-------------------------------------------------------------------- USE OF NOAA ESRL DATA These data are made freely available to the public and the scientific community in the belief that their wide dissemination will lead to greater understanding and new scientific insights. The availability of these data does not constitute publication of the data. NOAA relies on the ethics and integrity of the user to assure that ESRL receives fair credit for their work. If the data are obtained for potential use in a publication or presentation, ESRL should be informed at the outset of the nature of this work. If the ESRL data are essential to the work, or if an important result or conclusion depends on the ESRL data, co-authorship may be appropriate. This should be discussed at an early stage in the work. Manuscripts using the ESRL data should be sent to ESRL for review before they are submitted for publication so we can insure that the quality and limitations of the data are accurately represented. Contact: Tom Conway (303 497 6681; thomas.j.conway@noaa.gov) File Creation: Thu Jul 24 15:04:07 2008 RECIPROCITY Use of these data implies an agreement to reciprocate. Laboratories making similar measurements agree to make their own data available to the general public and to the scientific community in an equally complete and easily accessible form. Modelers are encouraged to make available to the community, upon request, their own tools used in the interpretation of the ESRL data, namely well documented model code, transport fields, and additional information necessary for other scientists to repeat the work and to run modified versions. Model availability includes collaborative support for new users of the models. -------------------------------------------------------------------- SPO 1975 01 21 09 00 41-74 S co2 329.350 +.. L2 1976 02 18 10 04 -89.9800 -24.8000 2810.00 126251 SPO 1975 01 21 09 00 42-74 S co2 328.710 -.. L2 1976 02 18 10 02 -89.9800 -24.8000 2810.00 126252 SPO 1975 02 09 03 00 43-74 S co2 328.890 .X. L2 1976 02 18 10 06 -89.9800 -24.8000 2810.00 126253 SPO 1975 02 09 03 00 44-74 S co2 328.780 .X. L2 1976 02 18 10 16 -89.9800 -24.8000 2810.00 126254 SPO 1975 02 23 07 00 45-74 S co2 328.390 .X. L2 1976 02 18 10 18 -89.9800 -24.8000 2810.00 126255 SPO 1975 02 23 07 00 46-74 S co2 328.880 .X. L2 1976 02 18 10 20 -89.9800 -24.8000 2810.00 126256 SPO 1975 03 07 04 00 47-74 S co2 328.570 .X. L2 1976 02 18 10 32 -89.9800 -24.8000 2810.00 126257 SPO 1975 03 07 04 00 48-74 S co2 328.640 .X. L2 1976 02 18 10 22 -89.9800 -24.8000 2810.00 126258 SPO 1975 03 20 06 00 49-74 S co2 329.140 .X. L2 1976 02 18 10 34 -89.9800 -24.8000 2810.00 126259 SPO 1975 03 20 06 00 50-74 S co2 329.430 .X. L2 1976 02 18 10 36 -89.9800 -24.8000 2810.00 126260 SPO 1975 04 01 10 00 52-74 S co2 328.840 N.. L2 1976 02 18 09 16 -89.9800 -24.8000 2810.00 126261 SPO 1975 04 15 01 00 53-74 S co2 329.640 -.. L2 1976 02 18 09 14 -89.9800 -24.8000 2810.00 126262 SPO 1975 04 15 01 00 54-74 S co2 330.250 +.. L2 1976 02 18 09 12 -89.9800 -24.8000 2810.00 126263 SPO 1975 05 01 01 00 55-74 S co2 333.530 N.. L2 1976 02 18 09 02 -89.9800 -24.8000 2810.00 126264 SPO 1975 05 01 01 00 56-74 S co2 333.940 N.. L2 1976 02 18 09 00 -89.9800 -24.8000 2810.00 126265 SPO 1975 05 15 03 00 57-74 S co2 330.680 N.. L2 1976 02 18 08 58 -89.9800 -24.8000 2810.00 126266 SPO 1975 05 15 03 00 58-74 S co2 330.650 N.. L2 1976 02 18 08 56 -89.9800 -24.8000 2810.00 126267 SPO 1975 06 01 01 00 59-74 S co2 332.070 -.. L2 1976 02 18 08 46 -89.9800 -24.8000 2810.00 126268 SPO 1975 06 01 01 00 60-74 S co2 332.610 +.. L2 1976 02 18 08 44 -89.9800 -24.8000 2810.00 126269 SPO 1975 06 15 04 00 81-74 S co2 336.250 N.. L2 1976 02 18 08 12 -89.9800 -24.8000 2810.00 126270 SPO 1975 06 15 04 00 82-74 S co2 336.420 N.. L2 1976 02 18 08 14 -89.9800 -24.8000 2810.00 126271 SPO 1975 07 01 01 00 83-74 S co2 329.210 ..L L2 1976 02 18 08 40 -89.9800 -24.8000 2810.00 126272 SPO 1975 07 01 01 00 84-74 S co2 330.790 +.. L2 1976 02 18 08 42 -89.9800 -24.8000 2810.00 126273 SPO 1975 07 15 01 00 85-74 S co2 329.690 ..H L2 1976 02 18 08 24 -89.9800 -24.8000 2810.00 126274 SPO 1975 07 15 01 00 86-74 S co2 328.860 ..L L2 1976 02 18 08 26 -89.9800 -24.8000 2810.00 126275 SPO 1975 08 01 01 00 87-74 S co2 330.090 .X. L2 1976 02 18 08 08 -89.9800 -24.8000 2810.00 126276 SPO 1975 08 01 01 00 88-74 S co2 330.300 .X. L2 1976 02 18 08 10 -89.9800 -24.8000 2810.00 126277 SPO 1975 08 15 01 00 89-74 S co2 329.870 ... L2 1976 02 18 08 28 -89.9800 -24.8000 2810.00 126278 SPO 1975 08 15 01 00 90-74 S co2 329.930 ... L2 1976 02 18 08 30 -89.9800 -24.8000 2810.00 126279 SPO 1975 09 01 04 00 91-74 S co2 330.420 ..H L2 1976 02 18 10 00 -89.9800 -24.8000 2810.00 126280 SPO 1975 09 01 04 00 92-74 S co2 329.870 ..L L2 1976 02 18 09 50 -89.9800 -24.8000 2810.00 126281 SPO 1975 09 15 01 35 93-74 S co2 331.020 +.. L2 1976 02 18 09 46 -89.9800 -24.8000 2810.00 126282 SPO 1975 09 15 01 35 94-74 S co2 329.960 ..L L2 1976 02 18 09 48 -89.9800 -24.8000 2810.00 126283 SPO 1975 10 01 01 50 95-74 S co2 329.970 ... L2 1976 02 18 09 34 -89.9800 -24.8000 2810.00 126284 SPO 1975 10 01 01 50 96-74 S co2 329.930 ... L2 1976 02 18 09 44 -89.9800 -24.8000 2810.00 126285 SPO 1975 10 15 03 15 97-74 S co2 330.230 ... L2 1976 02 18 09 18 -89.9800 -24.8000 2810.00 126286 SPO 1975 10 15 03 15 98-74 S co2 330.550 ... L2 1976 02 18 09 28 -89.9800 -24.8000 2810.00 126287 SPO 1975 11 01 19 35 99-74 S co2 329.990 ..L L2 1976 02 18 09 32 -89.9800 -24.8000 2810.00 126288 SPO 1975 11 01 19 35 100-74 S co2 330.760 ..H L2 1976 02 18 09 30 -89.9800 -24.8000 2810.00 126289 SPO 1975 11 15 05 26 101-74 S co2 329.900 .X. L2 1976 03 16 08 12 -89.9800 -24.8000 2810.00 126290 SPO 1975 11 15 05 26 102-74 S co2 329.870 .X. L2 1976 03 16 08 14 -89.9800 -24.8000 2810.00 126291 SPO 1975 12 01 03 20 103-74 S co2 330.430 ... L2 1976 03 16 08 24 -89.9800 -24.8000 2810.00 126292 SPO 1975 12 01 03 20 104-74 S co2 330.580 ... L2 1976 03 16 08 26 -89.9800 -24.8000 2810.00 126293 SPO 1975 12 14 21 20 105-74 S co2 331.310 +.. L2 1976 03 16 08 28 -89.9800 -24.8000 2810.00 126294 SPO 1975 12 14 21 20 106-74 S co2 330.210 ..L L2 1976 03 16 08 30 -89.9800 -24.8000 2810.00 126295 SPO 1976 01 02 23 25 107-74 S co2 329.470 ... L2 1976 03 16 08 40 -89.9800 -24.8000 2810.00 126296 SPO 1976 01 02 23 25 108-74 S co2 329.600 ... L2 1976 03 16 08 42 -89.9800 -24.8000 2810.00 126297 SPO 1976 01 15 03 30 109-74 S co2 329.440 ... L2 1976 03 16 08 44 -89.9800 -24.8000 2810.00 126298 SPO 1976 03 01 01 20 13-74 S co2 329.760 +.. L2 1977 01 21 09 18 -89.9800 -24.8000 2810.00 126299 SPO 1976 03 01 01 20 14-74 S co2 329.160 ..L L2 1977 01 21 09 28 -89.9800 -24.8000 2810.00 126300 SPO 1976 03 15 02 20 15-75 S co2 329.930 -.. L2 1977 01 21 09 30 -89.9800 -24.8000 2810.00 126301 SPO 1976 03 15 02 20 16-75 S co2 332.570 +.. L2 1977 01 21 09 32 -89.9800 -24.8000 2810.00 126302 SPO 1976 04 01 03 20 17-75 S co2 329.240 ... L2 1977 01 21 09 34 -89.9800 -24.8000 2810.00 126303 SPO 1976 04 01 03 20 18-75 S co2 329.300 ... L2 1977 01 21 09 44 -89.9800 -24.8000 2810.00 126304 SPO 1976 04 15 02 18 19-75 S co2 329.130 ... L2 1977 01 21 09 46 -89.9800 -24.8000 2810.00 126305 SPO 1976 04 15 02 18 20-75 S co2 329.300 ... L2 1977 01 21 09 48 -89.9800 -24.8000 2810.00 126306 SPO 1976 05 01 01 50 21-75 S co2 329.750 ... L2 1977 02 14 08 28 -89.9800 -24.8000 2810.00 126307 SPO 1976 05 01 01 50 22-75 S co2 329.520 ... L2 1977 02 14 08 30 -89.9800 -24.8000 2810.00 126308 SPO 1976 05 15 02 20 23-75 S co2 329.580 ... L2 1977 02 14 08 40 -89.9800 -24.8000 2810.00 126309 SPO 1976 05 15 02 20 24-75 S co2 329.640 ... L2 1977 02 14 08 42 -89.9800 -24.8000 2810.00 126310 SPO 1976 06 01 02 20 25-75 S co2 329.700 ... L2 1977 02 14 08 44 -89.9800 -24.8000 2810.00 126311 SPO 1976 06 01 02 20 26-75 S co2 329.640 ... L2 1977 02 14 08 46 -89.9800 -24.8000 2810.00 126312 SPO 1976 06 15 02 20 27-75 S co2 329.930 ... L2 1977 02 14 08 56 -89.9800 -24.8000 2810.00 126313 SPO 1976 06 15 02 20 28-75 S co2 329.690 ... L2 1977 02 14 08 58 -89.9800 -24.8000 2810.00 126314 SPO 1976 07 01 01 20 29-75 S co2 329.870 ... L2 1977 02 14 09 00 -89.9800 -24.8000 2810.00 126315 SPO 1976 07 01 01 20 30-75 S co2 329.750 ... L2 1977 02 14 09 02 -89.9800 -24.8000 2810.00 126316 SPO 1976 07 15 01 50 31-75 S co2 330.230 ... L2 1977 02 15 08 08 -89.9800 -24.8000 2810.00 126317 SPO 1976 07 15 01 50 32-75 S co2 330.170 ... L2 1977 02 15 08 10 -89.9800 -24.8000 2810.00 126318 SPO 1976 08 01 04 50 33-75 S co2 330.290 ... L2 1977 02 15 08 12 -89.9800 -24.8000 2810.00 126319 SPO 1976 08 01 04 50 34-75 S co2 330.470 ... L2 1977 02 15 08 14 -89.9800 -24.8000 2810.00 126320 SPO 1976 08 15 03 20 35-75 S co2 330.780 ... L2 1977 02 15 08 24 -89.9800 -24.8000 2810.00 126321 SPO 1976 08 15 03 20 36-75 S co2 330.580 ... L2 1977 02 15 08 26 -89.9800 -24.8000 2810.00 126322 SPO 1976 09 01 02 25 37-75 S co2 330.890 ... L2 1977 02 15 08 28 -89.9800 -24.8000 2810.00 126323 SPO 1976 09 01 02 25 38-75 S co2 331.060 ... L2 1977 02 15 08 30 -89.9800 -24.8000 2810.00 126324 SPO 1976 09 16 01 35 39-75 S co2 330.810 ... L2 1977 02 15 08 40 -89.9800 -24.8000 2810.00 126325 SPO 1976 09 16 01 35 40-75 S co2 331.040 ... L2 1977 02 15 08 42 -89.9800 -24.8000 2810.00 126326 SPO 1976 10 01 01 30 41-75 S co2 331.430 ... L2 1977 02 15 08 44 -89.9800 -24.8000 2810.00 126327 SPO 1976 10 01 01 30 42-75 S co2 331.720 ... L2 1977 02 28 08 08 -89.9800 -24.8000 2810.00 126328 SPO 1976 10 15 06 30 43-75 S co2 331.510 ... L2 1977 02 28 08 10 -89.9800 -24.8000 2810.00 126329 SPO 1976 10 15 06 30 44-75 S co2 331.150 ... L2 1977 02 28 08 12 -89.9800 -24.8000 2810.00 126330 SPO 1976 11 01 02 30 45-75 S co2 331.850 ... L2 1977 02 28 08 14 -89.9800 -24.8000 2810.00 126331 SPO 1976 11 17 21 05 47-75 S co2 331.510 ... L2 1977 02 28 08 24 -89.9800 -24.8000 2810.00 126332 SPO 1976 11 17 21 05 48-75 S co2 331.160 ... L2 1977 02 28 08 26 -89.9800 -24.8000 2810.00 126333 SPO 1976 12 01 02 30 49-75 S co2 331.220 ... L2 1977 02 28 08 28 -89.9800 -24.8000 2810.00 126334 SPO 1976 12 01 02 30 50-75 S co2 331.460 ... L2 1977 02 28 08 30 -89.9800 -24.8000 2810.00 126335 SPO 1976 12 15 21 25 51-75 S co2 331.100 ... L2 1977 02 28 08 40 -89.9800 -24.8000 2810.00 126336 SPO 1976 12 15 21 25 52-75 S co2 331.170 ... L2 1977 02 28 08 42 -89.9800 -24.8000 2810.00 126337 SPO 1977 01 01 02 30 53-75 S co2 330.810 ... L2 1977 02 28 08 44 -89.9800 -24.8000 2810.00 126338 SPO 1977 01 01 02 30 54-75 S co2 330.910 ... L2 1977 02 28 08 46 -89.9800 -24.8000 2810.00 126339 SPO 1977 02 09 05 30 55-75 S co2 330.610 ... L2 1977 02 28 08 56 -89.9800 -24.8000 2810.00 126340 SPO 1977 02 09 05 30 56-75 S co2 330.910 ... L2 1977 02 28 08 58 -89.9800 -24.8000 2810.00 126341 SPO 1977 02 15 04 30 58-75 S co2 334.100 N.. L2 1978 04 12 09 32 -89.9800 -24.8000 2810.00 126342 SPO 1977 03 03 03 00 60-75 S co2 331.050 ... L2 1978 04 13 08 40 -89.9800 -24.8000 2810.00 126343 SPO 1977 03 15 03 30 61-75 S co2 331.000 +.. L2 1978 04 12 09 00 -89.9800 -24.8000 2810.00 126344 SPO 1977 03 15 03 30 62-75 S co2 329.750 -.. L2 1978 04 12 09 02 -89.9800 -24.8000 2810.00 126345 SPO 1977 04 01 23 30 15-76 S co2 330.180 ... L2 1978 01 10 08 28 -89.9800 -24.8000 2810.00 126346 SPO 1977 04 01 23 30 16-76 S co2 330.540 ... L2 1978 01 10 08 30 -89.9800 -24.8000 2810.00 126347 SPO 1977 04 15 08 30 17-76 S co2 330.550 ... L2 1978 01 10 08 40 -89.9800 -24.8000 2810.00 126348 SPO 1977 04 15 08 30 18-76 S co2 330.650 ... L2 1978 01 10 08 42 -89.9800 -24.8000 2810.00 126349 SPO 1977 05 02 07 25 19-76 S co2 330.590 ... L2 1978 01 10 08 44 -89.9800 -24.8000 2810.00 126350 SPO 1977 05 15 23 30 21-76 S co2 330.650 ... L2 1978 01 10 08 46 -89.9800 -24.8000 2810.00 126351 SPO 1977 05 15 23 30 22-76 S co2 330.500 ... L2 1978 01 10 08 56 -89.9800 -24.8000 2810.00 126352 SPO 1977 06 15 02 30 25-76 S co2 330.800 ... L2 1978 01 10 08 58 -89.9800 -24.8000 2810.00 126353 SPO 1977 06 15 02 30 26-76 S co2 331.100 ... L2 1978 01 10 09 00 -89.9800 -24.8000 2810.00 126354 SPO 1977 07 01 07 30 27-76 S co2 331.310 ... L2 1978 01 10 09 02 -89.9800 -24.8000 2810.00 126355 SPO 1977 07 15 23 30 30-76 S co2 331.460 ... L2 1978 01 10 09 12 -89.9800 -24.8000 2810.00 126356 SPO 1977 08 01 03 30 32-76 S co2 331.940 ... L2 1978 01 10 09 14 -89.9800 -24.8000 2810.00 126357 SPO 1977 08 15 02 30 33-76 S co2 331.870 .X. L2 1978 01 10 09 16 -89.9800 -24.8000 2810.00 126358 SPO 1977 08 15 02 30 34-76 S co2 331.750 .X. L2 1978 01 10 09 18 -89.9800 -24.8000 2810.00 126359 SPO 1977 09 01 04 30 35-76 S co2 332.990 ... L2 1978 04 13 09 00 -89.9800 -24.8000 2810.00 126360 SPO 1977 09 15 08 30 38-76 S co2 333.130 ... L2 1978 04 13 08 42 -89.9800 -24.8000 2810.00 126361 SPO 1977 10 02 23 30 40-76 S co2 332.880 ... L2 1978 04 12 09 34 -89.9800 -24.8000 2810.00 126362 SPO 1977 10 14 07 30 41-76 S co2 332.600 ... L2 1978 01 10 09 32 -89.9800 -24.8000 2810.00 126363 SPO 1977 10 14 07 30 42-76 S co2 332.630 ... L2 1978 01 10 09 34 -89.9800 -24.8000 2810.00 126364 SPO 1977 11 01 03 30 43-76 S co2 332.890 ... L2 1978 01 10 09 28 -89.9800 -24.8000 2810.00 126365 SPO 1977 11 01 03 30 44-76 S co2 332.730 ... L2 1978 01 10 09 30 -89.9800 -24.8000 2810.00 126366 SPO 1977 11 15 02 30 45-76 S co2 332.350 ... L2 1978 01 10 08 12 -89.9800 -24.8000 2810.00 126367 SPO 1977 11 15 02 30 46-76 S co2 332.570 ... L2 1978 01 10 08 14 -89.9800 -24.8000 2810.00 126368 SPO 1977 12 01 01 30 47-76 S co2 331.940 ..L L2 1978 01 10 08 24 -89.9800 -24.8000 2810.00 126369 SPO 1977 12 01 01 30 48-76 S co2 332.580 ..H L2 1978 01 10 08 26 -89.9800 -24.8000 2810.00 126370 SPO 1977 12 19 01 29 49-76 S co2 332.580 ... L2 1978 01 10 08 08 -89.9800 -24.8000 2810.00 126371 SPO 1977 12 19 01 29 50-76 S co2 332.270 ... L2 1978 01 10 08 10 -89.9800 -24.8000 2810.00 126372 SPO 1978 01 03 10 30 51-76 S co2 332.550 ... L2 1978 04 10 08 28 -89.9800 -24.8000 2810.00 126373 SPO 1978 01 03 10 30 52-76 S co2 332.310 ... L2 1978 04 10 08 30 -89.9800 -24.8000 2810.00 126374 SPO 1978 01 15 20 30 53-76 S co2 332.820 ..H L2 1978 04 10 08 40 -89.9800 -24.8000 2810.00 126375 SPO 1978 01 15 20 30 54-76 S co2 332.210 ..L L2 1978 04 10 08 42 -89.9800 -24.8000 2810.00 126376 SPO 1978 01 30 23 30 31-75 S co2 332.200 ... L2 1978 04 10 08 24 -89.9800 -24.8000 2810.00 126377 SPO 1978 01 30 23 30 32-75 S co2 332.660 ... L2 1978 04 10 08 26 -89.9800 -24.8000 2810.00 126378 SPO 1978 02 14 04 30 43-75 S co2 333.410 .X. L2 1979 03 01 08 12 -89.9800 -24.8000 2810.00 126379 SPO 1978 02 14 04 30 44-75 S co2 333.290 .X. L2 1979 03 01 08 14 -89.9800 -24.8000 2810.00 126380 SPO 1978 03 01 02 30 11-76 S co2 333.180 .X. L2 1979 03 01 08 24 -89.9800 -24.8000 2810.00 126381 SPO 1978 03 01 02 30 12-76 S co2 332.930 .X. L2 1979 03 01 08 26 -89.9800 -24.8000 2810.00 126382 SPO 1978 03 15 01 30 55-76 S co2 332.370 ... L2 1979 03 01 08 28 -89.9800 -24.8000 2810.00 126383 SPO 1978 03 15 01 30 56-76 S co2 332.250 ... L2 1979 03 01 08 30 -89.9800 -24.8000 2810.00 126384 SPO 1978 04 01 03 30 57-76 S co2 333.230 +.. L2 1979 03 02 08 12 -89.9800 -24.8000 2810.00 126385 SPO 1978 04 01 03 30 58-76 S co2 332.200 ..L L2 1979 03 02 08 14 -89.9800 -24.8000 2810.00 126386 SPO 1978 04 17 01 30 59-76 S co2 332.690 ..L L2 1979 03 02 08 24 -89.9800 -24.8000 2810.00 126387 SPO 1978 04 17 01 30 60-76 S co2 333.290 +.. L2 1979 03 02 08 26 -89.9800 -24.8000 2810.00 126388 SPO 1978 05 01 01 30 145-77 S co2 357.520 +.. L2 1979 03 02 08 30 -89.9800 -24.8000 2810.00 126389 SPO 1978 05 01 01 30 146-77 S co2 332.990 ..L L2 1979 03 02 08 28 -89.9800 -24.8000 2810.00 126390 SPO 1978 05 15 01 30 147-77 S co2 333.120 ..L L2 1979 03 02 08 40 -89.9800 -24.8000 2810.00 126391 SPO 1978 05 15 01 30 148-77 S co2 380.920 +.. L2 1979 03 02 08 42 -89.9800 -24.8000 2810.00 126392 SPO 1978 06 01 09 30 149-77 S co2 335.240 +.. L2 1979 03 02 08 44 -89.9800 -24.8000 2810.00 126393 SPO 1978 06 01 09 30 150-77 S co2 333.310 ..L L2 1979 03 02 08 46 -89.9800 -24.8000 2810.00 126394 SPO 1978 06 15 22 30 151-77 S co2 333.450 ..L L2 1979 03 02 08 58 -89.9800 -24.8000 2810.00 126395 SPO 1978 06 15 22 30 152-77 S co2 350.740 +.. L2 1979 03 02 08 56 -89.9800 -24.8000 2810.00 126396 SPO 1978 07 01 10 30 153-77 S co2 333.570 ... L2 1979 03 02 09 00 -89.9800 -24.8000 2810.00 126397 SPO 1978 07 01 10 30 154-77 S co2 333.960 ... L2 1979 03 02 09 02 -89.9800 -24.8000 2810.00 126398 SPO 1978 07 15 06 30 155-77 S co2 333.740 ... L2 1979 03 02 09 44 -89.9800 -24.8000 2810.00 126399 SPO 1978 07 15 06 30 156-77 S co2 333.710 ... L2 1979 03 02 09 46 -89.9800 -24.8000 2810.00 126400 SPO 1978 08 01 02 30 157-77 S co2 334.080 ..L L2 1979 03 02 09 28 -89.9800 -24.8000 2810.00 126401 SPO 1978 08 01 02 30 158-77 S co2 334.840 +.. L2 1979 03 02 09 30 -89.9800 -24.8000 2810.00 126402 SPO 1978 08 15 01 30 159-77 S co2 334.670 ... L2 1979 03 02 09 32 -89.9800 -24.8000 2810.00 126403 SPO 1978 08 15 01 30 160-77 S co2 334.350 ... L2 1979 03 02 09 34 -89.9800 -24.8000 2810.00 126404 SPO 1978 09 01 09 30 161-77 S co2 379.690 +.. L2 1979 03 02 09 12 -89.9800 -24.8000 2810.00 126405 SPO 1978 09 01 09 30 162-77 S co2 334.770 ..L L2 1979 03 02 09 14 -89.9800 -24.8000 2810.00 126406 SPO 1978 09 16 04 30 163-77 S co2 349.940 +.. L2 1979 03 02 09 16 -89.9800 -24.8000 2810.00 126407 SPO 1978 09 16 04 30 164-77 S co2 334.540 ..L L2 1979 03 02 09 18 -89.9800 -24.8000 2810.00 126408 SPO 1978 10 01 05 30 165-77 S co2 335.430 ..H L2 1979 03 02 09 48 -89.9800 -24.8000 2810.00 126409 SPO 1978 10 01 05 30 166-77 S co2 334.530 ..L L2 1979 03 02 09 50 -89.9800 -24.8000 2810.00 126410 SPO 1978 10 15 01 30 167-77 S co2 335.620 ..L L2 1979 03 02 10 34 -89.9800 -24.8000 2810.00 126411 SPO 1978 10 15 01 30 168-77 S co2 346.490 +.. L2 1979 03 02 10 32 -89.9800 -24.8000 2810.00 126412 SPO 1978 11 01 08 30 169-77 S co2 335.580 ... L2 1979 03 02 10 36 -89.9800 -24.8000 2810.00 126413 SPO 1978 11 01 08 30 170-77 S co2 335.350 ... L2 1979 03 02 10 38 -89.9800 -24.8000 2810.00 126414 SPO 1978 12 24 01 10 7-77 N co2 334.790 ... L2 1979 03 02 10 18 -89.9800 -24.8000 2810.00 126415 SPO 1978 12 24 01 10 8-77 N co2 334.580 ... L2 1979 03 02 10 16 -89.9800 -24.8000 2810.00 126416 SPO 1978 12 30 01 57 27-77 N co2 334.010 .X. L2 1979 03 02 10 20 -89.9800 -24.8000 2810.00 126417 SPO 1978 12 30 01 57 28-77 N co2 333.910 .X. L2 1979 03 02 10 22 -89.9800 -24.8000 2810.00 126418 SPO 1979 01 06 02 12 179-77 N co2 336.180 .X. L2 1979 03 02 10 00 -89.9800 -24.8000 2810.00 126419 SPO 1979 01 06 02 12 180-77 N co2 337.150 .X. L2 1979 03 02 10 02 -89.9800 -24.8000 2810.00 126420 SPO 1979 01 13 02 07 171-77 N co2 335.340 .X. L2 1979 03 02 10 06 -89.9800 -24.8000 2810.00 126421 SPO 1979 01 13 02 07 172-77 N co2 336.020 .X. L2 1979 03 02 10 04 -89.9800 -24.8000 2810.00 126422 SPO 1979 01 27 05 28 185-77 N co2 334.440 .X. L2 1980 02 05 09 00 -89.9800 -24.8000 2810.00 126423 SPO 1979 01 27 05 28 186-77 N co2 334.370 .X. L2 1980 02 05 09 02 -89.9800 -24.8000 2810.00 126424 SPO 1979 02 03 03 14 187-77 N co2 334.210 .X. L2 1980 02 05 09 12 -89.9800 -24.8000 2810.00 126425 SPO 1979 02 03 03 14 188-77 N co2 333.820 .X. L2 1980 02 05 09 14 -89.9800 -24.8000 2810.00 126426 SPO 1979 02 10 02 22 433-78 N co2 333.800 .X. L2 1980 02 01 09 48 -89.9800 -24.8000 2810.00 126427 SPO 1979 02 10 02 22 434-78 N co2 334.110 .X. L2 1980 02 01 09 50 -89.9800 -24.8000 2810.00 126428 SPO 1979 02 17 04 20 435-78 N co2 333.810 ... L2 1980 02 01 10 00 -89.9800 -24.8000 2810.00 126429 SPO 1979 02 17 04 20 436-78 N co2 333.930 ... L2 1980 02 01 10 02 -89.9800 -24.8000 2810.00 126430 SPO 1979 02 23 23 40 437-78 N co2 333.860 .X. L2 1980 02 01 10 04 -89.9800 -24.8000 2810.00 126431 SPO 1979 02 23 23 40 438-78 N co2 334.200 .X. L2 1980 02 01 10 06 -89.9800 -24.8000 2810.00 126432 SPO 1979 03 03 04 18 439-78 N co2 333.950 ... L2 1980 02 05 08 08 -89.9800 -24.8000 2810.00 126433 SPO 1979 03 03 04 18 440-78 N co2 333.710 ... L2 1980 02 05 08 10 -89.9800 -24.8000 2810.00 126434 SPO 1979 03 10 04 40 441-78 N co2 334.440 -.. L2 1980 02 05 08 12 -89.9800 -24.8000 2810.00 126435 SPO 1979 03 10 04 40 442-78 N co2 -999.990 *.. L2 1980 02 05 08 14 -89.9800 -24.8000 2810.00 126436 SPO 1979 03 15 23 45 175-77 N co2 -999.990 *.. L2 1980 02 06 09 44 -89.9800 -24.8000 2810.00 126437 SPO 1979 03 15 23 45 176-77 N co2 333.470 ..L L2 1980 02 06 09 46 -89.9800 -24.8000 2810.00 126438 SPO 1979 03 20 23 20 177-77 N co2 333.090 -.. L2 1980 02 06 09 48 -89.9800 -24.8000 2810.00 126439 SPO 1979 03 20 23 20 178-77 N co2 334.910 +.. L2 1980 02 06 09 50 -89.9800 -24.8000 2810.00 126440 SPO 1979 03 23 00 41 179-77 N co2 333.370 ..L L2 1980 02 06 10 00 -89.9800 -24.8000 2810.00 126441 SPO 1979 03 23 00 41 180-77 N co2 336.260 +.. L2 1980 02 06 10 02 -89.9800 -24.8000 2810.00 126442 SPO 1979 03 28 00 30 181-77 N co2 333.810 ..L L2 1980 02 06 10 04 -89.9800 -24.8000 2810.00 126443 SPO 1979 03 28 00 30 182-77 N co2 358.010 +.. L2 1980 02 06 10 06 -89.9800 -24.8000 2810.00 126444 SPO 1979 03 31 02 15 183-77 N co2 333.820 ... L2 1980 02 06 10 16 -89.9800 -24.8000 2810.00 126445 SPO 1979 03 31 02 15 184-77 N co2 333.820 ... L2 1980 02 06 10 18 -89.9800 -24.8000 2810.00 126446 SPO 1979 04 03 23 30 189-77 N co2 333.740 ... L2 1980 02 05 09 16 -89.9800 -24.8000 2810.00 126447 SPO 1979 04 03 23 30 190-77 N co2 333.610 ... L2 1980 02 05 09 18 -89.9800 -24.8000 2810.00 126448 SPO 1979 04 06 23 55 191-77 N co2 333.970 ... L2 1980 02 06 08 56 -89.9800 -24.8000 2810.00 126449 SPO 1979 04 06 23 55 192-77 N co2 333.030 ... L2 1980 02 06 08 58 -89.9800 -24.8000 2810.00 126450 SPO 1979 04 11 00 45 193-77 N co2 334.200 ... L2 1980 02 06 09 00 -89.9800 -24.8000 2810.00 126451 SPO 1979 04 11 00 45 194-77 N co2 333.820 ... L2 1980 02 06 09 02 -89.9800 -24.8000 2810.00 126452 SPO 1979 04 14 01 20 443-78 N co2 334.070 ... L2 1980 02 07 08 08 -89.9800 -24.8000 2810.00 126453 SPO 1979 04 14 01 20 444-78 N co2 333.550 ... L2 1980 02 07 08 10 -89.9800 -24.8000 2810.00 126454 SPO 1979 04 18 00 55 455-78 N co2 333.710 ... L2 1980 02 07 08 12 -89.9800 -24.8000 2810.00 126455 SPO 1979 04 18 00 55 456-78 N co2 333.950 ... L2 1980 02 07 08 14 -89.9800 -24.8000 2810.00 126456 SPO 1979 04 21 02 56 463-78 N co2 334.560 .X. L2 1980 02 07 08 24 -89.9800 -24.8000 2810.00 126457 SPO 1979 04 21 02 56 464-78 N co2 334.250 .X. L2 1980 02 07 08 26 -89.9800 -24.8000 2810.00 126458 SPO 1979 04 25 04 30 465-78 N co2 333.870 ... L2 1980 02 07 08 28 -89.9800 -24.8000 2810.00 126459 SPO 1979 04 25 04 30 466-78 N co2 333.810 ... L2 1980 02 07 08 30 -89.9800 -24.8000 2810.00 126460 SPO 1979 04 28 02 00 467-78 N co2 334.170 ... L2 1980 02 07 08 40 -89.9800 -24.8000 2810.00 126461 SPO 1979 04 28 02 00 468-78 N co2 333.810 ... L2 1980 02 07 08 42 -89.9800 -24.8000 2810.00 126462 SPO 1979 05 02 02 05 507-78 N co2 334.090 ... L2 1980 02 06 09 12 -89.9800 -24.8000 2810.00 126463 SPO 1979 05 02 02 05 508-78 N co2 333.900 ... L2 1980 02 06 09 14 -89.9800 -24.8000 2810.00 126464 SPO 1979 05 05 02 10 505-78 N co2 334.600 ... L2 1980 02 06 09 16 -89.9800 -24.8000 2810.00 126465 SPO 1979 05 05 02 10 506-78 N co2 333.950 ... L2 1980 02 06 09 18 -89.9800 -24.8000 2810.00 126466 SPO 1979 05 08 23 52 503-78 N co2 334.190 ... L2 1980 02 06 09 28 -89.9800 -24.8000 2810.00 126467 SPO 1979 05 08 23 52 504-78 N co2 333.680 ... L2 1980 02 06 09 30 -89.9800 -24.8000 2810.00 126468 SPO 1979 05 11 23 55 501-78 N co2 333.730 ... L2 1980 02 06 09 32 -89.9800 -24.8000 2810.00 126469 SPO 1979 05 11 23 55 502-78 N co2 333.930 ... L2 1980 02 06 09 34 -89.9800 -24.8000 2810.00 126470 SPO 1979 05 16 01 37 499-78 N co2 334.460 ... L2 1980 02 06 08 08 -89.9800 -24.8000 2810.00 126471 SPO 1979 05 16 01 37 500-78 N co2 334.400 ... L2 1980 02 06 08 10 -89.9800 -24.8000 2810.00 126472 SPO 1979 05 19 00 45 489-78 N co2 334.360 ... L2 1980 02 05 08 24 -89.9800 -24.8000 2810.00 126473 SPO 1979 05 19 00 45 490-78 N co2 334.000 ... L2 1980 02 05 08 26 -89.9800 -24.8000 2810.00 126474 SPO 1979 05 23 01 30 491-78 N co2 334.350 ... L2 1980 02 05 08 28 -89.9800 -24.8000 2810.00 126475 SPO 1979 05 23 01 30 492-78 N co2 334.470 ... L2 1980 02 05 08 30 -89.9800 -24.8000 2810.00 126476 SPO 1979 05 26 00 45 493-78 N co2 334.430 ... L2 1980 02 05 08 40 -89.9800 -24.8000 2810.00 126477 SPO 1979 05 26 00 45 494-78 N co2 334.150 ... L2 1980 02 05 08 42 -89.9800 -24.8000 2810.00 126478 SPO 1979 05 29 23 20 495-78 N co2 334.150 ... L2 1980 02 05 08 44 -89.9800 -24.8000 2810.00 126479 SPO 1979 05 29 23 20 496-78 N co2 334.970 ... L2 1980 02 05 08 46 -89.9800 -24.8000 2810.00 126480 SPO 1979 06 02 02 10 469-78 N co2 334.340 ... L2 1980 02 07 08 44 -89.9800 -24.8000 2810.00 126481 SPO 1979 06 02 02 10 470-78 N co2 334.550 ... L2 1980 02 07 08 46 -89.9800 -24.8000 2810.00 126482 SPO 1979 06 06 00 55 471-78 N co2 333.920 ... L2 1980 02 07 09 00 -89.9800 -24.8000 2810.00 126483 SPO 1979 06 06 00 55 472-78 N co2 334.340 ... L2 1980 02 07 09 02 -89.9800 -24.8000 2810.00 126484 SPO 1979 06 09 00 10 473-78 N co2 334.240 ... L2 1980 02 07 09 12 -89.9800 -24.8000 2810.00 126485 SPO 1979 06 09 00 10 474-78 N co2 335.080 ... L2 1980 02 07 09 14 -89.9800 -24.8000 2810.00 126486 SPO 1979 06 13 00 45 475-78 N co2 334.710 ... L2 1980 02 07 09 16 -89.9800 -24.8000 2810.00 126487 SPO 1979 06 13 00 45 498-78 N co2 334.500 ... L2 1980 02 07 09 18 -89.9800 -24.8000 2810.00 126488 SPO 1979 06 16 12 00 477-78 N co2 334.290 ... L2 1980 02 07 09 28 -89.9800 -24.8000 2810.00 126489 SPO 1979 06 16 12 00 478-78 N co2 334.810 ... L2 1980 02 07 09 30 -89.9800 -24.8000 2810.00 126490 SPO 1979 06 18 12 00 476-78 N co2 349.980 -.. L2 1980 02 05 08 56 -89.9800 -24.8000 2810.00 126491 SPO 1979 06 18 12 00 497-78 N co2 -999.990 *.. L2 1980 02 05 08 58 -89.9800 -24.8000 2810.00 126492 SPO 1979 06 20 03 00 509-78 N co2 334.230 ... L2 1980 02 06 08 12 -89.9800 -24.8000 2810.00 126493 SPO 1979 06 20 03 00 510-78 N co2 334.400 ... L2 1980 02 06 08 14 -89.9800 -24.8000 2810.00 126494 SPO 1979 06 22 23 45 511-78 N co2 334.770 ... L2 1980 02 06 08 24 -89.9800 -24.8000 2810.00 126495 SPO 1979 06 22 23 45 512-78 N co2 334.670 ... L2 1980 02 06 08 26 -89.9800 -24.8000 2810.00 126496 SPO 1979 06 26 23 45 513-78 N co2 334.300 ... L2 1980 02 06 08 28 -89.9800 -24.8000 2810.00 126497 SPO 1979 06 26 23 45 514-78 N co2 334.500 ... L2 1980 02 06 08 30 -89.9800 -24.8000 2810.00 126498 SPO 1979 06 29 23 15 515-78 N co2 335.430 .X. L2 1980 02 06 08 40 -89.9800 -24.8000 2810.00 126499 SPO 1979 06 29 23 15 516-78 N co2 335.410 .X. L2 1980 02 06 08 42 -89.9800 -24.8000 2810.00 126500 SPO 1979 07 04 00 40 517-78 N co2 334.930 .X. L2 1980 02 06 08 44 -89.9800 -24.8000 2810.00 126501 SPO 1979 07 04 00 40 518-78 N co2 335.900 .X. L2 1980 02 06 08 46 -89.9800 -24.8000 2810.00 126502 SPO 1979 07 07 01 35 423-78 N co2 334.770 ..L L2 1980 02 07 10 20 -89.9800 -24.8000 2810.00 126503 SPO 1979 07 07 01 35 424-78 N co2 336.810 +.. L2 1980 02 07 10 22 -89.9800 -24.8000 2810.00 126504 SPO 1979 07 11 00 28 425-78 N co2 334.700 ... L2 1980 02 07 10 32 -89.9800 -24.8000 2810.00 126505 SPO 1979 07 11 00 28 426-78 N co2 334.480 ... L2 1980 02 07 10 34 -89.9800 -24.8000 2810.00 126506 SPO 1979 07 14 23 50 427-78 N co2 334.440 ... L2 1980 02 07 10 36 -89.9800 -24.8000 2810.00 126507 SPO 1979 07 14 23 50 428-78 N co2 334.790 ... L2 1980 02 07 10 38 -89.9800 -24.8000 2810.00 126508 SPO 1979 07 17 23 30 429-78 N co2 -999.990 *.. L2 1980 02 12 08 08 -89.9800 -24.8000 2810.00 126509 SPO 1979 07 17 23 30 430-78 N co2 335.220 ..L L2 1980 02 12 08 10 -89.9800 -24.8000 2810.00 126510 SPO 1979 07 21 00 40 431-78 N co2 335.780 .X. L2 1980 02 12 08 12 -89.9800 -24.8000 2810.00 126511 SPO 1979 07 21 00 40 432-78 N co2 335.190 .X. L2 1980 02 12 08 14 -89.9800 -24.8000 2810.00 126512 SPO 1979 07 24 23 25 479-78 N co2 335.200 ... L2 1980 02 07 09 32 -89.9800 -24.8000 2810.00 126513 SPO 1979 07 24 23 25 480-78 N co2 334.910 ... L2 1980 02 07 09 34 -89.9800 -24.8000 2810.00 126514 SPO 1979 07 27 23 25 481-78 N co2 335.570 .X. L2 1980 02 07 09 44 -89.9800 -24.8000 2810.00 126515 SPO 1979 07 27 23 25 482-78 N co2 336.130 .X. L2 1980 02 07 09 46 -89.9800 -24.8000 2810.00 126516 SPO 1979 08 01 01 00 483-78 N co2 335.530 ... L2 1980 02 07 09 48 -89.9800 -24.8000 2810.00 126517 SPO 1979 08 01 01 00 484-78 N co2 335.380 ... L2 1980 02 07 09 50 -89.9800 -24.8000 2810.00 126518 SPO 1979 08 04 02 30 485-78 N co2 335.350 ... L2 1980 02 07 10 00 -89.9800 -24.8000 2810.00 126519 SPO 1979 08 04 02 30 486-78 N co2 335.670 ... L2 1980 02 07 10 02 -89.9800 -24.8000 2810.00 126520 SPO 1979 08 08 00 55 487-78 N co2 337.330 -.. L2 1980 02 07 10 04 -89.9800 -24.8000 2810.00 126521 SPO 1979 08 08 00 55 488-78 N co2 338.910 +.. L2 1980 02 07 10 06 -89.9800 -24.8000 2810.00 126522 SPO 1979 08 11 08 05 301-78 N co2 335.200 ... L2 1980 01 31 09 00 -89.9800 -24.8000 2810.00 126523 SPO 1979 08 11 08 05 302-78 N co2 335.790 ... L2 1980 01 31 09 02 -89.9800 -24.8000 2810.00 126524 SPO 1979 08 15 00 35 299-78 N co2 335.110 .X. L2 1980 01 31 09 12 -89.9800 -24.8000 2810.00 126525 SPO 1979 08 15 00 35 300-78 N co2 334.750 .X. L2 1980 01 31 09 14 -89.9800 -24.8000 2810.00 126526 SPO 1979 08 18 01 40 297-78 N co2 334.460 -.. L2 