing
          the wedging of the outside clutch tripper.

     -    since this condition was discovered during the "routine bench
          test" and the affected housings were being hand ground to
          remove material to prevent wedging of the outside clutch
          tripper, it was presumed this condition had been

Page 3
July 12, 1995

Clutch Tripper Jam-up in SMB-00 Housing

          corrected on the affected actuators prior to shipping from our

          facility.

Limitorque Corporation Corrective Action

The following is a ha of modifications implemented by Limitorque to
correct this condition:

     o    prior to April 1979 - when the condition occurred during
          "routine bench test," material was removed by hand grinding the
          affected area of housing to prevent wedging.

     o    April 1979 - instructions given for potential installation of
          tripper stop, 60-505-0057-1 in the existing inventory of
          SMB/SB/SBD-00 housings - Exhibits B and G.

     Note:     Our investigation was unable to produce records to show
               the number of units that had the tripper stops installed.

     o    April 1979 - simultaneously a housing casting modification was
          implemented which added material to the housing casting.  This
          modification inherently provided a positive stop for the "side
          clutch tripper to prevent potential wedging.  This modification
          was made to subsequent orders of housing castings and
          eliminated the need for the installation of the tripper stop -
          Exhibit C.

     o    September 1994 - re-designed the clutch end of the housing
          casting to eliminate a requirement for a machining operation in
          this area, which was required by the above modification, and
          still maintain the positive stop for the outside clutch tripper
          to prevent potential wedging - Exhibit D.

Our investigation of this condition shows:

     o    SMB/SB/SBD-00 housings having a "cast date" of 1979 or earlier
          may have the potential for this wedging and installation of the
          "tripper stop" will provide a positive stop for the outside
          clutch tripper and prevent the tripper from potentially
          becoming wedged against the actuator housing.

     o    SMB/SB/SBD-00 housings having a "cast date" of 1980 or later
          will not have the potential for this wedging of the outside
          clutch tripper since it has had material added to the pad in
          the housing which will inherently prevent the tripper from
          becoming wedged against the actuator housing.

Page 4
July 12, 1995
Clutch Tripper Jam-up in SMB-00 Housing

     Notes:    Housings having a "cast date" of 1980 or later will have a
               Limitorque unit serial number of approximately 308000 or
               higher, also any serial number having an L-prefix followed
               by six digits will be in this category - example L365340.

               The serial number should not be the determining factor
               without "cast date," verification.

               The "casting date" is located on the top side of the
               housing between the two conduit entries - Exhibit E.

               If "cast date" of housing cannot be determined, the
               geometry of the access hole on the clutch side of the
               housing will allow determination of pre and post 1980
               housing castings.  Refer to the following Exhibits for die
               geometrical difference of the access holes in the housing:

                    1979 or earlier - Exhibit A or B
                    1980 or later - Exhibit C or D

Licensee/Customer Corrective Action

     o    Review internal practices to verify if your individual
          operating practices ensure actuator electrical (motor)
          operation after being in the handwheel operation position prior
          to placing the motor operated valve into safety related
          service.

          If your internal practices do not ensure the above, then the
          verification of the return to actuator electrical (motor)
          operation is required.  If this verification shows that the
          actuator has not automatically shifted to the motor operation
          after being in the handwheel operation position; an
          instantaneous tap on the declutch lever should free the outside
          clutch tripper from the wedged condition and the actuator will
          then automatically shift to motor operation.

          Note:     Do not fully depress the declutch lever when
                    performing this process, just tap the declutch lever
                    each time to free the outside clutch tripper from the
                    wedged condition.

Verification of the return to the electrical operating mode may be
accomplished by rotating the handwheel and verifying that the handwheel
is no longer in engagement with the clutch keys.  It is not necessary to
reposition the valve to accomplish this verification.

Page 5
July 12, 1995
Clutch Tripper Jam-up in SMB-00 Housing

It should be noted that Limitorque Corporation is not aware of other
field reports relative to this issue.  This would indicate that the
likelihood of recurrence is minimal or that operation's personnel have
been rectifying this problem.

The potential for occurrence however, exists on an actuator that
previously did not demonstrate this phenomenon, but has had the rotary
speed of the worm shaft increased via a motor or motor gear set
changeout.

