Beamline Shielding Configuration Status: RUN 2006-1 (01-26-06)
Kevin Beyer, P.K. Job, Rod Salazar, John Vacca, Wendy VanWingeren
Beamline Work Request# Beamline Status Survey
1-BM   Radiation Survey of Front End Work Completed  
  19712 Radiation Survey of upstream exterior wall 1-BM-B, Tecknit welding Type C
  19768 Radiation Survey of upstream wall of 1-BM-C Tecknit welding Type C
1-ID   Radiation Survey of Front End Work Completed  
  19700 Radiation Survey of downstream back wall of 1-ID-A, collimator relocation Type C
  19780 Radiation Survey of minihutch doors. Open mini 1-ID-B-MH-1, 1-ID-C-MH-1 for retagging Type C
  19745 Radiation Survey inboard 1-ID-C, Tecknit welding Type C
2-BM   Radiation Survey of Front End Work Completed  
2-ID   Radiation Survey of Front End Work Completed  
3-ID   Radiation Survey of Front End Work Completed Type C
  19736 Radiation Survey of entire minihutch 3-ID-C-MH-1. Radiation Survey of exit port in 3-ID-D with beam on shutter; minihutch header modification Type C
  19767 Radiation Survey; labyrinth mod Type C
  19791 Radiation Survey includes 3-ID-D upstream wall at guillotines, transport entering 3-ID-C transport; open guillotines Type C
  19809 Radiation survey 3-ID-C-MH-2 inboard door open; retagging Type C
4-ID   Radiation Survey of Front End Work Completed  
  19781 4-ID-B-MH-1 retagging Type C
  19778 4-ID-D upstream wall, inside, Tecknit welding; 4-ID-B outboard wall, Tecknit welding Type C
  19743 Radiation Survey of 4-ID-C endstation; revmoval of end station Type C
5-BM   Radiation Survey of Front End Work Completed  
5-ID   Radiation Survey of Front End Work Completed  
6-BM   Radiation Survey of Front End Work Completed  
6-ID   Radiation Survey of Front End Work Completed  
7-BM   Under Construction  
7-ID   Radiation Survey of Front End Work Completed  
  19802 Radiation Survey of 7-ID-B-MH-1, retagging Type C
  19815 Requires BSDRSC review Beamline can run, work has not begun
  19771 Requires BSDRSC review Beamline can run, work has not begun
8-BM   Radiation Survey of Front End Work Completed  
8-ID   Radiation Survey of Front End Work Completed  
  19532 Exit port survey in 8-ID-I, closed gap; shutter work performed Type C
  19804 Radiation Survey 8-ID-D-MH-1, retagging Type C
  19597 Radiation Survey of 8-ID-I upstream wall for Tecknit welding Type C
9-BM   Radiation Survey of Front End Work Completed  
9-ID   Radiation Survey of Front End Work Completed  
  19806 Radiation Survey of 9-ID-A-MH-2, 9-ID-A-MH-3, 9-ID-A-MH-4, retagging Type C
  19728 Radiation Survey of 9-ID-A-MH-2 Type C
10-BM   Radiation Survey of Front End Work Completed  
10-ID   Radiation Survey of Front End Work Completed  
  19698 Radiation Survey 10-ID-B, inboard wall for Tecknit welding Type C
11-BM   Under Construction  
11-ID   Radiation Survey of Front End Work Completed  
  handwritten Radiation Survey 11-ID-A-MH-1, 11-ID-D-MH-1; retagging Type C
12-BM   Radiation Survey of Front End Work Completed  
12-ID   Radiation Survey of Front End Work Completed  
  19817 Radiation Survey of 12-ID-B-MH-1, retagging Type C
13-BM   Radiation Survey of Front End Work Completed  
13-ID   Radiation Survey of Front End Work Completed  
14-BM   Radiation Survey of Front End Work Completed  
14-ID   Radiation Survey of Front End Work Completed  
    BCRRT to be held, Shielding Verification required, 2/7/06  
15-ID   Radiation Survey of 15-ID-A-MH-1, 15-ID-A-MH-2; retagging Type C
16-BM   Radiation Survey of Front End Work Completed  
16-ID   Radiation Survey of Front End Work Completed  
17-BM   Radiation Survey of Front End Work Completed  
17-ID 19755 Radiation Survey at shielded beam transport downstream of 17-ID-A; secure transport trim piece Type C
18-ID   Radiation Survey of Front End Work Completed  
19-BM   Radiation Survey of Front End Work Completed  
19-ID   Radiation Survey of Front End Work Completed  
20-BM   Radiation Survey of Front End Work Completed  
20-ID   Radiation Survey of Front End Work Completed  
21-ID   Radiation Survey of Front End Work Completed  
22-BM   Radiation Survey of Front End Work Completed  
22-ID   Radiation Survey of Front End Work Completed  
23-BM   Radiation Survey of Front End Work Completed  
23-ID   Radiation Survey of 23-ID-A-MH-1, retagging Type C
24-BM   Radiation Survey of Front End Work Completed  
24-ID   Radiation Survey of Front End Work Completed  
  19818 Radiation Survey of 23-ID-A door 3, adjusting PSS switches Type C
  19649 Radiation Survey at upstream wall/roof of 24-ID-A; Tecknit welding Type C
26-ID   Radiation Survey of Front End Work Completed  
  19764 Radiation Survey of 26-ID-C exit port at closed gap for both IDs; conversion to windowless operation Type C
  18500 Radiation Survey of Tecknit mitigation in 26-ID-C, door corners Type C
30-ID   Radiation Survey of Front End Work Completed  
  19760 Radiation Survey of 30-ID-B back wall and exit port; guillotines opening Type C
31-ID   Radiation Survey of Front End Work Completed  
32-ID   Radiation Survey of Front End Work Completed  
33-BM   Radiation Survey of Front End Work Completed  
33-ID   Radiation Survey of Front End Work Completed  
34-ID   Radiation Survey of Front End Work Completed  
35-BM   Radiation Survey of Front End Work Completed  
35-ID   Radiation Survey of Front End Work Completed  
N-ID-X   Radiation Survey of Front End Work Completed