1980 01 31 09 16 -89.9800 -24.8000 2810.00 126527 SPO 1979 08 18 01 40 298-78 N co2 338.080 +.. L2 1980 01 31 09 18 -89.9800 -24.8000 2810.00 126528 SPO 1979 08 21 23 32 295-78 N co2 335.410 .X. L2 1980 01 31 09 28 -89.9800 -24.8000 2810.00 126529 SPO 1979 08 21 23 32 296-78 N co2 334.820 .X. L2 1980 01 31 09 30 -89.9800 -24.8000 2810.00 126530 SPO 1979 08 25 01 30 293-78 N co2 335.730 ..L L2 1980 01 31 09 32 -89.9800 -24.8000 2810.00 126531 SPO 1979 08 25 01 30 294-78 N co2 336.970 +.. L2 1980 01 31 09 34 -89.9800 -24.8000 2810.00 126532 SPO 1979 08 29 00 32 291-78 N co2 335.520 ... L2 1980 01 31 09 44 -89.9800 -24.8000 2810.00 126533 SPO 1979 08 29 00 32 292-78 N co2 335.590 ... L2 1980 01 31 09 46 -89.9800 -24.8000 2810.00 126534 SPO 1979 09 01 07 38 241-78 N co2 335.330 ... L2 1980 01 31 10 04 -89.9800 -24.8000 2810.00 126535 SPO 1979 09 01 07 38 242-78 N co2 335.470 ... L2 1980 01 31 10 06 -89.9800 -24.8000 2810.00 126536 SPO 1979 09 04 23 50 243-78 N co2 335.260 ... L2 1980 01 31 10 00 -89.9800 -24.8000 2810.00 126537 SPO 1979 09 04 23 50 244-78 N co2 335.770 ... L2 1980 01 31 10 02 -89.9800 -24.8000 2810.00 126538 SPO 1979 09 07 23 55 231-78 N co2 335.610 ... L2 1980 02 01 08 40 -89.9800 -24.8000 2810.00 126539 SPO 1979 09 07 23 55 232-78 N co2 335.640 ... L2 1980 02 01 08 42 -89.9800 -24.8000 2810.00 126540 SPO 1979 09 12 00 40 233-78 N co2 337.510 +.. L2 1980 02 01 08 28 -89.9800 -24.8000 2810.00 126541 SPO 1979 09 12 00 40 234-78 N co2 336.030 -.. L2 1980 02 01 08 30 -89.9800 -24.8000 2810.00 126542 SPO 1979 09 15 01 25 235-78 N co2 335.690 ..L L2 1980 02 01 08 24 -89.9800 -24.8000 2810.00 126543 SPO 1979 09 15 01 25 236-78 N co2 337.720 +.. L2 1980 02 01 08 26 -89.9800 -24.8000 2810.00 126544 SPO 1979 09 16 23 45 61-76 N co2 337.070 +.. L2 1980 02 07 10 16 -89.9800 -24.8000 2810.00 126545 SPO 1979 09 16 23 45 62-76 N co2 335.570 ..L L2 1980 02 07 10 18 -89.9800 -24.8000 2810.00 126546 SPO 1979 09 19 01 06 237-78 N co2 336.420 .X. L2 1980 02 01 08 14 -89.9800 -24.8000 2810.00 126547 SPO 1979 09 19 01 06 238-78 N co2 336.770 .X. L2 1980 02 01 08 12 -89.9800 -24.8000 2810.00 126548 SPO 1979 09 22 01 20 239-78 N co2 336.090 .X. L2 1980 02 01 08 08 -89.9800 -24.8000 2810.00 126549 SPO 1979 09 22 01 20 240-78 N co2 335.250 .X. L2 1980 02 01 08 10 -89.9800 -24.8000 2810.00 126550 SPO 1979 09 24 00 50 63-76 N co2 335.380 ... L2 1980 02 07 08 56 -89.9800 -24.8000 2810.00 126551 SPO 1979 09 24 00 50 64-76 N co2 336.370 ... L2 1980 02 07 08 58 -89.9800 -24.8000 2810.00 126552 SPO 1979 09 25 23 50 245-78 N co2 335.060 ... L2 1980 01 31 09 50 -89.9800 -24.8000 2810.00 126553 SPO 1979 09 25 23 50 261-78 N co2 335.900 ... L2 1980 01 31 09 48 -89.9800 -24.8000 2810.00 126554 SPO 1979 09 29 00 50 262-78 N co2 335.720 ... L2 1980 01 31 08 08 -89.9800 -24.8000 2810.00 126555 SPO 1979 09 29 00 50 263-78 N co2 335.990 ... L2 1980 01 31 08 10 -89.9800 -24.8000 2810.00 126556 SPO 1979 10 03 01 40 264-78 N co2 335.450 ... L2 1980 01 31 08 12 -89.9800 -24.8000 2810.00 126557 SPO 1979 10 03 01 40 265-78 N co2 335.770 ... L2 1980 01 31 08 14 -89.9800 -24.8000 2810.00 126558 SPO 1979 10 06 03 20 266-78 N co2 334.950 .X. L2 1980 01 31 08 24 -89.9800 -24.8000 2810.00 126559 SPO 1979 10 06 03 20 267-78 N co2 335.530 .X. L2 1980 01 31 08 26 -89.9800 -24.8000 2810.00 126560 SPO 1979 10 09 23 42 268-78 N co2 335.570 ... L2 1980 01 31 08 28 -89.9800 -24.8000 2810.00 126561 SPO 1979 10 09 23 42 269-78 N co2 335.170 ... L2 1980 01 31 08 30 -89.9800 -24.8000 2810.00 126562 SPO 1979 10 13 00 25 270-78 N co2 335.940 ... L2 1980 01 31 08 40 -89.9800 -24.8000 2810.00 126563 SPO 1979 10 13 00 25 271-78 N co2 335.950 ... L2 1980 01 31 08 42 -89.9800 -24.8000 2810.00 126564 SPO 1979 10 17 02 40 272-78 N co2 335.530 ... L2 1980 01 31 08 44 -89.9800 -24.8000 2810.00 126565 SPO 1979 10 17 02 40 273-78 N co2 335.250 ... L2 1980 01 31 08 46 -89.9800 -24.8000 2810.00 126566 SPO 1979 10 19 23 55 274-78 N co2 335.680 ... L2 1980 01 31 08 56 -89.9800 -24.8000 2810.00 126567 SPO 1979 10 19 23 55 275-78 N co2 335.930 ... L2 1980 01 31 08 58 -89.9800 -24.8000 2810.00 126568 SPO 1979 10 23 23 25 276-78 N co2 335.850 ... L2 1980 02 01 09 32 -89.9800 -24.8000 2810.00 126569 SPO 1979 10 26 23 33 278-78 N co2 335.280 ... L2 1980 02 01 09 30 -89.9800 -24.8000 2810.00 126570 SPO 1979 10 26 23 33 279-78 N co2 335.420 ... L2 1980 02 01 09 28 -89.9800 -24.8000 2810.00 126571 SPO 1979 10 30 23 50 280-78 N co2 335.730 ... L2 1980 02 01 09 16 -89.9800 -24.8000 2810.00 126572 SPO 1979 10 30 23 50 281-78 N co2 335.790 ... L2 1980 02 01 09 18 -89.9800 -24.8000 2810.00 126573 SPO 1979 11 03 03 09 282-78 N co2 335.900 ... L2 1980 02 01 09 14 -89.9800 -24.8000 2810.00 126574 SPO 1979 11 03 03 09 283-78 N co2 335.130 ... L2 1980 02 01 09 12 -89.9800 -24.8000 2810.00 126575 SPO 1979 11 06 23 15 284-78 N co2 335.910 ... L2 1980 02 01 09 00 -89.9800 -24.8000 2810.00 126576 SPO 1979 11 06 23 15 285-78 N co2 335.830 ... L2 1980 02 01 09 02 -89.9800 -24.8000 2810.00 126577 SPO 1979 11 09 23 15 286-78 N co2 335.910 ... L2 1980 02 01 08 56 -89.9800 -24.8000 2810.00 126578 SPO 1979 11 09 23 15 287-78 N co2 335.890 ... L2 1980 02 01 08 58 -89.9800 -24.8000 2810.00 126579 SPO 1979 11 13 23 20 288-78 N co2 335.000 ... L2 1980 02 01 08 44 -89.9800 -24.8000 2810.00 126580 SPO 1979 11 13 23 20 289-78 N co2 335.720 ... L2 1980 02 01 08 46 -89.9800 -24.8000 2810.00 126581 SPO 1979 11 16 23 15 245-78 N co2 -999.990 *.. L2 1980 04 03 10 02 -89.9800 -24.8000 2810.00 126582 SPO 1979 11 16 23 15 246-78 N co2 335.220 -.. L2 1980 04 03 10 00 -89.9800 -24.8000 2810.00 126583 SPO 1979 11 16 23 15 290-78 N co2 335.740 ... L2 1980 02 01 09 44 -89.9800 -24.8000 2810.00 126584 SPO 1979 11 18 01 33 461-79 S co2 336.370 .X. L2 1980 01 30 08 44 -89.9800 -24.8000 2810.00 126585 SPO 1979 11 18 01 33 462-79 S co2 336.570 .X. L2 1980 01 30 08 46 -89.9800 -24.8000 2810.00 126586 SPO 1979 11 18 01 50 463-79 N co2 336.110 .X. L2 1980 01 30 08 56 -89.9800 -24.8000 2810.00 126587 SPO 1979 11 18 01 50 464-79 N co2 336.150 .X. L2 1980 01 30 08 58 -89.9800 -24.8000 2810.00 126588 SPO 1979 11 19 23 10 457-79 N co2 336.330 ... L2 1980 01 30 08 28 -89.9800 -24.8000 2810.00 126589 SPO 1979 11 19 23 10 458-79 N co2 335.650 ... L2 1980 01 30 08 30 -89.9800 -24.8000 2810.00 126590 SPO 1979 11 19 23 24 459-79 S co2 336.510 .X. L2 1980 01 30 08 40 -89.9800 -24.8000 2810.00 126591 SPO 1979 11 19 23 24 460-79 S co2 336.530 .X. L2 1980 01 30 08 42 -89.9800 -24.8000 2810.00 126592 SPO 1979 11 20 23 20 248-78 N co2 335.760 ... L2 1980 04 03 08 44 -89.9800 -24.8000 2810.00 126593 SPO 1979 11 20 23 20 249-78 N co2 335.820 ... L2 1980 04 03 08 46 -89.9800 -24.8000 2810.00 126594 SPO 1979 11 23 22 27 250-78 S co2 336.480 .X. L2 1980 04 03 08 40 -89.9800 -24.8000 2810.00 126595 SPO 1979 11 23 22 27 251-78 S co2 336.640 .X. L2 1980 04 03 08 42 -89.9800 -24.8000 2810.00 126596 SPO 1979 11 27 23 09 252-78 N co2 335.300 ... L2 1980 04 03 08 28 -89.9800 -24.8000 2810.00 126597 SPO 1979 11 27 23 09 253-78 N co2 335.950 ... L2 1980 04 03 08 30 -89.9800 -24.8000 2810.00 126598 SPO 1979 12 01 01 25 254-78 S co2 336.260 .X. L2 1980 04 03 08 24 -89.9800 -24.8000 2810.00 126599 SPO 1979 12 01 01 25 255-78 S co2 336.270 .X. L2 1980 04 03 08 26 -89.9800 -24.8000 2810.00 126600 SPO 1979 12 04 23 10 256-78 N co2 335.470 ... L2 1980 04 03 08 12 -89.9800 -24.8000 2810.00 126601 SPO 1979 12 04 23 10 257-78 N co2 335.360 ... L2 1980 04 03 08 14 -89.9800 -24.8000 2810.00 126602 SPO 1979 12 07 23 15 258-78 S co2 336.380 .X. L2 1980 04 03 08 10 -89.9800 -24.8000 2810.00 126603 SPO 1979 12 07 23 15 259-78 S co2 336.610 .X. L2 1980 04 03 08 08 -89.9800 -24.8000 2810.00 126604 SPO 1979 12 12 07 00 201-78 N co2 335.220 .X. L2 1980 04 03 09 16 -89.9800 -24.8000 2810.00 126605 SPO 1979 12 12 07 00 260-78 N co2 335.560 .X. L2 1980 04 03 09 18 -89.9800 -24.8000 2810.00 126606 SPO 1979 12 14 21 50 202-78 S co2 336.430 .XL L2 1980 04 03 09 28 -89.9800 -24.8000 2810.00 126607 SPO 1979 12 14 21 50 203-78 S co2 339.080 +.. L2 1980 04 03 09 30 -89.9800 -24.8000 2810.00 126608 SPO 1979 12 18 23 15 204-78 N co2 334.710 .X. L2 1980 04 03 09 32 -89.9800 -24.8000 2810.00 126609 SPO 1979 12 18 23 15 205-78 N co2 334.960 .X. L2 1980 04 03 09 34 -89.9800 -24.8000 2810.00 126610 SPO 1979 12 21 23 24 206-78 S co2 336.080 ... L2 1980 04 03 09 46 -89.9800 -24.8000 2810.00 126611 SPO 1979 12 21 23 24 207-78 S co2 336.000 ... L2 1980 04 03 09 44 -89.9800 -24.8000 2810.00 126612 SPO 1979 12 26 02 30 208-78 N co2 334.720 .X. L2 1980 04 03 09 48 -89.9800 -24.8000 2810.00 126613 SPO 1979 12 26 02 30 209-78 N co2 335.090 .X. L2 1980 04 03 09 50 -89.9800 -24.8000 2810.00 126614 SPO 1979 12 29 05 28 210-78 S co2 336.070 ... L2 1980 04 03 09 00 -89.9800 -24.8000 2810.00 126615 SPO 1979 12 29 05 28 211-78 S co2 335.980 ... L2 1980 04 03 09 02 -89.9800 -24.8000 2810.00 126616 SPO 1980 01 02 02 45 212-78 N co2 337.800 +.. L2 1980 04 03 09 12 -89.9800 -24.8000 2810.00 126617 SPO 1980 01 02 02 45 213-78 N co2 334.750 -.. L2 1980 04 03 09 14 -89.9800 -24.8000 2810.00 126618 SPO 1980 01 04 23 24 214-78 S co2 336.890 +.. L2 1980 05 23 08 28 -89.9800 -24.8000 2810.00 126619 SPO 1980 01 04 23 24 215-78 S co2 336.330 -.. L2 1980 05 23 08 30 -89.9800 -24.8000 2810.00 126620 SPO 1980 01 09 05 00 216-78 N co2 340.270 N.. L2 1980 05 22 08 58 -89.9800 -24.8000 2810.00 126621 SPO 1980 01 09 05 00 217-78 N co2 339.620 N.. L2 1980 05 22 09 00 -89.9800 -24.8000 2810.00 126622 SPO 1980 01 11 23 26 218-78 S co2 338.840 +.. L2 1980 05 22 08 46 -89.9800 -24.8000 2810.00 126623 SPO 1980 01 11 23 26 219-78 S co2 337.280 -.. L2 1980 05 22 08 56 -89.9800 -24.8000 2810.00 126624 SPO 1980 01 15 23 20 220-78 N co2 337.220 N.. L2 1980 05 22 09 02 -89.9800 -24.8000 2810.00 126625 SPO 1980 01 15 23 20 221-78 N co2 338.220 N.. L2 1980 05 22 09 12 -89.9800 -24.8000 2810.00 126626 SPO 1980 01 18 23 25 222-78 S co2 338.110 -.. L2 1980 05 22 09 14 -89.9800 -24.8000 2810.00 126627 SPO 1980 01 18 23 25 224-78 S co2 339.990 +.. L2 1980 05 22 09 16 -89.9800 -24.8000 2810.00 126628 SPO 1980 01 22 23 10 225-78 N co2 340.080 +.. L2 1980 05 23 08 08 -89.9800 -24.8000 2810.00 126629 SPO 1980 01 22 23 10 226-78 N co2 338.440 -.. L2 1980 05 23 08 10 -89.9800 -24.8000 2810.00 126630 SPO 1980 01 29 23 24 227-78 S co2 341.150 +.. L2 1980 05 23 08 12 -89.9800 -24.8000 2810.00 126631 SPO 1980 01 29 23 24 228-78 S co2 338.060 -.. L2 1980 05 23 08 14 -89.9800 -24.8000 2810.00 126632 SPO 1980 02 05 22 55 229-78 S co2 339.300 N.. L2 1980 05 23 08 24 -89.9800 -24.8000 2810.00 126633 SPO 1980 02 05 22 55 230-78 S co2 339.240 N.. L2 1980 05 23 08 26 -89.9800 -24.8000 2810.00 126634 SPO 1980 02 12 23 26 387-79 S co2 335.560 N.. L2 1981 01 22 09 48 -89.9800 -24.8000 2810.00 126635 SPO 1980 02 12 23 26 388-79 S co2 335.720 N.. L2 1981 01 22 09 50 -89.9800 -24.8000 2810.00 126636 SPO 1980 02 19 23 15 389-79 N co2 338.290 +.. L2 1981 01 22 10 00 -89.9800 -24.8000 2810.00 126637 SPO 1980 02 19 23 15 390-79 N co2 336.890 -.. L2 1981 01 22 10 02 -89.9800 -24.8000 2810.00 126638 SPO 1980 02 26 23 24 391-79 S co2 335.000 N.. L2 1981 01 22 10 04 -89.9800 -24.8000 2810.00 126639 SPO 1980 02 26 23 24 392-79 S co2 335.370 N.. L2 1981 01 22 10 06 -89.9800 -24.8000 2810.00 126640 SPO 1980 03 04 23 15 393-79 N co2 337.580 N.. L2 1981 01 22 10 20 -89.9800 -24.8000 2810.00 126641 SPO 1980 03 04 23 15 394-79 N co2 336.820 N.. L2 1981 01 22 10 22 -89.9800 -24.8000 2810.00 126642 SPO 1980 03 11 23 24 395-79 S co2 335.780 N.. L2 1981 01 22 10 32 -89.9800 -24.8000 2810.00 126643 SPO 1980 03 11 23 24 396-79 S co2 335.600 N.. L2 1981 01 22 10 34 -89.9800 -24.8000 2810.00 126644 SPO 1980 03 18 23 10 397-79 N co2 338.920 +.. L2 1981 01 22 08 08 -89.9800 -24.8000 2810.00 126645 SPO 1980 03 18 23 10 398-79 N co2 337.340 -.. L2 1981 01 22 08 10 -89.9800 -24.8000 2810.00 126646 SPO 1980 03 25 23 24 399-79 S co2 336.260 N.. L2 1981 01 22 08 12 -89.9800 -24.8000 2810.00 126647 SPO 1980 03 25 23 24 400-79 S co2 336.190 N.. L2 1981 01 22 08 14 -89.9800 -24.8000 2810.00 126648 SPO 1980 04 01 23 10 401-79 N co2 338.870 +.. L2 1981 01 22 08 28 -89.9800 -24.8000 2810.00 126649 SPO 1980 04 01 23 10 402-79 N co2 337.210 -.. L2 1981 01 22 08 30 -89.9800 -24.8000 2810.00 126650 SPO 1980 04 08 23 24 403-79 S co2 336.750 N.. L2 1981 01 22 08 40 -89.9800 -24.8000 2810.00 126651 SPO 1980 04 08 23 24 404-79 S co2 336.680 N.. L2 1981 01 22 08 42 -89.9800 -24.8000 2810.00 126652 SPO 1980 04 15 23 05 405-79 N co2 338.040 N.. L2 1981 01 22 08 44 -89.9800 -24.8000 2810.00 126653 SPO 1980 04 15 23 05 406-79 N co2 338.000 N.. L2 1981 01 22 08 46 -89.9800 -24.8000 2810.00 126654 SPO 1980 04 22 23 24 407-79 S co2 335.630 N.. L2 1981 01 22 10 36 -89.9800 -24.8000 2810.00 126655 SPO 1980 04 22 23 24 408-79 S co2 335.610 N.. L2 1981 01 22 10 38 -89.9800 -24.8000 2810.00 126656 SPO 1980 04 30 07 24 409-79 N co2 337.740 -.. L2 1981 01 22 10 48 -89.9800 -24.8000 2810.00 126657 SPO 1980 04 30 07 24 410-79 N co2 352.260 +.. L2 1981 01 22 10 50 -89.9800 -24.8000 2810.00 126658 SPO 1980 05 07 00 24 411-79 S co2 336.090 N.. L2 1981 01 22 11 20 -89.9800 -24.8000 2810.00 126659 SPO 1980 05 07 00 24 412-79 S co2 335.940 N.. L2 1981 01 22 11 22 -89.9800 -24.8000 2810.00 126660 SPO 1980 05 07 00 26 413-79 N co2 337.960 N.. L2 1981 01 22 10 52 -89.9800 -24.8000 2810.00 126661 SPO 1980 05 07 00 26 414-79 N co2 337.320 N.. L2 1981 01 22 10 54 -89.9800 -24.8000 2810.00 126662 SPO 1980 05 13 23 24 415-79 S co2 335.940 N.. L2 1981 01 22 11 04 -89.9800 -24.8000 2810.00 126663 SPO 1980 05 13 23 24 416-79 S co2 336.060 N.. L2 1981 01 22 11 06 -89.9800 -24.8000 2810.00 126664 SPO 1980 05 20 23 05 417-79 N co2 338.760 N.. L2 1981 01 22 09 00 -89.9800 -24.8000 2810.00 126665 SPO 1980 05 20 23 05 418-79 N co2 337.860 N.. L2 1981 01 22 09 02 -89.9800 -24.8000 2810.00 126666 SPO 1980 05 27 23 24 419-79 S co2 336.760 N.. L2 1981 01 22 08 58 -89.9800 -24.8000 2810.00 126667 SPO 1980 05 27 23 24 420-79 S co2 336.700 N.. L2 1981 01 22 08 56 -89.9800 -24.8000 2810.00 126668 SPO 1980 06 03 23 15 421-79 N co2 338.860 N.. L2 1981 01 22 09 16 -89.9800 -24.8000 2810.00 126669 SPO 1980 06 03 23 15 422-79 N co2 338.470 N.. L2 1981 01 22 09 18 -89.9800 -24.8000 2810.00 126670 SPO 1980 06 10 23 25 423-79 S co2 336.720 N.. L2 1981 01 22 09 28 -89.9800 -24.8000 2810.00 126671 SPO 1980 06 10 23 25 424-79 S co2 336.970 N.. L2 1981 01 22 09 30 -89.9800 -24.8000 2810.00 126672 SPO 1980 06 17 22 52 425-79 N co2 339.070 -.. L2 1981 01 22 09 32 -89.9800 -24.8000 2810.00 126673 SPO 1980 06 17 22 52 426-79 N co2 342.380 +.. L2 1981 01 22 09 34 -89.9800 -24.8000 2810.00 126674 SPO 1980 06 24 23 25 427-79 S co2 337.210 N.. L2 1981 01 21 08 44 -89.9800 -24.8000 2810.00 126675 SPO 1980 06 24 23 25 428-79 S co2 336.950 N.. L2 1981 01 21 08 46 -89.9800 -24.8000 2810.00 126676 SPO 1980 07 01 23 25 429-79 N co2 344.800 +.. L2 1981 01 21 08 40 -89.9800 -24.8000 2810.00 126677 SPO 1980 07 01 23 25 430-79 N co2 338.130 -.. L2 1981 01 21 08 42 -89.9800 -24.8000 2810.00 126678 SPO 1980 07 01 23 25 431-79 S co2 336.920 N.. L2 1981 01 21 08 28 -89.9800 -24.8000 2810.00 126679 SPO 1980 07 01 23 25 432-79 S co2 336.860 N.. L2 1981 01 21 08 30 -89.9800 -24.8000 2810.00 126680 SPO 1980 07 08 23 26 433-79 S co2 337.860 N.. L2 1981 01 21 08 12 -89.9800 -24.8000 2810.00 126681 SPO 1980 07 08 23 26 434-79 S co2 337.710 N.. L2 1981 01 21 08 14 -89.9800 -24.8000 2810.00 126682 SPO 1980 07 15 23 07 435-79 N co2 338.880 N.. L2 1981 01 21 08 08 -89.9800 -24.8000 2810.00 126683 SPO 1980 07 15 23 07 436-79 N co2 338.890 N.. L2 1981 01 21 08 10 -89.9800 -24.8000 2810.00 126684 SPO 1980 07 22 23 25 437-79 S co2 336.710 -.. L2 1981 01 29 09 12 -89.9800 -24.8000 2810.00 126685 SPO 1980 07 22 23 25 438-79 S co2 337.270 +.. L2 1981 01 29 09 14 -89.9800 -24.8000 2810.00 126686 SPO 1980 07 29 23 22 439-79 N co2 339.300 +.. L2 1981 01 29 09 16 -89.9800 -24.8000 2810.00 126687 SPO 1980 07 29 23 22 440-79 N co2 338.060 -.. L2 1981 01 29 09 18 -89.9800 -24.8000 2810.00 126688 SPO 1980 08 05 23 25 441-79 S co2 336.840 N.. L2 1981 01 29 09 32 -89.9800 -24.8000 2810.00 126689 SPO 1980 08 05 23 25 442-79 S co2 337.140 N.. L2 1981 01 29 09 34 -89.9800 -24.8000 2810.00 126690 SPO 1980 08 12 23 24 443-79 N co2 338.730 N.. L2 1981 01 29 09 44 -89.9800 -24.8000 2810.00 126691 SPO 1980 08 12 23 24 444-79 N co2 339.310 N.. L2 1981 01 29 09 46 -89.9800 -24.8000 2810.00 126692 SPO 1980 08 19 23 24 445-79 S co2 337.260 N.. L2 1981 01 29 09 48 -89.9800 -24.8000 2810.00 126693 SPO 1980 08 19 23 24 446-79 S co2 337.020 N.. L2 1981 01 29 09 50 -89.9800 -24.8000 2810.00 126694 SPO 1980 08 26 23 12 447-79 N co2 339.450 N.. L2 1981 01 29 10 00 -89.9800 -24.8000 2810.00 126695 SPO 1980 08 26 23 12 448-79 N co2 338.530 N.. L2 1981 01 29 10 02 -89.9800 -24.8000 2810.00 126696 SPO 1980 09 03 06 24 449-79 S co2 337.190 N.. L2 1981 01 29 10 16 -89.9800 -24.8000 2810.00 126697 SPO 1980 09 03 06 24 450-79 S co2 337.160 N.. L2 1981 01 29 10 18 -89.9800 -24.8000 2810.00 126698 SPO 1980 09 03 06 26 451-79 S co2 339.160 N.. L2 1981 01 29 10 06 -89.9800 -24.8000 2810.00 126699 SPO 1980 09 03 06 26 452-79 S co2 338.790 N.. L2 1981 01 29 10 04 -89.9800 -24.8000 2810.00 126700 SPO 1980 09 09 22 55 453-79 N co2 340.790 +.. L2 1981 01 29 10 20 -89.9800 -24.8000 2810.00 126701 SPO 1980 09 09 22 55 454-79 N co2 338.600 -.. L2 1981 01 29 10 22 -89.9800 -24.8000 2810.00 126702 SPO 1980 09 16 23 24 455-79 S co2 337.570 N.. L2 1981 01 29 10 32 -89.9800 -24.8000 2810.00 126703 SPO 1980 09 16 23 24 456-79 S co2 337.500 N.. L2 1981 01 29 10 34 -89.9800 -24.8000 2810.00 126704 SPO 1980 09 23 23 20 357-79 N co2 338.140 N.. L2 1981 01 29 08 08 -89.9800 -24.8000 2810.00 126705 SPO 1980 09 23 23 20 358-79 N co2 337.740 N.. L2 1981 01 29 08 10 -89.9800 -24.8000 2810.00 126706 SPO 1980 09 30 23 25 359-79 S co2 337.220 N.. L2 1981 01 29 08 12 -89.9800 -24.8000 2810.00 126707 SPO 1980 09 30 23 25 361-79 S co2 337.180 N.. L2 1981 01 29 08 14 -89.9800 -24.8000 2810.00 126708 SPO 1980 10 07 23 09 362-79 N co2 338.700 +.. L2 1981 01 29 08 24 -89.9800 -24.8000 2810.00 126709 SPO 1980 10 07 23 09 363-79 N co2 337.650 -.. L2 1981 01 29 08 26 -89.9800 -24.8000 2810.00 126710 SPO 1980 10 15 02 25 364-79 S co2 337.540 N.. L2 1981 01 29 08 28 -89.9800 -24.8000 2810.00 126711 SPO 1980 10 15 02 25 365-79 S co2 337.400 N.. L2 1981 01 29 08 30 -89.9800 -24.8000 2810.00 126712 SPO 1980 10 21 23 19 366-79 N co2 339.140 N.. L2 1981 01 29 08 44 -89.9800 -24.8000 2810.00 126713 SPO 1980 10 21 23 19 367-79 N co2 338.290 N.. L2 1981 01 29 08 46 -89.9800 -24.8000 2810.00 126714 SPO 1980 10 28 23 24 368-79 S co2 337.540 N.. L2 1981 01 29 08 56 -89.9800 -24.8000 2810.00 126715 SPO 1980 10 28 23 24 369-79 S co2 337.570 N.. L2 1981 01 29 08 58 -89.9800 -24.8000 2810.00 126716 SPO 1980 11 07 08 30 370-79 N co2 337.760 -.. L2 1981 01 29 09 00 -89.9800 -24.8000 2810.00 126717 SPO 1980 11 07 08 30 371-79 N co2 -999.990 *.. L2 1981 01 29 09 02 -89.9800 -24.8000 2810.00 126718 SPO 1980 11 13 23 28 372-79 S co2 346.550 N.. L2 1982 01 22 14 24 -89.9800 -24.8000 2810.00 126719 SPO 1980 11 13 23 28 373-79 S co2 346.310 N.. L2 1982 01 22 14 26 -89.9800 -24.8000 2810.00 126720 SPO 1980 11 19 23 20 374-79 N co2 355.330 -.. L2 1982 01 22 14 12 -89.9800 -24.8000 2810.00 126721 SPO 1980 11 19 23 20 375-79 N co2 357.320 +.. L2 1982 01 22 14 14 -89.9800 -24.8000 2810.00 126722 SPO 1980 11 25 23 28 376-79 S co2 349.490 +.. L2 1982 01 22 14 56 -89.9800 -24.8000 2810.00 126723 SPO 1980 11 25 23 28 377-79 S co2 346.220 -.. L2 1982 01 22 14 58 -89.9800 -24.8000 2810.00 126724 SPO 1980 12 11 03 30 380-79 S co2 351.150 +.. L2 1982 01 22 15 02 -89.9800 -24.8000 2810.00 126725 SPO 1980 12 11 03 30 381-79 S co2 345.840 -.. L2 1982 01 22 15 00 -89.9800 -24.8000 2810.00 126726 SPO 1980 12 19 02 40 384-79 N co2 355.780 -.. L2 1982 01 22 15 16 -89.9800 -24.8000 2810.00 126727 SPO 1980 12 19 02 40 385-79 N co2 358.470 +.. L2 1982 01 22 15 14 -89.9800 -24.8000 2810.00 126728 SPO 1981 01 01 02 51 83-80 N co2 337.150 N.. L2 1981 01 28 09 28 -89.9800 -24.8000 2810.00 126729 SPO 1981 01 01 02 51 84-80 N co2 337.340 N.. L2 1981 01 28 09 30 -89.9800 -24.8000 2810.00 126730 SPO 1981 01 11 00 30 109-80 S co2 337.620 N.. L2 1981 01 28 09 16 -89.9800 -24.8000 2810.00 126731 SPO 1981 01 11 00 30 110-80 S co2 337.760 N.. L2 1981 01 28 09 18 -89.9800 -24.8000 2810.00 126732 SPO 1981 02 15 01 30 589-80 S co2 341.340 +.. L2 1982 01 22 15 18 -89.9800 -24.8000 2810.00 126733 SPO 1981 02 15 01 30 590-80 S co2 337.690 -.. L2 1982 01 22 15 28 -89.9800 -24.8000 2810.00 126734 SPO 1981 02 22 12 45 591-80 N co2 341.980 +.. L2 1982 01 22 15 30 -89.9800 -24.8000 2810.00 126735 SPO 1981 02 22 12 45 592-80 N co2 340.860 -.. L2 1982 01 22 15 32 -89.9800 -24.8000 2810.00 126736 SPO 1981 03 01 02 30 266-80 S co2 338.570 -.. U1 1982 01 28 09 14 -89.9800 -24.8000 2810.00 126737 SPO 1981 03 01 02 30 267-80 S co2 340.010 +.. U1 1982 01 28 09 16 -89.9800 -24.8000 2810.00 126738 SPO 1981 03 09 12 22 268-80 N co2 338.840 N.. L2 1982 01 26 08 12 -89.9800 -24.8000 2810.00 126739 SPO 1981 03 09 12 22 269-80 N co2 338.180 N.. L2 1982 01 26 08 10 -89.9800 -24.8000 2810.00 126740 SPO 1981 03 15 02 30 270-80 S co2 337.830 N.. U1 1982 01 28 08 44 -89.9800 -24.8000 2810.00 126741 SPO 1981 03 15 02 30 271-80 S co2 338.140 N.. U1 1982 01 28 08 46 -89.9800 -24.8000 2810.00 126742 SPO 1981 03 15 03 30 272-80 S co2 337.570 -.. U1 1982 01 28 09 00 -89.9800 -24.8000 2810.00 126743 SPO 1981 03 15 03 30 273-80 S co2 349.800 +.. U1 1982 01 28 09 02 -89.9800 -24.8000 2810.00 126744 SPO 1981 03 23 01 55 274-80 N co2 338.290 -.. L2 1982 01 26 08 14 -89.9800 -24.8000 2810.00 126745 SPO 1981 03 23 01 55 275-80 N co2 354.790 +.. L2 1982 01 26 08 24 -89.9800 -24.8000 2810.00 126746 SPO 1981 03 23 01 55 276-80 N co2 338.160 N.. L2 1982 01 26 08 26 -89.9800 -24.8000 2810.00 126747 SPO 1981 03 28 00 40 277-80 N co2 338.140 -.. L2 1982 01 26 08 30 -89.9800 -24.8000 2810.00 126748 SPO 1981 03 28 00 40 278-80 N co2 339.260 +.. L2 1982 01 26 08 40 -89.9800 -24.8000 2810.00 126749 SPO 1981 04 05 02 30 279-80 S co2 338.020 N.. U1 1982 01 28 08 28 -89.9800 -24.8000 2810.00 126750 SPO 1981 04 05 02 30 280-80 S co2 338.320 N.. U1 1982 01 28 08 30 -89.9800 -24.8000 2810.00 126751 SPO 1981 04 12 02 30 311-80 N co2 339.950 N.. L2 1982 01 26 08 42 -89.9800 -24.8000 2810.00 126752 SPO 1981 04 12 02 30 312-80 N co2 339.680 N.. L2 1982 01 26 08 44 -89.9800 -24.8000 2810.00 126753 SPO 1981 04 19 01 30 313-80 S co2 337.780 -.. U1 1982 01 28 08 56 -89.9800 -24.8000 2810.00 126754 SPO 1981 04 19 01 30 314-80 S co2 338.640 +.. U1 1982 01 28 08 58 -89.9800 -24.8000 2810.00 126755 SPO 1981 04 26 01 35 315-80 N co2 339.570 N.. L2 1982 01 26 08 56 -89.9800 -24.8000 2810.00 126756 SPO 1981 04 26 01 35 316-80 N co2 339.920 N.. L2 1982 01 26 08 58 -89.9800 -24.8000 2810.00 126757 SPO 1981 05 03 02 30 317-80 S co2 337.510 -.. U1 1982 01 28 08 40 -89.9800 -24.8000 2810.00 126758 SPO 1981 05 03 02 30 318-80 S co2 338.080 +.. U1 1982 01 28 08 42 -89.9800 -24.8000 2810.00 126759 SPO 1981 05 10 01 55 319-80 N co2 342.730 +.. L2 1982 01 26 09 00 -89.9800 -24.8000 2810.00 126760 SPO 1981 05 10 01 55 320-80 N co2 338.780 -.. L2 1982 01 26 09 02 -89.9800 -24.8000 2810.00 126761 SPO 1981 05 17 00 30 321-80 S co2 339.370 -.. U1 1982 01 28 09 28 -89.9800 -24.8000 2810.00 126762 SPO 1981 05 17 00 30 322-80 S co2 340.520 +.. U1 1982 01 28 09 30 -89.9800 -24.8000 2810.00 126763 SPO 1981 05 17 00 30 323-80 S co2 338.360 N.. U1 1982 01 28 09 34 -89.9800 -24.8000 2810.00 126764 SPO 1981 05 24 00 58 296-80 N co2 340.470 +.. L2 1982 01 26 09 12 -89.9800 -24.8000 2810.00 126765 SPO 1981 05 24 00 58 324-80 N co2 339.100 -.. L2 1982 01 26 09 14 -89.9800 -24.8000 2810.00 126766 SPO 1981 05 31 10 32 297-80 S co2 337.410 -.. U2 1982 04 05 11 36 -89.9800 -24.8000 2810.00 126767 SPO 1981 05 31 10 32 298-80 S co2 338.760 +.. U2 1982 04 05 11 38 -89.9800 -24.8000 2810.00 126768 SPO 1981 05 31 10 32 299-80 S co2 337.760 N.. U2 1982 04 05 11 40 -89.9800 -24.8000 2810.00 126769 SPO 1981 05 31 11 30 300-80 S co2 338.130 +.. U2 1982 04 05 11 20 -89.9800 -24.8000 2810.00 126770 SPO 1981 05 31 11 30 301-80 S co2 337.450 -.. U2 1982 04 05 11 22 -89.9800 -24.8000 2810.00 126771 SPO 1981 06 07 01 46 302-80 N co2 345.650 +.. L2 1982 04 06 08 42 -89.9800 -24.8000 2810.00 126772 SPO 1981 06 07 01 46 303-80 N co2 344.430 -.. L2 1982 04 06 08 30 -89.9800 -24.8000 2810.00 126773 SPO 1981 06 14 02 31 304-80 S co2 337.660 N.. U2 1982 04 05 11 04 -89.9800 -24.8000 2810.00 126774 SPO 1981 06 14 02 31 305-80 S co2 337.840 N.. U2 1982 04 05 11 06 -89.9800 -24.8000 2810.00 126775 SPO 1981 06 21 01 41 306-80 N co2 339.250 N.. L2 1982 04 06 08 26 -89.9800 -24.8000 2810.00 126776 SPO 1981 06 21 01 41 307-80 N co2 339.990 N.. L2 1982 04 06 08 28 -89.9800 -24.8000 2810.00 126777 SPO 1981 06 28 04 30 308-80 S co2 337.850 N.. U2 1982 04 05 11 08 -89.9800 -24.8000 2810.00 126778 SPO 1981 06 28 04 30 309-80 S co2 337.750 N.. U2 1982 04 05 11 10 -89.9800 -24.8000 2810.00 126779 SPO 1981 07 06 02 43 221-80 N co2 338.230 -.. L2 1982 04 06 08 10 -89.9800 -24.8000 2810.00 126780 SPO 1981 07 06 02 43 310-80 N co2 342.070 +.. L2 1982 04 06 08 12 -89.9800 -24.8000 2810.00 126781 SPO 1981 07 14 03 31 222-80 S co2 339.060 .X. U1 1982 01 27 08 24 -89.9800 -24.8000 2810.00 126782 SPO 1981 07 14 03 31 223-80 S co2 339.310 .X. U1 1982 01 27 08 26 -89.9800 -24.8000 2810.00 126783 SPO 1981 07 21 02 21 226-80 P co2 338.970 ... U1 1982 01 27 08 28 -89.9800 -24.8000 2810.00 126784 SPO 1981 07 21 02 21 227-80 P co2 339.010 ... U1 1982 01 27 08 30 -89.9800 -24.8000 2810.00 126785 SPO 1981 07 21 02 27 224-80 P co2 359.680 -.. U1 1982 01 27 08 56 -89.9800 -24.8000 2810.00 126786 SPO 1981 07 21 02 27 225-80 P co2 -999.990 *.. U1 1982 01 27 08 58 -89.9800 -24.8000 2810.00 126787 SPO 1981 07 27 02 40 228-80 P co2 339.170 ..L U1 1982 01 27 09 16 -89.9800 -24.8000 2810.00 126788 SPO 1981 07 27 02 40 229-80 P co2 339.800 +.. U1 1982 01 27 09 18 -89.9800 -24.8000 2810.00 126789 SPO 1981 08 02 03 30 230-80 S co2 339.150 ..L U1 1982 01 27 08 44 -89.9800 -24.8000 2810.00 126790 SPO 1981 08 02 03 30 231-80 S co2 339.840 +.. U1 1982 01 27 08 46 -89.9800 -24.8000 2810.00 126791 SPO 1981 08 09 05 45 232-80 P co2 339.160 ... U1 1982 01 27 08 40 -89.9800 -24.8000 2810.00 126792 SPO 1981 08 09 05 45 233-80 P co2 339.210 ... U1 1982 01 27 08 42 -89.9800 -24.8000 2810.00 126793 SPO 1981 08 16 07 08 234-80 P co2 339.300 ..L U1 1982 01 27 09 00 -89.9800 -24.8000 2810.00 126794 SPO 1981 08 16 07 08 235-80 P co2 351.800 +.. U1 1982 01 27 09 02 -89.9800 -24.8000 2810.00 126795 SPO 1981 08 23 03 31 236-80 S co2 340.420 +.. U1 1982 01 27 10 00 -89.9800 -24.8000 2810.00 126796 SPO 1981 08 23 03 31 237-80 S co2 339.590 ..L U1 1982 01 27 10 02 -89.9800 -24.8000 2810.00 126797 SPO 1981 08 30 07 48 239-80 P co2 339.190 ... U1 1982 01 27 09 48 -89.9800 -24.8000 2810.00 126798 SPO 1981 08 30 07 48 241-80 P co2 339.410 ... U1 1982 01 27 09 50 -89.9800 -24.8000 2810.00 126799 SPO 1981 09 06 04 42 242-80 P co2 339.240 ... U1 1982 01 27 10 18 -89.9800 -24.8000 2810.00 126800 SPO 1981 09 06 04 42 243-80 P co2 339.350 ... U1 1982 01 27 10 20 -89.9800 -24.8000 2810.00 126801 SPO 1981 09 13 01 31 238-80 S co2 339.330 ..L U1 1982 01 27 09 44 -89.9800 -24.8000 2810.00 126802 SPO 1981 09 13 01 31 240-80 S co2 340.240 +.. U1 1982 01 27 09 46 -89.9800 -24.8000 2810.00 126803 SPO 1981 09 20 02 45 244-80 P co2 339.220 ... U1 1982 01 27 09 28 -89.9800 -24.8000 2810.00 126804 SPO 1981 09 20 02 45 245-80 P co2 339.240 ... U1 1982 01 27 09 30 -89.9800 -24.8000 2810.00 126805 SPO 1981 09 29 08 48 246-80 P co2 339.170 ..L U1 1982 01 27 10 04 -89.9800 -24.8000 2810.00 126806 SPO 1981 09 29 08 48 247-80 P co2 -999.990 *.. U1 1982 01 27 10 06 -89.9800 -24.8000 2810.00 126807 SPO 1981 10 04 03 31 248-80 S co2 340.020 .X. U1 1982 01 27 09 32 -89.9800 -24.8000 2810.00 126808 SPO 1981 10 04 03 31 249-80 S co2 339.700 .X. U1 1982 01 27 09 34 -89.9800 -24.8000 2810.00 126809 SPO 1981 10 11 03 57 250-80 P co2 339.190 ... U1 1982 01 28 08 24 -89.9800 -24.8000 2810.00 126810 SPO 1981 10 11 03 57 251-80 P co2 339.290 ... U1 1982 01 28 08 26 -89.9800 -24.8000 2810.00 126811 SPO 1981 10 18 04 44 252-80 P co2 339.210 ... U1 1982 01 27 11 04 -89.9800 -24.8000 2810.00 126812 SPO 1981 10 18 04 44 253-80 P co2 339.170 ... U1 1982 01 27 11 06 -89.9800 -24.8000 2810.00 126813 SPO 1981 10 31 00 32 254-80 S co2 339.360 ... U1 1982 01 27 10 36 -89.9800 -24.8000 2810.00 126814 SPO 1981 10 31 00 32 255-80 S co2 339.290 ... U1 1982 01 27 10 38 -89.9800 -24.8000 2810.00 126815 SPO 1981 11 04 05 08 256-80 P co2 339.390 ... U1 1982 01 27 11 08 -89.9800 -24.8000 2810.00 126816 SPO 1981 11 04 05 08 257-80 P co2 339.220 ... U1 1982 01 27 11 10 -89.9800 -24.8000 2810.00 126817 SPO 1981 11 08 02 41 258-80 P co2 339.170 ... U1 1982 01 27 10 32 -89.9800 -24.8000 2810.00 126818 SPO 1981 11 08 02 41 259-80 P co2 339.180 ... U1 1982 01 27 10 34 -89.9800 -24.8000 2810.00 126819 SPO 1981 11 15 03 15 261-80 P co2 339.390 ... U1 1982 01 27 11 20 -89.9800 -24.8000 