Limitorque Corporation obtained an SMB-00 actuator of pre 1980 housing
design.  This actuator was subjected to testing in an attempt to
duplicate the reported problem.  The actuator equipped with 37T motor
pinion and 28T worm shaft gear and driven by an 1800 rpm 3 phase motor
(nearly equal to 2300 rpm @ worm shaft) was placed in manual mode and
then electrically opened with no malfunction.  This operational sequence
was repeated over several cycles with no malfunction.

The actuator was then fitted with a 3600 rpm 3 phase motor and a 43T
motor pinion/22T worm shaft gear set (this gear set results in the
highest worm shaft speed nearly equal 6600 rpm).  The previously
mentioned operational sequence was duplicated and resulted in an
instantaneous malfunction.  The operational sequence was repeated and
produced several subsequent malfunctions and eventually resulted in
trouble fee operation.  This was the result of the tripper duplicating
the hand grinding of the casting material and eliminating the mechanical
interference which prevented any additional testing.

A visual verification of the potential problem may be accomplished by the
following method:

#1   -    Remove the motor from the actuator.
#2   -    Remove the grease from the tripper area.
#3   -    Place the actuator in manual operation.
#4   -    Depress the declutch lever to maintain the actuator in manual
          mode and move the outer tripper through its full travel while
          checking for interference with the housing.  If interference
          exists, install tripper stop #60-505-0057-1.  If interference
          does not exist, no action is required.

o    Contact Ms. Evelyn Crain, Nuclear Parts for the required number of
     tripper stops, #60-505-0057-1 for SMB/SB/SBD-00 housing having a
     "cast date" prior to 1980.  These components will be furnished at no
     charge by Limitorque.  Ms. Evelyn Crain can be contacted by phone
     (804) 528-4400, Ext. 9847, or fax (804) 845-9736.

Page 6
July 12, 1995
Clutch Tripper Jam-up in SMB-00 Housing

     The no charge order will include a Certificate of Compliance dating:

     o    Parts supplied are provided in accordance with Limitorque 's
          Management Quality System Manual.

     o    Proper installation of these parts will not adversely affect
          any existing qualification of the actuators involved.

Note:     If additional statements are required on the Certificate of
          Compliance, then charges would be assessed to the order by
          Limitorque.

Also, attached is Limitorque Drawing, #60-505-0057-1 and Installation
Instructions if the licensee/customer decides to fabricate the tripper
stop.

Any questions or clarifications regarding the above notification may be
directed to Mr. Pat McQuillan, Nuclear/Special Projects Manager at (804)
528-4400, Ext. 9714, or fax (804) 845-9736.

Signed,

Charles L. Hylton
Vice President - Engineering

WJM/kls/lab

Attachment(s)

cc:  Mr. J. J. Brennan
     Part 21 Notification File

**The vertical line in the right margin on page 5 indicates a revision to
the original letter submitted by fax.

Figures "Exhibits Pre April 1979 A, B, C, D, E, F, and G [TRIPPER
ADJUSTMENT SCREW AND WASHER]" omitted.

                        INSTALLATION INSTRUCTIONS
                                   FOR
                       TRIPPER STOP, 60-505-0057-1

                    References: L/C Bulletin SMBI-82

                             EXHIBITS A & B

1)   Remove the electric Motor in accordance with Limitorque instructions
     and Maintenance Manual, Bulletin SMBI-82.

2)   If necessary, remove grease from the clutch cavity.

3)   Remove the socket head screw and lockwasher that secures the tripper
     adjustment arm - see Exhibit A.

4)   Install, the tripper stop with the 'L' toward the tripper fingers,
     the socket head screw and lockwasher removed in step (3).

5)   The tripper stop should be positioned against the housing - see
     Exhibit B.

     Note:     If necessary readjust clutch tripper adjustment arm per
               instructions outlined in Bulletin SMBI-82.

6)   Move the outer tripper finger toward the tripper stop to ensure that
     it hits the short leg of the 'L'.

7)   Replace the grease and Motor

8)   Declutch and verify that actuator automatically shifts to electrical
     (motor) operation.

