Beamline Shielding Configuration Status: RUN 2006-1 (01-26-06) |
|||
Kevin Beyer, P.K. Job, Rod Salazar, John Vacca, Wendy VanWingeren |
|||
Beamline | Work Request# | Beamline Status | Survey |
1-BM | Radiation Survey of Front End Work Completed | ||
19712 | Radiation Survey of upstream exterior wall 1-BM-B, Tecknit welding | Type C | |
19768 | Radiation Survey of upstream wall of 1-BM-C Tecknit welding | Type C | |
1-ID | Radiation Survey of Front End Work Completed | ||
19700 | Radiation Survey of downstream back wall of 1-ID-A, collimator relocation | Type C | |
19780 | Radiation Survey of minihutch doors. Open mini 1-ID-B-MH-1, 1-ID-C-MH-1 for retagging | Type C | |
19745 | Radiation Survey inboard 1-ID-C, Tecknit welding | Type C | |
2-BM | Radiation Survey of Front End Work Completed | ||
2-ID | Radiation Survey of Front End Work Completed | ||
3-ID | Radiation Survey of Front End Work Completed | Type C | |
19736 | Radiation Survey of entire minihutch 3-ID-C-MH-1. Radiation Survey of exit port in 3-ID-D with beam on shutter; minihutch header modification | Type C | |
19767 | Radiation Survey; labyrinth mod | Type C | |
19791 | Radiation Survey includes 3-ID-D upstream wall at guillotines, transport entering 3-ID-C transport; open guillotines | Type C | |
19809 | Radiation survey 3-ID-C-MH-2 inboard door open; retagging | Type C | |
4-ID | Radiation Survey of Front End Work Completed | ||
19781 | 4-ID-B-MH-1 retagging | Type C | |
19778 | 4-ID-D upstream wall, inside, Tecknit welding; 4-ID-B outboard wall, Tecknit welding | Type C | |
19743 | Radiation Survey of 4-ID-C endstation; revmoval of end station | Type C | |
5-BM | Radiation Survey of Front End Work Completed | ||
5-ID | Radiation Survey of Front End Work Completed | ||
6-BM | Radiation Survey of Front End Work Completed | ||
6-ID | Radiation Survey of Front End Work Completed | ||
7-BM | Under Construction | ||
7-ID | Radiation Survey of Front End Work Completed | ||
19802 | Radiation Survey of 7-ID-B-MH-1, retagging | Type C | |
19815 | Requires BSDRSC review | Beamline can run, work has not begun | |
19771 | Requires BSDRSC review | Beamline can run, work has not begun | |
8-BM | Radiation Survey of Front End Work Completed | ||
8-ID | Radiation Survey of Front End Work Completed | ||
19532 | Exit port survey in 8-ID-I, closed gap; shutter work performed | Type C | |
19804 | Radiation Survey 8-ID-D-MH-1, retagging | Type C | |
19597 | Radiation Survey of 8-ID-I upstream wall for Tecknit welding | Type C | |
9-BM | Radiation Survey of Front End Work Completed | ||
9-ID | Radiation Survey of Front End Work Completed | ||
19806 | Radiation Survey of 9-ID-A-MH-2, 9-ID-A-MH-3, 9-ID-A-MH-4, retagging | Type C | |
19728 | Radiation Survey of 9-ID-A-MH-2 | Type C | |
10-BM | Radiation Survey of Front End Work Completed | ||
10-ID | Radiation Survey of Front End Work Completed | ||
19698 | Radiation Survey 10-ID-B, inboard wall for Tecknit welding | Type C | |
11-BM | Under Construction | ||
11-ID | Radiation Survey of Front End Work Completed | ||
handwritten | Radiation Survey 11-ID-A-MH-1, 11-ID-D-MH-1; retagging | Type C | |
12-BM | Radiation Survey of Front End Work Completed | ||
12-ID | Radiation Survey of Front End Work Completed | ||
19817 | Radiation Survey of 12-ID-B-MH-1, retagging | Type C | |
13-BM | Radiation Survey of Front End Work Completed | ||
13-ID | Radiation Survey of Front End Work Completed | ||
14-BM | Radiation Survey of Front End Work Completed | ||
14-ID | Radiation Survey of Front End Work Completed | ||
BCRRT to be held, Shielding Verification required, 2/7/06 | |||
15-ID | Radiation Survey of 15-ID-A-MH-1, 15-ID-A-MH-2; retagging | Type C | |
16-BM | Radiation Survey of Front End Work Completed | ||
16-ID | Radiation Survey of Front End Work Completed | ||
17-BM | Radiation Survey of Front End Work Completed | ||
17-ID | 19755 | Radiation Survey at shielded beam transport downstream of 17-ID-A; secure transport trim piece | Type C |
18-ID | Radiation Survey of Front End Work Completed | ||
19-BM | Radiation Survey of Front End Work Completed | ||
19-ID | Radiation Survey of Front End Work Completed | ||
20-BM | Radiation Survey of Front End Work Completed | ||
20-ID | Radiation Survey of Front End Work Completed | ||
21-ID | Radiation Survey of Front End Work Completed | ||
22-BM | Radiation Survey of Front End Work Completed | ||
22-ID | Radiation Survey of Front End Work Completed | ||
23-BM | Radiation Survey of Front End Work Completed | ||
23-ID | Radiation Survey of 23-ID-A-MH-1, retagging | Type C | |
24-BM | Radiation Survey of Front End Work Completed | ||
24-ID | Radiation Survey of Front End Work Completed | ||
19818 | Radiation Survey of 23-ID-A door 3, adjusting PSS switches | Type C | |
19649 | Radiation Survey at upstream wall/roof of 24-ID-A; Tecknit welding | Type C | |
26-ID | Radiation Survey of Front End Work Completed | ||
19764 | Radiation Survey of 26-ID-C exit port at closed gap for both IDs; conversion to windowless operation | Type C | |
18500 | Radiation Survey of Tecknit mitigation in 26-ID-C, door corners | Type C | |
30-ID | Radiation Survey of Front End Work Completed | ||
19760 | Radiation Survey of 30-ID-B back wall and exit port; guillotines opening | Type C | |
31-ID | Radiation Survey of Front End Work Completed | ||
32-ID | Radiation Survey of Front End Work Completed | ||
33-BM | Radiation Survey of Front End Work Completed | ||
33-ID | Radiation Survey of Front End Work Completed | ||
34-ID | Radiation Survey of Front End Work Completed | ||
35-BM | Radiation Survey of Front End Work Completed | ||
35-ID | Radiation Survey of Front End Work Completed | ||
N-ID-X | Radiation Survey of Front End Work Completed |