2810.00 126820 SPO 1981 11 15 03 15 262-80 P co2 339.280 ... U1 1982 01 27 11 24 -89.9800 -24.8000 2810.00 126821 SPO 1981 11 17 12 46 263-80 S co2 344.460 N.. U1 1982 01 27 10 52 -89.9800 -24.8000 2810.00 126822 SPO 1981 11 17 12 46 264-80 S co2 344.730 N.. U1 1982 01 27 10 54 -89.9800 -24.8000 2810.00 126823 SPO 1981 11 22 03 25 260-80 S co2 340.180 +.. U1 1982 01 27 10 48 -89.9800 -24.8000 2810.00 126824 SPO 1981 11 22 03 25 265-80 S co2 339.640 .XL U1 1982 01 27 10 50 -89.9800 -24.8000 2810.00 126825 SPO 1981 11 29 04 10 281-80 P co2 338.800 ... U2 1982 04 06 11 40 -89.9800 -24.8000 2810.00 126826 SPO 1981 11 29 04 10 282-80 P co2 338.730 ... U2 1982 04 06 11 42 -89.9800 -24.8000 2810.00 126827 SPO 1981 12 06 23 51 283-80 P co2 338.750 ... U2 1982 04 06 11 52 -89.9800 -24.8000 2810.00 126828 SPO 1981 12 06 23 51 284-80 P co2 338.800 ... U2 1982 04 06 11 54 -89.9800 -24.8000 2810.00 126829 SPO 1981 12 13 01 25 285-80 S co2 339.150 ... U2 1982 04 06 11 24 -89.9800 -24.8000 2810.00 126830 SPO 1981 12 13 01 25 286-80 S co2 339.010 ... U2 1982 04 06 11 26 -89.9800 -24.8000 2810.00 126831 SPO 1981 12 23 05 22 287-80 P co2 338.880 ... U2 1982 04 06 11 36 -89.9800 -24.8000 2810.00 126832 SPO 1981 12 23 05 22 288-80 P co2 339.120 ... U2 1982 04 06 11 38 -89.9800 -24.8000 2810.00 126833 SPO 1981 12 27 03 39 289-80 P co2 338.490 ... U2 1982 04 06 10 00 -89.9800 -24.8000 2810.00 126834 SPO 1981 12 27 03 39 290-80 P co2 338.440 ... U2 1982 04 06 10 02 -89.9800 -24.8000 2810.00 126835 SPO 1982 01 11 05 31 291-80 P co2 339.090 ..H U2 1982 04 05 11 24 -89.9800 -24.8000 2810.00 126836 SPO 1982 01 11 05 31 292-80 P co2 338.510 ..L U2 1982 04 05 11 26 -89.9800 -24.8000 2810.00 126837 SPO 1982 01 15 04 26 293-80 P co2 338.520 ... U2 1982 04 05 11 52 -89.9800 -24.8000 2810.00 126838 SPO 1982 01 15 04 26 294-80 P co2 338.510 ... U2 1982 04 05 11 54 -89.9800 -24.8000 2810.00 126839 SPO 1982 01 24 20 55 146-79 P co2 344.610 +.. U2 1982 04 12 08 46 -89.9800 -24.8000 2810.00 126840 SPO 1982 01 24 20 55 295-80 P co2 338.520 ..L U2 1982 04 06 10 04 -89.9800 -24.8000 2810.00 126841 SPO 1982 01 27 20 28 145-79 S co2 345.470 +.. U2 1982 04 12 08 44 -89.9800 -24.8000 2810.00 126842 SPO 1982 01 27 20 28 553-80 S co2 342.960 -.. U2 1982 04 12 08 40 -89.9800 -24.8000 2810.00 126843 SPO 1982 01 27 20 28 554-80 S co2 344.530 N.. U2 1982 04 12 08 42 -89.9800 -24.8000 2810.00 126844 SPO 1982 02 01 22 25 89-78 P co2 338.890 ... U2 1982 04 06 10 52 -89.9800 -24.8000 2810.00 126845 SPO 1982 02 01 22 25 90-78 P co2 338.750 ... U2 1982 04 06 10 54 -89.9800 -24.8000 2810.00 126846 SPO 1982 02 07 23 15 133-81 P co2 339.290 .X. U2 1982 04 06 11 20 -89.9800 -24.8000 2810.00 126847 SPO 1982 02 07 23 15 134-81 P co2 339.050 .X. U2 1982 04 06 11 22 -89.9800 -24.8000 2810.00 126848 SPO 1982 02 09 02 02 593-80 S co2 339.440 .X. U2 1982 04 06 10 32 -89.9800 -24.8000 2810.00 126849 SPO 1982 02 09 02 02 594-80 S co2 339.020 .X. U2 1982 04 06 10 34 -89.9800 -24.8000 2810.00 126850 SPO 1982 02 09 02 09 447-81 S co2 339.470 .X. U2 1982 04 06 10 36 -89.9800 -24.8000 2810.00 126851 SPO 1982 02 09 02 09 448-81 S co2 339.110 .X. U2 1982 04 06 10 38 -89.9800 -24.8000 2810.00 126852 SPO 1982 02 09 02 45 245-79 P co2 339.220 -.. U2 1982 04 06 11 04 -89.9800 -24.8000 2810.00 126853 SPO 1982 02 09 02 45 246-79 P co2 339.810 +.. U2 1982 04 06 11 06 -89.9800 -24.8000 2810.00 126854 SPO 1982 02 09 02 45 557-81 P co2 339.010 .X. U2 1982 04 06 11 08 -89.9800 -24.8000 2810.00 126855 SPO 1982 02 09 02 45 558-81 P co2 338.930 .X. U2 1982 04 06 11 10 -89.9800 -24.8000 2810.00 126856 SPO 1982 02 09 03 17 409-79 S co2 339.360 .X. U2 1982 04 12 08 24 -89.9800 -24.8000 2810.00 126857 SPO 1982 02 09 03 17 410-79 S co2 339.780 .X. U2 1982 04 12 08 26 -89.9800 -24.8000 2810.00 126858 SPO 1982 02 09 03 17 411-81 P co2 341.880 +.. U2 1982 04 12 08 28 -89.9800 -24.8000 2810.00 126859 SPO 1982 02 09 03 17 412-81 P co2 339.740 -.. U2 1982 04 12 08 30 -89.9800 -24.8000 2810.00 126860 SPO 1982 02 09 03 35 89-80 P co2 338.800 .X. U2 1982 04 06 10 16 -89.9800 -24.8000 2810.00 126861 SPO 1982 02 09 03 35 90-80 P co2 338.770 .X. U2 1982 04 06 10 18 -89.9800 -24.8000 2810.00 126862 SPO 1982 02 09 03 35 335-81 S co2 338.590 .X. U2 1982 04 06 10 20 -89.9800 -24.8000 2810.00 126863 SPO 1982 02 09 03 35 336-81 S co2 339.080 .X. U2 1982 04 06 10 22 -89.9800 -24.8000 2810.00 126864 SPO 1982 02 14 04 41 907-81 S co2 338.510 ... U1 1983 01 14 11 04 -89.9800 -24.8000 2810.00 126865 SPO 1982 02 14 04 41 908-81 S co2 338.500 ... U1 1983 01 14 11 06 -89.9800 -24.8000 2810.00 126866 SPO 1982 02 20 23 30 909-81 P co2 338.550 ... U1 1983 01 14 09 28 -89.9800 -24.8000 2810.00 126867 SPO 1982 02 20 23 30 910-81 P co2 338.530 ... U1 1983 01 14 09 30 -89.9800 -24.8000 2810.00 126868 SPO 1982 02 28 04 28 911-81 S co2 338.480 ... U1 1983 01 14 09 14 -89.9800 -24.8000 2810.00 126869 SPO 1982 02 28 04 28 912-81 S co2 338.440 ... U1 1983 01 14 09 16 -89.9800 -24.8000 2810.00 126870 SPO 1982 03 07 22 35 913-81 P co2 338.360 ... U1 1983 01 14 09 00 -89.9800 -24.8000 2810.00 126871 SPO 1982 03 07 22 35 914-81 P co2 338.400 ... U1 1983 01 14 09 02 -89.9800 -24.8000 2810.00 126872 SPO 1982 03 14 02 50 915-81 P co2 338.350 ... U1 1983 01 14 08 56 -89.9800 -24.8000 2810.00 126873 SPO 1982 03 14 02 50 916-81 P co2 338.350 ... U1 1983 01 14 08 58 -89.9800 -24.8000 2810.00 126874 SPO 1982 03 21 04 25 917-81 S co2 338.420 ... U1 1983 01 14 09 32 -89.9800 -24.8000 2810.00 126875 SPO 1982 03 21 04 25 918-81 S co2 338.470 ... U1 1983 01 14 09 34 -89.9800 -24.8000 2810.00 126876 SPO 1982 03 28 01 15 919-81 P co2 343.460 +.. U1 1983 01 14 09 44 -89.9800 -24.8000 2810.00 126877 SPO 1982 03 28 01 15 920-81 P co2 338.550 ..L U1 1983 01 14 09 46 -89.9800 -24.8000 2810.00 126878 SPO 1982 04 04 02 10 921-81 P co2 338.560 ... U1 1983 01 14 10 48 -89.9800 -24.8000 2810.00 126879 SPO 1982 04 04 02 10 922-81 P co2 338.470 ... U1 1983 01 14 10 50 -89.9800 -24.8000 2810.00 126880 SPO 1982 04 10 23 30 923-81 S co2 338.880 ..L U1 1983 01 14 11 08 -89.9800 -24.8000 2810.00 126881 SPO 1982 04 10 23 30 924-81 S co2 348.870 +.. U1 1983 01 14 11 10 -89.9800 -24.8000 2810.00 126882 SPO 1982 04 18 00 55 925-81 P co2 338.680 ... U1 1983 01 14 10 52 -89.9800 -24.8000 2810.00 126883 SPO 1982 04 18 00 55 926-81 P co2 338.870 ... U1 1983 01 14 10 54 -89.9800 -24.8000 2810.00 126884 SPO 1982 04 26 23 15 927-81 P co2 338.860 ..L U1 1983 01 17 09 28 -89.9800 -24.8000 2810.00 126885 SPO 1982 04 26 23 15 928-81 P co2 343.060 +.. U1 1983 01 17 09 30 -89.9800 -24.8000 2810.00 126886 SPO 1982 05 02 01 30 929-81 S co2 338.810 ..L U1 1983 01 17 09 32 -89.9800 -24.8000 2810.00 126887 SPO 1982 05 02 01 30 930-81 S co2 355.840 +.. U1 1983 01 17 09 34 -89.9800 -24.8000 2810.00 126888 SPO 1982 05 09 00 55 931-81 P co2 339.020 ... U1 1983 01 17 09 44 -89.9800 -24.8000 2810.00 126889 SPO 1982 05 09 00 55 932-81 P co2 339.000 ... U1 1983 01 17 09 46 -89.9800 -24.8000 2810.00 126890 SPO 1982 05 16 13 04 933-81 P co2 339.000 ... U1 1983 01 17 09 48 -89.9800 -24.8000 2810.00 126891 SPO 1982 05 16 13 04 934-81 P co2 339.030 ... U1 1983 01 17 09 50 -89.9800 -24.8000 2810.00 126892 SPO 1982 05 23 00 30 935-81 S co2 339.060 ... U1 1983 01 17 10 00 -89.9800 -24.8000 2810.00 126893 SPO 1982 05 23 00 30 936-81 S co2 338.970 ... U1 1983 01 17 10 02 -89.9800 -24.8000 2810.00 126894 SPO 1982 05 30 01 35 937-81 P co2 339.030 ... U1 1983 01 17 08 24 -89.9800 -24.8000 2810.00 126895 SPO 1982 05 30 01 35 938-81 P co2 339.070 ... U1 1983 01 17 08 26 -89.9800 -24.8000 2810.00 126896 SPO 1982 06 06 00 45 939-81 P co2 331.960 -.. U1 1983 01 17 08 28 -89.9800 -24.8000 2810.00 126897 SPO 1982 06 06 00 45 940-81 P co2 338.960 ..H U1 1983 01 17 08 30 -89.9800 -24.8000 2810.00 126898 SPO 1982 06 13 00 30 941-81 S co2 339.150 ... U1 1983 01 14 11 36 -89.9800 -24.8000 2810.00 126899 SPO 1982 06 13 00 30 942-81 S co2 339.130 ... U1 1983 01 14 11 38 -89.9800 -24.8000 2810.00 126900 SPO 1982 06 21 03 25 943-81 P co2 339.010 ... U1 1983 01 14 11 40 -89.9800 -24.8000 2810.00 126901 SPO 1982 06 21 03 25 944-81 P co2 339.050 ... U1 1983 01 14 11 42 -89.9800 -24.8000 2810.00 126902 SPO 1982 06 27 02 42 945-81 P co2 338.930 ... U1 1983 01 14 11 24 -89.9800 -24.8000 2810.00 126903 SPO 1982 06 27 02 42 946-81 P co2 339.130 ... U1 1983 01 14 11 26 -89.9800 -24.8000 2810.00 126904 SPO 1982 07 04 01 30 947-81 S co2 339.320 ... U1 1983 01 17 09 16 -89.9800 -24.8000 2810.00 126905 SPO 1982 07 04 01 30 948-81 S co2 339.390 ... U1 1983 01 17 09 18 -89.9800 -24.8000 2810.00 126906 SPO 1982 07 11 01 00 949-81 P co2 -999.990 *.. U1 1983 01 17 08 56 -89.9800 -24.8000 2810.00 126907 SPO 1982 07 11 01 00 950-81 P co2 349.070 -.. U1 1983 01 17 08 58 -89.9800 -24.8000 2810.00 126908 SPO 1982 07 18 00 15 951-81 P co2 -999.990 *.. U1 1983 01 17 09 00 -89.9800 -24.8000 2810.00 126909 SPO 1982 07 18 00 15 952-81 P co2 339.370 ..L U1 1983 01 17 09 02 -89.9800 -24.8000 2810.00 126910 SPO 1982 07 19 17 45 953-81 S co2 351.260 +.. U1 1983 01 17 08 40 -89.9800 -24.8000 2810.00 126911 SPO 1982 07 19 17 45 954-81 S co2 340.910 -.. U1 1983 01 17 08 42 -89.9800 -24.8000 2810.00 126912 SPO 1982 07 25 12 30 955-81 S co2 341.850 +.. U1 1983 01 17 08 44 -89.9800 -24.8000 2810.00 126913 SPO 1982 07 25 12 30 956-81 S co2 339.430 ..L U1 1983 01 17 08 46 -89.9800 -24.8000 2810.00 126914 SPO 1982 08 01 01 38 957-81 P co2 339.610 ..L U1 1983 01 14 10 32 -89.9800 -24.8000 2810.00 126915 SPO 1982 08 01 01 38 958-81 P co2 -999.990 *.. U1 1983 01 14 10 34 -89.9800 -24.8000 2810.00 126916 SPO 1982 08 08 01 55 959-81 P co2 -999.990 *.. U1 1983 01 14 10 20 -89.9800 -24.8000 2810.00 126917 SPO 1982 08 08 01 55 960-81 P co2 339.740 ..L U1 1983 01 14 10 22 -89.9800 -24.8000 2810.00 126918 SPO 1982 08 14 21 30 961-81 S co2 339.960 ... U1 1983 01 14 10 00 -89.9800 -24.8000 2810.00 126919 SPO 1982 08 14 21 30 962-81 S co2 339.800 ... U1 1983 01 14 10 02 -89.9800 -24.8000 2810.00 126920 SPO 1982 08 22 02 04 963-81 P co2 339.950 ..L U1 1983 01 14 10 04 -89.9800 -24.8000 2810.00 126921 SPO 1982 08 22 02 04 964-81 P co2 342.650 +.. U1 1983 01 14 10 06 -89.9800 -24.8000 2810.00 126922 SPO 1982 08 29 01 14 965-81 P co2 342.270 -.. U1 1983 01 14 09 48 -89.9800 -24.8000 2810.00 126923 SPO 1982 08 29 01 14 966-81 P co2 -999.990 *.. U1 1983 01 14 09 50 -89.9800 -24.8000 2810.00 126924 SPO 1982 09 05 00 30 967-81 S co2 340.030 ... U1 1983 01 14 08 40 -89.9800 -24.8000 2810.00 126925 SPO 1982 09 05 00 30 968-81 S co2 339.960 ... U1 1983 01 14 08 42 -89.9800 -24.8000 2810.00 126926 SPO 1982 09 12 01 54 969-81 P co2 340.360 ... U1 1983 01 14 08 44 -89.9800 -24.8000 2810.00 126927 SPO 1982 09 12 01 54 970-81 P co2 340.220 ... U1 1983 01 14 08 46 -89.9800 -24.8000 2810.00 126928 SPO 1982 09 19 01 50 971-81 P co2 340.050 ... U1 1983 01 14 08 24 -89.9800 -24.8000 2810.00 126929 SPO 1982 09 19 01 50 972-81 P co2 340.040 ... U1 1983 01 14 08 26 -89.9800 -24.8000 2810.00 126930 SPO 1982 09 25 23 30 973-81 S co2 340.030 ... U1 1983 01 14 08 28 -89.9800 -24.8000 2810.00 126931 SPO 1982 09 25 23 30 974-81 S co2 340.050 ... U1 1983 01 14 08 30 -89.9800 -24.8000 2810.00 126932 SPO 1982 10 02 23 13 975-81 P co2 340.070 ..L U1 1983 01 14 10 36 -89.9800 -24.8000 2810.00 126933 SPO 1982 10 02 23 13 976-81 P co2 340.620 ..H U1 1983 01 14 10 38 -89.9800 -24.8000 2810.00 126934 SPO 1982 10 12 22 48 977-81 P co2 340.220 ... U1 1983 04 05 08 56 -89.9800 -24.8000 2810.00 126935 SPO 1982 10 12 22 48 978-81 P co2 340.150 ... U1 1983 04 05 08 58 -89.9800 -24.8000 2810.00 126936 SPO 1982 10 17 00 30 979-81 S co2 340.030 ... U1 1983 04 05 08 40 -89.9800 -24.8000 2810.00 126937 SPO 1982 10 17 00 30 980-81 S co2 339.940 ... U1 1983 04 05 08 42 -89.9800 -24.8000 2810.00 126938 SPO 1982 10 25 23 35 981-81 P co2 340.350 ... U1 1983 04 05 08 44 -89.9800 -24.8000 2810.00 126939 SPO 1982 10 25 23 35 982-81 P co2 340.200 ... U1 1983 04 05 08 46 -89.9800 -24.8000 2810.00 126940 SPO 1982 10 31 05 48 983-81 P co2 340.370 ... U1 1983 04 04 10 48 -89.9800 -24.8000 2810.00 126941 SPO 1982 10 31 05 48 984-81 P co2 340.170 ... U1 1983 04 04 10 50 -89.9800 -24.8000 2810.00 126942 SPO 1982 11 07 03 10 987-81 P co2 340.320 ... U1 1983 04 04 10 00 -89.9800 -24.8000 2810.00 126943 SPO 1982 11 07 03 10 988-81 P co2 340.140 ... U1 1983 04 04 10 02 -89.9800 -24.8000 2810.00 126944 SPO 1982 11 07 03 30 985-81 S co2 340.020 ... U1 1983 04 04 10 52 -89.9800 -24.8000 2810.00 126945 SPO 1982 11 07 03 30 986-81 S co2 339.980 ... U1 1983 04 04 10 54 -89.9800 -24.8000 2810.00 126946 SPO 1982 11 14 03 50 989-81 P co2 339.880 ... U1 1983 04 04 10 04 -89.9800 -24.8000 2810.00 126947 SPO 1982 11 14 03 50 990-81 P co2 339.780 ... U1 1983 04 04 10 06 -89.9800 -24.8000 2810.00 126948 SPO 1982 11 21 03 47 991-81 P co2 340.170 ... U1 1983 04 04 10 16 -89.9800 -24.8000 2810.00 126949 SPO 1982 11 21 03 47 992-81 P co2 340.070 ... U1 1983 04 04 10 18 -89.9800 -24.8000 2810.00 126950 SPO 1982 11 27 02 05 993-81 P co2 339.730 ... U1 1983 04 04 10 32 -89.9800 -24.8000 2810.00 126951 SPO 1982 11 27 02 05 994-81 P co2 339.680 ... U1 1983 04 04 10 34 -89.9800 -24.8000 2810.00 126952 SPO 1982 11 28 02 50 995-81 P co2 339.820 ... U1 1983 04 04 10 36 -89.9800 -24.8000 2810.00 126953 SPO 1982 11 28 02 50 996-81 P co2 339.830 ... U1 1983 04 04 10 38 -89.9800 -24.8000 2810.00 126954 SPO 1982 11 28 02 50 997-81 S co2 339.740 ..L U1 1983 04 05 09 48 -89.9800 -24.8000 2810.00 126955 SPO 1982 11 28 02 50 998-81 S co2 344.960 +.. U1 1983 04 05 09 50 -89.9800 -24.8000 2810.00 126956 SPO 1982 12 05 02 00 999-81 P co2 339.940 ... U1 1983 04 05 09 28 -89.9800 -24.8000 2810.00 126957 SPO 1982 12 05 02 00 1000-81 P co2 339.870 ... U1 1983 04 05 09 30 -89.9800 -24.8000 2810.00 126958 SPO 1982 12 12 03 26 1001-81 S co2 339.990 ..L U1 1983 04 05 09 32 -89.9800 -24.8000 2810.00 126959 SPO 1982 12 12 03 26 1002-81 S co2 344.030 +.. U1 1983 04 05 09 34 -89.9800 -24.8000 2810.00 126960 SPO 1982 12 19 03 42 1003-81 P co2 339.780 ... U1 1983 04 05 09 16 -89.9800 -24.8000 2810.00 126961 SPO 1982 12 19 03 42 1004-81 P co2 339.780 ... U1 1983 04 05 09 18 -89.9800 -24.8000 2810.00 126962 SPO 1982 12 26 07 26 1005-81 S co2 347.680 +.. U1 1983 04 05 09 00 -89.9800 -24.8000 2810.00 126963 SPO 1982 12 26 07 26 1006-81 S co2 339.750 ..L U1 1983 04 05 09 02 -89.9800 -24.8000 2810.00 126964 SPO 1983 01 02 04 10 617-82 P co2 339.760 ... U1 1983 01 28 08 24 -89.9800 -24.8000 2810.00 126965 SPO 1983 01 02 04 10 618-82 P co2 339.640 ... U1 1983 01 28 08 26 -89.9800 -24.8000 2810.00 126966 SPO 1983 01 09 02 26 713-82 S co2 357.550 +.. U1 1983 01 28 08 28 -89.9800 -24.8000 2810.00 126967 SPO 1983 01 09 02 26 714-82 S co2 339.570 ..L U1 1983 01 28 08 30 -89.9800 -24.8000 2810.00 126968 SPO 1983 01 17 04 00 187-82 P co2 339.700 ... U1 1983 02 04 10 32 -89.9800 -24.8000 2810.00 126969 SPO 1983 01 17 04 00 188-82 P co2 339.670 ... U1 1983 02 04 10 34 -89.9800 -24.8000 2810.00 126970 SPO 1983 01 23 02 26 889-82 S co2 -999.990 *.. U1 1983 02 04 10 36 -89.9800 -24.8000 2810.00 126971 SPO 1983 01 23 02 26 890-82 S co2 368.100 -.. U1 1983 02 04 10 38 -89.9800 -24.8000 2810.00 126972 SPO 1983 01 30 09 34 285-82 S co2 339.620 ... U1 1983 02 15 09 44 -89.9800 -24.8000 2810.00 126973 SPO 1983 01 30 09 34 286-82 S co2 339.560 ... U1 1983 02 15 09 46 -89.9800 -24.8000 2810.00 126974 SPO 1983 02 04 02 12 341-82 P co2 339.710 ... U1 1983 02 15 09 32 -89.9800 -24.8000 2810.00 126975 SPO 1983 02 04 02 12 342-82 P co2 339.650 ... U1 1983 02 15 09 34 -89.9800 -24.8000 2810.00 126976 SPO 1983 02 13 23 47 1585-82 P co2 339.500 ... U1 1984 01 16 09 28 -89.9800 -24.8000 2810.00 126977 SPO 1983 02 13 23 47 1586-82 P co2 339.860 ... U1 1984 01 16 09 30 -89.9800 -24.8000 2810.00 126978 SPO 1983 02 20 02 34 1587-82 S co2 339.450 ... U1 1984 01 12 14 56 -89.9800 -24.8000 2810.00 126979 SPO 1983 02 20 02 34 1588-82 S co2 339.450 ... U1 1984 01 12 14 58 -89.9800 -24.8000 2810.00 126980 SPO 1983 02 27 00 47 1589-82 P co2 339.410 ... U1 1984 01 16 09 44 -89.9800 -24.8000 2810.00 126981 SPO 1983 02 27 00 47 1590-82 P co2 339.260 ... U1 1984 01 16 09 46 -89.9800 -24.8000 2810.00 126982 SPO 1983 03 06 01 24 1591-82 S co2 339.380 ... U1 1984 01 13 09 48 -89.9800 -24.8000 2810.00 126983 SPO 1983 03 06 01 24 1592-82 S co2 339.390 ... U1 1984 01 13 09 50 -89.9800 -24.8000 2810.00 126984 SPO 1983 03 13 03 26 1593-82 P co2 -999.990 *.. U1 1984 01 16 09 16 -89.9800 -24.8000 2810.00 126985 SPO 1983 03 13 03 26 1594-82 P co2 339.450 ... U1 1984 01 16 09 18 -89.9800 -24.8000 2810.00 126986 SPO 1983 03 20 02 24 1607-82 S co2 339.520 ... U1 1984 01 12 15 16 -89.9800 -24.8000 2810.00 126987 SPO 1983 03 20 02 24 1608-82 S co2 339.690 ... U1 1984 01 12 15 18 -89.9800 -24.8000 2810.00 126988 SPO 1983 03 27 02 42 1605-82 P co2 339.630 ... U1 1984 01 16 08 56 -89.9800 -24.8000 2810.00 126989 SPO 1983 03 27 02 42 1606-82 P co2 339.610 ... U1 1984 01 16 08 58 -89.9800 -24.8000 2810.00 126990 SPO 1983 04 03 03 28 1603-82 S co2 340.530 .X. U1 1984 01 12 15 00 -89.9800 -24.8000 2810.00 126991 SPO 1983 04 03 03 28 1604-82 S co2 340.110 .X. U1 1984 01 12 15 02 -89.9800 -24.8000 2810.00 126992 SPO 1983 04 10 02 13 1601-82 P co2 339.810 ... U1 1984 01 16 09 00 -89.9800 -24.8000 2810.00 126993 SPO 1983 04 10 02 13 1602-82 P co2 339.870 ... U1 1984 01 16 09 02 -89.9800 -24.8000 2810.00 126994 SPO 1983 04 17 05 32 1595-82 S co2 349.680 +.. U1 1984 01 13 10 00 -89.9800 -24.8000 2810.00 126995 SPO 1983 04 17 05 32 1596-82 S co2 339.950 ..L U1 1984 01 13 10 02 -89.9800 -24.8000 2810.00 126996 SPO 1983 04 24 02 24 1609-82 P co2 -999.990 *.. U1 1984 01 12 14 40 -89.9800 -24.8000 2810.00 126997 SPO 1983 04 24 02 24 1610-82 P co2 340.230 ..L U1 1984 01 12 14 42 -89.9800 -24.8000 2810.00 126998 SPO 1983 05 01 04 24 1611-82 S co2 340.120 ... U1 1984 01 13 09 00 -89.9800 -24.8000 2810.00 126999 SPO 1983 05 01 04 24 1612-82 S co2 340.150 ... U1 1984 01 13 09 02 -89.9800 -24.8000 2810.00 127000 SPO 1983 05 08 02 50 1613-82 P co2 340.260 ..L U1 1984 01 12 14 28 -89.9800 -24.8000 2810.00 127001 SPO 1983 05 08 02 50 1614-82 P co2 341.270 +.. U1 1984 01 12 14 30 -89.9800 -24.8000 2810.00 127002 SPO 1983 05 15 02 29 1615-82 S co2 340.630 ... U1 1984 01 13 08 24 -89.9800 -24.8000 2810.00 127003 SPO 1983 05 15 02 29 1616-82 S co2 340.470 ... U1 1984 01 13 08 26 -89.9800 -24.8000 2810.00 127004 SPO 1983 05 22 05 30 1617-82 P co2 340.520 ... U1 1984 01 16 08 24 -89.9800 -24.8000 2810.00 127005 SPO 1983 05 22 05 30 1618-82 P co2 340.440 ... U1 1984 01 16 08 26 -89.9800 -24.8000 2810.00 127006 SPO 1983 05 29 03 30 1619-82 S co2 343.950 +.. U1 1984 01 13 10 52 -89.9800 -24.8000 2810.00 127007 SPO 1983 05 29 03 30 1620-82 S co2 340.750 ..L U1 1984 01 13 10 54 -89.9800 -24.8000 2810.00 127008 SPO 1983 06 05 03 36 1621-82 P co2 340.530 ... U1 1984 01 16 09 48 -89.9800 -24.8000 2810.00 127009 SPO 1983 06 05 03 36 1622-82 P co2 340.590 ... U1 1984 01 16 09 50 -89.9800 -24.8000 2810.00 127010 SPO 1983 06 12 10 28 1623-82 P co2 340.520 ... U1 1984 01 13 08 56 -89.9800 -24.8000 2810.00 127011 SPO 1983 06 12 10 28 1624-82 P co2 340.430 ... U1 1984 01 13 08 58 -89.9800 -24.8000 2810.00 127012 SPO 1983 06 19 23 29 1625-82 S co2 340.630 ... U1 1984 01 13 08 40 -89.9800 -24.8000 2810.00 127013 SPO 1983 06 19 23 29 1626-82 S co2 340.610 ... U1 1984 01 13 08 42 -89.9800 -24.8000 2810.00 127014 SPO 1983 06 26 03 16 1627-82 P co2 341.170 +.. U1 1984 01 13 08 28 -89.9800 -24.8000 2810.00 127015 SPO 1983 06 26 03 16 1628-82 P co2 340.650 ..L U1 1984 01 13 08 30 -89.9800 -24.8000 2810.00 127016 SPO 1983 07 03 03 24 1629-82 S co2 -999.990 *.. U1 1984 01 13 09 28 -89.9800 -24.8000 2810.00 127017 SPO 1983 07 03 03 24 1630-82 S co2 340.960 ..L U1 1984 01 13 09 30 -89.9800 -24.8000 2810.00 127018 SPO 1983 07 10 00 13 1631-82 P co2 341.230 ... U1 1984 01 13 11 04 -89.9800 -24.8000 2810.00 127019 SPO 1983 07 10 00 13 1632-82 P co2 340.760 ... U1 1984 01 13 11 06 -89.9800 -24.8000 2810.00 127020 SPO 1983 07 17 05 40 1633-82 S co2 340.950 ... U1 1984 01 12 14 24 -89.9800 -24.8000 2810.00 127021 SPO 1983 07 17 05 40 1634-82 S co2 340.960 ... U1 1984 01 12 14 26 -89.9800 -24.8000 2810.00 127022 SPO 1983 07 24 02 42 1635-82 P co2 341.010 ... U1 1984 01 13 10 32 -89.9800 -24.8000 2810.00 127023 SPO 1983 07 24 02 42 1636-82 P co2 340.950 ... U1 1984 01 13 10 34 -89.9800 -24.8000 2810.00 127024 SPO 1983 07 31 00 25 1637-82 S co2 341.230 ..L U1 1984 01 13 08 44 -89.9800 -24.8000 2810.00 127025 SPO 1983 07 31 00 25 1638-82 S co2 342.780 +.. U1 1984 01 13 08 46 -89.9800 -24.8000 2810.00 127026 SPO 1983 08 07 04 25 1639-82 S co2 341.320 ... U1 1984 01 13 09 16 -89.9800 -24.8000 2810.00 127027 SPO 1983 08 07 04 25 1640-82 S co2 341.370 ... U1 1984 01 13 09 18 -89.9800 -24.8000 2810.00 127028 SPO 1983 08 14 00 25 1641-82 P co2 341.470 ..L U1 1984 01 13 09 32 -89.9800 -24.8000 2810.00 127029 SPO 1983 08 14 00 25 1642-82 P co2 -999.990 *.. U1 1984 01 13 09 34 -89.9800 -24.8000 2810.00 127030 SPO 1983 08 21 02 28 1643-82 S co2 341.970 ... U1 1984 01 13 09 44 -89.9800 -24.8000 2810.00 127031 SPO 1983 08 21 02 28 1644-82 S co2 341.790 ... U1 1984 01 13 09 46 -89.9800 -24.8000 2810.00 127032 SPO 1983 08 28 02 22 1645-82 P co2 341.720 ..L U1 1984 01 16 09 32 -89.9800 -24.8000 2810.00 127033 SPO 1983 08 28 02 22 1646-82 P co2 367.960 +.. U1 1984 01 16 09 34 -89.9800 -24.8000 2810.00 127034 SPO 1983 09 04 00 25 1647-82 S co2 341.760 ... U1 1984 01 12 14 44 -89.9800 -24.8000 2810.00 127035 SPO 1983 09 04 00 25 1648-82 S co2 341.760 ... U1 1984 01 12 14 46 -89.9800 -24.8000 2810.00 127036 SPO 1983 09 11 00 35 1649-82 P co2 341.840 ..L U1 1984 01 16 08 44 -89.9800 -24.8000 2810.00 127037 SPO 1983 09 11 00 35 1650-82 P co2 -999.990 *.. U1 1984 01 16 08 46 -89.9800 -24.8000 2810.00 127038 SPO 1983 09 18 02 25 1651-82 S co2 341.680 ... U1 1984 01 13 11 08 -89.9800 -24.8000 2810.00 127039 SPO 1983 09 18 02 25 1652-82 S co2 341.720 ... U1 1984 01 13 11 10 -89.9800 -24.8000 2810.00 127040 SPO 1983 09 25 04 13 1653-82 P co2 341.670 ... U1 1984 01 16 08 28 -89.9800 -24.8000 2810.00 127041 SPO 1983 09 25 04 13 1654-82 P co2 341.770 ... U1 1984 01 16 08 30 -89.9800 -24.8000 2810.00 127042 SPO 1983 10 02 04 27 1655-82 S co2 342.210 ... U1 1984 01 13 10 48 -89.9800 -24.8000 2810.00 127043 SPO 1983 10 02 04 27 1656-82 S co2 341.810 ... U1 1984 01 13 10 50 -89.9800 -24.8000 2810.00 127044 SPO 1983 10 16 02 25 1659-82 S co2 341.850 ... U1 1984 01 13 10 16 -89.9800 -24.8000 2810.00 127045 SPO 1983 10 16 02 25 1660-82 S co2 341.830 ... U1 1984 01 13 10 18 -89.9800 -24.8000 2810.00 127046 SPO 1983 10 23 01 53 1661-82 P co2 341.630 ... U1 1984 01 13 10 36 -89.9800 -24.8000 2810.00 127047 SPO 1983 10 23 01 53 1662-82 P co2 341.700 ... U1 1984 01 13 10 38 -89.9800 -24.8000 2810.00 127048 SPO 1983 10 30 04 25 1663-82 S co2 341.850 ... U1 1984 01 13 10 04 -89.9800 -24.8000 2810.00 127049 SPO 1983 10 30 04 25 1664-82 S co2 341.920 ... U1 1984 01 13 10 06 -89.9800 -24.8000 2810.00 127050 SPO 1983 11 06 03 28 1665-82 S co2 341.980 ... U1 1984 01 20 08 24 -89.9800 -24.8000 2810.00 127051 SPO 1983 11 06 03 28 1666-82 S co2 341.960 ... U1 1984 01 20 08 26 -89.9800 -24.8000 2810.00 127052 SPO 1983 11 06 05 35 1667-82 P co2 341.870 ..L U1 1984 01 16 08 40 -89.9800 -24.8000 2810.00 127053 SPO 1983 11 06 05 35 1668-82 P co2 362.850 +.. U1 1984 01 16 08 42 -89.9800 -24.8000 2810.00 127054 SPO 1983 11 12 23 25 1669-82 S co2 341.900 ... U1 1984 04 20 09 16 -89.9800 -24.8000 2810.00 127055 SPO 1983 11 12 23 25 1670-82 S co2 341.890 ... U1 1984 04 20 09 18 -89.9800 -24.8000 2810.00 127056 SPO 1983 11 19 23 50 1671-82 P co2 341.700 ... U1 1984 04 20 08 28 -89.9800 -24.8000 2810.00 127057 SPO 1983 11 19 23 50 1672-82 P co2 341.780 ... U1 1984 04 20 08 30 -89.9800 -24.8000 2810.00 127058 SPO 1983 11 27 01 28 1673-82 S co2 341.750 ..L U1 1984 04 11 09 32 -89.9800 -24.8000 2810.00 127059 SPO 1983 11 27 01 28 1674-82 S co2 347.880 +.. U1 1984 04 11 09 34 -89.9800 -24.8000 2810.00 127060 SPO 1983 12 03 23 45 1675-82 P co2 341.770 ... U1 1984 04 20 08 56 -89.9800 -24.8000 2810.00 127061 SPO 1983 12 03 23 45 1676-82 P co2 341.700 ... U1 1984 04 20 08 58 -89.9800 -24.8000 2810.00 127062 SPO 1983 12 11 00 26 1677-82 S co2 341.760 ... U1 1984 04 20 10 00 -89.9800 -24.8000 2810.00 127063 SPO 1983 12 11 00 26 1678-82 S co2 -999.990 *.. U1 1984 04 20 10 02 -89.9800 -24.8000 2810.00 127064 SPO 1983 12 18 02 00 1679-82 P co2 341.650 ... U1 1984 04 20 09 00 -89.9800 -24.8000 2810.00 127065 SPO 1983 12 18 02 00 1680-82 P co2 341.800 ... U1 1984 04 20 09 02 -89.9800 -24.8000 2810.00 127066 SPO 1983 12 24 01 06 1681-82 S co2 341.720 ... U1 1984 04 20 08 40 -89.9800 -24.8000 2810.00 127067 SPO 1983 12 24 01 06 1682-82 S co2 341.660 ... U1 1984 04 20 08 42 -89.9800 -24.8000 2810.00 127068 SPO 1983 12 31 01 55 1683-82 S co2 341.650 ..L U1 1984 04 20 08 24 -89.9800 -24.8000 2810.00 127069 SPO 1983 12 31 01 55 1684-82 S co2 348.230 +.. U1 1984 04 20 08 26 -89.9800 -24.8000 2810.00 127070 SPO 1984 01 07 02 10 1685-82 P co2 341.680 ... U1 1984 04 20 08 44 -89.9800 -24.8000 2810.00 127071 SPO 1984 01 07 02 10 1686-82 P co2 341.690 ... U1 1984 04 20 08 46 -89.9800 -24.8000 2810.00 127072 SPO 1984 01 15 01 27 1687-82 S co2 341.480 ... U1 1984 04 20 09 28 -89.9800 -24.8000 2810.00 127073 SPO 1984 01 15 01 27 1688-82 S co2 341.400 ... U1 1984 04 20 09 30 -89.9800 -24.8000 2810.00 127074 SPO 1984 01 15 01 35 3091-83 T co2 341.570 ... U1 1984 02 09 14 26 -89.9800 -24.8000 2810.00 127075 SPO 1984 01 15 01 35 3092-83 T co2 341.450 ... U1 1984 02 09 14 42 -89.9800 -24.8000 2810.00 127076 SPO 1984 01 23 03 25 1-82 P co2 341.680 ..L U1 1984 12 18 11 20 -89.9800 -24.8000 2810.00 127077 SPO 1984 01 23 03 25 2-82 P co2 342.250 +.. U1 1984 12 18 11 22 -89.9800 -24.8000 2810.00 127078 SPO 1984 01 23 03 25 3093-83 T co2 341.440 ... U1 1984 02 09 14 58 -89.9800 -24.8000 2810.00 127079 SPO 1984 01 23 03 25 3094-83 T co2 341.570 ... U1 1984 02 09 15 14 -89.9800 -24.8000 2810.00 127080 SPO 1984 01 29 22 20 3-82 S co2 342.290 .X. U1 1984 12 07 08 44 -89.9800 -24.8000 2810.00 127081 SPO 1984 01 29 22 20 4-82 S co2 342.200 .X. U1 1984 12 07 08 46 -89.9800 -24.8000 2810.00 127082 SPO 1984 01 29 22 32 3095-83 T co2 341.510 ... U1 1984 02 29 14 26 -89.9800 -24.8000 2810.00 127083 SPO 1984 01 29 22 32 3096-83 T co2 341.420 ... U1 1984 02 29 14 42 -89.9800 -24.8000 2810.00 127084 SPO 1984 02 03 23 25 859-81 P co2 348.350 +.. U1 1984 12 18 09 44 -89.9800 -24.8000 2810.00 127085 SPO 1984 02 03 23 25 860-81 P co2 343.190 -.. U1 1984 12 18 09 46 -89.9800 -24.8000 2810.00 127086 SPO 1984 02 11 03 25 945-81 S co2 343.400 .X. U1 1984 12 14 09 16 -89.9800 -24.8000 2810.00 127087 SPO 1984 02 11 03 25 946-81 S co2 342.900 .X. U1 1984 12 14 09 18 -89.9800 -24.8000 2810.00 127088 SPO 1984 02 17 23 20 341-82 P co2 342.450 -.. U1 1984 12 18 08 28 -89.9800 -24.8000 2810.00 127089 SPO 1984 02 17 23 20 342-82 P co2 344.830 +.. U1 1984 12 18 08 30 -89.9800 -24.8000 2810.00 127090 SPO 1984 02 25 01 25 1155-82 S co2 341.720 ... U1 1984 12 18 11 36 -89.9800 -24.8000 2810.00 127091 SPO 1984 02 25 01 25 1156-82 S co2 341.690 ... U1 1984 12 18 11 38 -89.9800 -24.8000 2810.00 127092 SPO 1984 03 02 23 25 1465-82 P co2 341.260 ... U1 1984 12 18 10 48 -89.9800 -24.8000 2810.00 127093 SPO 1984 03 02 23 25 1466-82 P co2 341.400 ... U1 1984 12 18 10 50 -89.9800 -24.8000 2810.00 127094 SPO 1984 03 10 02 25 195-83 S co2 343.550 +.. U1 1984 12 18 11 24 -89.9800 -24.8000 2810.00 127095 SPO 1984 03 10 02 25 196-83 S co2 341.230 ..L U1 1984 12 18 11 26 -89.9800 -24.8000 2810.00 127096 SPO 1984 03 17 02 20 711-83 P co2 341.550 ... U1 1984 12 18 10 52 -89.9800 -24.8000 2810.00 127097 SPO 1984 03 17 02 20 712-83 P co2 341.730 ... U1 1984 12 18 10 54 -89.9800 -24.8000 2810.00 127098 SPO 1984 03 24 04 25 755-83 S co2 342.180 .X. U1 1984 12 18 10 36 -89.9800 -24.8000 2810.00 127099 SPO 1984 03 24 04 25 756-83 S co2 341.860 .X. U1 1984 12 18 10 38 -89.9800 -24.8000 2810.00 127100 SPO 1984 03 31 01 45 767-83 P co2 341.460 ..L U1 1984 12 18 11 52 -89.9800 -24.8000 2810.00 127101 SPO 1984 03 31 01 45 768-83 P co2 344.840 +.. U1 1984 12 18 11 54 -89.9800 -24.8000 2810.00 127102 SPO 1984 04 06 23 25 827-83 S co2 341.310 ... U1 1984 12 07 09 00 -89.9800 -24.8000 2810.00 127103 SPO 1984 04 06 23 25 828-83 S co2 341.420 ... U1 1984 12 07 09 02 -89.9800 -24.8000 2810.00 127104 SPO 1984 04 14 02 20 829-83 P co2 343.780 +.. U1 1984 12 18 10 32 -89.9800 -24.8000 2810.00 127105 SPO 1984 04 14 02 20 830-83 P co2 341.430 ..L U1 1984 12 18 10 34 -89.9800 -24.8000 2810.00 127106 SPO 1984 04 20 23 25 831-83 S co2 341.400 ..L U1 1984 12 18 10 20 -89.9800 -24.8000 2810.00 127107 SPO 1984 04 20 23 25 832-83 S co2 344.210 +.. U1 1984 12 18 10 22 -89.9800 -24.8000 2810.00 127108 SPO 1984 04 28 01 55 833-83 P co2 341.500 ... U1 1984 12 18 08 40 -89.9800 -24.8000 2810.00 127109 SPO 1984 04 28 01 55 834-83 P co2 341.460 ... U1 1984 12 18 08 42 -89.9800 -24.8000 2810.00 127110 SPO 1984 05 04 22 26 835-83 S co2 341.500 ... U1 1984 12 18 10 00 -89.9800 -24.8000 2810.00 127111 SPO 1984 05 04 22 26 836-83 S co2 341.440 ... U1 1984 12 18 10 02 -89.9800 -24.8000 2810.00 127112 SPO 1984 