*** END OF DOCUMENT ***

ACCESSION #: 9507210322

Limitorque
Corporation

July 12, 1995

Document Control Desk
U. S. Nuclear Regulatory Commission
Washington, D. C. 20555

Pursuant to the requirements of Title 10 of the Code of Federal
Regulations Part 21, herein provided is notification of a potential
defect in Limitorque SMB/SB/SBD-00 actuators.  As detailed in the
attached letter, this condition is dependent on the individual Licensee's
internal operating practices that are used when declaring a motor
operated valve operable for safety related services Limitorque is making
written notice to both the Commission and the affected Nuclear Utilities
shown on the attached mailing list

Signed:

Charles L. Hylton
Vice President - Engineering

WJM/lab

Attachment

cc:  Part 21 Committee Members
     10 CFR Part 21 - #55 Evaluation File

Limitorque Corporation  P. O. Box 11318  5114 Woodall Road  Lynchburg,
VA 24506-1318  Tel. (804) 528-4400  FAX (804) 846-9736

                           PART 21 NOTIFICTION
                              MAILING LIST

Issued by:                                        Wm. J. Miluszusky,
               Quality Assurance Manager

LICENSEES

Alabama Power Company
Farley Nuclear Plant
J. Woodward, Plant Manager
Columbia, AL 36319

Alabama Power Company
J. W. McGowen, Mgr. Safety Audit & Engr. Review
P. O. Box 2641
Birmingham, AL 35291

American Electric Power Service Co.
Section Mgr. Audits & Procurement
P. O. Box 16631
Columbus, OH 43216

Arizona Public Service Company
Manager of Compliance-Mail Station 7636
P. O. Box 52034
Phoenix, AZ 85072-2034

Arkansas Power & Light Company
Arkansas Nuclear One Station
Purchasing
P. O. Box 551
Little Rock, AR 72203

Arkansas Power & Light Company
Operations Assessment Superintendent
Route 3, Box 137G
Russellville, AK 72801

Revision: 6                   Page 1 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Arkansas Power & Light Company
Engineering Support Supervisor
Route 3, Box 137G
Russellville, AK 72801

Baltimore Gas and Electric Company
Calvert Cliffs Nuclear Power Plant
R. C. L Olson
P. O. Box 1535
2-NOF
Lusby, MD 20657

Baltimore Gas and Electric Company
Calvert Cliffs Nuclear Power Plant
Daniel L Geneva, Supervisor Vendor Audits Unit
Nuclear Quality Assurance Department
1650 Calvert Cliffs Parkway-3rd Floor, NOF
Lusby, MD 20657

Baltimore Gas & Electric Company
Fort Smallwood Road Complex
J. A. Tierman, V. P. Nuclear Energy Quality Assurance
P. O. Box 1475
Baltimore, MD

Boston Edison Company
Pilgrim Nuclear Power
Edward S. Kraft, Jr.
600 Racky Hill Rd.-PNPS
Plymouth, MA 02360

Boston Edison Company
R. G. Bird, V. P. Nuclear
800 Boylston Street
Boston, MA 02199

Revision: 6                   Page 2 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Boston Edison Company
Pilgrim Station
Frank N. Famulari, Jr., Manager Quality Assurance Department
Rocky Hill Road
Plymouth, MA 02360

Carolina Power & Light Company
Ron Chenoweth, Manager Quality Assurance
P. O. Box 1551
Raleigh, NC 27602

Carolina Power & Light Company
Nuclear Generation
R. A. Watson
P. O. Box 1551
CPB-12
Raleigh, NC 27602

Carolina Power & Light Company
Brunswick Nuclear Project
Department Manager
Box 10429
Southport, NC 28461

Carolina Power & Light Company
Roy A. Anderson, VP Brunswick Nuclear
P. O. Box 10429
Southport, NC 28461

Carolina Power & Light Company
Harris Nuclear Project
Department Manager
Box 165
New Hill, NC 27562

Revision: 6                   Page 3 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Carolina Power & Light Company
Robinson Nuclear Project
Department Manager
Box 790
Hartsville, SC 29550

Cleveland Electric Illuminating Company
E. Riley, Director Quality Assurance
P. O. Box 97
Perry, OH 44081

Comision Federal De Electricidad
S. De La Pena
Ing. Benito Cuevas
Rio Rodano No. 14
Col.  Cvauhtemoc 06598
Mexico, DF

Commonwealth Edison
Walter J. Shewski, Manager Quality Assurance
P. O. Box 767
Chicago, IL 60690

Connecticut Yankee Atomic Power Co.
Haddem Neck Plant
D. B. Miller, Station Superintendent
P. O. Box 127E
East Hampton, CT 06424

Connecticut Yankee Atomic Power Co.

