 Owyhee Project 
 Engineering Data

Owyhee Project  -  Main Page

Facilities in Operation

Storage Dams

1      

Canals

172 mi  

Laterals

543 mi  

Pumping Plants

9      

Drains

227 mi  

Transmission Lines

19.4 mi  

Substations

7      


Storage Facilities

Carriage Facilities

North Canal

Location

From Lake Owyhee north about 65 miles to the Snake River across from Weiser, Idaho.

Construction period

1930-1936  

Total length

61.5 mi  

Diversion capacity

1,190 cfs  

Typical section in earth:

 

   Bottom width

24 ft  

   Side slopes

1.5:1  

   Water depth

10.9 ft  

Typical section, concrete lined:

 

   Bottom width

10.2 ft  

   Side slopes

1.25:1  

  Water depth

10 ft  

   Lining thickness

4 in  


North Canal Tunnel No. 1

Location

From Lake Owyhee near the dam, 3.5 miles northeast to Tunnel Canyon.

Construction period

1930-1932  

Length

3.5 mi  

Capacity

1,840 cfs  

Diameter

16.58 ft  

Cross section:

Horseshoe

Concrete lining

8-16 in  


Malheur River Siphon  -  North Canal

Location

In the valley of the Malheur River near Ontario, Oregon.

Construction period

1935  

Length

4.3 mi  

Capacity

325 cfs  

Diameter (inside)

6.67 ft  

Maximum head

283 ft  

Material:

Plate steel


South Canal

Location

From the end of North Canal Tunnel No.1 to Snake River opposite Marsing, Idaho.

Construction period

1930-1936  

Total length

37 mi  

Diversion capacity

490 cfs  

Typical section in earth:

 

   Bottom width

16 ft  

   Side slopes

1.5:1  

   Water depth

7 ft  


South Canal Tunnel No. 5

Location

From the end of North Canal Tunnel No. 1, southeast.

Construction period

1930-1932  

Length

4.2 mi  

Capacity

650 cfs  

Diameter:

 

   Horseshoe section

9.25 ft  

   Circular section

9.5 ft  

   Lining

6-10 in  


Pumping Plants

Designation

Number of units

Total capacity, cfs

Total dynamic head, ft

Total horsepower

Mitchell Butte Division:

       

   Ontario-Nyssa

4

130

120

2,250

   Owyhee Ditch

3

222

  50

1,500

Dead Ox Flat Division:

       

   Dead Ox

5

176

50-111

2,675

Succor Creek Division:1

       

   Succor Creek No. 1

1

  15

  61

---

   Succor Creek No. 2

1

  15

  66

---

Gem District:

       

   Gem Advancement District:

9

334

76-180

7,610

   South

1

  13

  20

     40

   North

1

 5.5

  33

     30

Kingman Colony District:

       

   Kingman Colony

1

    6

  44

     40

    1 Succor Creek No.1 and No. 2 are direct-connected hydraulic powered units. Other plants are supplied power from Boise Project powerplants.

 