05 12 01 50 837-83 P co2 341.530 ... U1 1984 12 18 08 56 -89.9800 -24.8000 2810.00 127113 SPO 1984 05 12 01 50 838-83 P co2 341.530 ... U1 1984 12 18 08 58 -89.9800 -24.8000 2810.00 127114 SPO 1984 05 19 02 25 839-83 S co2 341.720 ... U1 1984 12 07 08 40 -89.9800 -24.8000 2810.00 127115 SPO 1984 05 19 02 25 840-83 S co2 341.900 ... U1 1984 12 07 08 42 -89.9800 -24.8000 2810.00 127116 SPO 1984 05 25 23 40 841-83 P co2 341.440 ... U1 1984 12 18 08 44 -89.9800 -24.8000 2810.00 127117 SPO 1984 05 25 23 40 842-83 P co2 341.470 ... U1 1984 12 18 08 46 -89.9800 -24.8000 2810.00 127118 SPO 1984 06 02 02 25 843-83 S co2 342.440 .X. U1 1984 12 07 08 28 -89.9800 -24.8000 2810.00 127119 SPO 1984 06 02 02 25 844-83 S co2 342.080 .X. U1 1984 12 07 08 30 -89.9800 -24.8000 2810.00 127120 SPO 1984 06 09 04 25 845-83 S co2 341.670 ... U1 1984 12 18 11 40 -89.9800 -24.8000 2810.00 127121 SPO 1984 06 09 04 25 846-83 S co2 341.830 ... U1 1984 12 18 11 42 -89.9800 -24.8000 2810.00 127122 SPO 1984 06 16 04 50 847-83 P co2 341.770 ... U1 1984 12 07 08 24 -89.9800 -24.8000 2810.00 127123 SPO 1984 06 16 04 50 848-83 P co2 342.070 ... U1 1984 12 07 08 26 -89.9800 -24.8000 2810.00 127124 SPO 1984 06 23 00 25 849-83 S co2 341.880 ..L U1 1984 12 14 09 12 -89.9800 -24.8000 2810.00 127125 SPO 1984 06 23 00 25 850-83 S co2 343.490 +.. U1 1984 12 14 09 14 -89.9800 -24.8000 2810.00 127126 SPO 1984 06 30 02 25 851-83 P co2 341.970 ... U1 1984 12 18 09 12 -89.9800 -24.8000 2810.00 127127 SPO 1984 06 30 02 25 852-83 P co2 341.950 ... U1 1984 12 18 09 14 -89.9800 -24.8000 2810.00 127128 SPO 1984 07 07 01 25 853-83 S co2 341.840 ... U1 1984 12 18 09 48 -89.9800 -24.8000 2810.00 127129 SPO 1984 07 07 01 25 854-83 S co2 341.910 ... U1 1984 12 18 09 50 -89.9800 -24.8000 2810.00 127130 SPO 1984 07 14 00 10 855-83 P co2 345.160 +.. U1 1984 12 18 09 28 -89.9800 -24.8000 2810.00 127131 SPO 1984 07 14 00 10 856-83 P co2 342.120 ..L U1 1984 12 18 09 30 -89.9800 -24.8000 2810.00 127132 SPO 1984 07 20 23 25 857-83 S co2 342.290 ... U1 1984 12 18 11 06 -89.9800 -24.8000 2810.00 127133 SPO 1984 07 20 23 25 858-83 S co2 342.170 ... U1 1984 12 18 11 08 -89.9800 -24.8000 2810.00 127134 SPO 1984 07 27 23 50 907-83 P co2 342.590 ... U1 1984 12 18 08 24 -89.9800 -24.8000 2810.00 127135 SPO 1984 07 27 23 50 908-83 P co2 342.500 ... U1 1984 12 18 08 26 -89.9800 -24.8000 2810.00 127136 SPO 1984 08 04 02 25 909-83 S co2 342.410 ... U1 1984 12 18 09 32 -89.9800 -24.8000 2810.00 127137 SPO 1984 08 04 02 25 910-83 S co2 342.600 ... U1 1984 12 18 09 34 -89.9800 -24.8000 2810.00 127138 SPO 1984 08 11 01 50 859-83 P co2 342.400 ... U1 1984 12 18 09 00 -89.9800 -24.8000 2810.00 127139 SPO 1984 08 11 01 50 860-83 P co2 342.690 ... U1 1984 12 18 09 02 -89.9800 -24.8000 2810.00 127140 SPO 1984 08 18 01 25 861-83 S co2 342.770 ... U1 1984 12 07 09 28 -89.9800 -24.8000 2810.00 127141 SPO 1984 08 18 01 25 862-83 S co2 342.750 ... U1 1984 12 07 09 30 -89.9800 -24.8000 2810.00 127142 SPO 1984 08 25 01 55 863-83 P co2 342.790 ..L U1 1984 12 07 08 56 -89.9800 -24.8000 2810.00 127143 SPO 1984 08 25 01 55 864-83 P co2 343.470 +.. U1 1984 12 07 08 58 -89.9800 -24.8000 2810.00 127144 SPO 1984 09 01 02 25 865-83 S co2 343.510 -.. U1 1984 12 07 09 12 -89.9800 -24.8000 2810.00 127145 SPO 1984 09 01 02 25 866-83 S co2 -999.990 *.. U1 1984 12 07 09 14 -89.9800 -24.8000 2810.00 127146 SPO 1984 09 08 01 45 867-83 P co2 342.810 ... U1 1984 12 18 10 04 -89.9800 -24.8000 2810.00 127147 SPO 1984 09 08 01 45 868-83 P co2 342.950 ... U1 1984 12 18 10 06 -89.9800 -24.8000 2810.00 127148 SPO 1984 09 15 01 25 869-83 S co2 342.940 ... U1 1984 12 07 09 32 -89.9800 -24.8000 2810.00 127149 SPO 1984 09 15 01 25 870-83 S co2 342.970 ... U1 1984 12 07 09 34 -89.9800 -24.8000 2810.00 127150 SPO 1984 09 22 01 40 871-83 P co2 343.130 ..L U1 1985 01 30 08 44 -89.9800 -24.8000 2810.00 127151 SPO 1984 09 22 01 40 872-83 P co2 377.310 +.. U1 1985 01 30 08 46 -89.9800 -24.8000 2810.00 127152 SPO 1984 09 29 01 25 873-83 S co2 343.320 ... U1 1985 01 30 09 32 -89.9800 -24.8000 2810.00 127153 SPO 1984 09 29 01 25 874-83 S co2 343.080 ... U1 1985 01 30 09 34 -89.9800 -24.8000 2810.00 127154 SPO 1984 10 06 03 20 875-83 P co2 343.060 ... U1 1985 01 30 08 24 -89.9800 -24.8000 2810.00 127155 SPO 1984 10 06 03 20 876-83 P co2 342.980 ... U1 1985 01 30 08 26 -89.9800 -24.8000 2810.00 127156 SPO 1984 10 13 01 25 877-83 S co2 343.060 ... U1 1985 01 30 08 28 -89.9800 -24.8000 2810.00 127157 SPO 1984 10 13 01 25 878-83 S co2 343.090 ... U1 1985 01 30 08 30 -89.9800 -24.8000 2810.00 127158 SPO 1984 10 20 01 45 879-83 P co2 343.150 ... U1 1985 01 30 08 40 -89.9800 -24.8000 2810.00 127159 SPO 1984 10 20 01 45 880-83 P co2 342.980 ... U1 1985 01 30 08 42 -89.9800 -24.8000 2810.00 127160 SPO 1984 10 27 01 25 881-83 S co2 343.100 ... U1 1985 01 30 09 48 -89.9800 -24.8000 2810.00 127161 SPO 1984 10 27 01 25 882-83 S co2 343.210 ... U1 1985 01 30 09 50 -89.9800 -24.8000 2810.00 127162 SPO 1984 11 04 03 57 883-83 P co2 343.020 ... U1 1985 02 05 09 00 -89.9800 -24.8000 2810.00 127163 SPO 1984 11 04 03 57 884-83 P co2 342.930 ... U1 1985 02 05 09 02 -89.9800 -24.8000 2810.00 127164 SPO 1984 11 10 02 25 885-83 S co2 343.010 ... U1 1985 02 05 09 14 -89.9800 -24.8000 2810.00 127165 SPO 1984 11 10 02 25 886-83 S co2 342.920 ... U1 1985 02 05 09 18 -89.9800 -24.8000 2810.00 127166 SPO 1984 11 17 03 00 889-83 P co2 343.770 +.. U1 1985 02 05 09 44 -89.9800 -24.8000 2810.00 127167 SPO 1984 11 17 03 00 890-83 P co2 342.810 ..L U1 1985 02 05 09 46 -89.9800 -24.8000 2810.00 127168 SPO 1984 11 24 02 25 891-83 S co2 343.570 .X. U1 1985 02 05 09 32 -89.9800 -24.8000 2810.00 127169 SPO 1984 11 24 02 25 892-83 S co2 343.380 .X. U1 1985 02 05 09 34 -89.9800 -24.8000 2810.00 127170 SPO 1984 11 24 02 30 887-83 S co2 342.940 ... U1 1985 02 05 09 48 -89.9800 -24.8000 2810.00 127171 SPO 1984 12 01 01 49 893-83 P co2 344.320 +.. U1 1985 02 05 09 28 -89.9800 -24.8000 2810.00 127172 SPO 1984 12 01 01 49 894-83 P co2 343.350 .XL U1 1985 02 05 09 30 -89.9800 -24.8000 2810.00 127173 SPO 1984 12 08 02 51 895-83 S co2 342.970 ... U3 1985 04 15 08 12 -89.9800 -24.8000 2810.00 127174 SPO 1984 12 08 02 51 896-83 S co2 342.960 ... U3 1985 04 15 08 14 -89.9800 -24.8000 2810.00 127175 SPO 1984 12 15 06 10 897-83 P co2 342.850 ... U3 1985 04 18 10 02 -89.9800 -24.8000 2810.00 127176 SPO 1984 12 15 06 10 898-83 P co2 342.860 ... U3 1985 04 18 10 04 -89.9800 -24.8000 2810.00 127177 SPO 1984 12 22 02 04 1655-82 P co2 342.850 ..L U1 1985 01 17 08 28 -89.9800 -24.8000 2810.00 127178 SPO 1984 12 22 02 04 1656-82 P co2 -999.990 *.. U1 1985 01 17 08 30 -89.9800 -24.8000 2810.00 127179 SPO 1984 12 22 02 25 935-82 S co2 -999.990 *.. U1 1985 01 17 08 24 -89.9800 -24.8000 2810.00 127180 SPO 1984 12 22 02 25 936-82 S co2 -999.990 *.. U1 1985 01 17 08 26 -89.9800 -24.8000 2810.00 127181 SPO 1984 12 26 02 45 973-83 S co2 342.730 ... U1 1985 03 05 11 08 -89.9800 -24.8000 2810.00 127182 SPO 1984 12 26 02 45 974-83 S co2 342.690 ... U1 1985 03 05 11 10 -89.9800 -24.8000 2810.00 127183 SPO 1984 12 26 03 00 285-83 P co2 342.940 ... U3 1985 04 02 11 56 -89.9800 -24.8000 2810.00 127184 SPO 1984 12 26 03 00 286-83 P co2 342.890 ... U3 1985 04 02 11 58 -89.9800 -24.8000 2810.00 127185 SPO 1984 12 28 03 30 247-83 S co2 342.720 ... U1 1985 01 10 08 28 -89.9800 -24.8000 2810.00 127186 SPO 1984 12 28 03 30 248-83 S co2 342.730 ... U1 1985 01 10 08 30 -89.9800 -24.8000 2810.00 127187 SPO 1984 12 28 03 30 1081-82 P co2 342.760 ... U1 1985 01 10 08 24 -89.9800 -24.8000 2810.00 127188 SPO 1984 12 28 03 30 1082-82 P co2 342.780 ... U1 1985 01 10 08 26 -89.9800 -24.8000 2810.00 127189 SPO 1984 12 29 07 55 899-83 S co2 343.030 ... U3 1985 04 18 14 28 -89.9800 -24.8000 2810.00 127190 SPO 1984 12 29 07 55 900-83 S co2 342.920 ... U3 1985 04 18 14 30 -89.9800 -24.8000 2810.00 127191 SPO 1984 12 30 21 30 741-82 S co2 342.890 ... U1 1985 01 17 08 40 -89.9800 -24.8000 2810.00 127192 SPO 1984 12 30 21 30 742-82 S co2 342.670 ... U1 1985 01 17 08 42 -89.9800 -24.8000 2810.00 127193 SPO 1984 12 30 21 40 709-83 P co2 342.580 ..L U1 1985 01 17 08 44 -89.9800 -24.8000 2810.00 127194 SPO 1984 12 30 21 40 710-83 P co2 345.990 +.. U1 1985 01 17 08 46 -89.9800 -24.8000 2810.00 127195 SPO 1985 01 05 03 15 901-83 P co2 342.850 ... U3 1985 04 18 14 12 -89.9800 -24.8000 2810.00 127196 SPO 1985 01 05 03 15 902-83 P co2 342.840 ... U3 1985 04 18 14 14 -89.9800 -24.8000 2810.00 127197 SPO 1985 01 12 02 30 903-83 S co2 342.970 ... U3 1985 04 18 10 06 -89.9800 -24.8000 2810.00 127198 SPO 1985 01 12 02 30 904-83 S co2 342.890 ... U3 1985 04 18 10 08 -89.9800 -24.8000 2810.00 127199 SPO 1985 01 19 07 50 905-83 S co2 342.760 ... U3 1985 04 18 10 16 -89.9800 -24.8000 2810.00 127200 SPO 1985 01 19 07 50 906-83 S co2 342.650 ... U3 1985 04 18 10 18 -89.9800 -24.8000 2810.00 127201 SPO 1985 01 25 23 34 627-83 S co2 342.700 ... U1 1985 03 05 11 04 -89.9800 -24.8000 2810.00 127202 SPO 1985 01 25 23 34 628-83 S co2 342.610 ... U1 1985 03 05 11 06 -89.9800 -24.8000 2810.00 127203 SPO 1985 02 02 07 50 733-81 S co2 342.710 ... U3 1985 04 08 11 36 -89.9800 -24.8000 2810.00 127204 SPO 1985 02 02 07 50 734-81 S co2 342.790 ... U3 1985 04 08 11 38 -89.9800 -24.8000 2810.00 127205 SPO 1985 02 09 22 57 477-82 S co2 343.240 ... U3 1985 11 22 11 08 -89.9800 -24.8000 2810.00 127206 SPO 1985 02 09 22 57 478-82 S co2 343.230 ... U3 1985 11 22 11 10 -89.9800 -24.8000 2810.00 127207 SPO 1985 02 16 21 50 751-82 S co2 343.030 ... U3 1985 11 22 11 04 -89.9800 -24.8000 2810.00 127208 SPO 1985 02 16 21 50 752-82 S co2 342.750 ... U3 1985 11 22 11 06 -89.9800 -24.8000 2810.00 127209 SPO 1985 02 22 23 41 1-85 S co2 357.330 N.. U3 1986 02 11 11 52 -89.9800 -24.8000 2810.00 127210 SPO 1985 02 22 23 41 2-85 S co2 357.300 N.. U3 1986 02 11 11 54 -89.9800 -24.8000 2810.00 127211 SPO 1985 03 01 02 45 111-83 P co2 342.480 -.. U3 1986 01 03 09 48 -89.9800 -24.8000 2810.00 127212 SPO 1985 03 01 02 45 112-83 P co2 343.230 +.. U3 1986 01 03 09 50 -89.9800 -24.8000 2810.00 127213 SPO 1985 03 02 00 46 3-85 S co2 345.060 .X. U3 1986 02 11 08 44 -89.9800 -24.8000 2810.00 127214 SPO 1985 03 02 00 46 4-85 S co2 345.300 .X. U3 1986 02 11 08 46 -89.9800 -24.8000 2810.00 127215 SPO 1985 03 09 01 36 5-85 S co2 358.480 +.. U3 1986 02 11 11 56 -89.9800 -24.8000 2810.00 127216 SPO 1985 03 09 01 36 6-85 S co2 342.980 ..L U3 1986 02 11 11 58 -89.9800 -24.8000 2810.00 127217 SPO 1985 03 15 04 33 1649-82 P co2 342.890 ... U3 1986 01 06 10 00 -89.9800 -24.8000 2810.00 127218 SPO 1985 03 15 04 33 1650-82 P co2 343.230 ... U3 1986 01 06 10 02 -89.9800 -24.8000 2810.00 127219 SPO 1985 03 15 06 50 7-85 S co2 342.930 ... U3 1986 02 11 08 24 -89.9800 -24.8000 2810.00 127220 SPO 1985 03 15 06 50 8-85 S co2 342.730 ... U3 1986 02 11 08 26 -89.9800 -24.8000 2810.00 127221 SPO 1985 03 22 21 50 9-85 S co2 342.540 ... U3 1986 02 20 09 44 -89.9800 -24.8000 2810.00 127222 SPO 1985 03 22 21 50 10-85 S co2 342.530 ... U3 1986 02 20 09 46 -89.9800 -24.8000 2810.00 127223 SPO 1985 03 29 22 53 11-85 S co2 342.530 ... U3 1986 02 11 08 28 -89.9800 -24.8000 2810.00 127224 SPO 1985 03 29 22 53 12-85 S co2 342.470 ... U3 1986 02 11 08 30 -89.9800 -24.8000 2810.00 127225 SPO 1985 04 01 02 40 813-83 P co2 348.630 +.. U3 1985 11 22 10 36 -89.9800 -24.8000 2810.00 127226 SPO 1985 04 01 02 40 814-83 P co2 344.760 -.. U3 1985 11 22 10 38 -89.9800 -24.8000 2810.00 127227 SPO 1985 04 06 03 00 13-85 S co2 344.410 +.. U3 1986 02 20 10 00 -89.9800 -24.8000 2810.00 127228 SPO 1985 04 06 03 00 14-85 S co2 343.410 -.. U3 1986 02 20 10 02 -89.9800 -24.8000 2810.00 127229 SPO 1985 04 13 01 54 15-85 S co2 343.010 ... U3 1986 02 11 09 00 -89.9800 -24.8000 2810.00 127230 SPO 1985 04 13 01 54 16-85 S co2 342.880 ... U3 1986 02 11 09 02 -89.9800 -24.8000 2810.00 127231 SPO 1985 04 15 00 57 869-83 P co2 344.360 -.. U3 1985 11 22 10 00 -89.9800 -24.8000 2810.00 127232 SPO 1985 04 15 00 57 870-83 P co2 346.300 +.. U3 1985 11 22 10 02 -89.9800 -24.8000 2810.00 127233 SPO 1985 04 19 20 50 17-85 S co2 342.790 ... U3 1986 02 20 09 32 -89.9800 -24.8000 2810.00 127234 SPO 1985 04 19 20 50 18-85 S co2 343.240 ... U3 1986 02 20 09 34 -89.9800 -24.8000 2810.00 127235 SPO 1985 04 26 19 50 19-85 S co2 342.820 ... U3 1986 02 11 09 12 -89.9800 -24.8000 2810.00 127236 SPO 1985 04 26 19 50 20-85 S co2 343.000 ... U3 1986 02 11 09 18 -89.9800 -24.8000 2810.00 127237 SPO 1985 04 30 22 05 361-82 P co2 343.530 -.. U3 1985 11 20 10 04 -89.9800 -24.8000 2810.00 127238 SPO 1985 04 30 22 05 362-82 P co2 344.620 +.. U3 1985 11 20 10 06 -89.9800 -24.8000 2810.00 127239 SPO 1985 05 03 22 50 21-85 S co2 342.800 ..L U3 1986 02 14 09 48 -89.9800 -24.8000 2810.00 127240 SPO 1985 05 03 22 50 22-85 S co2 343.420 +.. U3 1986 02 14 09 50 -89.9800 -24.8000 2810.00 127241 SPO 1985 05 10 21 48 23-85 S co2 342.960 ... U3 1986 02 11 08 56 -89.9800 -24.8000 2810.00 127242 SPO 1985 05 10 21 48 24-85 S co2 342.910 ... U3 1986 02 11 08 58 -89.9800 -24.8000 2810.00 127243 SPO 1985 05 14 19 45 847-83 P co2 343.350 ... U3 1985 11 22 10 04 -89.9800 -24.8000 2810.00 127244 SPO 1985 05 14 19 45 848-83 P co2 343.500 ... U3 1985 11 22 10 06 -89.9800 -24.8000 2810.00 127245 SPO 1985 05 18 05 50 25-85 S co2 354.940 +.. U3 1986 02 14 10 00 -89.9800 -24.8000 2810.00 127246 SPO 1985 05 18 05 50 26-85 S co2 343.240 ..L U3 1986 02 14 10 02 -89.9800 -24.8000 2810.00 127247 SPO 1985 05 24 22 51 27-85 S co2 343.190 ... U3 1986 02 11 09 28 -89.9800 -24.8000 2810.00 127248 SPO 1985 05 24 22 51 28-85 S co2 343.170 ... U3 1986 02 11 09 30 -89.9800 -24.8000 2810.00 127249 SPO 1985 06 01 04 50 29-85 S co2 343.390 ... U3 1986 02 14 10 04 -89.9800 -24.8000 2810.00 127250 SPO 1985 06 01 04 50 30-85 S co2 343.130 ... U3 1986 02 14 10 06 -89.9800 -24.8000 2810.00 127251 SPO 1985 06 01 05 20 993-81 P co2 343.550 -.. U3 1985 11 22 09 48 -89.9800 -24.8000 2810.00 127252 SPO 1985 06 01 05 20 994-81 P co2 345.060 +.. U3 1985 11 22 09 50 -89.9800 -24.8000 2810.00 127253 SPO 1985 06 07 22 50 31-85 S co2 343.790 -.. U3 1986 02 11 08 40 -89.9800 -24.8000 2810.00 127254 SPO 1985 06 07 22 50 32-85 S co2 344.650 +.. U3 1986 02 11 08 42 -89.9800 -24.8000 2810.00 127255 SPO 1985 06 15 23 35 1539-82 P co2 344.270 .X. U3 1985 11 22 09 44 -89.9800 -24.8000 2810.00 127256 SPO 1985 06 15 23 35 1540-82 P co2 344.330 .X. U3 1985 11 22 09 46 -89.9800 -24.8000 2810.00 127257 SPO 1985 06 15 23 50 33-85 S co2 343.370 ..L U3 1986 02 14 10 18 -89.9800 -24.8000 2810.00 127258 SPO 1985 06 15 23 50 34-85 S co2 346.180 +.. U3 1986 02 14 10 20 -89.9800 -24.8000 2810.00 127259 SPO 1985 06 21 22 53 35-85 S co2 343.310 ... U3 1986 01 22 09 48 -89.9800 -24.8000 2810.00 127260 SPO 1985 06 21 22 53 36-85 S co2 343.360 ... U3 1986 01 22 09 50 -89.9800 -24.8000 2810.00 127261 SPO 1985 06 29 07 50 37-85 S co2 343.480 ... U3 1986 02 11 09 32 -89.9800 -24.8000 2810.00 127262 SPO 1985 06 29 07 50 38-85 S co2 343.550 ... U3 1986 02 11 09 34 -89.9800 -24.8000 2810.00 127263 SPO 1985 07 01 04 40 1171-82 P co2 344.170 -.. U3 1985 11 20 10 00 -89.9800 -24.8000 2810.00 127264 SPO 1985 07 01 04 40 1172-82 P co2 346.440 +.. U3 1985 11 20 10 02 -89.9800 -24.8000 2810.00 127265 SPO 1985 07 05 21 50 39-85 S co2 343.630 ... U3 1986 01 22 09 44 -89.9800 -24.8000 2810.00 127266 SPO 1985 07 05 21 50 40-85 S co2 343.550 ... U3 1986 01 22 09 46 -89.9800 -24.8000 2810.00 127267 SPO 1985 07 12 21 50 41-85 S co2 343.890 ... U3 1986 02 14 10 32 -89.9800 -24.8000 2810.00 127268 SPO 1985 07 12 21 50 42-85 S co2 343.650 ... U3 1986 02 14 10 34 -89.9800 -24.8000 2810.00 127269 SPO 1985 07 14 23 20 945-81 P co2 344.130 -.. U3 1985 11 20 09 44 -89.9800 -24.8000 2810.00 127270 SPO 1985 07 14 23 20 946-81 P co2 344.680 +.. U3 1985 11 20 09 46 -89.9800 -24.8000 2810.00 127271 SPO 1985 07 19 22 05 43-85 S co2 343.810 +.. U3 1986 01 22 09 32 -89.9800 -24.8000 2810.00 127272 SPO 1985 07 19 22 05 44-85 S co2 343.230 -.. U3 1986 01 22 09 34 -89.9800 -24.8000 2810.00 127273 SPO 1985 07 26 16 50 45-85 S co2 -999.990 *.. U3 1986 02 11 09 48 -89.9800 -24.8000 2810.00 127274 SPO 1985 07 26 16 50 46-85 S co2 344.120 ..L U3 1986 02 11 09 50 -89.9800 -24.8000 2810.00 127275 SPO 1985 08 01 02 12 849-82 P co2 344.480 -.. U3 1985 11 22 10 32 -89.9800 -24.8000 2810.00 127276 SPO 1985 08 01 02 12 850-82 P co2 345.360 +.. U3 1985 11 22 10 34 -89.9800 -24.8000 2810.00 127277 SPO 1985 08 02 23 15 47-85 S co2 344.350 ... U3 1986 01 22 09 28 -89.9800 -24.8000 2810.00 127278 SPO 1985 08 02 23 15 48-85 S co2 344.260 ... U3 1986 01 22 09 30 -89.9800 -24.8000 2810.00 127279 SPO 1985 08 09 21 50 49-85 S co2 344.430 ... U3 1986 02 14 09 44 -89.9800 -24.8000 2810.00 127280 SPO 1985 08 09 21 50 50-85 S co2 344.420 ... U3 1986 02 14 09 46 -89.9800 -24.8000 2810.00 127281 SPO 1985 08 14 23 10 801-83 P co2 345.530 .X. U3 1985 11 22 10 20 -89.9800 -24.8000 2810.00 127282 SPO 1985 08 14 23 10 802-83 P co2 345.200 .X. U3 1985 11 22 10 22 -89.9800 -24.8000 2810.00 127283 SPO 1985 08 16 22 22 51-85 S co2 344.370 ... U3 1986 01 22 09 00 -89.9800 -24.8000 2810.00 127284 SPO 1985 08 16 22 22 52-85 S co2 344.290 ... U3 1986 01 22 09 02 -89.9800 -24.8000 2810.00 127285 SPO 1985 08 23 21 50 53-85 S co2 344.550 ... U3 1986 02 11 09 44 -89.9800 -24.8000 2810.00 127286 SPO 1985 08 23 21 50 54-85 S co2 344.500 ... U3 1986 02 11 09 46 -89.9800 -24.8000 2810.00 127287 SPO 1985 08 30 22 20 55-85 S co2 344.530 ... U3 1986 01 22 08 56 -89.9800 -24.8000 2810.00 127288 SPO 1985 08 30 22 20 56-85 S co2 344.360 ... U3 1986 01 22 08 58 -89.9800 -24.8000 2810.00 127289 SPO 1985 08 31 22 50 861-83 P co2 345.050 -.. U3 1985 11 20 09 48 -89.9800 -24.8000 2810.00 127290 SPO 1985 08 31 22 50 862-83 P co2 346.000 +.. U3 1985 11 20 09 50 -89.9800 -24.8000 2810.00 127291 SPO 1985 09 06 20 50 57-85 S co2 344.440 ... U3 1986 04 09 10 36 -89.9800 -24.8000 2810.00 127292 SPO 1985 09 06 20 50 58-85 S co2 344.480 ... U3 1986 04 09 10 38 -89.9800 -24.8000 2810.00 127293 SPO 1985 09 13 21 40 59-85 S co2 344.880 ... U3 1986 04 09 10 48 -89.9800 -24.8000 2810.00 127294 SPO 1985 09 13 21 40 60-85 S co2 344.620 ... U3 1986 04 09 10 50 -89.9800 -24.8000 2810.00 127295 SPO 1985 09 14 23 20 1199-82 P co2 345.660 +.. U3 1985 11 22 10 48 -89.9800 -24.8000 2810.00 127296 SPO 1985 09 14 23 20 1200-82 P co2 344.950 -.. U3 1985 11 22 10 50 -89.9800 -24.8000 2810.00 127297 SPO 1985 09 20 20 50 61-85 S co2 344.680 ... U3 1986 04 14 08 40 -89.9800 -24.8000 2810.00 127298 SPO 1985 09 20 20 50 62-85 S co2 344.580 ... U3 1986 04 14 08 42 -89.9800 -24.8000 2810.00 127299 SPO 1985 09 27 19 50 63-85 S co2 344.540 ... U3 1986 04 14 08 44 -89.9800 -24.8000 2810.00 127300 SPO 1985 09 27 19 50 64-85 S co2 344.600 ... U3 1986 04 14 08 46 -89.9800 -24.8000 2810.00 127301 SPO 1985 10 01 05 05 745-82 P co2 344.870 -.. U3 1985 12 03 10 52 -89.9800 -24.8000 2810.00 127302 SPO 1985 10 01 05 05 746-82 P co2 345.540 +.. U3 1985 12 03 10 54 -89.9800 -24.8000 2810.00 127303 SPO 1985 10 04 20 50 65-85 S co2 344.610 ... U3 1986 04 14 08 56 -89.9800 -24.8000 2810.00 127304 SPO 1985 10 04 20 50 66-85 S co2 344.460 ... U3 1986 04 14 08 58 -89.9800 -24.8000 2810.00 127305 SPO 1985 10 11 22 06 67-85 S co2 344.670 ... U3 1986 04 14 09 14 -89.9800 -24.8000 2810.00 127306 SPO 1985 10 11 22 06 68-85 S co2 344.510 ... U3 1986 04 14 09 18 -89.9800 -24.8000 2810.00 127307 SPO 1985 10 15 02 45 725-82 P co2 345.450 +.. U3 1985 12 03 11 04 -89.9800 -24.8000 2810.00 127308 SPO 1985 10 15 02 45 726-82 P co2 344.830 -.. U3 1985 12 03 11 06 -89.9800 -24.8000 2810.00 127309 SPO 1985 10 18 22 51 69-85 S co2 344.640 ..L U3 1986 04 14 09 28 -89.9800 -24.8000 2810.00 127310 SPO 1985 10 18 22 51 70-85 S co2 -999.990 *.. U3 1986 04 14 09 30 -89.9800 -24.8000 2810.00 127311 SPO 1985 10 25 22 53 72-85 S co2 344.670 ... U3 1986 04 09 08 42 -89.9800 -24.8000 2810.00 127312 SPO 1985 10 31 23 25 43-83 P co2 344.610 ... U3 1985 11 22 08 56 -89.9800 -24.8000 2810.00 127313 SPO 1985 10 31 23 25 44-83 P co2 344.760 ... U3 1985 11 22 08 58 -89.9800 -24.8000 2810.00 127314 SPO 1985 11 02 02 06 73-85 S co2 345.210 +.. U3 1986 04 09 10 32 -89.9800 -24.8000 2810.00 127315 SPO 1985 11 02 02 06 74-85 S co2 344.570 -.. U3 1986 04 09 10 34 -89.9800 -24.8000 2810.00 127316 SPO 1985 11 10 02 45 1667-82 P co2 344.890 -.. U3 1985 11 22 10 52 -89.9800 -24.8000 2810.00 127317 SPO 1985 11 10 02 45 1668-82 P co2 346.110 +.. U3 1985 11 22 10 54 -89.9800 -24.8000 2810.00 127318 SPO 1985 11 16 03 32 1317-82 S co2 344.710 ... U3 1985 12 17 09 28 -89.9800 -24.8000 2810.00 127319 SPO 1985 11 16 03 32 1318-82 S co2 344.670 ... U3 1985 12 17 09 30 -89.9800 -24.8000 2810.00 127320 SPO 1985 11 23 03 15 11-83 P co2 344.760 -.. U3 1985 12 11 09 14 -89.9800 -24.8000 2810.00 127321 SPO 1985 11 23 03 15 12-83 P co2 345.400 +.. U3 1985 12 11 09 16 -89.9800 -24.8000 2810.00 127322 SPO 1985 11 30 09 55 75-85 S co2 344.390 ... U3 1986 04 09 10 04 -89.9800 -24.8000 2810.00 127323 SPO 1985 11 30 09 55 76-85 S co2 344.590 ... U3 1986 04 09 10 06 -89.9800 -24.8000 2810.00 127324 SPO 1985 12 07 03 30 78-85 S co2 344.640 ... U3 1986 04 09 10 16 -89.9800 -24.8000 2810.00 127325 SPO 1985 12 12 03 40 79-85 P co2 347.370 -.. U3 1986 04 24 11 24 -89.9800 -24.8000 2810.00 127326 SPO 1985 12 12 03 40 80-85 P co2 351.160 +.. U3 1986 04 24 11 26 -89.9800 -24.8000 2810.00 127327 SPO 1985 12 14 08 57 81-85 S co2 344.500 ... U3 1986 04 09 10 00 -89.9800 -24.8000 2810.00 127328 SPO 1985 12 14 08 57 82-85 S co2 344.400 ... U3 1986 04 09 10 02 -89.9800 -24.8000 2810.00 127329 SPO 1985 12 21 07 25 83-85 S co2 344.330 ... U3 1986 04 14 09 00 -89.9800 -24.8000 2810.00 127330 SPO 1985 12 21 07 25 84-85 S co2 344.500 ... U3 1986 04 14 09 02 -89.9800 -24.8000 2810.00 127331 SPO 1985 12 21 07 52 85-85 P co2 344.430 ... U3 1986 04 15 11 04 -89.9800 -24.8000 2810.00 127332 SPO 1985 12 21 07 52 86-85 P co2 344.440 ... U3 1986 04 15 11 06 -89.9800 -24.8000 2810.00 127333 SPO 1985 12 29 00 50 87-85 S co2 344.320 ... U3 1986 04 17 10 04 -89.9800 -24.8000 2810.00 127334 SPO 1985 12 29 00 50 88-85 S co2 344.360 ... U3 1986 04 17 10 06 -89.9800 -24.8000 2810.00 127335 SPO 1986 01 03 02 35 91-85 P co2 348.200 -.. U3 1986 04 15 11 08 -89.9800 -24.8000 2810.00 127336 SPO 1986 01 03 02 35 92-85 P co2 349.340 +.. U3 1986 04 15 11 10 -89.9800 -24.8000 2810.00 127337 SPO 1986 01 03 23 20 89-85 S co2 344.480 ... U3 1986 04 17 10 00 -89.9800 -24.8000 2810.00 127338 SPO 1986 01 03 23 20 90-85 S co2 344.350 ... U3 1986 04 17 10 02 -89.9800 -24.8000 2810.00 127339 SPO 1986 01 11 08 00 93-85 S co2 -999.990 N.. U3 1986 04 17 10 18 -89.9800 -24.8000 2810.00 127340 SPO 1986 01 11 08 00 94-85 S co2 -999.990 N.. U3 1986 04 17 10 20 -89.9800 -24.8000 2810.00 127341 SPO 1986 01 18 08 15 103-85 P co2 347.980 +.. U3 1986 04 15 11 20 -89.9800 -24.8000 2810.00 127342 SPO 1986 01 18 08 15 104-85 P co2 347.380 -.. U3 1986 04 15 11 22 -89.9800 -24.8000 2810.00 127343 SPO 1986 01 18 08 45 101-85 S co2 344.640 ... U3 1986 04 17 10 32 -89.9800 -24.8000 2810.00 127344 SPO 1986 01 18 08 45 102-85 S co2 344.560 ... U3 1986 04 17 10 34 -89.9800 -24.8000 2810.00 127345 SPO 1986 01 25 05 30 99-85 S co2 344.480 ... U3 1986 04 17 10 36 -89.9800 -24.8000 2810.00 127346 SPO 1986 01 25 05 30 100-85 S co2 344.420 ... U3 1986 04 17 10 38 -89.9800 -24.8000 2810.00 127347 SPO 1986 01 31 01 50 97-85 S co2 344.580 ... U3 1986 04 17 10 48 -89.9800 -24.8000 2810.00 127348 SPO 1986 01 31 01 50 98-85 S co2 344.380 ... U3 1986 04 17 10 50 -89.9800 -24.8000 2810.00 127349 SPO 1986 01 31 02 37 95-85 P co2 351.000 +.. U3 1986 04 15 11 24 -89.9800 -24.8000 2810.00 127350 SPO 1986 01 31 02 37 96-85 P co2 347.700 -.. U3 1986 04 15 11 26 -89.9800 -24.8000 2810.00 127351 SPO 1986 02 08 23 50 749-85 S co2 344.150 ... U3 1987 04 16 09 00 -89.9800 -24.8000 2810.00 127352 SPO 1986 02 08 23 50 750-85 S co2 344.140 ... U3 1987 04 16 09 02 -89.9800 -24.8000 2810.00 127353 SPO 1986 02 15 03 30 801-85 P co2 345.630 +.. U3 1987 04 17 10 32 -89.9800 -24.8000 2810.00 127354 SPO 1986 02 15 03 30 802-85 P co2 345.020 -.. U3 1987 04 17 10 34 -89.9800 -24.8000 2810.00 127355 SPO 1986 02 22 03 40 747-85 S co2 343.930 ... U3 1987 04 16 10 04 -89.9800 -24.8000 2810.00 127356 SPO 1986 02 22 03 40 748-85 S co2 343.800 ... U3 1987 04 16 10 06 -89.9800 -24.8000 2810.00 127357 SPO 1986 03 01 09 14 799-85 P co2 344.960 -.. U3 1987 04 17 10 52 -89.9800 -24.8000 2810.00 127358 SPO 1986 03 01 09 14 800-85 P co2 346.810 +.. U3 1987 04 17 10 54 -89.9800 -24.8000 2810.00 127359 SPO 1986 03 08 08 53 745-85 S co2 345.840 -.. U3 1987 04 16 10 16 -89.9800 -24.8000 2810.00 127360 SPO 1986 03 08 08 53 746-85 S co2 348.950 +.. U3 1987 04 16 10 18 -89.9800 -24.8000 2810.00 127361 SPO 1986 03 22 04 45 819-85 S co2 344.200 ... U3 1987 04 17 09 16 -89.9800 -24.8000 2810.00 127362 SPO 1986 03 22 04 45 820-85 S co2 344.510 ... U3 1987 04 17 09 18 -89.9800 -24.8000 2810.00 127363 SPO 1986 03 29 02 47 767-85 P co2 348.180 +.. U3 1987 04 16 08 28 -89.9800 -24.8000 2810.00 127364 SPO 1986 03 29 02 47 768-85 P co2 345.200 -.. U3 1987 04 16 08 30 -89.9800 -24.8000 2810.00 127365 SPO 1986 04 05 02 17 817-85 S co2 344.230 ... U3 1987 04 17 08 44 -89.9800 -24.8000 2810.00 127366 SPO 1986 04 05 02 17 818-85 S co2 344.050 ... U3 1987 04 17 08 46 -89.9800 -24.8000 2810.00 127367 SPO 1986 04 12 04 28 765-85 P co2 346.730 -.. U3 1987 04 16 08 24 -89.9800 -24.8000 2810.00 127368 SPO 1986 04 12 04 28 766-85 P co2 355.320 +.. U3 1987 04 16 08 26 -89.9800 -24.8000 2810.00 127369 SPO 1986 04 19 03 45 763-85 S co2 -999.990 *.. U3 1987 04 17 08 24 -89.9800 -24.8000 2810.00 127370 SPO 1986 04 19 03 45 764-85 S co2 344.220 ..L U3 1987 04 17 08 42 -89.9800 -24.8000 2810.00 127371 SPO 1986 04 26 02 42 815-85 P co2 346.020 -.. U3 1987 04 16 08 44 -89.9800 -24.8000 2810.00 127372 SPO 1986 04 26 02 42 816-85 P co2 350.400 +.. U3 1987 04 16 08 46 -89.9800 -24.8000 2810.00 127373 SPO 1986 05 03 04 04 743-85 S co2 344.330 ... U3 1987 04 17 09 32 -89.9800 -24.8000 2810.00 127374 SPO 1986 05 03 04 04 744-85 S co2 344.190 ... U3 1987 04 17 09 34 -89.9800 -24.8000 2810.00 127375 SPO 1986 05 10 03 34 795-85 P co2 347.720 -.. U3 1987 04 17 09 48 -89.9800 -24.8000 2810.00 127376 SPO 1986 05 10 03 34 796-85 P co2 353.340 +.. U3 1987 04 17 09 50 -89.9800 -24.8000 2810.00 127377 SPO 1986 05 15 07 55 793-85 P co2 344.510 ..L U3 1987 04 17 10 48 -89.9800 -24.8000 2810.00 127378 SPO 1986 05 15 07 55 794-85 P co2 348.140 +.. U3 1987 04 17 10 50 -89.9800 -24.8000 2810.00 127379 SPO 1986 05 17 03 49 741-85 S co2 344.260 ..L U3 1987 04 17 11 40 -89.9800 -24.8000 2810.00 127380 SPO 1986 05 17 03 49 742-85 S co2 345.560 +.. U3 1987 04 17 11 42 -89.9800 -24.8000 2810.00 127381 SPO 1986 05 31 07 54 791-85 S co2 344.720 ... U3 1987 04 17 11 56 -89.9800 -24.8000 2810.00 127382 SPO 1986 05 31 07 54 792-85 S co2 344.530 ... U3 1987 04 17 11 58 -89.9800 -24.8000 2810.00 127383 SPO 1986 06 01 00 45 739-85 P co2 344.910 ... U3 1987 04 17 11 04 -89.9800 -24.8000 2810.00 127384 SPO 1986 06 01 00 45 740-85 P co2 344.940 ... U3 1987 04 17 11 06 -89.9800 -24.8000 2810.00 127385 SPO 1986 06 14 08 52 761-85 S co2 344.820 ... U3 1987 04 17 09 44 -89.9800 -24.8000 2810.00 127386 SPO 1986 06 14 08 52 762-85 S co2 344.600 ... U3 1987 04 17 09 46 -89.9800 -24.8000 2810.00 127387 SPO 1986 06 15 06 15 814-85 P co2 361.340 N.. U3 1987 04 17 10 18 -89.9800 -24.8000 2810.00 127389 SPO 1986 06 28 03 42 811-85 S co2 344.550 ... U3 1987 04 17 08 56 -89.9800 -24.8000 2810.00 127390 SPO 1986 06 28 03 42 812-85 S co2 344.720 ... U3 1987 04 17 08 58 -89.9800 -24.8000 2810.00 127391 SPO 1986 07 01 05 40 759-85 P co2 345.170 ... U3 1987 04 17 10 00 -89.9800 -24.8000 2810.00 127392 SPO 1986 07 01 05 40 760-85 P co2 345.000 ... U3 1987 04 17 10 02 -89.9800 -24.8000 2810.00 127393 SPO 1986 07 12 03 05 809-85 S co2 345.000 ... U3 1987 04 17 11 52 -89.9800 -24.8000 2810.00 127394 SPO 1986 07 12 03 05 810-85 S co2 345.010 ... U3 1987 04 17 11 54 -89.9800 -24.8000 2810.00 127395 SPO 1986 07 26 00 20 755-85 S co2 345.020 ... U3 1987 04 17 11 08 -89.9800 -24.8000 2810.00 127396 SPO 1986 07 26 00 20 756-85 S co2 345.270 ... U3 1987 04 17 11 10 -89.9800 -24.8000 2810.00 127397 SPO 1986 08 01 04 25 807-85 P co2 346.670 .X. U3 1987 04 16 09 48 -89.9800 -24.8000 2810.00 127398 SPO 1986 08 01 04 25 808-85 P co2 346.270 .X. U3 1987 04 16 09 50 -89.9800 -24.8000 2810.00 127399 SPO 1986 08 08 23 50 753-85 S co2 346.870 +.. U3 1987 04 17 11 24 -89.9800 -24.8000 2810.00 127400 SPO 1986 08 08 23 50 754-85 S co2 345.420 ..L U3 1987 04 17 11 26 -89.9800 -24.8000 2810.00 127401 SPO 1986 08 15 05 15 805-85 P co2 345.600 ... U3 1987 04 16 10 00 -89.9800 -24.8000 2810.00 127402 SPO 1986 08 15 05 15 806-85 P co2 345.520 ... U3 1987 04 16 10 02 -89.9800 -24.8000 2810.00 127403 SPO 1986 08 23 02 20 751-85 S co2 370.720 +.. U3 1987 04 17 11 20 -89.9800 -24.8000 2810.00 127404 SPO 1986 08 23 02 20 752-85 S co2 345.690 ..L U3 1987 04 17 11 22 -89.9800 -24.8000 2810.00 127405 SPO 1986 09 01 09 35 803-85 P co2 345.710 ..L U3 1987 04 17 10 20 -89.9800 -24.8000 2810.00 127406 SPO 1986 09 01 09 35 804-85 P co2 348.670 +.. U3 1987 04 17 10 22 -89.9800 -24.8000 2810.00 127407 SPO 1986 09 06 08 58 831-85 S