Haddem Neck Plant
John P. Stetz, Vice President
362 Injun Hollow Rd.
E. Hampton, CT 06424

Revision: 6                   Page 4 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Consolidated Edison Company of New York, Inc.
Indian Point Station #2
Mr. Stephen E. Quinn, Vice President, Nuclear Power
Broadway and Bleakley Avenue
Buchanan, NY 10511-1099

Consolidated Edison Company of New York, Inc.
Regulatory Affairs Manager
Broadway & Bleakley Avenues
Buchanan, NY 10511

Consumers Power Company
Palisades Nuclear Plant
J. D. Alderink
27780 Blue Star Highway
Covert, MI 49043

Crane-Aloyco, Inc.
Jerry Kurowski
P. O. Box 3339
Joliet, IL 60434

Detroit Edison
S. E. Kremer, Nuclear Procurement Supv.
6400 North Dixie Highway
Newport, MI 48166

Duke Power Company
M. S. Tuckman, Station Manager
Seneca, SC 29679

Duke Power Company
Manager Safety Assurance - Mail Code EC05N
P. O. Box 10069
Charlotte, NC 28201-1006

Revision: 6                   Page 5 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Duke Power Company
C. M. Ballard
P. O. Box 1002
Charlotte, NC 28201-1015

Duke Power Company
McGuire Station
T. L. McConnell, Station Manager
P. O. Box 488
Cornelius, NC 28013

Duke Power Company
McGuire Nuclear Station
E. M. Geddie, MGO1VP - Station Manager
12700 Hagers Ferry Road
Huntersville, NC 28078

Duke Power Company
Catawba Purchasing
4800 Concord Road
York, SC 29745

Duke Power Company
Oconee Purchasing
P. O. Box 219
Seneca, SC 29679

Duquesne Light Company
Beaver Valley Power Station
K. D. Grada, Manager Quality Assurance
P. O. Box 4, BV-QA
Shippingport, PA 15077

Duquesne Light Company
Beaver Valley Power Station
Manager of Nuclear Safety
P. O. Box 4
Shippingport PA 15077

Revision: 6                   Page 6 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Duquesne Light Company
BVPS - 2
Document Control Supervisor
P. O. Box 4
Shippingport, PA 15077

Entergy Operations, Inc.
Arkansas Nuclear One
Dwight Mims
Director - Nuclear Licensensing
1448 SR 333
Russellville, AR 72801

Entergy Operations, Inc.
Waterford 3 SES
Vice President - Nuclear
P. O. Box B
Killona, LA 70066-0751

Entergy Operations, Inc.
Director - Nuclear Licensing
P. O. Box 220
St Francisville, LA 70775

Entergy Operations, Inc.
Grand Gulf Nuclear Station
M. J. Meisner - Director, Nuclear Safety and Regulatory Affairs
P. O. Box 756
Port Gibson, MS 39150

Entergy Operations, Inc.
Arkansas Nuclear One
Supervisor - Engineering Databases
1448 SR 333
Russellville, AR 72801

Revision: 6                   Page 7 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Entergy Operations, Inc.
Arkansas Nuclear One
Dale E. James, Supervision, Licensing
Route 3, Box 137G
Russellville, AR 72801

Entergy Operations, Inc.
Licensing
L. W. Laughlin, Manager
P. O. Box B - Waterford 3
Killona, LA 70066

Florida Power & Light
Turkey Point Station
C. J. Baker, Plant Manager
P. O. Box 4332
Princeton, FL 33032

Florida Power & Light
St.  Lucie Station
G. J. Boissy, Plant Manager
P. O. Box 128
Fort Pierce, FL 34954

Florida Power & Light
R. A. Symes, V. P. Nuclear Operations
P. O. Box 14000
Juno Beach, FL 33408

Florida Power & Light
Ken Harris, Site Vice President
P. O. Box 128
Ft. Pierce, FL 34954

Revision: 6                   Page 8 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Florida Power & Light Co.
St. Lucie Plt.
Site Purchasing Supervisor
P. O. Box 1200
Jensen Beach, FL 34958-1200

Florida Power & Light Co.
Turkey Point Nuclear Plt
P. O. Box 3088
Florida City, FL 33034

Florida Power and Light Company
R. A. Symes, Manager of QA Services
P. O. Box 14000
Juno Beach, FL 33408

Florida Power Corporation
G. R. Westafer, Director Quality Programs
P. O. Box 14042
St Petersburg, FL 33733

Florida Power Corporation
Legal Department
P. O. Box 14042
St. Petersburg, FL 33733