co2 346.110 ... U3 1987 04 22 10 00 -89.9800 -24.8000 2810.00 127408 SPO 1986 09 06 08 58 832-85 S co2 346.130 ... U3 1987 04 22 10 02 -89.9800 -24.8000 2810.00 127409 SPO 1986 09 15 08 10 783-85 P co2 346.040 ... U3 1987 04 16 08 40 -89.9800 -24.8000 2810.00 127410 SPO 1986 09 15 08 10 784-85 P co2 345.860 ... U3 1987 04 16 08 42 -89.9800 -24.8000 2810.00 127411 SPO 1986 09 20 08 50 829-85 S co2 346.080 ... U3 1987 04 17 09 00 -89.9800 -24.8000 2810.00 127412 SPO 1986 09 20 08 50 830-85 S co2 345.900 ... U3 1987 04 17 09 02 -89.9800 -24.8000 2810.00 127413 SPO 1986 10 01 09 52 781-85 P co2 345.830 ... U3 1987 04 16 08 56 -89.9800 -24.8000 2810.00 127414 SPO 1986 10 01 09 52 782-85 P co2 345.810 ... U3 1987 04 16 08 58 -89.9800 -24.8000 2810.00 127415 SPO 1986 10 04 09 54 785-85 S co2 345.600 ... U3 1987 04 17 08 28 -89.9800 -24.8000 2810.00 127416 SPO 1986 10 04 09 54 786-85 S co2 345.570 ... U3 1987 04 17 08 30 -89.9800 -24.8000 2810.00 127417 SPO 1986 10 15 09 15 779-85 P co2 346.080 ... U3 1987 04 16 09 12 -89.9800 -24.8000 2810.00 127418 SPO 1986 10 15 09 15 780-85 P co2 346.000 ... U3 1987 04 16 09 14 -89.9800 -24.8000 2810.00 127419 SPO 1986 10 18 05 40 777-85 S co2 345.790 ..L U3 1986 12 09 09 32 -89.9800 -24.8000 2810.00 127420 SPO 1986 10 18 05 40 778-85 S co2 348.610 +.. U3 1986 12 09 09 34 -89.9800 -24.8000 2810.00 127421 SPO 1986 11 01 04 30 827-85 S co2 346.910 +.. U3 1986 12 09 09 28 -89.9800 -24.8000 2810.00 127422 SPO 1986 11 01 04 30 828-85 S co2 346.070 ..L U3 1986 12 09 09 30 -89.9800 -24.8000 2810.00 127423 SPO 1986 11 01 10 39 737-85 P co2 -999.990 *.. U3 1986 12 09 08 56 -89.9800 -24.8000 2810.00 127424 SPO 1986 11 01 10 39 738-85 P co2 346.090 ..L U3 1986 12 09 08 58 -89.9800 -24.8000 2810.00 127425 SPO 1986 11 15 04 19 789-85 S co2 345.600 ..L U3 1986 12 09 09 12 -89.9800 -24.8000 2810.00 127426 SPO 1986 11 15 04 19 790-85 S co2 -999.990 *.. U3 1986 12 09 09 16 -89.9800 -24.8000 2810.00 127427 SPO 1986 11 15 05 16 735-85 P co2 345.690 ... U3 1986 12 09 08 44 -89.9800 -24.8000 2810.00 127428 SPO 1986 11 15 05 16 736-85 P co2 345.680 ... U3 1986 12 09 08 46 -89.9800 -24.8000 2810.00 127429 SPO 1986 11 22 02 30 787-85 S co2 345.610 ... U3 1986 12 09 09 00 -89.9800 -24.8000 2810.00 127430 SPO 1986 11 22 02 30 788-85 S co2 345.630 ... U3 1986 12 09 09 02 -89.9800 -24.8000 2810.00 127431 SPO 1986 11 29 01 49 769-85 P co2 345.920 ... U3 1987 01 23 10 32 -89.9800 -24.8000 2810.00 127432 SPO 1986 11 29 01 49 770-85 P co2 345.850 ... U3 1987 01 23 10 34 -89.9800 -24.8000 2810.00 127433 SPO 1986 12 06 23 52 99-83 S co2 345.860 ... U3 1987 01 09 08 44 -89.9800 -24.8000 2810.00 127434 SPO 1986 12 06 23 52 100-83 S co2 345.680 ... U3 1987 01 09 08 46 -89.9800 -24.8000 2810.00 127435 SPO 1986 12 15 06 01 657-83 P co2 345.830 ... U3 1987 01 09 08 56 -89.9800 -24.8000 2810.00 127436 SPO 1986 12 15 06 01 658-83 P co2 345.740 ... U3 1987 01 09 08 58 -89.9800 -24.8000 2810.00 127437 SPO 1986 12 22 08 59 387-85 S co2 -999.990 *.. U3 1987 01 14 08 28 -89.9800 -24.8000 2810.00 127438 SPO 1986 12 22 08 59 388-85 S co2 345.860 ..L U3 1987 01 14 08 30 -89.9800 -24.8000 2810.00 127439 SPO 1987 01 01 08 30 291-82 P co2 345.600 ... U3 1987 01 14 08 24 -89.9800 -24.8000 2810.00 127440 SPO 1987 01 01 08 30 292-82 P co2 345.640 ... U3 1987 01 14 08 26 -89.9800 -24.8000 2810.00 127441 SPO 1987 01 04 06 30 771-85 P co2 345.490 ... U3 1987 01 23 10 18 -89.9800 -24.8000 2810.00 127442 SPO 1987 01 04 06 30 772-85 P co2 345.550 ... U3 1987 01 23 10 22 -89.9800 -24.8000 2810.00 127443 SPO 1987 01 08 02 53 421-83 S co2 345.790 ... U3 1987 04 17 09 12 -89.9800 -24.8000 2810.00 127444 SPO 1987 01 08 02 53 422-83 S co2 345.610 ... U3 1987 04 17 09 14 -89.9800 -24.8000 2810.00 127445 SPO 1987 01 12 10 50 825-85 P co2 345.550 ... U3 1987 04 16 11 08 -89.9800 -24.8000 2810.00 127446 SPO 1987 01 12 10 50 826-85 P co2 345.490 ... U3 1987 04 16 11 10 -89.9800 -24.8000 2810.00 127447 SPO 1987 01 15 04 13 773-85 P co2 345.750 ... U3 1987 04 16 10 48 -89.9800 -24.8000 2810.00 127448 SPO 1987 01 15 04 13 774-85 P co2 345.600 ... U3 1987 04 16 10 50 -89.9800 -24.8000 2810.00 127449 SPO 1987 01 16 09 31 821-85 P co2 349.120 +.. U3 1987 04 16 11 20 -89.9800 -24.8000 2810.00 127450 SPO 1987 01 16 09 31 822-85 P co2 345.730 ..L U3 1987 04 16 11 22 -89.9800 -24.8000 2810.00 127451 SPO 1987 01 17 07 55 823-85 P co2 345.710 ... U3 1987 04 16 11 04 -89.9800 -24.8000 2810.00 127452 SPO 1987 01 17 07 55 824-85 P co2 345.660 ... U3 1987 04 16 11 06 -89.9800 -24.8000 2810.00 127453 SPO 1987 01 18 04 53 775-85 P co2 345.760 ... U3 1987 04 16 09 32 -89.9800 -24.8000 2810.00 127454 SPO 1987 01 18 04 53 776-85 P co2 345.530 ... U3 1987 04 16 09 34 -89.9800 -24.8000 2810.00 127455 SPO 1987 01 19 06 34 107-85 P co2 346.040 ... U3 1987 04 16 10 36 -89.9800 -24.8000 2810.00 127456 SPO 1987 01 19 06 34 108-85 P co2 345.860 ... U3 1987 04 16 10 38 -89.9800 -24.8000 2810.00 127457 SPO 1987 01 25 04 37 363-86 S co2 345.700 ..L S1 1987 12 10 10 48 -89.9800 -24.8000 2810.00 127458 SPO 1987 01 25 04 37 364-86 S co2 350.370 +.. S1 1987 12 10 10 50 -89.9800 -24.8000 2810.00 127459 SPO 1987 02 01 09 17 407-86 P co2 345.710 ... S1 1987 12 10 10 52 -89.9800 -24.8000 2810.00 127460 SPO 1987 02 01 09 17 408-86 P co2 345.610 ... S1 1987 12 10 10 54 -89.9800 -24.8000 2810.00 127461 SPO 1987 02 07 23 45 411-86 S co2 345.790 ..L S1 1987 12 15 09 48 -89.9800 -24.8000 2810.00 127462 SPO 1987 02 07 23 45 412-86 S co2 -999.990 +.. S1 1987 12 15 09 50 -89.9800 -24.8000 2810.00 127463 SPO 1987 02 15 08 32 413-86 P co2 345.610 ... S1 1987 12 10 09 32 -89.9800 -24.8000 2810.00 127464 SPO 1987 02 15 08 32 414-86 P co2 345.710 ... S1 1987 12 10 09 34 -89.9800 -24.8000 2810.00 127465 SPO 1987 02 22 22 49 369-86 S co2 -999.990 *.. S1 1987 12 11 08 28 -89.9800 -24.8000 2810.00 127466 SPO 1987 02 22 22 49 370-86 S co2 345.720 ..L S1 1987 12 11 08 30 -89.9800 -24.8000 2810.00 127467 SPO 1987 03 01 02 54 367-86 P co2 345.730 ... S1 1987 12 15 09 44 -89.9800 -24.8000 2810.00 127468 SPO 1987 03 01 02 54 368-86 P co2 345.760 ... S1 1987 12 15 09 46 -89.9800 -24.8000 2810.00 127469 SPO 1987 03 07 23 15 409-86 S co2 346.060 ... S1 1987 12 15 08 44 -89.9800 -24.8000 2810.00 127470 SPO 1987 03 07 23 15 410-86 S co2 345.610 ... S1 1987 12 15 08 46 -89.9800 -24.8000 2810.00 127471 SPO 1987 03 15 00 55 365-86 P co2 358.320 +.. S1 1987 12 15 09 02 -89.9800 -24.8000 2810.00 127472 SPO 1987 03 15 00 55 366-86 P co2 345.700 ..L S1 1987 12 15 09 00 -89.9800 -24.8000 2810.00 127473 SPO 1987 03 21 23 10 397-86 S co2 345.760 ... S1 1987 12 15 10 00 -89.9800 -24.8000 2810.00 127474 SPO 1987 03 21 23 10 398-86 S co2 345.560 ... S1 1987 12 15 10 02 -89.9800 -24.8000 2810.00 127475 SPO 1987 04 01 00 48 399-86 P co2 345.960 ..L S1 1987 12 15 09 28 -89.9800 -24.8000 2810.00 127476 SPO 1987 04 01 00 48 400-86 P co2 350.130 +.. S1 1987 12 15 09 30 -89.9800 -24.8000 2810.00 127477 SPO 1987 04 07 22 56 405-86 S co2 345.920 ... S1 1987 12 15 08 40 -89.9800 -24.8000 2810.00 127478 SPO 1987 04 07 22 56 406-86 S co2 345.940 ... S1 1987 12 15 08 42 -89.9800 -24.8000 2810.00 127479 SPO 1987 04 15 00 47 361-86 P co2 347.480 -.. S1 1987 12 15 09 12 -89.9800 -24.8000 2810.00 127480 SPO 1987 04 15 00 47 362-86 P co2 348.970 +.. S1 1987 12 15 09 16 -89.9800 -24.8000 2810.00 127481 SPO 1987 04 22 22 57 403-86 S co2 346.060 ... S1 1987 12 15 08 24 -89.9800 -24.8000 2810.00 127482 SPO 1987 04 22 22 57 404-86 S co2 346.270 ... S1 1987 12 15 08 26 -89.9800 -24.8000 2810.00 127483 SPO 1987 05 04 01 30 359-86 P co2 346.040 ... S1 1987 12 15 09 32 -89.9800 -24.8000 2810.00 127484 SPO 1987 05 04 01 30 360-86 P co2 345.910 ... S1 1987 12 15 09 34 -89.9800 -24.8000 2810.00 127485 SPO 1987 05 07 22 57 401-86 S co2 346.220 ... S1 1987 12 15 08 28 -89.9800 -24.8000 2810.00 127486 SPO 1987 05 07 22 57 402-86 S co2 345.940 ... S1 1987 12 15 08 30 -89.9800 -24.8000 2810.00 127487 SPO 1987 05 15 00 55 357-86 P co2 346.060 ..L S1 1987 12 15 08 56 -89.9800 -24.8000 2810.00 127488 SPO 1987 05 15 00 55 358-86 P co2 349.960 +.. S1 1987 12 15 08 58 -89.9800 -24.8000 2810.00 127489 SPO 1987 05 22 23 57 415-86 S co2 346.070 ... S1 1987 12 10 10 18 -89.9800 -24.8000 2810.00 127490 SPO 1987 05 22 23 57 416-86 S co2 346.060 ... S1 1987 12 10 10 22 -89.9800 -24.8000 2810.00 127491 SPO 1987 06 01 01 58 371-86 P co2 346.210 ... S1 1987 12 10 10 36 -89.9800 -24.8000 2810.00 127492 SPO 1987 06 01 01 58 372-86 P co2 346.240 ... S1 1987 12 10 10 38 -89.9800 -24.8000 2810.00 127493 SPO 1987 06 07 22 57 373-86 S co2 346.690 ... S1 1987 12 10 10 00 -89.9800 -24.8000 2810.00 127494 SPO 1987 06 07 22 57 374-86 S co2 346.620 ... S1 1987 12 10 10 02 -89.9800 -24.8000 2810.00 127495 SPO 1987 06 15 00 50 417-86 P co2 346.530 ... S1 1987 12 10 10 04 -89.9800 -24.8000 2810.00 127496 SPO 1987 06 15 00 50 418-86 P co2 346.560 ... S1 1987 12 10 10 06 -89.9800 -24.8000 2810.00 127497 SPO 1987 06 17 00 59 419-86 P co2 346.540 ... S1 1987 12 11 08 24 -89.9800 -24.8000 2810.00 127498 SPO 1987 06 17 00 59 420-86 P co2 346.690 ... S1 1987 12 11 08 26 -89.9800 -24.8000 2810.00 127499 SPO 1987 06 22 22 59 377-86 S co2 346.690 ... S1 1987 12 10 09 44 -89.9800 -24.8000 2810.00 127500 SPO 1987 06 22 22 59 378-86 S co2 346.710 ... S1 1987 12 10 09 46 -89.9800 -24.8000 2810.00 127501 SPO 1987 07 01 00 58 375-86 P co2 346.840 ... S1 1987 12 10 09 48 -89.9800 -24.8000 2810.00 127502 SPO 1987 07 01 00 58 376-86 P co2 346.960 ... S1 1987 12 10 09 50 -89.9800 -24.8000 2810.00 127503 SPO 1987 07 07 22 57 421-86 S co2 347.340 ... S1 1987 12 10 09 28 -89.9800 -24.8000 2810.00 127504 SPO 1987 07 07 22 57 422-86 S co2 347.280 ... S1 1987 12 10 09 30 -89.9800 -24.8000 2810.00 127505 SPO 1987 07 15 01 02 391-86 P co2 347.010 ... S1 1987 12 09 09 44 -89.9800 -24.8000 2810.00 127506 SPO 1987 07 15 01 02 392-86 P co2 346.930 ... S1 1987 12 09 09 46 -89.9800 -24.8000 2810.00 127507 SPO 1987 07 22 22 57 349-86 S co2 347.110 ... S1 1987 12 10 08 24 -89.9800 -24.8000 2810.00 127508 SPO 1987 07 22 22 57 350-86 S co2 347.100 ... S1 1987 12 10 08 26 -89.9800 -24.8000 2810.00 127509 SPO 1987 08 01 01 08 389-86 P co2 347.230 ... S1 1987 12 10 09 12 -89.9800 -24.8000 2810.00 127510 SPO 1987 08 01 01 08 390-86 P co2 347.220 ... S1 1987 12 10 09 16 -89.9800 -24.8000 2810.00 127511 SPO 1987 08 07 22 57 351-86 S co2 347.400 ... S1 1987 12 10 09 00 -89.9800 -24.8000 2810.00 127512 SPO 1987 08 07 22 57 352-86 S co2 347.440 ... S1 1987 12 10 09 02 -89.9800 -24.8000 2810.00 127513 SPO 1987 08 15 01 04 395-86 P co2 347.550 ..L S1 1987 12 10 08 56 -89.9800 -24.8000 2810.00 127514 SPO 1987 08 15 01 04 396-86 P co2 349.570 +.. S1 1987 12 10 08 58 -89.9800 -24.8000 2810.00 127515 SPO 1987 08 22 21 57 355-86 S co2 347.680 ... S1 1987 12 10 08 44 -89.9800 -24.8000 2810.00 127516 SPO 1987 08 22 21 57 356-86 S co2 347.680 ... S1 1987 12 10 08 46 -89.9800 -24.8000 2810.00 127517 SPO 1987 09 02 00 54 393-86 P co2 347.820 ... S1 1987 12 10 08 40 -89.9800 -24.8000 2810.00 127518 SPO 1987 09 02 00 54 394-86 P co2 347.930 ... S1 1987 12 10 08 42 -89.9800 -24.8000 2810.00 127519 SPO 1987 09 08 11 58 353-86 S co2 348.120 ... S1 1987 12 10 08 28 -89.9800 -24.8000 2810.00 127520 SPO 1987 09 08 11 58 354-86 S co2 348.050 ... S1 1987 12 10 08 30 -89.9800 -24.8000 2810.00 127521 SPO 1987 09 15 00 51 339-86 P co2 348.020 ..L S1 1988 01 15 09 28 -89.9800 -24.8000 2810.00 127522 SPO 1987 09 15 00 51 340-86 P co2 349.160 +.. S1 1988 01 15 09 30 -89.9800 -24.8000 2810.00 127523 SPO 1987 09 22 21 57 327-86 S co2 348.150 ..L S1 1988 01 15 09 00 -89.9800 -24.8000 2810.00 127524 SPO 1987 09 22 21 57 328-86 S co2 357.060 +.. S1 1988 01 15 09 02 -89.9800 -24.8000 2810.00 127525 SPO 1987 10 02 00 04 383-86 P co2 348.110 ... S1 1988 01 15 09 16 -89.9800 -24.8000 2810.00 127526 SPO 1987 10 02 00 04 384-86 P co2 348.060 ... S1 1988 01 15 09 18 -89.9800 -24.8000 2810.00 127527 SPO 1987 10 07 23 57 335-86 S co2 348.370 ... S1 1988 01 15 08 44 -89.9800 -24.8000 2810.00 127528 SPO 1987 10 07 23 57 336-86 S co2 348.310 ... S1 1988 01 15 08 46 -89.9800 -24.8000 2810.00 127529 SPO 1987 10 15 12 34 331-86 P co2 348.080 ... S1 1988 01 15 08 28 -89.9800 -24.8000 2810.00 127530 SPO 1987 10 15 12 34 332-86 P co2 348.140 ... S1 1988 01 15 08 30 -89.9800 -24.8000 2810.00 127531 SPO 1987 10 22 21 57 325-86 S co2 348.270 ... S1 1988 01 15 08 24 -89.9800 -24.8000 2810.00 127532 SPO 1987 10 22 21 57 326-86 S co2 348.240 ... S1 1988 01 15 08 26 -89.9800 -24.8000 2810.00 127533 SPO 1987 11 01 02 07 329-86 P co2 348.060 ... S1 1988 01 19 09 46 -89.9800 -24.8000 2810.00 127534 SPO 1987 11 01 02 07 330-86 P co2 348.310 ... S1 1988 01 19 09 50 -89.9800 -24.8000 2810.00 127535 SPO 1987 11 10 04 55 337-86 S co2 354.060 +.. S1 1988 01 19 10 00 -89.9800 -24.8000 2810.00 127536 SPO 1987 11 10 04 55 338-86 S co2 348.230 ..L S1 1988 01 19 10 04 -89.9800 -24.8000 2810.00 127537 SPO 1987 11 15 23 20 319-86 P co2 348.300 ..L S1 1988 01 05 11 24 -89.9800 -24.8000 2810.00 127538 SPO 1987 11 15 23 20 320-86 P co2 349.200 +.. S1 1988 01 05 11 26 -89.9800 -24.8000 2810.00 127539 SPO 1987 12 01 12 34 321-86 P co2 354.210 +.. S1 1988 01 05 11 20 -89.9800 -24.8000 2810.00 127540 SPO 1987 12 01 12 34 322-86 P co2 348.300 ..L S1 1988 01 05 11 22 -89.9800 -24.8000 2810.00 127541 SPO 1987 12 08 13 55 323-86 S co2 348.130 ... S1 1988 01 06 09 32 -89.9800 -24.8000 2810.00 127542 SPO 1987 12 08 13 55 324-86 S co2 348.180 ... S1 1988 01 06 09 34 -89.9800 -24.8000 2810.00 127543 SPO 1987 12 23 10 55 333-86 S co2 348.190 ... S1 1988 01 06 10 00 -89.9800 -24.8000 2810.00 127544 SPO 1987 12 23 10 55 334-86 S co2 348.120 ... S1 1988 01 06 10 02 -89.9800 -24.8000 2810.00 127545 SPO 1987 12 27 07 30 523-87 P co2 348.270 ... S1 1988 03 04 08 56 -89.9800 -24.8000 2810.00 127546 SPO 1987 12 27 07 30 524-87 P co2 348.150 ... S1 1988 03 04 08 58 -89.9800 -24.8000 2810.00 127547 SPO 1988 01 01 12 00 525-87 P co2 348.590 ... S1 1988 03 04 09 28 -89.9800 -24.8000 2810.00 127548 SPO 1988 01 01 12 00 526-87 P co2 348.360 ... S1 1988 03 04 09 30 -89.9800 -24.8000 2810.00 127549 SPO 1988 01 10 18 50 527-87 S co2 348.060 ... S1 1988 03 04 09 14 -89.9800 -24.8000 2810.00 127550 SPO 1988 01 10 18 50 528-87 S co2 348.530 ... S1 1988 03 04 09 12 -89.9800 -24.8000 2810.00 127551 SPO 1988 01 22 11 59 529-87 S co2 347.840 ... S1 1988 03 04 09 00 -89.9800 -24.8000 2810.00 127552 SPO 1988 01 22 11 59 530-87 S co2 347.950 ... S1 1988 03 04 09 02 -89.9800 -24.8000 2810.00 127553 SPO 1988 01 27 01 30 347-86 P co2 348.010 ... S1 1988 03 01 10 04 -89.9800 -24.8000 2810.00 127556 SPO 1988 01 27 01 30 348-86 P co2 348.150 ... S1 1988 03 01 10 06 -89.9800 -24.8000 2810.00 127557 SPO 1988 02 09 06 00 385-86 S co2 347.960 ..L S1 1988 03 01 08 24 -89.9800 -24.8000 2810.00 127558 SPO 1988 02 09 06 00 386-86 S co2 -999.990 +.. S1 1988 03 01 08 26 -89.9800 -24.8000 2810.00 127559 SPO 1988 02 09 23 45 345-86 P co2 350.310 +.. S1 1988 03 28 09 00 -89.9800 -24.8000 2810.00 127560 SPO 1988 02 09 23 45 346-86 P co2 347.870 ..L S1 1988 03 28 09 02 -89.9800 -24.8000 2810.00 127561 SPO 1988 02 22 06 00 387-86 S co2 347.940 ..L S1 1988 12 09 11 08 -89.9800 -24.8000 2810.00 127562 SPO 1988 02 22 06 00 388-86 S co2 348.500 +.. S1 1988 12 09 11 10 -89.9800 -24.8000 2810.00 127563 SPO 1988 02 28 04 45 341-86 P co2 -999.990 *.. S1 1988 12 09 09 48 -89.9800 -24.8000 2810.00 127564 SPO 1988 02 28 04 45 342-86 P co2 348.090 ..L S1 1988 12 09 09 50 -89.9800 -24.8000 2810.00 127565 SPO 1988 03 08 04 50 379-86 P co2 347.540 ... S1 1988 12 09 09 32 -89.9800 -24.8000 2810.00 127566 SPO 1988 03 08 04 50 380-86 P co2 347.730 ... S1 1988 12 09 09 34 -89.9800 -24.8000 2810.00 127567 SPO 1988 03 14 01 00 343-86 S co2 -999.990 *.. S1 1988 12 09 09 28 -89.9800 -24.8000 2810.00 127568 SPO 1988 03 14 01 00 344-86 S co2 348.010 ..L S1 1988 12 09 09 30 -89.9800 -24.8000 2810.00 127569 SPO 1988 03 23 03 15 381-86 P co2 -999.990 *.. S1 1988 12 09 10 28 -89.9800 -24.8000 2810.00 127570 SPO 1988 03 23 03 15 382-86 P co2 349.980 -.. S1 1988 12 09 10 30 -89.9800 -24.8000 2810.00 127571 SPO 1988 03 28 23 55 409-87 S co2 348.200 ... S1 1988 12 09 09 12 -89.9800 -24.8000 2810.00 127572 SPO 1988 03 28 23 55 410-87 S co2 348.400 ... S1 1988 12 09 09 14 -89.9800 -24.8000 2810.00 127573 SPO 1988 04 01 02 00 411-87 P co2 348.180 ... S1 1988 12 09 11 56 -89.9800 -24.8000 2810.00 127574 SPO 1988 04 01 02 00 412-87 P co2 348.390 ... S1 1988 12 09 11 58 -89.9800 -24.8000 2810.00 127575 SPO 1988 04 15 09 40 413-87 P co2 348.320 ... S1 1988 12 09 11 00 -89.9800 -24.8000 2810.00 127576 SPO 1988 04 15 09 40 414-87 P co2 348.270 ... S1 1988 12 09 11 02 -89.9800 -24.8000 2810.00 127577 SPO 1988 04 25 23 55 415-87 S co2 352.610 +.. S1 1988 12 09 09 52 -89.9800 -24.8000 2810.00 127578 SPO 1988 04 25 23 55 416-87 S co2 348.270 ..L S1 1988 12 09 09 54 -89.9800 -24.8000 2810.00 127579 SPO 1988 05 02 03 15 417-87 P co2 348.570 ... S1 1988 12 09 10 36 -89.9800 -24.8000 2810.00 127580 SPO 1988 05 02 03 15 418-87 P co2 348.350 ... S1 1988 12 09 10 38 -89.9800 -24.8000 2810.00 127581 SPO 1988 05 08 00 55 419-87 S co2 348.400 ..L S1 1988 12 09 11 36 -89.9800 -24.8000 2810.00 127582 SPO 1988 05 08 00 55 420-87 S co2 377.980 +.. S1 1988 12 09 11 38 -89.9800 -24.8000 2810.00 127583 SPO 1988 05 15 11 14 505-87 P co2 348.360 ... S1 1988 12 09 10 00 -89.9800 -24.8000 2810.00 127584 SPO 1988 05 15 11 14 506-87 P co2 348.420 ... S1 1988 12 09 10 02 -89.9800 -24.8000 2810.00 127585 SPO 1988 05 22 22 59 507-87 S co2 348.530 ... S1 1988 12 09 10 04 -89.9800 -24.8000 2810.00 127586 SPO 1988 05 22 22 59 508-87 S co2 348.400 ... S1 1988 12 09 10 06 -89.9800 -24.8000 2810.00 127587 SPO 1988 06 01 12 34 509-87 P co2 348.240 ... S1 1988 12 09 10 20 -89.9800 -24.8000 2810.00 127588 SPO 1988 06 01 12 34 510-87 P co2 348.270 ... S1 1988 12 09 10 22 -89.9800 -24.8000 2810.00 127589 SPO 1988 06 08 05 59 511-87 S co2 -999.990 *.. S1 1988 12 09 09 56 -89.9800 -24.8000 2810.00 127590 SPO 1988 06 08 05 59 512-87 S co2 348.740 ..L S1 1988 12 09 09 58 -89.9800 -24.8000 2810.00 127591 SPO 1988 06 13 23 50 513-87 P co2 348.960 ..L S1 1988 12 09 10 48 -89.9800 -24.8000 2810.00 127592 SPO 1988 06 13 23 50 514-87 P co2 361.790 +.. S1 1988 12 09 10 50 -89.9800 -24.8000 2810.00 127593 SPO 1988 06 22 22 59 515-87 S co2 348.960 ... S1 1988 12 09 11 40 -89.9800 -24.8000 2810.00 127594 SPO 1988 06 22 22 59 516-87 S co2 348.950 ... S1 1988 12 09 11 42 -89.9800 -24.8000 2810.00 127595 SPO 1988 07 01 02 44 517-87 P co2 348.630 ..L S1 1988 12 09 10 32 -89.9800 -24.8000 2810.00 127596 SPO 1988 07 01 02 44 518-87 P co2 350.610 +.. S1 1988 12 09 10 34 -89.9800 -24.8000 2810.00 127597 SPO 1988 07 09 04 00 489-87 S co2 348.950 ... S1 1988 12 09 09 00 -89.9800 -24.8000 2810.00 127598 SPO 1988 07 09 04 00 490-87 S co2 349.280 ... S1 1988 12 09 09 02 -89.9800 -24.8000 2810.00 127599 SPO 1988 07 17 03 44 493-87 P co2 349.320 ..L S1 1988 12 09 10 16 -89.9800 -24.8000 2810.00 127600 SPO 1988 07 17 03 44 494-87 P co2 -999.990 *.. S1 1988 12 09 10 18 -89.9800 -24.8000 2810.00 127601 SPO 1988 07 23 03 00 495-87 S co2 349.200 ..L S1 1988 12 09 11 52 -89.9800 -24.8000 2810.00 127602 SPO 1988 07 23 03 00 496-87 S co2 378.940 +.. S1 1988 12 09 11 54 -89.9800 -24.8000 2810.00 127603 SPO 1988 08 03 02 30 497-87 P co2 349.240 ... S1 1988 12 09 11 20 -89.9800 -24.8000 2810.00 127604 SPO 1988 08 03 02 30 498-87 P co2 349.400 ... S1 1988 12 09 11 22 -89.9800 -24.8000 2810.00 127605 SPO 1988 08 08 06 00 499-87 S co2 349.420 ... S1 1988 12 09 12 00 -89.9800 -24.8000 2810.00 127606 SPO 1988 08 08 06 00 500-87 S co2 349.100 ... S1 1988 12 09 12 02 -89.9800 -24.8000 2810.00 127607 SPO 1988 08 15 03 14 501-87 P co2 349.680 ... S1 1988 12 09 10 56 -89.9800 -24.8000 2810.00 127608 SPO 1988 08 15 03 14 502-87 P co2 349.560 ... S1 1988 12 09 10 58 -89.9800 -24.8000 2810.00 127609 SPO 1988 08 26 09 00 503-87 S co2 -999.990 *.. S1 1988 12 09 09 44 -89.9800 -24.8000 2810.00 127610 SPO 1988 08 26 09 00 504-87 S co2 353.260 -.. S1 1988 12 09 09 46 -89.9800 -24.8000 2810.00 127611 SPO 1988 09 06 08 47 477-87 P co2 373.490 +.. S1 1988 12 09 11 24 -89.9800 -24.8000 2810.00 127612 SPO 1988 09 06 08 47 478-87 P co2 349.930 ..L S1 1988 12 09 11 26 -89.9800 -24.8000 2810.00 127613 SPO 1988 09 12 22 00 479-87 S co2 349.750 ... S1 1988 12 09 10 52 -89.9800 -24.8000 2810.00 127614 SPO 1988 09 12 22 00 480-87 S co2 349.760 ... S1 1988 12 09 10 54 -89.9800 -24.8000 2810.00 127615 SPO 1988 09 16 08 34 481-87 P co2 349.670 ... S1 1988 12 09 08 56 -89.9800 -24.8000 2810.00 127616 SPO 1988 09 16 08 34 482-87 P co2 349.870 ... S1 1988 12 09 08 58 -89.9800 -24.8000 2810.00 127617 SPO 1988 09 23 22 00 483-87 S co2 349.720 ... S1 1988 12 09 11 28 -89.9800 -24.8000 2810.00 127618 SPO 1988 09 23 22 00 484-87 S co2 349.840 ... S1 1988 12 09 11 30 -89.9800 -24.8000 2810.00 127619 SPO 1988 10 02 02 29 485-87 P co2 349.730 ... S1 1988 12 09 09 24 -89.9800 -24.8000 2810.00 127620 SPO 1988 10 02 02 29 486-87 P co2 349.640 ... S1 1988 12 09 09 26 -89.9800 -24.8000 2810.00 127621 SPO 1988 10 09 05 00 487-87 S co2 349.880 ..L S1 1988 12 09 09 20 -89.9800 -24.8000 2810.00 127622 SPO 1988 10 09 05 00 488-87 S co2 354.060 +.. S1 1988 12 09 09 22 -89.9800 -24.8000 2810.00 127623 SPO 1988 10 15 03 12 491-87 P co2 349.960 ... S1 1988 12 09 11 04 -89.9800 -24.8000 2810.00 127624 SPO 1988 10 15 03 12 492-87 P co2 350.290 ... S1 1988 12 09 11 06 -89.9800 -24.8000 2810.00 127625 SPO 1988 10 25 23 59 463-87 S co2 350.120 ... S1 1989 02 08 08 20 -89.9800 -24.8000 2810.00 127626 SPO 1988 10 25 23 59 464-87 S co2 350.040 ... S1 1989 02 08 08 22 -89.9800 -24.8000 2810.00 127627 SPO 1988 11 02 05 40 466-87 P co2 350.040 ... S1 1989 02 08 08 54 -89.9800 -24.8000 2810.00 127628 SPO 1988 11 02 05 40 467-87 P co2 349.970 ... S1 1989 02 08 08 52 -89.9800 -24.8000 2810.00 127629 SPO 1988 11 09 02 50 469-87 S co2 349.930 ... S1 1989 02 08 08 12 -89.9800 -24.8000 2810.00 127630 SPO 1988 11 09 02 50 470-87 S co2 349.910 ... S1 1989 02 08 08 14 -89.9800 -24.8000 2810.00 127631 SPO 1988 11 22 10 00 471-87 S co2 350.770 +.. S1 1989 02 08 08 16 -89.9800 -24.8000 2810.00 127632 SPO 1988 11 22 10 00 472-87 S co2 349.910 ..L S1 1989 02 08 08 18 -89.9800 -24.8000 2810.00 127633 SPO 1988 11 27 22 00 473-87 P co2 350.040 ... S1 1989 02 08 08 56 -89.9800 -24.8000 2810.00 127634 SPO 1988 11 27 22 00 474-87 P co2 349.770 ... S1 1989 02 08 08 58 -89.9800 -24.8000 2810.00 127635 SPO 1988 12 03 04 20 475-87 P co2 349.870 ... S1 1989 02 08 08 48 -89.9800 -24.8000 2810.00 127636 SPO 1988 12 03 04 20 476-87 P co2 349.750 ... S1 1989 02 08 08 50 -89.9800 -24.8000 2810.00 127637 SPO 1988 12 06 03 50 601-81 P co2 349.760 ... S1 1988 12 22 09 20 -89.9800 -24.8000 2810.00 127638 SPO 1988 12 06 03 50 602-81 P co2 349.910 ... S1 1988 12 22 09 22 -89.9800 -24.8000 2810.00 127639 SPO 1988 12 06 23 00 599-81 S co2 349.770 ..L S1 1988 12 22 09 16 -89.9800 -24.8000 2810.00 127640 SPO 1988 12 06 23 00 600-81 S co2 364.780 +.. S1 1988 12 22 09 18 -89.9800 -24.8000 2810.00 127641 SPO 1988 12 07 03 00 595-81 P co2 349.990 ... S1 1989 01 20 10 20 -89.9800 -24.8000 2810.00 127642 SPO 1988 12 07 03 00 596-81 P co2 349.920 ... S1 1989 01 20 10 22 -89.9800 -24.8000 2810.00 127643 SPO 1988 12 08 22 00 435-87 S co2 350.030 ... S1 1989 04 13 09 52 -89.9800 -24.8000 2810.00 127644 SPO 1988 12 08 22 00 436-87 S co2 349.900 ... S1 1989 04 13 09 54 -89.9800 -24.8000 2810.00 127645 SPO 1988 12 09 02 58 573-81 S co2 -999.990 *.. S1 1989 01 20 08 44 -89.9800 -24.8000 2810.00 127646 SPO 1988 12 09 02 58 574-81 S co2 349.940 ..L S1 1989 01 20 08 46 -89.9800 -24.8000 2810.00 127647 SPO 1988 12 12 00 00 593-81 S co2 349.880 ..L S1 1989 01 20 10 00 -89.9800 -24.8000 2810.00 127648 SPO 1988 12 12 00 00 594-81 S co2 -999.990 *.. S1 1989 01 20 10 02 -89.9800 -24.8000 2810.00 127649 SPO 1988 12 12 00 00 597-81 P co2 349.780 ... S1 1989 01 20 11 04 -89.9800 -24.8000 2810.00 127650 SPO 1988 12 12 00 00 598-81 P co2 349.980 ... S1 1989 01 20 11 06 -89.9800 -24.8000 2810.00 127651 SPO 1988 12 17 12 34 439-87 P co2 352.540 +.. S1 1989 04 13 10 20 -89.9800 -24.8000 2810.00 127654 SPO 1988 12 17 12 34 440-87 P co2 349.930 ..L S1 1989 04 13 10 22 -89.9800 -24.8000 2810.00 127655 SPO 1988 12 22 04 05 437-87 S co2 349.800 ... S1 1989 04 13 09 12 -89.9800 -24.8000 2810.00 127656 SPO 1988 12 22 04 05 443-87 S co2 349.680 ... S1 1989 04 13 09 14 -89.9800 -24.8000 2810.00 127657 SPO 1989 01 04 22 40 441-87 P co2 350.060 ... S1 1989 04 13 08 48 -89.9800 -24.8000 2810.00 127658 SPO 1989 01 04 22 40 444-87 P co2 349.880 ... S1 1989 04 13 08 50 -89.9800 -24.8000 2810.00 127659 SPO 1989 01 09 05 00 438-87 S co2 353.290 +.. S1 1989 04 13 09 18 -89.9800 -24.8000 2810.00 127660 SPO 1989 01 09 05 00 442-87 S co2 350.270 -.. S1 1989 04 13 09 16 -89.9800 -24.8000 2810.00 127661 SPO 1989 01 20 12 32 446-87 P co2 349.910 ... S1 1989 04 13 09 20 -89.9800 -24.8000 2810.00 127662 SPO 1989 01 20 12 32 448-87 P co2 350.190 ... S1 1989 04 13 09 22 -89.9800 -24.8000 2810.00 127663 SPO 1989 01 25 18 00 445-87 S co2 349.780 ... S1 1989 04 13 10 48 -89.9800 -24.8000 2810.00 127664 SPO 1989 01 25 18 00 447-87 S co2 350.030 ... S1 1989 04 13 10 50 -89.9800 -24.8000 2810.00 127665 SPO 1989 02 06 07 30 451-87 P co2 349.890 ... S1 1989 12 05 10 00 -89.9800 -24.8000 2810.00 127666 SPO 1989 02 06 07 30 452-87 P co2 349.950 ... S1 1989 12 05 10 02 -89.9800 -24.8000 2810.00 127667 SPO 1989 02 08 04 25 461-87 S co2 349.880 ... S1 1989 04 10 08 56 -89.9800 -24.8000 2810.00 127668 SPO 1989 02 08 04 25 462-87 S co2 349.980 ... S1 1989 04 10 08 58 -89.9800 -24.8000 2810.00 127669 SPO 1989 02 17 09 15 453-87 P co2 351.030 +.. S1 1989 12 01 10 16 -89.9800 -24.8000 2810.00 127670 SPO 1989 02 17 09 15 454-87 P co2 350.020 -.. S1 1989 12 01 10 18 -89.9800 -24.8000 2810.00 127671 SPO 1989 02 21 21 55 449-87 S co2 348.330 -.. S1 1989 12 01 10 20 -89.9800 -24.8000 2810.00 127672 SPO 1989 02 21 21 55 450-87 S co2 350.030 +.. S1 1989 12 01 10 22 -89.9800 -24.8000 2810.00 127673 SPO 1989 03 01 03 05 455-87 P co2 350.030 ... S1 1989 12 05 10 24 -89.9800 -24.8000 2810.00 127674 SPO 1989 03 01 03 05 456-87 P co2 349.830 ... S1 1989 12 05 10 26 -89.9800 -24.8000 2810.00 127675 SPO 1989 03 07 21 55 459-87 S co2 349.700 ... S1 1989 12 05 10 16 -89.9800 -24.8000 2810.00 127676 SPO 1989 03 07 21 55 460-87 S co2 349.660 ... S1 1989 12 05 10 18 -89.9800 -24.8000 2810.00 127677 SPO 1989 03 20 23 15 457-87 P co2 369.320 +.. S1 1989 12 05 10 04 -89.9800 -24.8000 2810.00 127678 SPO 1989 03 20 23 15 458-87 P co2 349.780 -.. S1 1989 12 05 10 06 -89.9800 -24.8000 2810.00 127679 SPO 1989 03 21 22 44 693-81 S co2 349.870 ... S1 1989 12 05 12 08 -89.9800 -24.8000 2810.00 127680 SPO 1989 03 21 22 44 694-81 S co2 349.990 ... S1 1989 12 05 12 10 -89.9800 -24.8000 2810.00 127681 SPO 1989 04 02 22 41 691-81 P co2 349.920 ... S1 1989 12 05 12 40 -89.9800 -24.8000 2810.00 127682 SPO 1989 04 02 22 41 692-81 P co2 349.890 ... S1 1989 12 05 12 42 -89.9800 -24.8000 2810.00 127683 SPO 1989 04 10 22 06 695-81 S co2 349.950 ... S1 1989 12 05 12 00 -89.9800 -24.8000 2810.00 127684 SPO 1989 04 10 22 06 696-81 S co2 350.130 ... S1 1989 12 05 12 02 -89.9800 -24.8000 2810.00 127685 SPO 1989 04 15 02 20 697-81 P co2 350.020 ... S1 1989 12 05 11 00 -89.9800 -24.8000 2810.00 127686 SPO 1989 04 15 02 20 698-81 P co2 349.990 ... S1 1989 12 05 11 02 -89.9800 -24.8000 2810.00 127687 SPO 1989 04 21 23 10 700-81 S co2 350.050 ... S1 1989 12 05 12 04 -89.9800 -24.8000 2810.00 127688 SPO 1989 04 21 23 10 702-81 S co2 349.760 ... S1 1989 12 05 12 06 -89.9800 -24.8000 2810.00 127689 SPO 1989 05 01 10 25 699-81 P co2 350.000 ... S1 1989 12 05 11 20 -89.9800 -24.8000 2810.00 127690 SPO 1989 05 01 10 25 701-81 P co2 349.990 ... S1 1989 12 05 11 22 -89.9800 -24.8000 2810.00 127691 SPO 1989 05 09 21 45 424-87 S co2 350.040 ... S1 1989 12 01 09 52 -89.9800 -24.8000 2810.00 127692 SPO 1989 05 09 21 45 431-87 S co2 350.060 ... S1 1989 12 01 09 54 -89.9800 -24.8000 2810.00 127693 SPO 1989 05 17 23 55 421-87 P co2 350.170 ... S1 1989 12 01 09 28 -89.9800 -24.8000 2810.00 127694 SPO 1989 05 21 23 45 422-87 S co2 349.990 ... S1 1989 12 01 09 48 -89.9800 -24.8000 2810.00 127695 SPO 1989 05 21 23 45 434-87 S co2 350.120 ... S1 1989 12 01 09 50 -89.9800 -24.8000 2810.00 127696 SPO 1989 06 01 04 12 433-87 P co2 350.100 ... S1 1989 12 01 09 30 -89.9800 -24.8000 2810.00 127697 SPO 1989 06 07 23 31 425-87 S co2 350.260 ... S1 1989 12 01 09 20 -89.9800 -24.8000 2810.00 127698 SPO 1989 06 07 23 31 432-87 S co2 350.230 ... S1 1989 12 01 09 22 -89.9800 -24.8000 2810.00 127699 SPO 1989 06 15 08 20 429-87 P co2 350.440 ... S1 1989 12 01 09 56 -89.9800 -24.8000 2810.00 127700 SPO 1989 06 15 08 20 430-87 P co2 350.260 ... S1 1989 12 01 09 58 -89.9800 -24.8000 2810.00 127701 SPO 1989 06 22 22 05 427-87 S co2 350.450 ... S1 1989 12 01 09 26 -89.9800 -24.8000 2810.00 127702 SPO 1989 07 02 18 40 703-81 P co2 350.870 ... S1 1989 12 05 10 28 -89.9800 -24.8000 2810.00 127703 SPO 1989 07 02 18 40 704-81 P co2 350.740 ... S1 1989 12 05 10 30 -89.9800 -24.8000 2810.00 127704 SPO 1989 07 09 22 50 737-81 S co2 350.470 ... S1 1989 12 05 11 08 -89.9800 -24.8000 2810.00 127705 SPO 1989 07 09 22 50 738-81 S co2 350.390 ... S1 1989 12 05 11 10 -89.9800 -24.8000 2810.00 127706 SPO 1989 07 17 12 34 739-81 P co2 350.820 ... S1 1989 12 05 10 56 -89.9800 -24.8000 2810.00 127707 SPO 1989 07 17 12 34 742-81 P co2 350.670 ... S1 1989 12 05 10 58 -89.9800 -24.8000 2810.00 127708 SPO 1989 07 22 01 55 740-81 S co2 350.840 ... S1 1989 12 05 10 54 -89.9800 -24.8000 2810.00 127709 SPO 1989 07 22 01 55 741-81 S co2 350.910 ... S1 1989 12 05 10 52 -89.9800 -24.8000 2810.00 127710 SPO 1989 08 02 15 20 743-81 P co2 351.170 ... S1 1989 12 05 11 04 -89.9800 -24.8000 2810.00 127711 SPO 1989 08 02 15 20 744-81 P co2 351.280 ... S1 1989 12 05 11 06 -89.9800 -24.8000 2810.00 127712 SPO 1989 08 07 23 50 745-81 S co2 352.530 +.. S1 1989 12 05 12 12 -89.9800 -24.8000 2810.00 127713 SPO 1989 08 07 23 50 746-81 S co2 351.570 -.. S1 1989 12 05 12 14 -89.9800 -24.8000 2810.00 127714 SPO 1989 08 14 23 50 769-81 P co2 351.390 ... S1 1989 12 05 10 48 -89.9800 -24.8000 2810.00 127715 SPO 1989 08 14 23 50 770-81 P co2 351.170 ... S1 1989 12 05 10 50 -89.9800 -24.8000 2810.00 127716 SPO 1989 08 21 22 55 771-81 S co2 351.300 ... S1 1989 12 05 11 56 -89.9800 -24.8000 2810.00 127717 SPO 1989 08 21 22 55 772-81 S co2 351.260 ... S1 1989 12 05 11 58 -89.9800 -24.8000 2810.00 127718 SPO 1989 09 01 16 04 773-81 P co2 351.490 -.. S1 1989 12 05 12 24 -89.9800 -24.8000 2810.00 127719 SPO 1989 09 01 16 04 774-81 P co2 -999.990 *.. S1 1989 12 05 12 26 -89.9800 -24.8000 2810.00 127720 SPO 1989 09 07 23 55 775-81 S co2 351.160 ... S1 1989 12 05 10 36 -89.9800 -24.8000 2810.00 127721 SPO 1989 09 07 23 55 776-81 S co2 351.460 ... S1 1989 12 05 10 38 -89.9800 -24.8000 2810.00 127722 SPO 1989 09 18 23 20 777-81 P co2 372.760 +.. S1 1989 12 05 10 32 -89.9800 -24.8000 2810.00 127723 SPO 1989 09 18 23 20 778-81 P co2 351.450 -.. S1 1989 12 05 10 34 -89.9800 -24.8000 2810.00 127724 SPO 1989 09 21 23 50 779-81 S co2 351.730 ... S1 1989 12 01 09 44 -89.9800 -24.8000 2810.00 127725 SPO 1989 09 21 23 50 780-81 S co2 351.860 ... S1 1989 12 01 09 46 -89.9800 -24.8000 2810.00 127726 SPO 1989 10 02 10 35 781-81 P co2 351.280 ... S1 1989 12 01 09 12 -89.9800 -24.8000 2810.00 127727 SPO 1989 10 02 10 35 782-81 P co2 351.250 ... S1 1989 12 01 09 14 -89.9800 -24.8000 2810.00 127728 SPO 1989 10 09 22 55 783-81 S co2 351.410 ... S1 1989 12 01 09 32 -89.9800 -24.8000 2810.00 127729 SPO 1989 10 09 22 55 784-81 S co2 351.390 ... S1 1989 12 01 09 34 -89.9800 -24.8000 2810.00 127730 SPO 1989 10 14 14 21 753-81 P co2 351.500 ... S1 1990 03 21 08 20 -89.9800 -24.8000 2810.00 127731 SPO 1989 10 14 14 21 754-81 P co2 351.610 ... S1 1990 03 21 08 22 -89.9800 -24.8000 2810.00 127732 SPO 1989 10 22 21 55 755-81 S co2 351.190 .X. S1 1990 03 21 12 32 -89.9800 -24.8000 2810.00 127733 SPO 1989 10 22 21 55 756-81 S co2 351.280 .X. S1 1990 03 21 12 34 -89.9800 -24.8000 2810.00 127734 SPO 1989 11 05 00 12 757-81 P co2 352.850 .X. S1 1990 03 21 08 40 -89.9800 -24.8000 2810.00 127735 SPO 1989 11 05 00 12 758-81 P co2 352.390 .X. S1 1990 03 21 08 42 -89.9800 -24.8000 2810.00 127736 SPO 1989 11 08 10 02 759-81 S co2 351.950 +.. S1 1990 03 21 09 12 -89.9800 -24.8000 2810.00 127737 SPO 1989 11 08 10 02 760-81 S co2 351.410 -.. S1 1990 03 21 09 14 -89.9800 -24.8000 2810.00 127738 SPO 1989 11 15 12 34 767-81 P co2 352.350 -.. S1 1990 03 21 08 28 -89.9800 -24.8000 2810.00 127739 SPO 1989 11 15 12 34 768-81 P co2 355.360 +.. S1 1990 03 21 08 30 -89.9800 -24.8000 2810.00 127740 SPO 1989 11 25 12 00 765-81 S co2 351.170 .X. S1 1990 03 21 08 48 -89.9800 -24.8000 2810.00 127741 SPO 1989 11 25 12 00 766-81 S co2 351.280 .X. S1 1990 03 21 08 50 -89.9800 -24.8000 2810.00 127742 SPO 1989 12 03 22 20 761-81 P co2 352.240 .X. S1 1990 03 21 08 44 -89.9800 -24.8000 2810.00 127743 SPO 1989 12 03 22 20 762-81 P co2 352.410 .X. S1 1990 03 21 08 46 -89.9800 -24.8000 2810.00 127744 SPO 1989 12 08 11 40 763-81 S co2 351.970 ... S1 1990 03 21 08 16 -89.9800 -24.8000 2810.00 127745 SPO 1989 12 08 11 40 764-81 S co2 352.090 ... S1 1990 03 21 08 18 -89.9800 -24.8000 2810.00 127746 SPO 1989 12 15 09 31 749-81 P co2 351.630 -.. S1 1991 01 11 10 32 -89.9800 -24.8000 2810.00 127747 SPO 1989 12 15 09 31 750-81 P co2 357.790 +.. S1 1991 01 11 10 34 -89.9800 -24.8000 2810.00 127748 SPO 1989 12 26 04 57 747-81 S co2 350.510 .X. S1 1991 01 07 08 48 -89.9800 -24.8000 2810.00 127749 SPO 1989 12 26 04 57 748-81 S co2 350.940 .X. S1 1991 01 07 08 50 -89.9800 -24.8000 2810.00 127750 SPO 1990 01 04 08 40 751-81 P co2 351.200 ... S1 1991 01 11 10 36 -89.9800 -24.8000 2810.00 127751 SPO 1990 01 04 08 40 752-81 P co2 351.230 ... S1 1991 01 11 10 38 -89.9800 -24.8000 2810.00 127752 SPO 1990 01 07 20 46 721-81 S co2 372.860 +.. S1 1991 01 07 10 20 -89.9800 -24.8000 2810.00 127753 SPO 1990 01 07 20 46 722-81 S co2 351.290 -.. S1 1991 01 07 10 22 -89.9800 -24.8000 2810.00 127754 SPO 1990 02 05 12 34 723-81 P co2 351.260 +.. S1 1991 01 07 10 32 -89.9800 -24.8000 2810.00 127755 SPO 1990 02 05 12 34 724-81 P co2 350.450 -.. S1 1991 01 07 10 34 -89.9800 -24.8000 2810.00 127756 SPO 1990 02 09 03 59 725-81 S co2 350.650 -.. S1 1991 01 07 09 52 -89.9800 -24.8000 2810.00 127757 SPO 1990 02 09 03 59 726-81 S co2 352.090 +.. S1 1991 01 07 09 54 -89.9800 -24.8000 2810.00 127758 SPO 1990 02 19 03 47 791-81 P co2 351.010 ... S1 1991 01 17 09 52 -89.9800 -24.8000 2810.00 127759 SPO 1990 02 19 03 47 792-81 P co2 350.760 ... S1 1991 01 17 09 54 -89.9800 -24.8000 2810.00 127760 SPO 1990 02 27 02 59 793-81 S co2 350.950 ... S1 1991 01 17 10 16 -89.9800 -24.8000 2810.00 127761 SPO 1990 02 27 02 59 794-81 S co2 350.530 ... S1 1991 01 17 10 18 -89.9800 -24.8000 2810.00 127762 SPO 1990 03 03 02 35 787-81 P co2 349.510 -.. S1 1991 01 17 09 48 -89.9800 -24.8000 2810.00 127763 SPO 1990 03 03 02 35 788-81 P co2 351.120 +.. S1 1991 01 17 09 50 -89.9800 -24.8000 2810.00 127764 SPO 1990 03 09 03 57 795-81 S co2 364.980 +.. S1 1991 01 17 08 44 -89.9800 -24.8000 2810.00 127765 SPO 1990 03 09 03 57 796-81 S co2 352.750 -.. S1 1991 01 17 08 46 -89.9800 -24.8000 2810.00 127766 SPO 1990 03 16 03 25 789-81 P co2 351.040 ... S1 1991 01 17 09 44 -89.9800 -24.8000 2810.00 127767 SPO 1990 03 16 03 25 790-81 P co2 350.800 ... S1 1991 01 17 09 46 -89.9800 -24.8000 2810.00 127768 SPO 1990 03 23 04 57 797-81 S co2 351.390 +.. S1 1991 01 17 10 20 -89.9800 -24.8000 2810.00 127769 SPO 1990 03 23 04 57 798-81 S co2 350.840 -.. S1 1991 01 17 10 22 -89.9800 -24.8000 2810.00 127770 SPO 1990 04 09 05 10 799-81 P co2 354.090 +.. S1 1991 01 16 10 00 -89.9800 -24.8000 2810.00 127771 SPO 1990 04 09 05 10 800-81 P co2 353.560 -.. S1 1991 01 16 10 02 -89.9800 -24.8000 2810.00 127772 SPO 1990 04 16 04 57 729-81 S co2 350.880 ... S1 1991 01 23 09 16 -89.9800 -24.8000 2810.00 127773 SPO 1990 04 16 04 57 730-81 S co2 350.570 ... S1 1991 01 23 09 18 -89.9800 -24.8000 2810.00 127774 SPO 1990 04 16 05 21 733-81 P co2 350.970 ... S1 1991 01 17 08 20 -89.9800 -24.8000 2810.00 127775 SPO 1990 04 16 05 21 734-81 P co2 351.130 ... S1 1991 01 17 08 22 -89.9800 -24.8000 2810.00 127776 SPO 1990 04 24 22 58 727-81 S co2 350.960 ... S1 1991 01 17 08 16 -89.9800 -24.8000 2810.00 127777 SPO 1990 04 24 22 58 728-81 S co2 351.240 ... S1 1991 01 17 08 18 -89.9800 -24.8000 2810.00 127778 SPO 1990 05 02 21 59 731-81 P co2 351.770 ... S1 1991 01 17 09 20 -89.9800 -24.8000 2810.00 127779 SPO 1990 05 02 21 59 732-81 P co2 351.640 ... S1 1991 01 17 09 22 -89.9800 -24.8000 2810.00 127780 SPO 1990 05 02 22 59 705-81 S co2 351.460 ... S1 1991 01 17 08 52 -89.9800 -24.8000 2810.00 127781 SPO 1990 05 02 22 59 706-81 S co2 351.150 ... S1 1991 01 17 08 54 -89.9800 -24.8000 2810.00 127782 SPO 1990 05 08 09 59 707-81 S co2 351.880 ... S1 1991 01 17 08 48 -89.9800 -24.8000 2810.00 127783 SPO 1990 05 08 09 59 708-81 S co2 351.480 ... S1 1991 01 17 08 50 -89.9800 -24.8000 2810.00 127784 SPO 1990 05 08 11 59 736-81 S co2 352.350 N.. S1 1991 01 17 08 12 -89.9800 -24.8000 2810.00 127785 SPO 1990 05 21 03 49 711-81 P co2 351.780 ... S1 1991 01 16 10 04 -89.9800 -24.8000 2810.00 127786 SPO 1990 05 21 03 49 712-81 P co2 351.470 ... S1 1991 01 16 10 06 -89.9800 -24.8000 2810.00 127787 SPO 1990 05 21 03 59 715-81 S co2 351.480 ... S1 1991 01 16 10 16 -89.9800 -24.8000 2810.00 127788 SPO 1990 05 21 03 59 716-81 S co2 351.630 ... S1 1991 01 16 10 18 -89.9800 -24.8000 2810.00 127789 SPO 1990 05 29 03 59 785-81 S co2 351.660 -.. S1 1991 01 16 11 20 -89.9800 -24.8000 2810.00 127790 SPO 1990 05 29 03 59 786-81 S co2 -999.990 *.. S1 1991 01 16 11 22 -89.9800 -24.8000 2810.00 127791 SPO 1990 06 04 11 06 713-81 P co2 351.720 ... S1 1991 01 16 10 36 -89.9800 -24.8000 2810.00 127792 SPO 1990 06 04 11 06 714-81 P co2 351.420 ... S1 1991 01 16 10 38 -89.9800 -24.8000 2810.00 127793 SPO 1990 06 09 14 59 719-81 S co2 352.730 +.. S1 1991 01 16 10 32 -89.9800 -24.8000 2810.00 127794 SPO 1990 06 09 14 59 720-81 S co2 351.440 -.. S1 1991 01 16 10 34 -89.9800 -24.8000 2810.00 127795 SPO 1990 06 19 03 45 717-81 P co2 351.490 ... S1 1991 01 16 10 48 -89.9800 -24.8000 2810.00 127796 SPO 1990 06 19 03 45 718-81 P co2 351.940 ... S1 1991 01 16 10 50 -89.9800 -24.8000 2810.00 127797 SPO 1990 06 19 03 59 709-81 S co2 351.670 ... S1 1991 01 16 09 16 -89.9800 -24.8000 2810.00 127798 SPO 1990 06 19 03 59 710-81 S co2 351.640 ... S1 1991 01 16 09 18 -89.9800 -24.8000 2810.00 127799 SPO 1990 06 26 08 59 1351-81 S co2 361.700 -.. S1 1991 01 07 08 16 -89.9800 -24.8000 2810.00 127800 SPO 1990 06 26 08 59 1352-81 S co2 363.200 +.. S1 1991 01 07 08 18 -89.9800 -24.8000 2810.00 127801 SPO 1990 07 02 04 21 1353-81 P co2 351.840 ... S1 1991 01 07 08 12 -89.9800 -24.8000 2810.00 127802 SPO 1990 07 02 04 21 1354-81 P co2 351.700 ... S1 1991 01 07 08 14 -89.9800 -24.8000 2810.00 127803 SPO 1990 07 02 04 59 1347-81 S co2 351.870 ... S1 1991 01 07 08 28 -89.9800 -24.8000 2810.00 127804 SPO 1990 07 02 04 59 1348-81 S co2 351.930 ... S1 1991 01 07 08 30 -89.9800 -24.8000 2810.00 127805 SPO 1990 07 07 12 59 1349-81 S co2 351.890 ... S1 1991 01 07 08 24 -89.9800 -24.8000 2810.00 127806 SPO 1990 07 07 12 59 1350-81 S co2 351.920 ... S1 1991 01 07 08 26 -89.9800 -24.8000 2810.00 127807 SPO 1990 07 18 05 31 1343-81 P co2 352.310 ... S1 1991 01 07 08 40 -89.9800 -24.8000 2810.00 127808 SPO 1990 07 18 05 31 1344-81 P co2 352.170 ... S1 1991 01 07 08 42 -89.9800 -24.8000 2810.00 127809 SPO 1990 07 18 05 59 1345-81 S co2 351.970 ... S1 1991 01 07 08 52 -89.9800 -24.8000 2810.00 127810 SPO 1990 07 18 05 59 1346-81 S co2 352.150 ... S1 1991 01 07 08 54 -89.9800 -24.8000 2810.00 127811 SPO 1990 07 22 05 07 1371-81 S co2 352.160 ... S1 1991 01 07 08 44 -89.9800 -24.8000 2810.00 127812 SPO 1990 07 22 05 07 1372-81 S co2 352.170 ... S1 1991 01 07 08 46 -89.9800 -24.8000 2810.00 127813 SPO 1990 08 06 12 33 1373-81 P co2 352.320 ... S1 1991 01 07 09 00 -89.9800 -24.8000 2810.00 127814 SPO 1990 08 06 12 33 1374-81 P co2 352.240 ... S1 1991 01 07 09 02 -89.9800 -24.8000 2810.00 127815 SPO 1990 08 06 12 59 1375-81 S co2 352.250 -.. S1 1991 01 07 10 24 -89.9800 -24.8000 2810.00 127816 SPO 1990 08 06 12 59 1376-81 S co2 366.090 +.. S1 1991 01 07 10 26 -89.9800 -24.8000 2810.00 127817 SPO 1990 08 13 08 59 1377-81 S co2 367.620 +.. S1 1991 01 07 08 56 -89.9800 -24.8000 2810.00 127818 SPO 1990 08 13 08 59 1378-81 S co2 352.400 -.. S1 1991 01 07 08 58 -89.9800 -24.8000 2810.00 127819 SPO 1990 08 16 03 37 1379-81 P co2 352.270 ... S1 1991 01 07 10 28 -89.9800 -24.8000 2810.00 127820 SPO 1990 08 16 03 37 1380-81 P co2 352.430 ... S1 1991 01 07 10 30 -89.9800 -24.8000 2810.00 127821 SPO 1990 08 16 03 59 1381-81 S co2 352.420 ... S1 1991 01 11 10 28 -89.9800 -24.8000 2810.00 127822 SPO 1990 08 16 03 59 1382-81 S co2 352.390 ... S1 1991 01 11 10 30 -89.9800 -24.8000 2810.00 127823 SPO 1990 08 26 10 59 1421-81 S co2 352.580 ... S1 1991 01 07 09 44 -89.9800 -24.8000 2810.00 127824 SPO 1990 08 26 10 59 1422-81 S co2 352.600 ... S1 1991 01 07 09 46 -89.9800 -24.8000 2810.00 127825 SPO 1990 09 04 09 56 1419-81 P co2 352.660 ... S1 1991 01 07 08 20 -89.9800 -24.8000 2810.00 127826 SPO 1990 09 04 09 56 1420-81 P co2 352.630 ... S1 1991 01 07 08 22 -89.9800 -24.8000 2810.00 127827 SPO 1990 09 04 09 59 1423-81 S co2 352.580 ... S1 1991 01 07 09 48 -89.9800 -24.8000 2810.00 127828 SPO 1990 09 04 09 59 1424-81 S co2 352.640 ... S1 1991 01 07 09 50 -89.9800 -24.8000 2810.00 127829 SPO 1990 09 10 08 59 1425-81 S co2 352.600 ... S1 1991 01 07 09 56 -89.9800 -24.8000 2810.00 127830 SPO 1990 09 10 08 59 1426-81 S co2 352.630 ... S1 1991 01 07 09 58 -89.9800 -24.8000 2810.00 127831 SPO 1990 09 20 02 42 1427-81 P co2 352.610 ... S1 1991 01 07 09 32 -89.9800 -24.8000 2810.00 127832 SPO 1990 09 20 02 42 1428-81 P co2 352.690 ... S1 1991 01 07 09 34 -89.9800 -24.8000 2810.00 127833 SPO 1990 09 20 02 59 1429-81 S co2 352.710 ... S1 1991 01 07 09 28 -89.9800 -24.8000 2810.00 127834 SPO 1990 09 20 02 59 1430-81 S co2 352.700 ... S1 1991 01 07 09 30 -89.9800 -24.8000 2810.00 127835 SPO 1990 09 26 02 59 1399-81 S co2 352.760 ... S1 1991 01 23 10 20 -89.9800 -24.8000 2810.00 127836 SPO 1990 09 26 02 59 1400-81 S co2 352.830 ... S1 1991 01 23 10 22 -89.9800 -24.8000 2810.00 127837 SPO 1990 10 05 03 19 1401-81 P co2 354.690 +.. S1 1991 01 23 10 32 -89.9800 -24.8000 2810.00 127838 SPO 1990 10 05 03 19 1402-81 P co2 352.560 -.. S1 1991 01 23 10 34 -89.9800 -24.8000 2810.00 127839 SPO 1990 10 05 03 59 1403-81 S co2 352.520 ... S1 1991 01 23 10 04 -89.9800 -24.8000 2810.00 127840 SPO 1990 10 05 03 59 1404-81 S co2 352.630 ... S1 1991 01 23 10 06 -89.9800 -24.8000 2810.00 127841 SPO 1990 10 11 21 59 1405-81 S co2 352.690 ... S1 1991 01 23 10 16 -89.9800 -24.8000 2810.00 127842 SPO 1990 10 11 21 59 1406-81 S co2 352.680 ... S1 1991 01 23 10 18 -89.9800 -24.8000 2810.00 127843 SPO 1990 10 18 03 23 1407-81 P co2 352.660 ... S1 1991 01 23 10 24 -89.9800 -24.8000 2810.00 127844 SPO 1990 10 18 03 23 1408-81 P co2 352.790 ... S1 1991 01 23 10 26 -89.9800 -24.8000 2810.00 127845 SPO 1990 10 18 04 59 1409-81 S co2 352.660 -.. S1 1991 01 23 10 36 -89.9800 -24.8000 2810.00 127846 SPO 1990 10 18 04 59 1410-81 S co2 357.650 +.. S1 1991 01 23 10 38 -89.9800 -24.8000 2810.00 127847 SPO 1990 10 24 02 59 1443-81 S co2 352.890 ... S1 1991 01 17 09 12 -89.9800 -24.8000 2810.00 127848 SPO 1990 10 24 02 59 1444-81 S co2 352.760 ... S1 1991 01 17 09 14 -89.9800 -24.8000 2810.00 127849 SPO 1990 11 06 03 15 1441-81 S co2 353.030 ... S1 1991 01 23 09 00 -89.9800 -24.8000 2810.00 127850 SPO 1990 11 06 03 15 1442-81 S co2 352.980 ... S1 1991 01 23 09 02 -89.9800 -24.8000 2810.00 127851 SPO 1990 11 06 03 27 1439-81 P co2 353.040 ... S1 1991 01 23 09 28 -89.9800 -24.8000 2810.00 127852 SPO 1990 11 06 03 27 1440-81 P co2 352.830 ... S1 1991 01 23 09 30 -89.9800 -24.8000 2810.00 127853 SPO 1990 11 15 04 35 1445-81 S co2 352.810 ... S1 1991 01 23 09 24 -89.9800 -24.8000 2810.00 127854 SPO 1990 11 15 04 35 1446-81 S co2 352.910 ... S1 1991 01 23 09 26 -89.9800 -24.8000 2810.00 127855 SPO 1990 11 15 04 40 1391-81 P co2 352.870 ... S1 1991 01 23 09 12 -89.9800 -24.8000 2810.00 127856 SPO 1990 11 15 04 40 1392-81 P co2 352.830 ... S1 1991 01 23 09 14 -89.9800 -24.8000 2810.00 127857 SPO 1990 11 23 03 40 1393-81 S co2 353.920 -.. S1 1991 01 23 10 56 -89.9800 -24.8000 2810.00 127858 SPO 1990 11 23 03 40 1394-81 S co2 358.560 +.. S1 1991 01 23 10 58 -89.9800 -24.8000 2810.00 127859 SPO 1990 12 01 05 41 1369-81 P co2 352.580 ... S1 1991 01 23 11 00 -89.9800 -24.8000 2810.00 127860 SPO 1990 12 01 05 41 1370-81 P co2 352.600 ... S1 1991 01 23 11 02 -89.9800 -24.8000 2810.00 127861 SPO 1990 12 01 05 50 1367-81 S co2 352.640 ... S1 1991 01 23 11 24 -89.9800 -24.8000 2810.00 127862 SPO 1990 12 01 05 50 1368-81 S co2 352.660 ... S1 1991 01 23 11 26 -89.9800 -24.8000 2810.00 127863 SPO 1990 12 15 04 09 1397-81 S co2 352.410 ... S1 1991 01 23 11 28 -89.9800 -24.8000 2810.00 127864 SPO 1990 12 15 04 09 1398-81 S co2 352.480 ... S1 1991 01 23 11 30 -89.9800 -24.8000 2810.00 127865 SPO 1990 12 15 04 16 1395-81 P co2 352.450 ... S1 1991 01 23 10 52 -89.9800 -24.8000 2810.00 127866 SPO 1990 12 15 04 16 1396-81 P co2 352.430 ... S1 1991 01 23 10 54 -89.9800 -24.8000 2810.00 127867 SPO 1990 12 22 04 29 919-81 S co2 352.620 ... S1 1991 04 05 08 40 -89.9800 -24.8000 2810.00 127868 SPO 1990 12 22 04 29 920-81 S co2 352.720 ... S1 1991 04 05 08 42 -89.9800 -24.8000 2810.00 127869 SPO 1990 12 29 12 34 201-81 S co2 352.660 -.. S1 1991 04 05 08 44 -89.9800 -24.8000 2810.00 127870 SPO 1990 12 29 12 34 202-81 S co2 353.510 +.. S1 1991 04 05 08 46 -89.9800 -24.8000 2810.00 127871 SPO 1990 12 29 12 34 567-81 P co2 352.710 ... S1 1991 04 05 10 00 -89.9800 -24.8000 2810.00 127872 SPO 1990 12 29 12 34 568-81 P co2 352.590 ... S1 1991 04 05 10 02 -89.9800 -24.8000 2810.00 127873 SPO 1991 01 07 03 55 1149-81 S co2 352.830 ... S1 1991 04 05 09 44 -89.9800 -24.8000 2810.00 127874 SPO 1991 01 07 03 55 1150-81 S co2 352.750 ... S1 1991 04 05 09 46 -89.9800 -24.8000 2810.00 127875 SPO 1991 01 12 12 34 1303-81 S co2 352.790 ... S1 1991 03 29 08 16 -89.9800 -24.8000 2810.00 127876 SPO 1991 01 12 12 34 1304-81 S co2 352.820 ... S1 1991 03 29 08 18 -89.9800 -24.8000 2810.00 127877 SPO 1991 01 19 02 55 1223-81 S co2 352.690 ... S1 1991 03 29 08 20 -89.9800 -24.8000 2810.00 127878 SPO 1991 01 19 02 55 1224-81 S co2 352.660 ... S1 1991 03 29 08 22 -89.9800 -24.8000 2810.00 127879 SPO 1991 01 28 05 56 1433-81 S co2 352.480 ... S1 1991 12 13 11 32 -89.9800 -24.8000 2810.00 127880 SPO 1991 01 28 05 56 1434-81 S co2 352.380 ... S1 1991 12 13 11 34 -89.9800 -24.8000 2810.00 127881 SPO 1991 02 01 03 35 1417-81 P co2 352.210 ... S1 1991 12 13 11 24 -89.9800 -24.8000 2810.00 127882 SPO 1991 02 01 03 35 1418-81 P co2 352.190 ... S1 1991 12 13 11 26 -89.9800 -24.8000 2810.00 127883 SPO 1991 02 02 06 58 1435-81 S co2 351.650 .X. S1 1991 12 13 11 28 -89.9800 -24.8000 2810.00 127884 SPO 1991 02 02 06 58 1436-81 S co2 351.570 .X. S1 1991 12 13 11 30 -89.9800 -24.8000 2810.00 127885 SPO 1991 02 12 12 34 1437-81 P co2 354.140 +.. S1 1991 12 18 10 28 -89.9800 -24.8000 2810.00 127886 SPO 1991 02 12 12 34 1438-81 P co2 352.300 -.. S1 1991 12 18 10 30 -89.9800 -24.8000 2810.00 127887 SPO 1991 02 16 04 06 1431-81 S co2 352.530 ... S1 1991 12 13 10 56 -89.9800 -24.8000 2810.00 127888 SPO 1991 02 16 04 06 1432-81 S co2 352.600 ... S1 1991 12 13 10 58 -89.9800 -24.8000 2810.00 127889 SPO 1991 02 22 22 42 1415-81 S co2 352.960 .X. S1 1991 12 18 10 24 -89.9800 -24.8000 2810.00 127890 SPO 1991 02 22 22 42 1416-81 S co2 352.770 .X. S1 1991 12 18 10 26 -89.9800 -24.8000 2810.00 127891 SPO 1991 03 01 15 50 1411-81 P co2 352.260 ... S1 1991 12 13 11 20 -89.9800 -24.8000 2810.00 127892 SPO 1991 03 01 15 50 1412-81 P co2 352.260 ... S1 1991 12 13 11 22 -89.9800 -24.8000 2810.00 127893 SPO 1991 03 02 02 00 1413-81 S co2 352.150 ... S1 1991 12 13 11 04 -89.9800 -24.8000 2810.00 127894 SPO 1991 03 02 02 00 1414-81 S co2 352.080 ... S1 1991 12 13 11 06 -89.9800 -24.8000 2810.00 127895 SPO 1991 03 09 02 10 1385-81 S co2 354.390 -.. S1 1991 12 13 10 28 -89.9800 -24.8000 2810.00 127896 SPO 1991 03 09 02 10 1386-81 S co2 355.560 +.. S1 1991 12 13 10 30 -89.9800 -24.8000 2810.00 127897 SPO 1991 03 16 02 17 1389-81 S co2 352.200 -.. S1 1991 12 13 11 08 -89.9800 -24.8000 2810.00 127898 SPO 1991 03 16 02 17 1390-81 S co2 356.590 +.. S1 1991 12 13 11 10 -89.9800 -24.8000 2810.00 127899 SPO 1991 03 16 14 55 1387-81 P co2 -999.990 *.. S1 1991 12 13 10 32 -89.9800 -24.8000 2810.00 127900 SPO 1991 03 16 14 55 1388-81 P co2 352.200 -.. S1 1991 12 13 10 34 -89.9800 -24.8000 2810.00 127901 SPO 1991 03 26 04 50 1365-81 S co2 352.780 ... S1 1991 12 18 10 36 -89.9800 -24.8000 2810.00 127902 SPO 1991 03 26 04 50 1366-81 S co2 352.360 ... S1 1991 12 18 10 38 -89.9800 -24.8000 2810.00 127903 SPO 1991 03 30 01 31 1363-81 S co2 352.050 .X. S1 1991 12 18 10 48 -89.9800 -24.8000 2810.00 127904 SPO 1991 03 30 01 31 1364-81 S co2 352.030 .X. S1 1991 12 18 10 50 -89.9800 -24.8000 2810.00 127905 SPO 1991 04 01 04 02 1361-81 P co2 352.190 ... S1 1991 12 18 10 32 -89.9800 -24.8000 2810.00 127906 SPO 1991 04 01 04 02 1362-81 P co2 352.180 ... S1 1991 12 18 10 34 -89.9800 -24.8000 2810.00 127907 SPO 1991 04 07 23 30 1359-81 S co2 352.520 ... S1 1991 12 18 10 52 -89.9800 -24.8000 2810.00 127908 SPO 1991 04 07 23 30 1360-81 S co2 352.530 ... S1 1991 12 18 10 54 -89.9800 -24.8000 2810.00 127909 SPO 1991 04 13 01 33 1357-81 S co2 352.510 ... S1 1991 12 13 10 52 -89.9800 -24.8000 2810.00 127910 SPO 1991 04 13 01 33 1358-81 S co2 352.550 ... S1 1991 12 13 10 54 -89.9800 -24.8000 2810.00 127911 SPO 1991 04 15 03 15 1355-81 P co2 352.480 -.. S1 1991 12 18 09 24 -89.9800 -24.8000 2810.00 127912 SPO 1991 04 15 03 15 1356-81 P co2 353.130 +.. S1 1991 12 18 09 26 -89.9800 -24.8000 2810.00 127913 SPO 1991 04 20 02 20 1503-81 S co2 352.940 ... S1 1991 12 13 10 16 -89.9800 -24.8000 2810.00 127914 SPO 1991 04 20 02 20 1504-81 S co2 352.910 ... S1 1991 12 13 10 18 -89.9800 -24.8000 2810.00 127915 SPO 1991 04 27 01 37 1505-81 S co2 352.860 ... S1 1991 12 13 10 24 -89.9800 -24.8000 2810.00 127916 SPO 1991 04 27 01 37 1506-81 S co2 352.790 ... S1 1991 12 13 10 26 -89.9800 -24.8000 2810.00 127917 SPO 1991 05 01 10 50 1497-81 P co2 355.600 -.. S1 1991 12 13 10 20 -89.9800 -24.8000 2810.00 127918 SPO 1991 05 01 10 50 1498-81 P co2 360.110 +.. S1 1991 12 13 10 22 -89.9800 -24.8000 2810.00 127919 SPO 1991 05 04 02 52 1487-81 S co2 352.880 ... S1 1991 12 13 10 00 -89.9800 -24.8000 2810.00 127920 SPO 1991 05 04 02 52 1488-81 S co2 353.350 ... S1 1991 12 13 10 02 -89.9800 -24.8000 2810.00 127921 SPO 1991 05 15 02 48 1489-81 P co2 352.300 ... S1 1991 12 13 09 48 -89.9800 -24.8000 2810.00 127922 SPO 1991 05 15 02 48 1490-81 P co2 352.550 ... S1 1991 12 13 09 50 -89.9800 -24.8000 2810.00 127923 SPO 1991 05 18 02 10 1495-81 S co2 353.820 +.. S1 1991 12 13 10 04 -89.9800 -24.8000 2810.00 127924 SPO 1991 05 18 02 10 1496-81 S co2 352.740 -.. S1 1991 12 13 10 06 -89.9800 -24.8000 2810.00 127925 SPO 1991 05 25 03 06 1519-81 S co2 353.060 -.. S1 1991 12 13 10 48 -89.9800 -24.8000 2810.00 127926 SPO 1991 05 25 03 06 1520-81 S co2 355.950 +.. S1 1991 12 13 10 50 -89.9800 -24.8000 2810.00 127927 SPO 1991 06 01 10 57 1535-81 S co2 359.740 +.. S1 1991 12 18 09 30 -89.9800 -24.8000 2810.00 127928 SPO 1991 06 01 10 57 1536-81 S co2 353.720 -.. S1 1991 12 18 09 28 -89.9800 -24.8000 2810.00 127929 SPO 1991 06 01 13 47 1513-81 P co2 352.990 ... S1 1991 12 18 09 12 -89.9800 -24.8000 2810.00 127930 SPO 1991 06 01 13 47 1514-81 P co2 352.490 ... S1 1991 12 18 09 14 -89.9800 -24.8000 2810.00 127931 SPO 1991 06 08 01 10 1511-81 S co2 352.800 ... S1 1991 12 18 09 16 -89.9800 -24.8000 2810.00 127932 SPO 1991 06 08 01 10 1512-81 S co2 352.950 ... S1 1991 12 18 09 18 -89.9800 -24.8000 2810.00 127933 SPO 1991 06 15 01 13 1515-81 S co2 353.300 -.. S1 1991 12 18 09 00 -89.9800 -24.8000 2810.00 127934 SPO 1991 06 15 01 13 1516-81 S co2 355.800 +.. S1 1991 12 18 09 02 -89.9800 -24.8000 2810.00 127935 SPO 1991 06 15 03 27 1517-81 P co2 353.090 -.. S1 1991 12 18 08 56 -89.9800 -24.8000 2810.00 127936 SPO 1991 06 15 03 27 1518-81 P co2 354.120 +.. S1 1991 12 18 08 58 -89.9800 -24.8000 2810.00 127937 SPO 1991 06 22 02 30 619-81 S co2 353.180 ... S1 1991 12 13 09 12 -89.9800 -24.8000 2810.00 127938 SPO 1991 06 22 02 30 620-81 S co2 353.360 ... S1 1991 12 13 09 14 -89.9800 -24.8000 2810.00 127939 SPO 1991 07 01 08 52 901-81 S co2 353.180 ... S1 1991 12 13 09 00 -89.9800 -24.8000 2810.00 127940 SPO 1991 07 01 08 52 902-81 S co2 353.220 ... S1 1991 12 13 09 02 -89.9800 -24.8000 2810.00 127941 SPO 1991 07 01 10 00 505-81 P co2 353.290 ... S1 1991 12 13 08 48 -89.9800 -24.8000 2810.00 127942 SPO 1991 07 01 10 00 506-81 P co2 353.400 ... S1 1991 12 13 08 50 -89.9800 -24.8000 2810.00 127943 SPO 1991 07 07 21 51 899-81 S co2 353.350 -.. S1 1991 12 13 08 44 -89.9800 -24.8000 2810.00 127944 SPO 1991 07 07 21 51 900-81 S co2 354.440 +.. S1 1991 12 13 08 46 -89.9800 -24.8000 2810.00 127945 SPO 1991 07 13 02 43 987-81 S co2 -999.990 *.. S1 1991 12 13 08 52 -89.9800 -24.8000 2810.00 127946 SPO 1991 07 13 02 43 988-81 S co2 354.440 -.. S1 1991 12 13 08 54 -89.9800 -24.8000 2810.00 127947 SPO 1991 07 15 03 51 1119-81 P co2 353.330 ... S1 1991 12 13 08 56 -89.9800 -24.8000 2810.00 127948 SPO 1991 07 15 03 51 1120-81 P co2 353.370 ... S1 1991 12 13 08 58 -89.9800 -24.8000 2810.00 127949 SPO 1991 07 22 02 17 1531-81 S co2 -999.990 *.. S1 1991 12 13 09 20 -89.9800 -24.8000 2810.00 127950 SPO 1991 07 22 02 17 1532-81 S co2 -999.990 *.. S1 1991 12 13 09 22 -89.9800 -24.8000 2810.00 127951 SPO 1991 07 27 01 55 57-81 S co2 353.580 ... S1 1991 12 18 08 28 -89.9800 -24.8000 2810.00 127952 SPO 1991 07 27 01 55 58-81 S co2 353.790 ... S1 1991 12 18 08 30 -89.9800 -24.8000 2810.00 127953 SPO 1991 08 01 03 07 1527-81 P co2 353.730 ... S1 1991 12 13 08 40 -89.9800 -24.8000 2810.00 127954 SPO 1991 08 01 03 07 1528-81 P co2 353.790 ... S1 1991 12 13 08 42 -89.9800 -24.8000 2810.00 127955 SPO 1991 08 03 03 16 1529-81 S co2 354.210 ... S1 1991 12 18 11 00 -89.9800 -24.8000 2810.00 127956 SPO 1991 08 03 03 16 1530-81 S co2 353.940 ... S1 1991 12 18 11 02 -89.9800 -24.8000 2810.00 127957 SPO 1991 08 10 03 11 1543-81 S co2 354.070 -.. S1 1991 12 18 10 56 -89.9800 -24.8000 2810.00 127958 SPO 1991 08 10 03 11 1544-81 S co2 358.300 +.. S1 1991 12 18 10 58 -89.9800 -24.8000 2810.00 127959 SPO 1991 08 15 23 05 1097-81 P co2 353.750 ... S1 1991 12 13 09 52 -89.9800 -24.8000 2810.00 127960 SPO 1991 08 15 23 05 1098-81 P co2 353.720 ... S1 1991 12 13 09 54 -89.9800 -24.8000 2810.00 127961 SPO 1991 08 26 21 05 145-81 S co2 353.810 ... S1 1991 12 13 09 56 -89.9800 -24.8000 2810.00 127962 SPO 1991 08 26 21 05 146-81 S co2 353.730 ... S1 1991 12 13 09 58 -89.9800 -24.8000 2810.00 127963 SPO 1991 08 31 03 22 1331-81 S co2 353.860 ... S1 1991 12 13 09 44 -89.9800 -24.8000 2810.00 127964 SPO 1991 08 31 03 22 1332-81 S co2 353.840 ... S1 1991 12 13 09 46 -89.9800 -24.8000 2810.00 127965 SPO 1991 09 02 22 33 365-81 P co2 355.820 +.. S1 1991 12 13 09 32 -89.9800 -24.8000 2810.00 127966 SPO 1991 09 02 22 33 366-81 P co2 355.120 -.. S1 1991 12 13 09 34 -89.9800 -24.8000 2810.00 127967 SPO 1991 09 09 21 55 1541-81 S co2 355.360 +.. S1 1991 12 13 08 28 -89.9800 -24.8000 2810.00 127968 SPO 1991 09 09 21 55 1542-81 S co2 353.860 -.. S1 1991 12 13 08 30 -89.9800 -24.8000 2810.00 127969 SPO 1991 09 14 02 10 1471-81 S co2 -999.990 *.. S1 1991 12 13 09 28 -89.9800 -24.8000 2810.00 127970 SPO 1991 09 14 02 10 1472-81 S co2 354.040 -.. S1 1991 12 13 09 30 -89.9800 -24.8000 2810.00 127971 SPO 1991 09 22 22 12 199-81 S co2 353.980 ... S1 1991 12 18 08 24 -89.9800 -24.8000 2810.00 127972 SPO 1991 09 22 22 12 200-81 S co2 354.070 ... S1 1991 12 18 08 26 -89.9800 -24.8000 2810.00 127973 SPO 1991 09 29 22 52 1139-81 S co2 354.040 ... S1 1991 12 18 08 20 -89.9800 -24.8000 2810.00 127974 SPO 1991 09 29 22 52 1140-81 S co2 354.040 ... S1 1991 12 18 08 22 -89.9800 -24.8000 2810.00 127975 SPO 1991 10 01 14 18 665-81 P co2 353.940 ... S1 1991 12 13 11 40 -89.9800 -24.8000 2810.00 127976 SPO 1991 10 01 14 18 666-81 P co2 353.900 ... S1 1991 12 13 11 42 -89.9800 -24.8000 2810.00 127977 SPO 1991 10 05 02 28 489-81 S co2 354.580 +.. S1 1991 12 18 08 40 -89.9800 -24.8000 2810.00 127978 SPO 1991 10 05 02 28 490-81 S co2 354.000 -.. S1 1991 12 18 08 42 -89.9800 -24.8000 2810.00 127979 SPO 1991 10 12 02 15 685-81 S co2 353.980 ... S1 1991 12 18 08 44 -89.9800 -24.8000 2810.00 127980 SPO 1991 10 12 02 15 686-81 S co2 353.870 ... S1 1991 12 18 08 46 -89.9800 -24.8000 2810.00 127981 SPO 1991 10 15 22 48 1461-81 P co2 353.880 ... S1 1991 12 13 11 36 -89.9800 -24.8000 2810.00 127982 SPO 1991 10 15 22 48 1462-81 P co2 353.890 ... S1 1991 12 13 11 38 -89.9800 -24.8000 2810.00 127983 SPO 1991 10 19 02 35 1033-81 S co2 353.860 ... S1 1991 12 31 08 56 -89.9800 -24.8000 2810.00 127984 SPO 1991 10 19 02 35 1034-81 S co2 353.840 ... S1 1991 12 31 08 58 -89.9800 -24.8000 2810.00 127985 SPO 1991 10 26 04 40 69-81 S co2 353.790 ... S1 1991 12 31 08 52 -89.9800 -24.8000 2810.00 127986 SPO 1991 10 26 04 40 70-81 S co2 353.780 ... S1 1991 12 31 08 54 -89.9800 -24.8000 2810.00 127987 SPO 1991 11 01 22 45 803-81 P co2 353.730 ... S1 1991 12 31 09 12 -89.9800 -24.8000 2810.00 127988 SPO 1991 11 01 22 45 804-81 P co2 353.710 ... S1 1991 12 31 09 14 -89.9800 -24.8000 2810.00 127989 SPO 1991 11 02 04 12 601-81 S co2 353.720 ... S1 1991 12 31 09 20 -89.9800 -24.8000 2810.00 127990 SPO 1991 11 02 04 12 602-81 S co2 353.730 ... S1 1991 12 31 09 22 -89.9800 -24.8000 2810.00 127991 SPO 1991 11 08 20 43 487-81 S co2 353.820 ... S1 1991 12 31 09 16 -89.9800 -24.8000 2810.00 127992 SPO 1991 11 08 20 43 488-81 S co2 353.900 ... S1 1991 12 31 09 18 -89.9800 -24.8000 2810.00 127993 SPO 1991 11 15 03 58 449-81 S co2 353.900 ... S1 1992 02 25 09 52 -89.9800 -24.8000 2810.00 127994 SPO 1991 11 15 03 58 450-81 S co2 353.890 ... S1 1992 02 25 09 54 -89.9800 -24.8000 2810.00 127995 SPO 1991 11 15 04 55 397-81 P co2 353.940 ... S1 1991 12 31 09 00 -89.9800 -24.8000 2810.00 127996 SPO 1991 11 15 04 55 398-81 