Florida Power Corporation
George Oberndorfer-Manager, Procurement and Materials QA
15760 West Power Line Street MAC SA2D
Crystal River, FL 34428-6708

Florida Power Corporation
Crystal River Energy
J. E. Colby, Manager, Procurement Engineering Services
15760 West Power Line Street MAC SA2G
Crystal River, FL 34428-6708

Revision: 6                   Page 9 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

GPU Nuclear Corporation
Three Mile Island Nuclear Station
Steve Devito, Vendor Document Control
P. O. Box 480
Middletown, PA 17057

GPU Nuclear Corporation
Three Mile Island Nuclear Station
T. G. Broughton, VP & Director TMI-1

P. O. Box 480
Middletown, PA 17057

Georgia Power Company
I. Otis Berkham, Vice President Procurement & Materials
P. O. Box 4545
Atlanta, GA 30302

Georgia Power Company
Vogtle Project
Manager-Nuclear Engineering and Licensing
P. O. Box 1295
Birmingham, AL 35201

Georgia Power Company
General Manager, Nuclear Operations
P. O. Box 1600
Waynesboro, GA 30830

Georgia Power Company
Vogle Electric Generating Plant
J. B. Beasley
General Manager
P. O. Box 1600
Waynesboro, GA 30830

Revision: 6                  Page 10 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

GPU Nuclear Corporation
Anthony A. Cavallo, Jr./VDC
P. O. Box 388 - Trailer 300C
Forked River, NJ 08731

GPU Nuclear Corporation
G. W. Busch, Licensing Manager
P. O. Box 388
Forked River, NJ 08731

Gulf States Utilities Company
River Bend Station
L. L. Dietrich
P. O. Box 220 MA 3
St Francisville, LA 70775

Gulf States Utilities Company
River Bend Station
Philip D. Graham, Vice President - River Bend Nuclear Group
P. O. Box 220
St Francisville, LA 70775

Houston Lighting & Power Company
South Texas Plant
Manager of Nuclear Licensing
P. O. Box 289
Wadsworth, TX 77483

Houston Lighting and Power Company
Project Manager
P. O. Box 289
Wadsworth, TX 77483

Illinois Power Company
Clinton Power Station
R. E. Campbell, Director of Licensing - MC-V920
P. O. Box 678
Clinton, IL 61727

Revision: 6                  Page 11 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Indiana/Michigan Power Company
Donald C. Cook Nuclear Plant
W. G. Smith, Jr., Plant Manager
P. O. Box 458
Bridgman, MI 49106

Iowa Electric Light & Power Company
General Office
Ken Peveler, Manager Quality Assurance
Cedar Rapids, IA 51406

Korea Electric Power Company
Lee, Gil Gu
Yongdong P. O. Box 40.167
Samsong-Dong
Kangnam-Gu Seoul, Korea 135-791

Long Island Lighting Company
Shoremam
W. E. Steiger, Plant Manager
P. O. Box 618
Wading River, NY 11792

Long Island Lighting Company
Corporate Services
John D. Leonard, Vice President - Nuclear Operations
P. O. Box 618 - North Country Road
Wading River, NY 11792

Louisiana Power & Light Company
Waterford Nuclear Station
N. S. Cams, Plant Manager
P. O. Box B, Highway 18
Killona, LA 70066

Revision: 6                  Page 12 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Maine Yankee Atomic Power Company
C. D. Frizzle, Vice President Manager of Operations
Edison Drive
Augusta, ME 04336

Maine Yankee Atomic Power Company
NUC Engineering & Licensing
Steven E. Nichols, Manager Licensing & Engineering Support
83 Edison Drive
Augusta, ME 04330

Metalka Commerce
Ljubljana
A. Mateljan
61000 Ljubljana
Dalmatinova 2
Slovenia

Nebraska Public Power District
David A Whitman
Div. Mgr. of Nuclear Suport
1414 15th Street
Columbus, NE 68602

Nebraska Public Power District
Cooper Power Plant
G. R. Horn, Division Manager Nuclear Operations
P. O. Box 98
Brownville, NE 68321

New Hampshire Yankee
B. L. Drawbridge, Executive Director - Nuclear Production
P. O. Box 300
Seabrook, NH 03874

Revision: 6                   Page 13 of 29       Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

New Hampshire Yankee
R. J. DeLoach, Executive Director - Engineering and Licensing
P. O. Box 300
Seabrook, NH 03874