P co2 353.840 ... S1 1991 12 31 09 02 -89.9800 -24.8000 2810.00 127997 SPO 1991 11 22 01 50 693-81 S co2 353.850 ... S1 1992 02 25 09 56 -89.9800 -24.8000 2810.00 127998 SPO 1991 11 22 01 50 694-81 S co2 353.880 ... S1 1992 02 25 09 58 -89.9800 -24.8000 2810.00 127999 SPO 1991 11 29 01 12 1327-81 S co2 354.080 ... S1 1992 02 25 09 44 -89.9800 -24.8000 2810.00 128000 SPO 1991 11 29 01 12 1328-81 S co2 354.050 ... S1 1992 02 25 09 46 -89.9800 -24.8000 2810.00 128001 SPO 1991 12 01 01 25 887-81 P co2 353.770 ... S1 1992 02 25 09 48 -89.9800 -24.8000 2810.00 128002 SPO 1991 12 01 01 25 888-81 P co2 353.910 ... S1 1992 02 25 09 50 -89.9800 -24.8000 2810.00 128003 SPO 1991 12 06 00 43 979-81 S co2 354.020 ... S1 1992 02 25 09 28 -89.9800 -24.8000 2810.00 128004 SPO 1991 12 06 00 43 980-81 S co2 353.860 ... S1 1992 02 25 09 30 -89.9800 -24.8000 2810.00 128005 SPO 1991 12 13 01 31 1109-81 S co2 353.800 ... S1 1992 02 25 09 32 -89.9800 -24.8000 2810.00 128006 SPO 1991 12 13 01 31 1110-81 S co2 353.810 ... S1 1992 02 25 09 34 -89.9800 -24.8000 2810.00 128007 SPO 1991 12 16 21 05 677-81 P co2 353.760 ... S1 1992 04 21 10 04 -89.9800 -24.8000 2810.00 128008 SPO 1991 12 16 21 05 678-81 P co2 353.720 ... S1 1992 04 21 10 06 -89.9800 -24.8000 2810.00 128009 SPO 1991 12 20 19 55 1485-81 S co2 353.700 ... S1 1992 04 21 10 00 -89.9800 -24.8000 2810.00 128010 SPO 1991 12 20 19 55 1486-81 S co2 353.780 ... S1 1992 04 21 10 02 -89.9800 -24.8000 2810.00 128011 SPO 1991 12 26 20 21 1117-81 S co2 353.750 ... S1 1992 04 22 08 16 -89.9800 -24.8000 2810.00 128012 SPO 1991 12 26 20 21 1118-81 S co2 353.760 ... S1 1992 04 22 08 18 -89.9800 -24.8000 2810.00 128013 SPO 1992 01 01 00 35 301-81 P co2 353.710 ... S1 1992 04 22 08 12 -89.9800 -24.8000 2810.00 128014 SPO 1992 01 01 00 35 302-81 P co2 353.900 ... S1 1992 04 22 08 14 -89.9800 -24.8000 2810.00 128015 SPO 1992 01 03 17 52 1073-81 S co2 353.980 ... S1 1992 04 21 09 44 -89.9800 -24.8000 2810.00 128016 SPO 1992 01 03 17 52 1074-81 S co2 353.800 ... S1 1992 04 21 09 46 -89.9800 -24.8000 2810.00 128017 SPO 1992 01 16 07 12 1539-81 P co2 354.010 +.. S1 1993 01 06 11 00 -89.9800 -24.8000 2810.00 128018 SPO 1992 01 16 07 12 1540-81 P co2 353.430 -.. S1 1993 01 06 11 02 -89.9800 -24.8000 2810.00 128019 SPO 1992 01 16 07 52 895-81 S co2 353.640 ... S1 1992 04 21 09 56 -89.9800 -24.8000 2810.00 128020 SPO 1992 01 16 07 52 896-81 S co2 353.730 ... S1 1992 04 21 09 58 -89.9800 -24.8000 2810.00 128021 SPO 1992 01 24 01 50 1525-81 S co2 353.610 ... S1 1993 01 13 08 28 -89.9800 -24.8000 2810.00 128022 SPO 1992 01 24 01 50 1526-81 S co2 353.710 ... S1 1993 01 13 08 30 -89.9800 -24.8000 2810.00 128023 SPO 1992 01 30 19 57 1533-81 S co2 358.160 +.. S1 1992 12 23 11 40 -89.9800 -24.8000 2810.00 128024 SPO 1992 01 30 19 57 1534-81 S co2 354.920 -.. S1 1992 12 23 11 42 -89.9800 -24.8000 2810.00 128025 SPO 1992 02 01 07 24 1521-81 P co2 355.180 -.. S1 1992 12 23 11 52 -89.9800 -24.8000 2810.00 128026 SPO 1992 02 01 07 24 1522-81 P co2 357.620 +.. S1 1992 12 23 11 54 -89.9800 -24.8000 2810.00 128027 SPO 1992 02 06 20 57 1537-81 S co2 352.820 ... S1 1992 12 23 11 36 -89.9800 -24.8000 2810.00 128028 SPO 1992 02 06 20 57 1538-81 S co2 353.080 ... S1 1992 12 23 11 38 -89.9800 -24.8000 2810.00 128029 SPO 1992 02 13 20 57 1523-81 S co2 353.260 ... S1 1992 12 23 11 32 -89.9800 -24.8000 2810.00 128030 SPO 1992 02 13 20 57 1524-81 S co2 353.230 ... S1 1992 12 23 11 34 -89.9800 -24.8000 2810.00 128031 SPO 1992 02 15 22 51 863-81 P co2 353.360 ... S1 1993 01 13 08 48 -89.9800 -24.8000 2810.00 128032 SPO 1992 02 15 22 51 864-81 P co2 352.950 ... S1 1993 01 13 08 50 -89.9800 -24.8000 2810.00 128033 SPO 1992 02 20 20 57 613-81 S co2 353.140 ... S1 1993 01 13 08 52 -89.9800 -24.8000 2810.00 128034 SPO 1992 02 20 20 57 614-81 S co2 353.150 ... S1 1993 01 13 08 54 -89.9800 -24.8000 2810.00 128035 SPO 1992 02 26 22 57 683-81 S co2 352.950 ... S1 1993 01 13 09 20 -89.9800 -24.8000 2810.00 128036 SPO 1992 02 26 22 57 684-81 S co2 352.910 ... S1 1993 01 13 09 22 -89.9800 -24.8000 2810.00 128037 SPO 1992 03 01 19 37 627-81 P co2 353.300 ... S1 1993 01 13 09 16 -89.9800 -24.8000 2810.00 128038 SPO 1992 03 01 19 37 628-81 P co2 353.220 ... S1 1993 01 13 09 18 -89.9800 -24.8000 2810.00 128039 SPO 1992 03 01 19 58 947-81 S co2 353.280 ... S1 1993 01 05 12 04 -89.9800 -24.8000 2810.00 128040 SPO 1992 03 01 19 58 948-81 S co2 353.230 ... S1 1993 01 05 12 06 -89.9800 -24.8000 2810.00 128041 SPO 1992 03 08 19 57 999-81 S co2 355.780 +.. S1 1993 01 13 08 24 -89.9800 -24.8000 2810.00 128042 SPO 1992 03 08 19 57 1000-81 S co2 353.420 -.. S1 1993 01 13 08 26 -89.9800 -24.8000 2810.00 128043 SPO 1992 03 15 23 56 1507-81 S co2 352.050 -.. S1 1993 01 06 10 36 -89.9800 -24.8000 2810.00 128044 SPO 1992 03 15 23 56 1508-81 S co2 356.260 +.. S1 1993 01 06 10 38 -89.9800 -24.8000 2810.00 128045 SPO 1992 03 16 01 29 1509-81 P co2 352.860 -.. S1 1993 01 06 10 32 -89.9800 -24.8000 2810.00 128046 SPO 1992 03 16 01 29 1510-81 P co2 357.760 +.. S1 1993 01 06 10 34 -89.9800 -24.8000 2810.00 128047 SPO 1992 03 22 22 57 1491-81 S co2 357.490 +.. S1 1993 01 06 09 56 -89.9800 -24.8000 2810.00 128048 SPO 1992 03 22 22 57 1492-81 S co2 356.270 -.. S1 1993 01 06 09 58 -89.9800 -24.8000 2810.00 128049 SPO 1992 03 29 17 57 1499-81 S co2 354.930 +.. S1 1993 01 06 10 28 -89.9800 -24.8000 2810.00 128050 SPO 1992 03 29 17 57 1500-81 S co2 353.250 -.. S1 1993 01 06 10 30 -89.9800 -24.8000 2810.00 128051 SPO 1992 04 01 01 21 1501-81 P co2 353.130 ... S1 1993 01 06 10 48 -89.9800 -24.8000 2810.00 128052 SPO 1992 04 01 01 21 1502-81 P co2 352.840 ... S1 1993 01 06 10 50 -89.9800 -24.8000 2810.00 128053 SPO 1992 04 06 20 57 1493-81 S co2 358.580 -.. S1 1993 01 06 10 52 -89.9800 -24.8000 2810.00 128054 SPO 1992 04 06 20 57 1494-81 S co2 -999.990 *.. S1 1993 01 06 10 54 -89.9800 -24.8000 2810.00 128055 SPO 1992 04 13 20 57 771-81 S co2 353.070 ... S1 1993 01 05 11 04 -89.9800 -24.8000 2810.00 128056 SPO 1992 04 13 20 57 772-81 S co2 353.030 ... S1 1993 01 05 11 06 -89.9800 -24.8000 2810.00 128057 SPO 1992 04 15 12 06 123-81 P co2 353.280 ... S1 1993 01 05 09 28 -89.9800 -24.8000 2810.00 128058 SPO 1992 04 15 12 06 124-81 P co2 353.250 ... S1 1993 01 05 09 30 -89.9800 -24.8000 2810.00 128059 SPO 1992 04 19 09 57 1047-81 S co2 353.250 ... S1 1993 01 06 09 44 -89.9800 -24.8000 2810.00 128060 SPO 1992 04 19 09 57 1048-81 S co2 353.350 ... S1 1993 01 06 09 46 -89.9800 -24.8000 2810.00 128061 SPO 1992 04 26 11 58 689-81 S co2 353.610 ... S1 1993 01 06 09 32 -89.9800 -24.8000 2810.00 128062 SPO 1992 04 26 11 58 690-81 S co2 353.340 ... S1 1993 01 06 09 34 -89.9800 -24.8000 2810.00 128063 SPO 1992 05 02 10 28 81-81 P co2 353.450 ... S1 1993 01 06 09 48 -89.9800 -24.8000 2810.00 128064 SPO 1992 05 02 10 28 82-81 P co2 353.510 ... S1 1993 01 06 09 50 -89.9800 -24.8000 2810.00 128065 SPO 1992 05 02 10 57 23-81 S co2 353.560 ... S1 1993 01 06 09 52 -89.9800 -24.8000 2810.00 128066 SPO 1992 05 02 10 57 24-81 S co2 353.480 ... S1 1993 01 06 09 54 -89.9800 -24.8000 2810.00 128067 SPO 1992 05 10 20 59 1269-81 S co2 353.660 -.. S1 1993 01 05 12 00 -89.9800 -24.8000 2810.00 128068 SPO 1992 05 10 20 59 1270-81 S co2 354.160 +.. S1 1993 01 05 12 02 -89.9800 -24.8000 2810.00 128069 SPO 1992 05 15 09 37 593-81 P co2 353.670 ... S1 1993 01 05 11 56 -89.9800 -24.8000 2810.00 128070 SPO 1992 05 15 09 37 594-81 P co2 353.620 ... S1 1993 01 05 11 58 -89.9800 -24.8000 2810.00 128071 SPO 1992 05 18 09 56 1287-81 S co2 353.610 ... S1 1993 01 05 11 24 -89.9800 -24.8000 2810.00 128072 SPO 1992 05 18 09 56 1288-81 S co2 353.610 ... S1 1993 01 05 11 26 -89.9800 -24.8000 2810.00 128073 SPO 1992 05 23 07 57 833-81 S co2 353.600 -.. S1 1993 01 05 11 32 -89.9800 -24.8000 2810.00 128074 SPO 1992 05 23 07 57 834-81 S co2 356.060 +.. S1 1993 01 05 11 34 -89.9800 -24.8000 2810.00 128075 SPO 1992 06 04 11 59 751-81 S co2 353.840 ... S1 1993 01 05 11 52 -89.9800 -24.8000 2810.00 128076 SPO 1992 06 04 11 59 752-81 S co2 353.750 ... S1 1993 01 05 11 54 -89.9800 -24.8000 2810.00 128077 SPO 1992 06 04 12 15 1247-81 P co2 353.750 ... S1 1993 01 05 11 28 -89.9800 -24.8000 2810.00 128078 SPO 1992 06 04 12 15 1248-81 P co2 353.740 ... S1 1993 01 05 11 30 -89.9800 -24.8000 2810.00 128079 SPO 1992 06 08 11 56 527-81 S co2 353.830 ... S1 1993 01 06 08 28 -89.9800 -24.8000 2810.00 128080 SPO 1992 06 08 12 56 3-81 S co2 353.970 ... S1 1993 01 05 09 52 -89.9800 -24.8000 2810.00 128081 SPO 1992 06 08 12 56 4-81 S co2 353.920 ... S1 1993 01 05 09 54 -89.9800 -24.8000 2810.00 128082 SPO 1992 06 13 12 33 673-81 P co2 353.920 ... S1 1993 01 05 09 56 -89.9800 -24.8000 2810.00 128083 SPO 1992 06 13 12 33 674-81 P co2 353.900 ... S1 1993 01 05 09 58 -89.9800 -24.8000 2810.00 128084 SPO 1992 06 13 12 56 185-81 S co2 353.900 ... S1 1993 01 05 10 00 -89.9800 -24.8000 2810.00 128085 SPO 1992 06 13 12 56 186-81 S co2 353.930 ... S1 1993 01 05 10 02 -89.9800 -24.8000 2810.00 128086 SPO 1992 06 21 12 06 1241-81 S co2 354.150 ... S1 1993 01 05 10 24 -89.9800 -24.8000 2810.00 128087 SPO 1992 06 21 12 06 1242-81 S co2 354.150 ... S1 1993 01 05 10 26 -89.9800 -24.8000 2810.00 128088 SPO 1992 06 28 08 18 151-81 S co2 354.200 ... S1 1993 01 06 08 44 -89.9800 -24.8000 2810.00 128089 SPO 1992 06 28 08 18 152-81 S co2 354.640 ... S1 1993 01 06 08 46 -89.9800 -24.8000 2810.00 128090 SPO 1992 07 01 09 29 1233-81 P co2 354.240 ... S1 1993 01 06 08 48 -89.9800 -24.8000 2810.00 128091 SPO 1992 07 01 09 29 1234-81 P co2 354.280 ... S1 1993 01 06 08 50 -89.9800 -24.8000 2810.00 128092 SPO 1992 07 04 00 56 479-81 S co2 354.450 ... S1 1993 01 06 08 40 -89.9800 -24.8000 2810.00 128093 SPO 1992 07 04 00 56 480-81 S co2 354.440 ... S1 1993 01 06 08 42 -89.9800 -24.8000 2810.00 128094 SPO 1992 07 11 08 57 667-81 S co2 354.440 -.. S1 1993 01 06 08 20 -89.9800 -24.8000 2810.00 128095 SPO 1992 07 11 08 57 668-81 S co2 354.960 +.. S1 1993 01 06 08 22 -89.9800 -24.8000 2810.00 128096 SPO 1992 07 14 08 36 113-81 P co2 355.670 +.. S1 1993 01 06 09 28 -89.9800 -24.8000 2810.00 128097 SPO 1992 07 14 08 36 114-81 P co2 354.400 -.. S1 1993 01 06 09 30 -89.9800 -24.8000 2810.00 128098 SPO 1992 07 19 12 59 247-81 S co2 354.610 ... S1 1993 01 06 08 24 -89.9800 -24.8000 2810.00 128099 SPO 1992 07 19 12 59 248-81 S co2 354.560 ... S1 1993 01 06 08 26 -89.9800 -24.8000 2810.00 128100 SPO 1992 07 25 17 57 717-81 S co2 354.620 ... S1 1993 01 06 10 56 -89.9800 -24.8000 2810.00 128101 SPO 1992 07 25 17 57 718-81 S co2 354.630 ... S1 1993 01 06 10 58 -89.9800 -24.8000 2810.00 128102 SPO 1992 08 04 21 58 921-81 S co2 355.990 +.. S1 1993 01 05 08 20 -89.9800 -24.8000 2810.00 128103 SPO 1992 08 04 21 58 922-81 S co2 354.810 -.. S1 1993 01 05 08 22 -89.9800 -24.8000 2810.00 128104 SPO 1992 08 04 22 15 1545-81 P co2 354.840 +.. S1 1993 01 05 08 40 -89.9800 -24.8000 2810.00 128105 SPO 1992 08 04 22 15 1546-81 P co2 354.310 -.. S1 1993 01 05 08 42 -89.9800 -24.8000 2810.00 128106 SPO 1992 08 08 00 57 445-81 S co2 354.920 ... S1 1993 01 05 08 28 -89.9800 -24.8000 2810.00 128107 SPO 1992 08 08 00 57 446-81 S co2 355.080 ... S1 1993 01 05 08 30 -89.9800 -24.8000 2810.00 128108 SPO 1992 08 14 02 32 743-81 P co2 354.930 ... S1 1993 01 05 10 28 -89.9800 -24.8000 2810.00 128109 SPO 1992 08 14 02 32 744-81 P co2 354.910 ... S1 1993 01 05 10 30 -89.9800 -24.8000 2810.00 128110 SPO 1992 08 14 02 57 969-81 S co2 355.040 ... S1 1993 01 05 11 00 -89.9800 -24.8000 2810.00 128111 SPO 1992 08 14 02 57 970-81 S co2 354.850 ... S1 1993 01 05 11 02 -89.9800 -24.8000 2810.00 128112 SPO 1992 08 21 21 57 1557-81 S co2 355.290 -.. S1 1993 01 05 08 24 -89.9800 -24.8000 2810.00 128113 SPO 1992 08 21 21 57 1558-81 S co2 370.340 +.. S1 1993 01 05 08 26 -89.9800 -24.8000 2810.00 128114 SPO 1992 08 28 23 00 769-81 S co2 355.080 ... S1 1993 01 05 10 32 -89.9800 -24.8000 2810.00 128115 SPO 1992 08 28 23 00 770-81 S co2 355.090 ... S1 1993 01 05 10 34 -89.9800 -24.8000 2810.00 128116 SPO 1992 09 01 00 13 467-81 P co2 355.080 ... S1 1993 01 05 09 32 -89.9800 -24.8000 2810.00 128117 SPO 1992 09 01 00 13 468-81 P co2 355.000 ... S1 1993 01 05 09 34 -89.9800 -24.8000 2810.00 128118 SPO 1992 09 04 23 57 831-81 S co2 355.060 +.. S1 1993 01 05 08 56 -89.9800 -24.8000 2810.00 128119 SPO 1992 09 04 23 57 832-81 S co2 352.760 -.. S1 1993 01 05 08 58 -89.9800 -24.8000 2810.00 128120 SPO 1992 09 11 21 57 945-81 S co2 355.200 ... S1 1993 01 05 08 44 -89.9800 -24.8000 2810.00 128121 SPO 1992 09 11 21 57 946-81 S co2 354.990 ... S1 1993 01 05 08 46 -89.9800 -24.8000 2810.00 128122 SPO 1992 09 14 20 58 1135-81 P co2 355.120 ... S1 1993 01 05 08 48 -89.9800 -24.8000 2810.00 128123 SPO 1992 09 14 20 58 1136-81 P co2 355.110 ... S1 1993 01 05 08 50 -89.9800 -24.8000 2810.00 128124 SPO 1992 09 19 19 58 1041-81 S co2 355.280 ... S1 1993 01 05 09 24 -89.9800 -24.8000 2810.00 128125 SPO 1992 09 19 19 58 1042-81 S co2 355.250 ... S1 1993 01 05 09 26 -89.9800 -24.8000 2810.00 128126 SPO 1992 09 27 19 56 927-81 S co2 355.130 ... S1 1993 01 05 11 08 -89.9800 -24.8000 2810.00 128127 SPO 1992 09 27 19 56 928-81 S co2 355.240 ... S1 1993 01 05 11 10 -89.9800 -24.8000 2810.00 128128 SPO 1992 10 01 00 16 1347-81 P co2 355.300 ... S1 1993 01 05 11 20 -89.9800 -24.8000 2810.00 128129 SPO 1992 10 01 00 16 1348-81 P co2 355.150 ... S1 1993 01 05 11 22 -89.9800 -24.8000 2810.00 128130 SPO 1992 10 06 20 57 883-81 S co2 355.230 ... S1 1993 01 29 14 20 -89.9800 -24.8000 2810.00 128131 SPO 1992 10 06 20 57 884-81 S co2 355.170 ... S1 1993 01 29 14 22 -89.9800 -24.8000 2810.00 128132 SPO 1992 10 13 19 57 369-81 S co2 355.240 ... S1 1993 01 29 14 12 -89.9800 -24.8000 2810.00 128133 SPO 1992 10 13 19 57 370-81 S co2 355.190 ... S1 1993 01 29 14 14 -89.9800 -24.8000 2810.00 128134 SPO 1992 10 13 20 11 1089-81 P co2 355.220 ... S1 1993 01 29 15 44 -89.9800 -24.8000 2810.00 128135 SPO 1992 10 13 20 11 1090-81 P co2 355.220 ... S1 1993 01 29 15 46 -89.9800 -24.8000 2810.00 128136 SPO 1992 10 17 19 57 1547-81 S co2 355.070 ... S1 1993 01 29 15 20 -89.9800 -24.8000 2810.00 128137 SPO 1992 10 17 19 57 1548-81 S co2 355.080 ... S1 1993 01 29 15 22 -89.9800 -24.8000 2810.00 128138 SPO 1992 10 26 01 56 223-81 S co2 355.060 ... S1 1993 01 29 15 36 -89.9800 -24.8000 2810.00 128139 SPO 1992 10 26 01 56 224-81 S co2 355.040 ... S1 1993 01 29 15 38 -89.9800 -24.8000 2810.00 128140 SPO 1992 11 01 00 26 64-81 P co2 355.020 ... S1 1993 01 29 14 46 -89.9800 -24.8000 2810.00 128141 SPO 1992 11 01 01 57 89-81 S co2 355.020 ... S1 1993 01 29 14 52 -89.9800 -24.8000 2810.00 128142 SPO 1992 11 01 01 57 90-81 S co2 354.960 ... S1 1993 01 29 14 54 -89.9800 -24.8000 2810.00 128143 SPO 1992 11 08 21 56 1549-81 S co2 355.040 ... S1 1993 01 29 15 12 -89.9800 -24.8000 2810.00 128144 SPO 1992 11 08 21 56 1550-81 S co2 355.130 ... S1 1993 01 29 15 14 -89.9800 -24.8000 2810.00 128145 SPO 1992 11 15 19 56 1045-81 S co2 354.990 ... S1 1993 01 29 14 40 -89.9800 -24.8000 2810.00 128146 SPO 1992 11 15 19 56 1046-81 S co2 355.120 ... S1 1993 01 29 14 42 -89.9800 -24.8000 2810.00 128147 SPO 1992 11 15 20 21 911-81 P co2 355.020 ... S1 1993 01 29 15 08 -89.9800 -24.8000 2810.00 128148 SPO 1992 11 15 20 21 912-81 P co2 355.070 ... S1 1993 01 29 15 10 -89.9800 -24.8000 2810.00 128149 SPO 1992 11 23 03 56 393-81 S co2 355.030 ... S1 1993 01 29 15 24 -89.9800 -24.8000 2810.00 128150 SPO 1992 11 23 03 56 394-81 S co2 354.940 ... S1 1993 01 29 15 26 -89.9800 -24.8000 2810.00 128151 SPO 1992 11 29 19 57 21-81 S co2 355.140 ... S1 1993 01 29 15 04 -89.9800 -24.8000 2810.00 128152 SPO 1992 11 29 19 57 22-81 S co2 355.250 ... S1 1993 01 29 15 06 -89.9800 -24.8000 2810.00 128153 SPO 1992 12 10 21 45 1039-81 P co2 355.040 ... S1 1993 03 02 11 00 -89.9800 -24.8000 2810.00 128154 SPO 1992 12 10 21 45 1040-81 P co2 354.890 ... S1 1993 03 02 11 02 -89.9800 -24.8000 2810.00 128155 SPO 1992 12 11 02 56 1553-81 S co2 354.970 ... S1 1993 03 02 10 48 -89.9800 -24.8000 2810.00 128156 SPO 1992 12 11 02 56 1554-81 S co2 354.890 ... S1 1993 03 02 10 50 -89.9800 -24.8000 2810.00 128157 SPO 1992 12 21 01 55 377-81 S co2 354.710 ... S1 1993 03 02 10 56 -89.9800 -24.8000 2810.00 128158 SPO 1992 12 21 01 55 1087-81 S co2 354.840 ... S1 1993 03 02 10 58 -89.9800 -24.8000 2810.00 128159 SPO 1992 12 21 02 08 465-81 P co2 354.840 ... S1 1993 03 02 10 32 -89.9800 -24.8000 2810.00 128160 SPO 1992 12 21 02 08 466-81 P co2 354.870 ... S1 1993 03 02 10 34 -89.9800 -24.8000 2810.00 128161 SPO 1992 12 28 03 55 501-81 S co2 354.760 ... S1 1993 03 02 11 04 -89.9800 -24.8000 2810.00 128162 SPO 1992 12 28 03 55 502-81 S co2 355.040 ... S1 1993 03 02 11 06 -89.9800 -24.8000 2810.00 128163 SPO 1993 01 03 19 55 1551-81 S co2 354.650 ... S1 1993 03 02 10 52 -89.9800 -24.8000 2810.00 128164 SPO 1993 01 03 19 55 1552-81 S co2 354.600 ... S1 1993 03 02 10 54 -89.9800 -24.8000 2810.00 128165 SPO 1993 01 03 20 32 995-81 P co2 354.800 ... S1 1993 03 18 11 56 -89.9800 -24.8000 2810.00 128166 SPO 1993 01 03 20 32 996-81 P co2 354.980 ... S1 1993 03 18 11 58 -89.9800 -24.8000 2810.00 128167 SPO 1993 01 17 20 56 401-81 S co2 355.340 .X. S1 1993 03 18 12 04 -89.9800 -24.8000 2810.00 128168 SPO 1993 01 17 20 56 402-81 S co2 355.100 .X. S1 1993 03 18 12 06 -89.9800 -24.8000 2810.00 128169 SPO 1993 01 17 21 30 1231-81 P co2 354.550 ... S1 1993 03 18 11 52 -89.9800 -24.8000 2810.00 128170 SPO 1993 01 17 21 30 1232-81 P co2 354.530 ... S1 1993 03 18 11 54 -89.9800 -24.8000 2810.00 128171 SPO 1993 01 25 09 55 1301-81 S co2 354.600 ... S1 1993 03 18 12 08 -89.9800 -24.8000 2810.00 128172 SPO 1993 01 25 09 55 1302-81 S co2 354.650 ... S1 1993 03 18 12 10 -89.9800 -24.8000 2810.00 128173 SPO 1993 01 28 21 55 503-81 S co2 354.530 ... S1 1993 03 18 12 00 -89.9800 -24.8000 2810.00 128174 SPO 1993 01 28 21 55 504-81 S co2 354.450 ... S1 1993 03 18 12 02 -89.9800 -24.8000 2810.00 128175 SPO 1993 01 29 01 05 243-81 P co2 354.510 ... S1 1993 03 18 12 12 -89.9800 -24.8000 2810.00 128176 SPO 1993 01 29 01 05 244-81 P co2 354.470 ... S1 1993 03 18 12 14 -89.9800 -24.8000 2810.00 128177 SPO 1993 02 07 21 58 383-81 S co2 354.480 ... S1 1993 12 17 10 32 -89.9800 -24.8000 2810.00 128178 SPO 1993 02 07 21 58 384-81 S co2 354.450 ... S1 1993 12 17 10 34 -89.9800 -24.8000 2810.00 128179 SPO 1993 02 15 20 55 761-81 S co2 354.610 ... S1 1993 12 22 11 08 -89.9800 -24.8000 2810.00 128180 SPO 1993 02 15 20 55 762-81 S co2 354.640 ... S1 1993 12 22 11 10 -89.9800 -24.8000 2810.00 128181 SPO 1993 02 15 22 55 171-81 P co2 354.480 ... S1 1993 12 17 10 24 -89.9800 -24.8000 2810.00 128182 SPO 1993 02 15 22 55 172-81 P co2 354.510 ... S1 1993 12 17 10 26 -89.9800 -24.8000 2810.00 128183 SPO 1993 02 21 20 56 543-81 S co2 354.230 +.. S1 1993 12 22 11 04 -89.9800 -24.8000 2810.00 128184 SPO 1993 02 21 20 56 544-81 S co2 353.450 -.. S1 1993 12 22 11 06 -89.9800 -24.8000 2810.00 128185 SPO 1993 02 28 20 58 1555-81 S co2 354.400 ... S1 1993 12 17 10 36 -89.9800 -24.8000 2810.00 128186 SPO 1993 02 28 20 58 1556-81 S co2 354.320 ... S1 1993 12 17 10 38 -89.9800 -24.8000 2810.00 128187 SPO 1993 02 28 21 24 909-81 P co2 354.350 ... S1 1993 12 22 11 40 -89.9800 -24.8000 2810.00 128188 SPO 1993 02 28 21 24 910-81 P co2 354.370 ... S1 1993 12 22 11 42 -89.9800 -24.8000 2810.00 128189 SPO 1993 03 07 21 55 435-81 S co2 354.160 ... S1 1993 12 17 10 28 -89.9800 -24.8000 2810.00 128190 SPO 1993 03 07 21 55 436-81 S co2 354.190 ... S1 1993 12 17 10 30 -89.9800 -24.8000 2810.00 128191 SPO 1993 03 14 21 55 415-81 S co2 354.440 ... S1 1993 12 22 11 28 -89.9800 -24.8000 2810.00 128192 SPO 1993 03 14 21 55 416-81 S co2 354.350 ... S1 1993 12 22 11 30 -89.9800 -24.8000 2810.00 128193 SPO 1993 03 15 22 30 1155-81 P co2 354.420 -.. S1 1993 12 22 11 32 -89.9800 -24.8000 2810.00 128194 SPO 1993 03 15 22 30 1156-81 P co2 363.570 +.. S1 1993 12 22 11 34 -89.9800 -24.8000 2810.00 128195 SPO 1993 03 22 22 55 283-81 S co2 357.520 +.. S1 1993 12 22 11 36 -89.9800 -24.8000 2810.00 128196 SPO 1993 03 22 22 55 284-81 S co2 354.080 -.. S1 1993 12 22 11 38 -89.9800 -24.8000 2810.00 128197 SPO 1993 03 28 23 56 251-91 S co2 349.160 -.. S1 1994 01 07 09 12 -89.9800 -24.8000 2810.00 128198 SPO 1993 03 28 23 56 252-91 S co2 354.060 +.. S1 1994 01 07 09 14 -89.9800 -24.8000 2810.00 128199 SPO 1993 04 01 23 50 253-91 P co2 354.270 ... S1 1994 01 07 09 16 -89.9800 -24.8000 2810.00 128200 SPO 1993 04 01 23 50 254-91 P co2 354.220 ... S1 1994 01 07 09 18 -89.9800 -24.8000 2810.00 128201 SPO 1993 04 04 21 55 227-91 S co2 354.060 ... S1 1994 01 13 09 16 -89.9800 -24.8000 2810.00 128202 SPO 1993 04 04 21 55 228-91 S co2 354.320 ... S1 1994 01 13 09 18 -89.9800 -24.8000 2810.00 128203 SPO 1993 04 11 21 55 229-91 S co2 354.240 ... S1 1994 01 13 09 12 -89.9800 -24.8000 2810.00 128204 SPO 1993 04 11 21 55 230-91 S co2 354.210 ... S1 1994 01 13 09 14 -89.9800 -24.8000 2810.00 128205 SPO 1993 04 15 06 15 89-91 P co2 354.220 ... S1 1993 12 17 08 24 -89.9800 -24.8000 2810.00 128206 SPO 1993 04 15 06 15 90-91 P co2 354.180 ... S1 1993 12 17 08 26 -89.9800 -24.8000 2810.00 128207 SPO 1993 04 19 04 55 175-91 S co2 354.070 ... S1 1993 12 17 08 20 -89.9800 -24.8000 2810.00 128208 SPO 1993 04 19 04 55 176-91 S co2 354.110 ... S1 1993 12 17 08 22 -89.9800 -24.8000 2810.00 128209 SPO 1993 04 25 22 55 199-91 S co2 354.310 ... S1 1994 01 07 08 08 -89.9800 -24.8000 2810.00 128210 SPO 1993 04 25 22 55 200-91 S co2 354.270 ... S1 1994 01 07 08 10 -89.9800 -24.8000 2810.00 128211 SPO 1993 05 01 22 31 201-91 P co2 354.400 ... S1 1994 01 07 08 12 -89.9800 -24.8000 2810.00 128212 SPO 1993 05 01 22 31 202-91 P co2 354.250 ... S1 1994 01 07 08 14 -89.9800 -24.8000 2810.00 128213 SPO 1993 05 03 05 55 205-91 S co2 354.270 -.. S1 1994 01 13 09 44 -89.9800 -24.8000 2810.00 128214 SPO 1993 05 03 05 55 206-91 S co2 354.780 +.. S1 1994 01 13 09 46 -89.9800 -24.8000 2810.00 128215 SPO 1993 05 09 22 57 207-91 S co2 354.270 ... S1 1994 01 13 09 48 -89.9800 -24.8000 2810.00 128216 SPO 1993 05 09 22 57 208-91 S co2 354.260 ... S1 1994 01 13 09 50 -89.9800 -24.8000 2810.00 128217 SPO 1993 05 16 21 57 231-91 S co2 354.170 ... S1 1994 01 07 09 56 -89.9800 -24.8000 2810.00 128218 SPO 1993 05 16 21 57 232-91 S co2 354.230 ... S1 1994 01 07 09 58 -89.9800 -24.8000 2810.00 128219 SPO 1993 05 16 22 25 233-91 P co2 354.480 ... S1 1994 01 07 09 52 -89.9800 -24.8000 2810.00 128220 SPO 1993 05 16 22 25 234-91 P co2 354.840 ... S1 1994 01 07 09 54 -89.9800 -24.8000 2810.00 128221 SPO 1993 05 24 21 56 51-91 S co2 354.240 ... S1 1994 01 13 10 04 -89.9800 -24.8000 2810.00 128222 SPO 1993 05 24 21 56 52-91 S co2 354.260 ... S1 1994 01 13 10 06 -89.9800 -24.8000 2810.00 128223 SPO 1993 05 30 23 56 53-91 S co2 354.550 ... S1 1994 01 13 10 20 -89.9800 -24.8000 2810.00 128224 SPO 1993 05 30 23 56 54-91 S co2 354.750 ... S1 1994 01 13 10 22 -89.9800 -24.8000 2810.00 128225 SPO 1993 06 01 07 47 255-91 P co2 354.880 ... S1 1993 12 17 08 56 -89.9800 -24.8000 2810.00 128226 SPO 1993 06 01 07 47 256-91 P co2 354.700 ... S1 1993 12 17 08 58 -89.9800 -24.8000 2810.00 128227 SPO 1993 06 07 02 56 257-91 S co2 354.790 ... S1 1993 12 17 08 28 -89.9800 -24.8000 2810.00 128228 SPO 1993 06 07 02 56 258-91 S co2 354.350 ... S1 1993 12 17 08 30 -89.9800 -24.8000 2810.00 128229 SPO 1993 06 17 10 55 243-91 S co2 354.550 ... S1 1994 01 05 08 40 -89.9800 -24.8000 2810.00 128230 SPO 1993 06 17 10 55 244-91 S co2 354.520 ... S1 1994 01 05 08 42 -89.9800 -24.8000 2810.00 128231 SPO 1993 06 17 12 22 245-91 P co2 354.740 ... S1 1994 01 05 08 52 -89.9800 -24.8000 2810.00 128232 SPO 1993 06 17 12 22 246-91 P co2 354.600 ... S1 1994 01 05 08 54 -89.9800 -24.8000 2810.00 128233 SPO 1993 06 21 05 55 177-91 S co2 355.760 +.. S1 1994 01 13 09 52 -89.9800 -24.8000 2810.00 128234 SPO 1993 06 21 05 55 178-91 S co2 354.610 -.. S1 1994 01 13 09 54 -89.9800 -24.8000 2810.00 128235 SPO 1993 06 28 11 55 183-91 S co2 354.960 ... S1 1994 01 13 09 56 -89.9800 -24.8000 2810.00 128236 SPO 1993 06 28 11 55 184-91 S co2 354.570 ... S1 1994 01 13 09 58 -89.9800 -24.8000 2810.00 128237 SPO 1993 07 01 23 30 203-91 P co2 354.980 ... S1 1994 01 07 09 44 -89.9800 -24.8000 2810.00 128238 SPO 1993 07 01 23 30 204-91 P co2 355.110 ... S1 1994 01 07 09 46 -89.9800 -24.8000 2810.00 128239 SPO 1993 07 05 23 55 213-91 S co2 354.990 +.. S1 1994 01 07 09 48 -89.9800 -24.8000 2810.00 128240 SPO 1993 07 05 23 55 214-91 S co2 348.800 -.. S1 1994 01 07 09 50 -89.9800 -24.8000 2810.00 128241 SPO 1993 07 14 21 57 21-91 S co2 355.080 +.. S1 1993 12 30 08 48 -89.9800 -24.8000 2810.00 128242 SPO 1993 07 14 21 57 22-91 S co2 351.630 -.. S1 1993 12 30 08 50 -89.9800 -24.8000 2810.00 128243 SPO 1993 07 19 02 57 193-91 S co2 355.820 +.. S1 1993 12 30 08 52 -89.9800 -24.8000 2810.00 128244 SPO 1993 07 19 02 57 194-91 S co2 352.660 -.. S1 1993 12 30 08 54 -89.9800 -24.8000 2810.00 128245 SPO 1993 07 19 10 31 149-91 P co2 354.970 ... S1 1994 01 13 11 00 -89.9800 -24.8000 2810.00 128246 SPO 1993 07 19 10 31 150-91 P co2 355.220 ... S1 1994 01 13 11 02 -89.9800 -24.8000 2810.00 128247 SPO 1993 07 26 22 57 157-91 S co2 355.150 -.. S1 1994 01 13 10 56 -89.9800 -24.8000 2810.00 128248 SPO 1993 07 26 22 57 158-91 S co2 356.290 +.. S1 1994 01 13 10 58 -89.9800 -24.8000 2810.00 128249 SPO 1993 08 02 22 50 197-91 P co2 355.770 +.. S1 1994 01 05 09 48 -89.9800 -24.8000 2810.00 128250 SPO 1993 08 02 22 50 198-91 P co2 353.690 -.. S1 1994 01 05 09 50 -89.9800 -24.8000 2810.00 128251 SPO 1993 08 02 23 55 163-91 S co2 354.210 -.. S1 1994 01 05 09 44 -89.9800 -24.8000 2810.00 128252 SPO 1993 08 02 23 55 164-91 S co2 355.310 +.. S1 1994 01 05 09 46 -89.9800 -24.8000 2810.00 128253 SPO 1993 08 09 00 55 209-91 S co2 355.650 ... S1 1994 01 13 10 52 -89.9800 -24.8000 2810.00 128254 SPO 1993 08 09 00 55 210-91 S co2 355.860 ... S1 1994 01 13 10 54 -89.9800 -24.8000 2810.00 128255 SPO 1993 08 16 23 44 211-91 P co2 356.290 .X. S1 1994 01 13 10 48 -89.9800 -24.8000 2810.00 128256 SPO 1993 08 16 23 44 212-91 P co2 355.820 .X. S1 1994 01 13 10 50 -89.9800 -24.8000 2810.00 128257 SPO 1993 08 16 23 57 217-91 S co2 355.520 ... S1 1994 01 07 08 56 -89.9800 -24.8000 2810.00 128258 SPO 1993 08 16 23 57 218-91 S co2 355.360 ... S1 1994 01 07 08 58 -89.9800 -24.8000 2810.00 128259 SPO 1993 08 23 00 57 219-91 S co2 355.280 ... S1 1994 01 07 08 20 -89.9800 -24.8000 2810.00 128260 SPO 1993 08 23 00 57 220-91 S co2 355.350 ... S1 1994 01 07 08 22 -89.9800 -24.8000 2810.00 128261 SPO 1993 08 29 23 57 95-91 S co2 355.700 ... S1 1993 12 30 10 28 -89.9800 -24.8000 2810.00 128262 SPO 1993 08 29 23 57 96-91 S co2 355.580 ... S1 1993 12 30 10 30 -89.9800 -24.8000 2810.00 128263 SPO 1993 09 01 22 41 151-91 P co2 355.910 ... S1 1993 12 30 08 44 -89.9800 -24.8000 2810.00 128264 SPO 1993 09 01 22 41 152-91 P co2 355.970 ... S1 1993 12 30 08 46 -89.9800 -24.8000 2810.00 128265 SPO 1993 09 07 10 56 179-91 S co2 355.550 ... S1 1994 01 05 10 28 -89.9800 -24.8000 2810.00 128266 SPO 1993 09 07 10 56 180-91 S co2 355.550 ... S1 1994 01 05 10 30 -89.9800 -24.8000 2810.00 128267 SPO 1993 09 13 23 55 181-91 S co2 355.800 ... S1 1994 01 05 10 24 -89.9800 -24.8000 2810.00 128268 SPO 1993 09 13 23 55 182-91 S co2 355.770 ... S1 1994 01 05 10 26 -89.9800 -24.8000 2810.00 128269 SPO 1993 09 16 23 55 239-91 P co2 356.010 ... S1 1993 12 22 09 44 -89.9800 -24.8000 2810.00 128270 SPO 1993 09 16 23 55 240-91 P co2 355.980 ... S1 1993 12 22 09 46 -89.9800 -24.8000 2810.00 128271 SPO 1993 09 19 22 56 241-91 S co2 355.750 ... S1 1993 12 22 09 52 -89.9800 -24.8000 2810.00 128272 SPO 1993 09 19 22 56 242-91 S co2 355.620 ... S1 1993 12 22 09 54 -89.9800 -24.8000 2810.00 128273 SPO 1993 09 27 23 58 236-91 S co2 355.790 ... S1 1993 12 22 10 16 -89.9800 -24.8000 2810.00 128274 SPO 1993 09 27 23 58 237-91 S co2 355.790 ... S1 1993 12 22 10 18 -89.9800 -24.8000 2810.00 128275 SPO 1993 10 01 23 20 235-91 P co2 355.800 ... S1 1993 12 22 08 52 -89.9800 -24.8000 2810.00 128276 SPO 1993 10 01 23 20 238-91 P co2 355.870 ... S1 1993 12 22 08 54 -89.9800 -24.8000 2810.00 128277 SPO 1993 10 04 02 55 57-91 S co2 355.740 ... S1 1994 02 17 08 12 -89.9800 -24.8000 2810.00 128278 SPO 1993 10 04 02 55 58-91 S co2 355.790 ... S1 1994 02 17 08 14 -89.9800 -24.8000 2810.00 128279 SPO 1993 10 14 01 57 161-91 S co2 355.540 ... S1 1994 02 17 09 56 -89.9800 -24.8000 2810.00 128280 SPO 1993 10 14 01 57 162-91 S co2 355.500 ... S1 1994 02 17 09 58 -89.9800 -24.8000 2810.00 128281 SPO 1993 10 17 06 47 23-91 P co2 355.880 ... S1 1994 02 17 08 28 -89.9800 -24.8000 2810.00 128282 SPO 1993 10 17 06 47 24-91 P co2 355.770 ... S1 1994 02 17 08 30 -89.9800 -24.8000 2810.00 128283 SPO 1993 10 17 06 47 165-91 S co2 355.570 ... S1 1994 02 17 08 24 -89.9800 -24.8000 2810.00 128284 SPO 1993 10 17 06 47 166-91 S co2 355.600 ... S1 1994 02 17 08 26 -89.9800 -24.8000 2810.00 128285 SPO 1993 10 26 20 57 29-91 S co2 355.580 ... S1 1994 02 17 09 24 -89.9800 -24.8000 2810.00 128286 SPO 1993 10 26 20 57 30-91 S co2 355.620 ... S1 1994 02 17 09 26 -89.9800 -24.8000 2810.00 128287 SPO 1993 10 31 22 51 33-91 P co2 355.830 ... S1 1994 02 17 09 20 -89.9800 -24.8000 2810.00 128288 SPO 1993 10 31 22 51 34-91 P co2 355.830 ... S1 1994 02 17 09 22 -89.9800 -24.8000 2810.00 128289 SPO 1993 11 01 