North Atlantic Energy Service Corporation
Bill Hinton, Materials Requirements Department Supervisor
P. O. Box 300
Seabrook NH 03874

New York Power Authority
James A.  Fitzpatrick Plant
Resident Manager
P. O. Box 41
Lycoming, NY 13093

New York Power Authority
Gerald C. Goldstein
Assistant General Counsel
1633 Broadway
New York, NY 10019

New York Power Authority
Indian Point Unit #3
Resident Manager
P. O. Box 215
Buchanan, NY 10511

New York Power Authority
Indian Point 3NPS
L. Guaquil, QA Superintendent
P. O. Box 215
Buchanan,Y 10511

Revision: 6                  Page 14 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Niagara Mohawk Power Corporation
Gary D. Wilson, ESQ
Managing Counsel
300 Erie Blvd. West
Syracuse, NY 13202

Niagara Mohawk Power Corporation
Ralph Sylvia
Executive Vice President
301 Plainfield Road
Syracuse, NY 13212

Niagara Mohawk Power Corporation
Nine Mile Point Nuclear Station, Unit 2
A. E. Winegard
P. O. Box 63
Lycoming, NY 13093-0063

Niagara Mohawk Power Corporation
J. Rivers Walsh, Vice-President Nuclear Engineering
Salina Meadows - 302 Plainfield Road
Syracuse, NY 13212

Niagara Mohawk Power Corporation
Nine Mile Point
T. J. Perkins, General Sup't Nuclear Generation
P. O. Box 32
Lycoming, NY 13093

Northeast Utilities Service Company
Nuclear Operations
Executive Officer
P. O. Box 270
Hartford, CT 06141

Revision: 6                   Page 15 of 29       Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Northeast Utilities
Supervisor, Procurement QA
P. O. Box 270
Hartford, CT 06140-0270

Northern States Power Company
Monticello Nuclear Generating Plant
Superintendent, Materials Engineering
2807 West County Road 75
Monticello, MN 55362

Northern States Power Company
Prarie Island Nuclear Station
E. Watzi Plant Manager
1717 Wakouada Drive, East
Welch, MN 55089

Northern States Power Company
Prairie Island NPS
M. B. Sellman, Plant Manager
1717 Wakonade Drive East
Welch, Mn 55089

Omaha Public Power District
Manager, Nuclear Licensing and Industry Affairs
Mail Stop FC-2-4 Administration Building
Box 399 Highway 75 North of Fort Calhoun
Fort Calhoun, NE 68023

Omaha Public Power District
Manager, Nuclear Licensing &
Industry Affairs, 8E/EP4
444 South 16th Street Mall
Omaha, NE 68102-2247

Revision: 6                  Page 16 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Omaha Public Power District
Ft. Calhoun Nuclear Station
L. T. Kusek, Supervisor Operation
P. O. Box 399
Ft Calhoun, NE 68023

Omaha Public Power District
Nuclear Operations
T. L. Patterson
P. O. Box 399
Omaha, NE 68023

Pacific Gas & Electric Company
Richard F. Locke
P. O. Box 7442
San Francisco, CA 94120

Pacific Gas & Electric Company
Greg M. Rueger
77 Beale Street - Room F 14451800
San Francisco, CA 94106-94105

PECO Energy Company
Manager Licensing Section
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087

Pennsylvania Power & Light Company
NQA-Procurement A2-2
A. R. Sabel, Manager Nuclear Quality Assurance
Two North Ninth Street
Allentown, PA 18101

Revision: 6                  Page 17 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Pennsylvania Power & Light Company
Licensing
T. G. Bannon
Two North Ninth St
A2-4
Allentown, PA 18101

Philadelphia Electric Company
Limerick Station
Brian Curry
P. O. Box A, Sanatoga Branch
Pottstown, PA 19464

Philadelphia Electric Company
Director Quality Assurance
2301 Market Street
Philadelphia, PA 19103

Portland General Electric Company
General Manager, Nuclear Plant Engineering
71760 Columbia River Hwy.
Ranier, OR 97048

Public Service Company of Colorado
Ft. St. Wain Generating Station
C. H. Fullers, Plant Manager
16805 Weld County Road - 19 1/2
Platteville, CO 80651

Public Service Company of Colorado
P. O. Box 840
Denver, CO 80201

Public Service Company of Colorado
Nuclear Licensing Department
16805 Weld County Road 19 1/2
Platteville, CO 80651

Revision: 6                  Page 18 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Public Service Electric & Gas Company
Procurement Quality Assurance
Nuclear Department
Manager-Mail Code N-14 P. O. Box 236
Hancocks Bridge, NJ 08038

Public Service Electric & Gas Company
Nuclear Department
R. Hovey, Vice President Chief Nuclear Officer
P. O. Box 236
Hancocks Bridge, NJ 08038

Rochester Gas & Electric Corporation
Nuclear Production
Robert C. Mecredy
Plant Manager
89 East Avenue
Rochester, NY 14649

Rochester Gas & Electric Corporation
Richard Morrill, Operations Assessment
89 East Avenue
Rochester, NY 14649

Rochester Gas & Electric Corporation
Robert E. Ginna Plant
Michael P. Lilly, Manager Nuclear Assurance
1503 Lake Road
Ontario, NY 14519

Sacramento Municipal Utility District
Rancho Seco Nuclear Plant
Director of Quality Assurance
14440 Twin Cities Road
Herald, CA 95638-9799

Revision: 6                  Page 19 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Southern California Edison
San Onofre Nuclear Generating Station
Brian Katz, Manager, Nuclear Oversight Division
P. O. Box 128
San Clemente, CA 92674-0128

South Carolina Electric & Gas Company
V. C. Summer Nuclear Station
A. R. Koon, Manager Nuclear Licensing (830)
P. O. Box 88
Jenkinsville, SC 29065

Southern Company Services, Inc.
Nuclear Procurement Organization
D. M. Varner
P. O. Box 1295, Bldg. 40 Iverness
Bin B001
Birmingham, AL 35201

System Energy Resources, Inc.
Grand Gulf 1 & 2
W. E. Edge, Manager Programs Quality Assurance
P. O. Box 756
Port Gibson, MS 39150

Tennessee Valley Authority - Nuclear Power
Manager, Technical Licensing Services
LP 5N 156B
1100 Market Street
Chattanooga, TN 37402-2801

Tennessee Valley Authority
Nuclear Power
O. D. Kingsley
1101 Market Street Lookout Pl.
6N38A
Chattanooga, TN 37402

Revision: 6                   Page 20 of 29       Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

TU Electric
Nuclear Licensing Library
Gayle Deck
Licenensing Secretary
400 N. Olive St LB 81
Dallas, TX 75201

TU Electric Company - Production Division
Skyway Tower
Group Vice President
Nuclear Engeering & Operations
400 N. Olive St, L.B. 81
Dallas, TX 75201

TU Electric Company
Procurement QA Manager
P. O. Box 1002
Glen Rose, TX 76043

Toledo Edison Company
L. Ramsett, Director Quality Assurance
5501 N. State Rt. 2
Oak Harbor, OH 43449

Toledo Edison Company
Davis-Besse Mail Stop 3043
Manager - Design Engineering
5501 N. State Route 2
Oak Harbor, OH 43449

Toledo Edison Company
Davis-Besse Mail Stop 2101
Plant Manager
5501 N. State Route 2
Oak Harbor, OH 43449

Revision: 6                  Page 21 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Toledo Edison Company
Davis-Besse Mail Stop 3387
QA Director - Nuclear Assurance
5501 N. State Route 2
Oak Harbor, OH 43449

Union Electric Company
D. F. Schnell
Sr. Vice President - Nuclear
P. O. Box 149
St Louis, MO 63166

Union Electric Company
Callaway Plant
VETIP Coordinator
P. O. Box 620
Fulton, MO 65251

Union Electric Company
A. P. Neuhalfen, Manager Quality Assurance
P. O. Box 149
St Louis, MO 63166

Vermont Yankee Nuclear Power Corporation
J. G. Weigand, President
Route 5, Box 169
Brattleboro, VT 05301

Vermont Yankee Nuclear Power Corp.
Rick McCullough, Operating Experience Coordinator
P. O. Box 157
Vernon, VT 05354

Virginia Power
W. L. Stewart, Vice President Nuclear Operations
P. O. Box 26666
Richmond, VA 23261

Revision: 6                  Page 22 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Virginia Power
Innsbrook Technical Center
M. L. Bowling, Manager of Nuclear Licensing and Programs
5000 Dominion Boulevard
Glen Allen, VA 23060

Washington Public Power Supply System
P. L. Ledford - Specialist, Nuclear Safety Engineering
Mail Drop PE21
P. O. Box 968
Richland, WA 99342

Westinghouse Electric Corporation
Energy System Business Unit
Chris Delsignore
P. O. Box 355
Pittsburgh, PA 15230

Westinghouse Electric Corporation
Nuclear and Adv. Technology
W. C. Gangloff
Manager Strategic Marketing
P. O. Box 355
Pittsburgh, PA 15230

Wisconsin Electric Power Company
Point Beach Nuclear Plant
G. J. Maxfield, Manager
6610 Nuclear Road
Two Rivers, WI 54241

Wisconsin Public Service Corporation
Superintendent, Nuclear Licensing and Systems
P. O. Box 19002
Green Bay, WI 54307-9002

Revision: 6                   Page 23 of 29       Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Wolf Creek Nuclear Operating Corp.
Manager Document Services (WC-DS)
P. O. Box 411
Burlington, KS 66839

Wolf Creek Nuclear Operating Corporation
Neil S. Carns
President
P. O. box 411
Burlington, KS 66839

Yankee Atomic Electric Company
580 Main Street
Bolton, MA 01740

Revision: 6                  Page 24 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

NON-LICENSEES

Anchor Darling Valve Company
George Knieser, Quality Assurance Manager
701 First Street
Williamsport PA 17701

Anchor Darling Valve Company
J. J. Chappell, Manager - Engineering
P. O. Box 3428
Willimasport, PA 17701

B & W Nuclear Service Company
Sub DasGupta, Quality Assurance Manager
3315 Old Forest Road - P. O. Box 10935
Lynchburg, VA 24506

BWR Owners' Group,
GE Nuclear Energy
George Levy M/C 753
175 Curtner Ave.
San Jose, CA 95125

Contramatics
Jim Sylvester, Quality Assurance Specialist
38 Power St
Milford, NH 03055

Edwards Valve Inc.
Rafiq Bandukwala, Quality Assurance Manager
1900 S. Saunders Street
Raleigh, NC 27603

Henry Pratt Company
Bruce Cummins, Quality Assurance Manager
401 S. Highland Avenue
Aurora, IL 60507

Revision: 6                  Page 25 of 29        Dated: January 19,1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Velan Valve
Edwary Francois, V.P. of Quality Assurance
Avenue C - Griswold Industrial Park
Williston, VT 05495

Westinghouse Electric Corporation
Energy Systems
Box 2728
Pittsburgh, PA 15230

Revision: 6                  Page 26 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

LIMITORQUE REGIONAL SALES MANAGERS

Limitorque Corporation
Dave Culp
2600 E.  Miroloma Way
Anaheim, CA 92806

Limitorque Corporation
Don Lindberg
P. O. Box 430
Walnut Creek, CA 94597-0430

Limitorque of Canada Ltd.
Jean Gratton
100 Alexis Nihon Blvd., Suite 208
St Laurent, Quebec H4M 2N7
Canada

Limitorque of Canada Ltd.
2525 Dunwin Dr., Unit 1
Mississauga, Ontario L5L 1R9
Canada

Limitorque Corporation
Barry Moyer
P. O. Box 671287
Marietta, GA 30066-0139

Limitorque Corporation
Ed Harper
845 Midway Drive
Willowbrook, IL 60521

Limitorque Corporation
Bill Breitmayer
P. O. Box 14007
Lenexa, KS 66215

Revision: 6                  Page 27 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Limitorque Corporation
Dave Odom
47 Harrington Way
Shrewsbury, MA 01545

Limitorque Corporation
Michael C. Balkun
432 Elwood Street
Piscataway, NJ 08854

Limitorque Corporation
Bob Derr
726 E. Main Street, Suite F
Lebanon, OH 45036

Limitorque Corporation
Walt Denkowski
P. O. Box 507
Gilbertsville, PA 19525

Limitorque Corporation
Sterling Adams
8901 Jameel Road, Suite 180
Houston, TX 77040

Limitorque Corporation
Woody Lawman
1407 Huguenot Road
Suite 105
Midlothian, VA 23113

Limitorque International
Tom May

Limitorque Asia
Dan Warsing

Revision: 6                  Part 28 of 29        Dated: January 19, 1995

                           PART 21 NOTIFICTION
                              MAILING LIST

Control Engineering Pty. Ltd.
Ian Kilpatrick
P. O. Box 691
Pennant Hills, NSW 2120
108 Fallon Drive., Dural, NSW 2158
Australia

Revision: 6                  Page 29 of 29        Dated: January 19, 1995

*** END OF DOCUMENT ***