02 25 103-91 S co2 355.550 ... S1 1994 02 25 10 28 -89.9800 -24.8000 2810.00 128290 SPO 1993 11 01 02 25 104-91 S co2 355.640 ... S1 1994 02 25 10 30 -89.9800 -24.8000 2810.00 128291 SPO 1993 11 08 01 01 191-91 S co2 355.520 ... S1 1994 02 25 10 32 -89.9800 -24.8000 2810.00 128292 SPO 1993 11 08 01 01 192-91 S co2 355.500 ... S1 1994 02 25 10 34 -89.9800 -24.8000 2810.00 128293 SPO 1993 11 17 21 10 171-91 P co2 355.690 ... S1 1994 02 25 10 24 -89.9800 -24.8000 2810.00 128294 SPO 1993 11 17 21 10 172-91 P co2 355.690 ... S1 1994 02 25 10 26 -89.9800 -24.8000 2810.00 128295 SPO 1993 11 17 22 58 159-91 S co2 355.440 ... S1 1994 02 25 10 04 -89.9800 -24.8000 2810.00 128296 SPO 1993 11 17 22 58 160-91 S co2 355.640 ... S1 1994 02 25 10 06 -89.9800 -24.8000 2810.00 128297 SPO 1993 11 24 01 58 27-91 S co2 355.480 ... S1 1994 02 25 09 28 -89.9800 -24.8000 2810.00 128298 SPO 1993 11 24 01 58 28-91 S co2 355.510 ... S1 1994 02 25 09 30 -89.9800 -24.8000 2810.00 128299 SPO 1993 12 06 11 59 221-91 S co2 355.550 ... S1 1994 02 25 08 44 -89.9800 -24.8000 2810.00 128300 SPO 1993 12 06 11 59 222-91 S co2 355.510 ... S1 1994 02 25 08 46 -89.9800 -24.8000 2810.00 128301 SPO 1993 12 06 12 26 153-91 P co2 355.670 ... S1 1994 02 25 09 52 -89.9800 -24.8000 2810.00 128302 SPO 1993 12 06 12 26 154-91 P co2 355.630 ... S1 1994 02 25 09 54 -89.9800 -24.8000 2810.00 128303 SPO 1993 12 15 05 00 49-91 S co2 355.320 ... S1 1994 02 25 09 24 -89.9800 -24.8000 2810.00 128304 SPO 1993 12 15 05 00 50-91 S co2 355.310 ... S1 1994 02 25 09 26 -89.9800 -24.8000 2810.00 128305 SPO 1993 12 18 09 34 35-91 P co2 355.610 ... S1 1994 03 15 08 12 -89.9800 -24.8000 2810.00 128306 SPO 1993 12 18 09 34 36-91 P co2 355.530 ... S1 1994 03 15 08 14 -89.9800 -24.8000 2810.00 128307 SPO 1993 12 22 03 51 47-91 S co2 355.370 ... S1 1994 03 15 09 12 -89.9800 -24.8000 2810.00 128308 SPO 1993 12 22 03 51 48-91 S co2 355.430 ... S1 1994 03 15 09 14 -89.9800 -24.8000 2810.00 128309 SPO 1994 01 01 08 02 15-91 S co2 355.210 ... S1 1994 02 17 08 16 -89.9800 -24.8000 2810.00 128310 SPO 1994 01 01 08 02 16-91 S co2 355.190 ... S1 1994 02 17 08 18 -89.9800 -24.8000 2810.00 128311 SPO 1994 01 04 05 49 169-91 P co2 355.310 ... S1 1994 02 17 08 20 -89.9800 -24.8000 2810.00 128312 SPO 1994 01 04 05 49 170-91 P co2 355.290 ... S1 1994 02 17 08 22 -89.9800 -24.8000 2810.00 128313 SPO 1994 01 08 01 00 223-91 S co2 355.110 ... S1 1994 03 15 09 28 -89.9800 -24.8000 2810.00 128314 SPO 1994 01 08 01 00 224-91 S co2 355.180 ... S1 1994 03 15 09 30 -89.9800 -24.8000 2810.00 128315 SPO 1994 01 16 00 00 225-91 S co2 355.550 ... S1 1994 03 15 09 44 -89.9800 -24.8000 2810.00 128316 SPO 1994 01 16 00 00 226-91 S co2 355.550 ... S1 1994 03 15 09 46 -89.9800 -24.8000 2810.00 128317 SPO 1994 01 19 12 21 187-91 P co2 355.420 ... S1 1994 03 15 09 16 -89.9800 -24.8000 2810.00 128318 SPO 1994 01 19 12 21 188-91 P co2 355.380 ... S1 1994 03 15 09 18 -89.9800 -24.8000 2810.00 128319 SPO 1994 01 23 22 00 195-91 S co2 355.120 ... S1 1994 03 15 08 56 -89.9800 -24.8000 2810.00 128320 SPO 1994 01 23 22 00 196-91 S co2 355.100 ... S1 1994 03 15 08 58 -89.9800 -24.8000 2810.00 128321 SPO 1994 01 31 22 00 185-91 S co2 355.460 ... S1 1994 03 15 09 20 -89.9800 -24.8000 2810.00 128322 SPO 1994 01 31 22 00 186-91 S co2 355.440 ... S1 1994 03 15 09 22 -89.9800 -24.8000 2810.00 128323 SPO 1994 02 03 14 59 189-91 P co2 355.500 ... S1 1994 03 15 09 24 -89.9800 -24.8000 2810.00 128324 SPO 1994 02 03 14 59 190-91 P co2 355.340 ... S1 1994 03 15 09 26 -89.9800 -24.8000 2810.00 128325 SPO 1994 02 14 15 58 247-91 S co2 355.080 ... S1 1994 12 09 09 44 -89.9800 -24.8000 2810.00 128326 SPO 1994 02 14 15 58 248-91 S co2 355.100 ... S1 1994 12 09 09 46 -89.9800 -24.8000 2810.00 128327 SPO 1994 02 17 22 42 267-91 P co2 355.310 ... S1 1994 12 09 08 12 -89.9800 -24.8000 2810.00 128328 SPO 1994 02 17 22 42 268-91 P co2 355.240 ... S1 1994 12 09 08 14 -89.9800 -24.8000 2810.00 128329 SPO 1994 02 23 15 59 249-91 S co2 355.120 ... S1 1994 12 09 11 36 -89.9800 -24.8000 2810.00 128330 SPO 1994 02 23 15 59 250-91 S co2 355.100 ... S1 1994 12 09 11 38 -89.9800 -24.8000 2810.00 128331 SPO 1994 03 03 17 45 271-91 P co2 355.450 ... S1 1994 12 09 08 16 -89.9800 -24.8000 2810.00 128332 SPO 1994 03 03 17 45 272-91 P co2 355.380 ... S1 1994 12 09 08 18 -89.9800 -24.8000 2810.00 128333 SPO 1994 03 07 04 56 85-91 S co2 355.380 ... S1 1994 12 09 08 40 -89.9800 -24.8000 2810.00 128334 SPO 1994 03 07 04 56 86-91 S co2 355.400 ... S1 1994 12 09 08 42 -89.9800 -24.8000 2810.00 128335 SPO 1994 03 14 11 58 87-91 S co2 355.420 ... S1 1994 12 09 08 28 -89.9800 -24.8000 2810.00 128336 SPO 1994 03 14 11 58 88-91 S co2 355.170 ... S1 1994 12 09 08 30 -89.9800 -24.8000 2810.00 128337 SPO 1994 03 16 17 38 93-91 P co2 355.430 -.. S1 1994 12 07 08 28 -89.9800 -24.8000 2810.00 128338 SPO 1994 03 16 17 38 94-91 P co2 356.310 +.. S1 1994 12 07 08 30 -89.9800 -24.8000 2810.00 128339 SPO 1994 03 21 23 01 215-91 S co2 355.360 ... S1 1994 12 07 08 40 -89.9800 -24.8000 2810.00 128340 SPO 1994 03 21 23 01 216-91 S co2 355.410 ... S1 1994 12 07 08 42 -89.9800 -24.8000 2810.00 128341 SPO 1994 04 01 08 59 79-91 S co2 355.140 ... S1 1994 12 09 11 32 -89.9800 -24.8000 2810.00 128342 SPO 1994 04 01 08 59 80-91 S co2 355.100 ... S1 1994 12 09 11 34 -89.9800 -24.8000 2810.00 128343 SPO 1994 04 04 03 38 105-91 P co2 355.450 ... S1 1994 12 13 10 04 -89.9800 -24.8000 2810.00 128344 SPO 1994 04 04 03 38 106-91 P co2 355.460 ... S1 1994 12 13 10 06 -89.9800 -24.8000 2810.00 128345 SPO 1994 04 11 10 58 263-91 S co2 355.380 ... S1 1994 12 07 08 48 -89.9800 -24.8000 2810.00 128346 SPO 1994 04 11 10 58 264-91 S co2 355.370 ... S1 1994 12 07 08 50 -89.9800 -24.8000 2810.00 128347 SPO 1994 04 15 20 58 265-91 P co2 355.560 ... S1 1994 12 07 08 44 -89.9800 -24.8000 2810.00 128348 SPO 1994 04 15 20 58 266-91 P co2 355.550 ... S1 1994 12 07 08 46 -89.9800 -24.8000 2810.00 128349 SPO 1994 04 19 14 58 259-91 S co2 355.520 ... S1 1994 12 09 11 24 -89.9800 -24.8000 2810.00 128350 SPO 1994 04 19 14 58 260-91 S co2 355.470 ... S1 1994 12 09 11 26 -89.9800 -24.8000 2810.00 128351 SPO 1994 04 28 03 02 261-91 S co2 355.370 ... S1 1994 12 09 11 28 -89.9800 -24.8000 2810.00 128352 SPO 1994 04 28 03 02 262-91 S co2 355.350 ... S1 1994 12 09 11 30 -89.9800 -24.8000 2810.00 128353 SPO 1994 05 05 02 01 3-91 S co2 351.920 +.. S1 1994 12 13 08 56 -89.9800 -24.8000 2810.00 128354 SPO 1994 05 05 02 01 4-91 S co2 349.610 -.. S1 1994 12 13 08 58 -89.9800 -24.8000 2810.00 128355 SPO 1994 05 05 04 29 269-91 P co2 355.540 ... S1 1994 12 13 08 48 -89.9800 -24.8000 2810.00 128356 SPO 1994 05 05 04 29 270-91 P co2 355.500 ... S1 1994 12 13 08 50 -89.9800 -24.8000 2810.00 128357 SPO 1994 05 13 02 59 561-91 S co2 355.300 ... S1 1994 12 09 13 16 -89.9800 -24.8000 2810.00 128358 SPO 1994 05 13 02 59 562-91 S co2 355.150 ... S1 1994 12 09 13 18 -89.9800 -24.8000 2810.00 128359 SPO 1994 05 16 16 14 643-91 P co2 374.860 +.. S1 1994 12 13 10 00 -89.9800 -24.8000 2810.00 128360 SPO 1994 05 16 16 14 644-91 P co2 355.880 -.. S1 1994 12 13 10 02 -89.9800 -24.8000 2810.00 128361 SPO 1994 05 21 03 59 645-91 S co2 355.430 +.. S1 1994 12 13 08 52 -89.9800 -24.8000 2810.00 128362 SPO 1994 05 21 03 59 646-91 S co2 348.810 -.. S1 1994 12 13 08 54 -89.9800 -24.8000 2810.00 128363 SPO 1994 05 28 03 00 649-91 S co2 349.050 -.. S1 1994 12 13 09 00 -89.9800 -24.8000 2810.00 128364 SPO 1994 05 28 03 00 650-91 S co2 355.630 +.. S1 1994 12 13 09 02 -89.9800 -24.8000 2810.00 128365 SPO 1994 06 01 02 41 517-91 P co2 355.150 ... S1 1994 12 13 09 56 -89.9800 -24.8000 2810.00 128366 SPO 1994 06 01 02 41 518-91 P co2 355.620 ... S1 1994 12 13 09 58 -89.9800 -24.8000 2810.00 128367 SPO 1994 06 04 04 56 521-91 S co2 355.700 ... S1 1994 12 13 09 52 -89.9800 -24.8000 2810.00 128368 SPO 1994 06 04 04 56 522-91 S co2 355.590 ... S1 1994 12 13 09 54 -89.9800 -24.8000 2810.00 128369 SPO 1994 06 14 10 59 519-91 S co2 355.910 ... S1 1994 12 13 08 40 -89.9800 -24.8000 2810.00 128370 SPO 1994 06 14 10 59 520-91 S co2 355.810 ... S1 1994 12 13 08 42 -89.9800 -24.8000 2810.00 128371 SPO 1994 06 15 00 18 563-91 P co2 355.900 ... S1 1994 12 13 08 44 -89.9800 -24.8000 2810.00 128372 SPO 1994 06 15 00 18 564-91 P co2 356.020 ... S1 1994 12 13 08 46 -89.9800 -24.8000 2810.00 128373 SPO 1994 06 24 05 14 513-91 S co2 355.660 +.. S1 1994 12 13 08 28 -89.9800 -24.8000 2810.00 128374 SPO 1994 06 24 05 14 514-91 S co2 352.930 -.. S1 1994 12 13 08 30 -89.9800 -24.8000 2810.00 128375 SPO 1994 07 05 06 01 511-91 P co2 356.040 ... S1 1994 12 15 09 00 -89.9800 -24.8000 2810.00 128376 SPO 1994 07 05 06 01 512-91 P co2 356.020 ... S1 1994 12 15 09 02 -89.9800 -24.8000 2810.00 128377 SPO 1994 07 07 04 58 535-91 S co2 356.090 ... S1 1994 12 13 09 20 -89.9800 -24.8000 2810.00 128378 SPO 1994 07 07 04 58 536-91 S co2 355.970 ... S1 1994 12 13 09 22 -89.9800 -24.8000 2810.00 128379 SPO 1994 07 14 08 00 529-91 S co2 356.220 ... S1 1994 12 13 09 16 -89.9800 -24.8000 2810.00 128380 SPO 1994 07 14 08 00 530-91 S co2 356.150 ... S1 1994 12 13 09 18 -89.9800 -24.8000 2810.00 128381 SPO 1994 07 17 11 14 545-91 P co2 356.390 ... S1 1994 12 15 09 16 -89.9800 -24.8000 2810.00 128382 SPO 1994 07 17 11 14 546-91 P co2 356.330 ... S1 1994 12 15 09 18 -89.9800 -24.8000 2810.00 128383 SPO 1994 07 20 12 56 531-91 S co2 356.400 ... S1 1994 12 19 10 24 -89.9800 -24.8000 2810.00 128384 SPO 1994 07 20 12 56 532-91 S co2 356.090 ... S1 1994 12 19 10 26 -89.9800 -24.8000 2810.00 128385 SPO 1994 07 29 03 04 533-91 S co2 356.650 ... S1 1994 12 19 10 20 -89.9800 -24.8000 2810.00 128386 SPO 1994 07 29 03 04 534-91 S co2 356.520 ... S1 1994 12 19 10 22 -89.9800 -24.8000 2810.00 128387 SPO 1994 08 02 10 02 611-91 P co2 356.580 ... S1 1994 12 13 08 20 -89.9800 -24.8000 2810.00 128388 SPO 1994 08 02 10 02 612-91 P co2 356.500 ... S1 1994 12 13 08 22 -89.9800 -24.8000 2810.00 128389 SPO 1994 08 06 04 48 515-91 S co2 356.420 ... S1 1994 12 13 08 24 -89.9800 -24.8000 2810.00 128390 SPO 1994 08 06 04 48 516-91 S co2 356.500 ... S1 1994 12 13 08 26 -89.9800 -24.8000 2810.00 128391 SPO 1994 08 15 06 03 626-91 S co2 356.640 ... S1 1994 12 13 09 26 -89.9800 -24.8000 2810.00 128392 SPO 1994 08 17 14 34 605-91 P co2 357.040 ... S1 1994 12 13 09 32 -89.9800 -24.8000 2810.00 128393 SPO 1994 08 17 14 34 606-91 P co2 356.940 ... S1 1994 12 13 09 34 -89.9800 -24.8000 2810.00 128394 SPO 1994 08 23 05 00 613-91 S co2 356.780 ... S1 1994 12 13 09 28 -89.9800 -24.8000 2810.00 128395 SPO 1994 08 23 05 00 614-91 S co2 356.720 ... S1 1994 12 13 09 30 -89.9800 -24.8000 2810.00 128396 SPO 1994 08 31 04 17 621-91 S co2 357.000 ... S1 1994 12 15 10 24 -89.9800 -24.8000 2810.00 128397 SPO 1994 08 31 04 17 622-91 S co2 356.920 ... S1 1994 12 15 10 26 -89.9800 -24.8000 2810.00 128398 SPO 1994 09 05 00 04 623-91 P co2 357.120 ... S1 1994 12 19 10 28 -89.9800 -24.8000 2810.00 128399 SPO 1994 09 05 00 04 624-91 P co2 357.100 ... S1 1994 12 19 10 30 -89.9800 -24.8000 2810.00 128400 SPO 1994 09 09 04 57 631-91 S co2 357.200 ... S1 1994 12 15 10 32 -89.9800 -24.8000 2810.00 128401 SPO 1994 09 09 04 57 632-91 S co2 356.880 ... S1 1994 12 15 10 34 -89.9800 -24.8000 2810.00 128402 SPO 1994 09 16 06 51 155-91 P co2 357.510 ... S1 1994 12 19 10 16 -89.9800 -24.8000 2810.00 128403 SPO 1994 09 16 06 51 156-91 P co2 357.470 ... S1 1994 12 19 10 18 -89.9800 -24.8000 2810.00 128404 SPO 1994 09 17 04 13 363-91 S co2 357.360 ... S1 1994 12 13 09 12 -89.9800 -24.8000 2810.00 128405 SPO 1994 09 17 04 13 364-91 S co2 357.370 ... S1 1994 12 13 09 14 -89.9800 -24.8000 2810.00 128406 SPO 1994 09 26 08 01 25-91 S co2 357.440 ... S1 1994 12 13 09 48 -89.9800 -24.8000 2810.00 128407 SPO 1994 09 26 08 01 26-91 S co2 357.380 ... S1 1994 12 13 09 50 -89.9800 -24.8000 2810.00 128408 SPO 1994 10 02 07 05 361-91 P co2 357.520 ... S1 1994 12 13 09 44 -89.9800 -24.8000 2810.00 128409 SPO 1994 10 02 07 05 362-91 P co2 357.430 ... S1 1994 12 13 09 46 -89.9800 -24.8000 2810.00 128410 SPO 1994 10 03 07 57 301-91 S co2 357.210 ... S1 1994 12 09 08 56 -89.9800 -24.8000 2810.00 128411 SPO 1994 10 03 07 57 302-91 S co2 357.160 ... S1 1994 12 09 08 58 -89.9800 -24.8000 2810.00 128412 SPO 1994 10 11 22 58 493-91 S co2 357.100 ... S1 1994 12 09 09 00 -89.9800 -24.8000 2810.00 128413 SPO 1994 10 11 22 58 494-91 S co2 357.070 ... S1 1994 12 09 09 02 -89.9800 -24.8000 2810.00 128414 SPO 1994 10 18 22 34 173-91 P co2 357.460 ... S1 1994 12 09 08 52 -89.9800 -24.8000 2810.00 128415 SPO 1994 10 18 22 34 174-91 P co2 357.440 ... S1 1994 12 09 08 54 -89.9800 -24.8000 2810.00 128416 SPO 1994 10 18 22 59 553-91 S co2 357.360 ... S1 1994 12 09 08 48 -89.9800 -24.8000 2810.00 128417 SPO 1994 10 18 22 59 554-91 S co2 357.320 ... S1 1994 12 09 08 50 -89.9800 -24.8000 2810.00 128418 SPO 1994 10 28 14 00 635-91 S co2 357.220 ... S1 1995 01 10 09 16 -89.9800 -24.8000 2810.00 128419 SPO 1994 10 28 14 00 636-91 S co2 357.130 ... S1 1995 01 10 09 18 -89.9800 -24.8000 2810.00 128420 SPO 1994 11 02 22 45 637-91 P co2 357.490 ... S1 1995 01 10 08 20 -89.9800 -24.8000 2810.00 128421 SPO 1994 11 02 22 45 638-91 P co2 357.470 ... S1 1995 01 10 08 22 -89.9800 -24.8000 2810.00 128422 SPO 1994 11 02 22 56 595-91 S co2 357.160 ... S1 1995 01 10 08 56 -89.9800 -24.8000 2810.00 128423 SPO 1994 11 02 22 56 596-91 S co2 357.160 ... S1 1995 01 10 08 58 -89.9800 -24.8000 2810.00 128424 SPO 1994 11 10 04 55 633-91 S co2 357.160 ... S1 1995 01 10 10 00 -89.9800 -24.8000 2810.00 128425 SPO 1994 11 10 04 55 634-91 S co2 357.140 ... S1 1995 01 10 10 02 -89.9800 -24.8000 2810.00 128426 SPO 1994 11 16 03 56 597-91 S co2 357.500 ... S1 1995 01 10 08 12 -89.9800 -24.8000 2810.00 128427 SPO 1994 11 16 03 56 598-91 S co2 357.360 ... S1 1995 01 10 08 14 -89.9800 -24.8000 2810.00 128428 SPO 1994 11 16 04 18 639-91 P co2 357.520 ... S1 1995 01 10 08 16 -89.9800 -24.8000 2810.00 128429 SPO 1994 11 16 04 18 640-91 P co2 357.510 ... S1 1995 01 10 08 18 -89.9800 -24.8000 2810.00 128430 SPO 1994 11 24 19 58 601-91 S co2 357.470 ... S1 1995 01 10 09 12 -89.9800 -24.8000 2810.00 128431 SPO 1994 11 24 19 58 602-91 S co2 357.400 ... S1 1995 01 10 09 14 -89.9800 -24.8000 2810.00 128432 SPO 1994 12 03 03 50 647-91 P co2 357.350 ... S1 1995 02 02 08 24 -89.9800 -24.8000 2810.00 128433 SPO 1994 12 03 03 50 648-91 P co2 357.400 ... S1 1995 02 02 08 26 -89.9800 -24.8000 2810.00 128434 SPO 1994 12 03 04 57 603-91 S co2 356.940 ... S1 1995 01 10 09 00 -89.9800 -24.8000 2810.00 128435 SPO 1994 12 03 04 57 604-91 S co2 357.070 ... S1 1995 01 10 09 02 -89.9800 -24.8000 2810.00 128436 SPO 1994 12 07 01 55 589-91 S co2 357.290 ... S1 1995 02 02 08 12 -89.9800 -24.8000 2810.00 128437 SPO 1994 12 07 01 55 590-91 S co2 357.220 ... S1 1995 02 02 08 14 -89.9800 -24.8000 2810.00 128438 SPO 1994 12 15 04 06 593-91 P co2 357.350 ... S1 1995 02 02 08 20 -89.9800 -24.8000 2810.00 128439 SPO 1994 12 15 04 06 594-91 P co2 357.410 ... S1 1995 02 02 08 22 -89.9800 -24.8000 2810.00 128440 SPO 1994 12 15 04 55 525-91 S co2 357.060 ... S1 1995 02 14 12 08 -89.9800 -24.8000 2810.00 128441 SPO 1994 12 15 04 55 526-91 S co2 357.080 ... S1 1995 02 14 12 10 -89.9800 -24.8000 2810.00 128442 SPO 1994 12 18 19 55 567-91 S co2 357.160 ... S1 1995 02 02 08 16 -89.9800 -24.8000 2810.00 128443 SPO 1994 12 18 19 55 568-91 S co2 357.130 ... S1 1995 02 02 08 18 -89.9800 -24.8000 2810.00 128444 SPO 1994 12 28 03 57 523-91 S co2 357.410 ... S1 1995 02 14 11 52 -89.9800 -24.8000 2810.00 128445 SPO 1994 12 28 03 57 524-91 S co2 357.460 ... S1 1995 02 14 11 54 -89.9800 -24.8000 2810.00 128446 SPO 1995 01 05 21 44 591-91 P co2 357.290 ... S1 1995 02 14 12 04 -89.9800 -24.8000 2810.00 128447 SPO 1995 01 05 21 44 592-91 P co2 357.420 ... S1 1995 02 14 12 06 -89.9800 -24.8000 2810.00 128448 SPO 1995 01 05 23 55 615-91 S co2 357.010 ... S1 1995 04 06 08 24 -89.9800 -24.8000 2810.00 128449 SPO 1995 01 05 23 55 616-91 S co2 357.060 ... S1 1995 04 06 08 26 -89.9800 -24.8000 2810.00 128450 SPO 1995 01 13 21 55 617-91 S co2 356.910 ... S1 1995 04 06 08 56 -89.9800 -24.8000 2810.00 128451 SPO 1995 01 13 21 55 618-91 S co2 356.830 ... S1 1995 04 06 08 58 -89.9800 -24.8000 2810.00 128452 SPO 1995 01 15 09 27 585-91 P co2 357.360 ... S1 1995 04 05 10 16 -89.9800 -24.8000 2810.00 128453 SPO 1995 01 15 09 27 586-91 P co2 357.130 ... S1 1995 04 05 10 18 -89.9800 -24.8000 2810.00 128454 SPO 1995 01 15 09 55 587-91 S co2 357.070 ... S1 1995 04 05 09 56 -89.9800 -24.8000 2810.00 128455 SPO 1995 01 15 09 55 588-91 S co2 357.010 ... S1 1995 04 05 09 58 -89.9800 -24.8000 2810.00 128456 SPO 1995 01 26 03 35 555-91 P co2 356.870 ... S1 1995 04 06 08 16 -89.9800 -24.8000 2810.00 128457 SPO 1995 01 26 03 35 556-91 P co2 356.970 ... S1 1995 04 06 08 18 -89.9800 -24.8000 2810.00 128458 SPO 1995 01 26 06 55 557-91 S co2 357.020 ... S1 1995 04 12 09 20 -89.9800 -24.8000 2810.00 128459 SPO 1995 01 26 06 55 558-91 S co2 356.970 ... S1 1995 04 12 09 22 -89.9800 -24.8000 2810.00 128460 SPO 1995 02 02 20 55 497-91 S co2 357.290 .X. S1 1995 12 18 11 24 -89.9800 -24.8000 2810.00 128461 SPO 1995 02 02 20 55 498-91 S co2 357.760 .X. S1 1995 12 18 11 26 -89.9800 -24.8000 2810.00 128462 SPO 1995 02 08 20 55 507-91 S co2 357.340 ... S1 1995 12 18 11 28 -89.9800 -24.8000 2810.00 128463 SPO 1995 02 08 20 55 508-91 S co2 357.270 ... S1 1995 12 18 11 30 -89.9800 -24.8000 2810.00 128464 SPO 1995 02 15 03 40 63-91 P co2 356.520 ... S1 1995 12 20 09 00 -89.9800 -24.8000 2810.00 128465 SPO 1995 02 15 03 40 64-91 P co2 357.000 ... S1 1995 12 20 09 02 -89.9800 -24.8000 2810.00 128466 SPO 1995 02 15 04 55 327-91 S co2 356.940 ... S1 1995 12 20 09 12 -89.9800 -24.8000 2810.00 128467 SPO 1995 02 15 04 55 328-91 S co2 356.960 ... S1 1995 12 20 09 14 -89.9800 -24.8000 2810.00 128468 SPO 1995 02 22 03 56 279-91 S co2 356.960 ... S1 1995 12 20 10 20 -89.9800 -24.8000 2810.00 128469 SPO 1995 02 22 03 56 280-91 S co2 357.120 ... S1 1995 12 20 10 22 -89.9800 -24.8000 2810.00 128470 SPO 1995 03 02 00 55 19-91 S co2 357.100 ... S1 1995 12 20 08 52 -89.9800 -24.8000 2810.00 128471 SPO 1995 03 02 00 55 20-91 S co2 357.050 ... S1 1995 12 20 08 54 -89.9800 -24.8000 2810.00 128472 SPO 1995 03 02 03 39 287-91 P co2 357.240 ... S1 1995 12 20 10 28 -89.9800 -24.8000 2810.00 128473 SPO 1995 03 02 03 39 288-91 P co2 357.160 ... S1 1995 12 20 10 30 -89.9800 -24.8000 2810.00 128474 SPO 1995 03 06 21 55 495-91 S co2 357.270 ... S1 1995 12 20 08 56 -89.9800 -24.8000 2810.00 128475 SPO 1995 03 06 21 55 496-91 S co2 356.950 ... S1 1995 12 20 08 58 -89.9800 -24.8000 2810.00 128476 SPO 1995 03 15 01 06 303-91 P co2 357.010 ... S1 1995 12 20 10 36 -89.9800 -24.8000 2810.00 128477 SPO 1995 03 15 01 06 304-91 P co2 356.560 ... S1 1995 12 20 10 38 -89.9800 -24.8000 2810.00 128478 SPO 1995 03 15 04 55 311-91 S co2 356.920 -.. S1 1995 12 20 10 32 -89.9800 -24.8000 2810.00 128479 SPO 1995 03 15 04 55 312-91 S co2 357.760 +.. S1 1995 12 20 10 34 -89.9800 -24.8000 2810.00 128480 SPO 1995 03 20 01 57 571-91 S co2 356.980 ... S1 1995 12 20 09 24 -89.9800 -24.8000 2810.00 128481 SPO 1995 03 20 01 57 572-91 S co2 357.010 ... S1 1995 12 20 09 26 -89.9800 -24.8000 2810.00 128482 SPO 1995 03 29 05 55 629-91 S co2 357.160 ... S1 1995 12 20 09 20 -89.9800 -24.8000 2810.00 128483 SPO 1995 03 29 05 55 630-91 S co2 357.130 ... S1 1995 12 20 09 22 -89.9800 -24.8000 2810.00 128484 SPO 1995 04 01 04 55 619-91 S co2 357.030 ... S1 1995 12 20 10 00 -89.9800 -24.8000 2810.00 128485 SPO 1995 04 01 04 55 620-91 S co2 357.010 ... S1 1995 12 20 10 02 -89.9800 -24.8000 2810.00 128486 SPO 1995 04 01 05 12 583-91 P co2 357.260 ... S1 1995 12 20 09 56 -89.9800 -24.8000 2810.00 128487 SPO 1995 04 01 05 12 584-91 P co2 357.040 ... S1 1995 12 20 09 58 -89.9800 -24.8000 2810.00 128488 SPO 1995 04 03 22 57 581-91 S co2 353.830 -.. S1 1995 12 20 08 20 -89.9800 -24.8000 2810.00 128489 SPO 1995 04 03 22 57 582-91 S co2 357.100 +.. S1 1995 12 20 08 22 -89.9800 -24.8000 2810.00 128490 SPO 1995 04 10 22 55 627-91 S co2 357.220 +.. S1 1995 12 18 10 16 -89.9800 -24.8000 2810.00 128491 SPO 1995 04 10 22 55 628-91 S co2 356.430 -.. S1 1995 12 18 10 18 -89.9800 -24.8000 2810.00 128492 SPO 1995 04 15 02 55 547-91 S co2 357.010 ... S1 1995 12 20 08 40 -89.9800 -24.8000 2810.00 128493 SPO 1995 04 15 02 55 548-91 S co2 357.070 ... S1 1995 12 20 08 42 -89.9800 -24.8000 2810.00 128494 SPO 1995 04 15 03 34 569-91 P co2 357.470 ... S1 1995 12 20 10 48 -89.9800 -24.8000 2810.00 128495 SPO 1995 04 15 03 34 570-91 P co2 357.900 ... S1 1995 12 20 10 50 -89.9800 -24.8000 2810.00 128496 SPO 1995 04 19 10 55 1295-91 S co2 356.130 -.. S1 1995 12 18 11 32 -89.9800 -24.8000 2810.00 128497 SPO 1995 04 19 10 55 1296-91 S co2 356.970 +.. S1 1995 12 18 11 34 -89.9800 -24.8000 2810.00 128498 SPO 1995 04 24 23 55 1297-91 S co2 354.020 -.. S1 1995 12 18 11 20 -89.9800 -24.8000 2810.00 128499 SPO 1995 04 24 23 55 1298-91 S co2 357.490 +.. S1 1995 12 18 11 22 -89.9800 -24.8000 2810.00 128500 SPO 1995 05 01 01 57 1289-91 S co2 357.310 ... S1 1995 12 18 10 24 -89.9800 -24.8000 2810.00 128501 SPO 1995 05 01 01 57 1290-91 S co2 357.260 ... S1 1995 12 18 10 26 -89.9800 -24.8000 2810.00 128502 SPO 1995 05 01 02 41 1287-91 P co2 357.400 +.. S1 1995 12 18 10 48 -89.9800 -24.8000 2810.00 128503 SPO 1995 05 01 02 41 1288-91 P co2 356.810 -.. S1 1995 12 18 10 50 -89.9800 -24.8000 2810.00 128504 SPO 1995 05 08 23 55 1291-91 S co2 357.690 +.. S1 1995 12 20 11 20 -89.9800 -24.8000 2810.00 128505 SPO 1995 05 08 23 55 1292-91 S co2 356.280 -.. S1 1995 12 20 11 22 -89.9800 -24.8000 2810.00 128506 SPO 1995 05 17 11 58 1325-91 S co2 -999.990 *.. S1 1995 12 20 11 32 -89.9800 -24.8000 2810.00 128507 SPO 1995 05 17 11 58 1326-91 S co2 357.260 -.. S1 1995 12 20 11 34 -89.9800 -24.8000 2810.00 128508 SPO 1995 05 17 16 39 1321-91 P co2 357.770 ... S1 1995 12 20 10 16 -89.9800 -24.8000 2810.00 128509 SPO 1995 05 17 16 39 1322-91 P co2 357.840 ... S1 1995 12 20 10 18 -89.9800 -24.8000 2810.00 128510 SPO 1995 05 22 02 55 1323-91 S co2 357.230 ... S1 1995 12 20 10 04 -89.9800 -24.8000 2810.00 128511 SPO 1995 05 22 02 55 1324-91 S co2 357.220 ... S1 1995 12 20 10 06 -89.9800 -24.8000 2810.00 128512 SPO 1995 06 02 04 12 1333-91 P co2 357.590 ... S1 1995 12 20 09 16 -89.9800 -24.8000 2810.00 128513 SPO 1995 06 02 04 12 1334-91 P co2 357.550 ... S1 1995 12 20 09 18 -89.9800 -24.8000 2810.00 128514 SPO 1995 06 02 05 56 1335-91 S co2 357.340 ... S1 1995 12 20 09 28 -89.9800 -24.8000 2810.00 128515 SPO 1995 06 02 05 56 1336-91 S co2 357.290 ... S1 1995 12 20 09 30 -89.9800 -24.8000 2810.00 128516 SPO 1995 06 07 03 55 1281-91 S co2 357.570 ... S1 1995 12 20 09 44 -89.9800 -24.8000 2810.00 128517 SPO 1995 06 07 03 55 1282-91 S co2 358.060 ... S1 1995 12 20 09 46 -89.9800 -24.8000 2810.00 128518 SPO 1995 06 16 11 11 1315-91 P co2 357.770 ... S1 1995 12 20 09 32 -89.9800 -24.8000 2810.00 128519 SPO 1995 06 16 11 11 1316-91 P co2 357.710 ... S1 1995 12 20 09 34 -89.9800 -24.8000 2810.00 128520 SPO 1995 06 16 11 55 1189-91 S co2 357.680 ... S1 1995 12 20 09 52 -89.9800 -24.8000 2810.00 128521 SPO 1995 06 16 11 55 1190-91 S co2 357.580 ... S1 1995 12 20 09 54 -89.9800 -24.8000 2810.00 128522 SPO 1995 06 21 05 55 1191-91 S co2 357.740 ... S1 1995 12 20 09 48 -89.9800 -24.8000 2810.00 128523 SPO 1995 06 21 05 55 1192-91 S co2 357.630 ... S1 1995 12 20 09 50 -89.9800 -24.8000 2810.00 128524 SPO 1995 07 05 12 55 1169-91 S co2 357.860 +.. S1 1995 12 06 14 04 -89.9800 -24.8000 2810.00 128525 SPO 1995 07 05 12 55 1170-91 S co2 355.800 -.. S1 1995 12 06 14 06 -89.9800 -24.8000 2810.00 128526 SPO 1995 07 05 23 35 197-91 P co2 352.420 +.. S1 1995 12 06 13 16 -89.9800 -24.8000 2810.00 128527 SPO 1995 07 05 23 35 198-91 P co2 344.510 -.. S1 1995 12 06 13 18 -89.9800 -24.8000 2810.00 128528 SPO 1995 07 13 14 55 1167-91 S co2 358.240 ... S1 1995 12 06 14 00 -89.9800 -24.8000 2810.00 128529 SPO 1995 07 13 14 55 1168-91 S co2 358.220 ... S1 1995 12 06 14 02 -89.9800 -24.8000 2810.00 128530 SPO 1995 07 15 11 50 1213-91 P co2 357.950 ... S1 1995 12 06 14 20 -89.9800 -24.8000 2810.00 128531 SPO 1995 07 15 11 50 1214-91 P co2 358.060 ... S1 1995 12 06 14 22 -89.9800 -24.8000 2810.00 128532 SPO 1995 07 15 11 57 95-91 S co2 358.040 +.. S1 1995 12 06 13 12 -89.9800 -24.8000 2810.00 128533 SPO 1995 07 15 11 57 96-91 S co2 355.970 -.. S1 1995 12 06 13 14 -89.9800 -24.8000 2810.00 128534 SPO 1995 07 20 05 55 115-91 S co2 358.600 ... S1 1995 12 06 13 28 -89.9800 -24.8000 2810.00 128535 SPO 1995 07 20 05 55 116-91 S co2 358.280 ... S1 1995 12 06 13 30 -89.9800 -24.8000 2810.00 128536 SPO 1995 07 23 22 55 117-91 S co2 358.070 ... S1 1995 12 06 14 08 -89.9800 -24.8000 2810.00 128537 SPO 1995 07 23 22 55 118-91 S co2 358.190 ... S1 1995 12 06 14 10 -89.9800 -24.8000 2810.00 128538 SPO 1995 08 01 04 55 163-91 S co2 359.070 +.. S1 1995 12 06 13 08 -89.9800 -24.8000 2810.00 128539 SPO 1995 08 01 04 55 164-91 S co2 358.160 -.. S1 1995 12 06 13 10 -89.9800 -24.8000 2810.00 128540 SPO 1995 08 01 05 30 65-91 P co2 358.450 ... S1 1995 12 08 08 52 -89.9800 -24.8000 2810.00 128541 SPO 1995 08 01 05 30 66-91 P co2 358.320 ... S1 1995 12 08 08 54 -89.9800 -24.8000 2810.00 128542 SPO 1995 08 11 13 55 199-91 S co2 358.700 -.. S1 1995 12 08 09 32 -89.9800 -24.8000 2810.00 128543 SPO 1995 08 11 13 55 200-91 S co2 378.630 +.. S1 1995 12 08 09 34 -89.9800 -24.8000 2810.00 128544 SPO 1995 08 18 04 36 1163-91 P co2 358.730 ... S1 1995 12 08 09 48 -89.9800 -24.8000 2810.00 128545 SPO 1995 08 18 04 36 1164-91 P co2 358.680 ... S1 1995 12 08 09 50 -89.9800 -24.8000 2810.00 128546 SPO 1995 08 18 05 55 1165-91 S co2 358.400 ... S1 1995 12 08 09 56 -89.9800 -24.8000 2810.00 128547 SPO 1995 08 18 05 55 1166-91 S co2 358.390 ... S1 1995 12 08 09 58 -89.9800 -24.8000 2810.00 128548 SPO 1995 08 22 22 25 1329-91 S co2 358.220 ... S1 1995 12 08 09 28 -89.9800 -24.8000 2810.00 128549 SPO 1995 08 22 22 25 1330-91 S co2 358.230 ... S1 1995 12 08 09 30 -89.9800 -24.8000 2810.00 128550 SPO 1995 09 03 01 55 1161-91 S co2 362.090 +.. S1 1995 12 08 08 28 -89.9800 -24.8000 2810.00 128551 SPO 1995 09 03 01 55 1162-91 S co2 358.500 -.. S1 1995 12 08 08 30 -89.9800 -24.8000 2810.00 128552 SPO 1995 09 03 02 10 1331-91 P co2 358.880 ... S1 1995 12 08 08 56 -89.9800 -24.8000 2810.00 128553 SPO 1995 09 03 02 10 1332-91 P co2 358.920 ... S1 1995 12 08 08 58 -89.9800 -24.8000 2810.00 128554 SPO 1995 09 06 22 55 1215-91 S co2 358.780 +.. S1 1995 12 08 08 40 -89.9800 -24.8000 2810.00 128555 SPO 1995 09 06 22 55 1216-91 S co2 355.270 -.. S1 1995 12 08 08 42 -89.9800 -24.8000 2810.00 128556 SPO 1995 09 15 23 55 1207-91 S co2 358.550 ... S1 1995 12 20 08 28 -89.9800 -24.8000 2810.00 128557 SPO 1995 09 15 23 55 1208-91 S co2 358.500 ... S1 1995 12 20 08 30 -89.9800 -24.8000 2810.00 128558 SPO 1995 09 20 02 45 1209-91 P co2 359.060 ... S1 1995 12 20 11 28 -89.9800 -24.8000 2810.00 128559 SPO 1995 09 20 02 45 1210-91 P co2 359.040 ... S1 1995 12 20 11 30 -89.9800 -24.8000 2810.00 128560 SPO 1995 09 20 04 55 559-91 S co2 358.890 ... S1 1995 12 18 09 48 -89.9800 -24.8000 2810.00 128561 SPO 1995 09 20 04 55 560-91 S co2 358.830 ... S1 1995 12 18 09 50 -89.9800 -24.8000 2810.00 128562 SPO 1995 09 28 23 55 609-91 S co2 358.790 ... S1 1995 12 18 09 52 -89.9800 -24.8000 2810.00 128563 SPO 1995 09 28 23 55 610-91 S co2 358.810 ... S1 1995 12 18 09 54 -89.9800 -24.8000 2810.00 128564 SPO 1995 10 01 03 09 1309-91 P co2 358.710 ... S1 1995 12 20 08 48 -89.9800 -24.8000 2810.00 128565 SPO 1995 10 01 03 09 1310-91 P co2 358.640 ... S1 1995 12 20 08 50 -89.9800 -24.8000 2810.00 128566 SPO 1995 10 01 03 56 1311-91 S co2 358.900 ... S1 1995 12 18 10 20 -89.9800 -24.8000 2810.00 128567 SPO 1995 10 01 03 56 1312-91 S co2 358.910 ... S1 1995 12 18 10 22 -89.9800 -24.8000 2810.00 128568 SPO 1995 10 05 22 56 1317-91 S co2 358.850 ... S1 1995 12 18 08 52 -89.9800 -24.8000 2810.00 128569 SPO 1995 10 05 22 56 1318-91 S co2 358.840 ... S1 1995 12 18 08 54 -89.9800 -24.8000 2810.00 128570 SPO 1995 10 11 23 56 1319-91 S co2 359.100 ... S1 1995 12 18 09 12 -89.9800 -24.8000 2810.00 128571 SPO 1995 10 11 23 56 1320-91 S co2 359.100 ... S1 1995 12 18 09 14 -89.9800 -24.8000 2810.00 128572 SPO 1995 10 18 03 55 1313-91 S co2 359.000 ... S1 1996 01 22 09 24 -89.9800 -24.8000 2810.00 128573 SPO 1995 10 18 03 55 1314-91 S co2 359.200 ... S1 1996 01 22 09 26 -89.9800 -24.8000 2810.00 128574 SPO 1995 10 19 02 30 317-91 P co2 359.230 ... S1 1996 01 22 09 20 -89.9800 -24.8000 2810.00 128575 SPO 1995 10 19 02 30 318-91 P co2 359.150 ... S1 1996 01 22 09 22 -89.9800 -24.8000 2810.00 128576 SPO 1995 11 01 02 57 1293-91 S co2 359.240 ... S1 1996 01 22 08 44 -89.9800 -24.8000 2810.00 128577 SPO 1995 11 01 02 57 1294-91 S co2 359.300 ... S1 1996 01 22 08 46 -89.9800 -24.8000 2810.00 128578 SPO 1995 11 04 01 42 1279-91 P co2 359.220 ... S1 1996 01 18 09 52 -89.9800 -24.8000 2810.00 128579 SPO 1995 11 04 01 42 1280-91 P co2 359.310 ... S1 1996 01 18 09 54 -89.9800 -24.8000 2810.00 128580 SPO 1995 11 07 07 09 607-91 S co2 359.730 ... S1 1996 01 22 09 32 -89.9800 -24.8000 2810.00 128581 SPO 1995 11 07 07 09 608-91 S co2 359.650 ... S1 1996 01 22 09 34 -89.9800 -24.8000 2810.00 128582 SPO 1995 11 15 23 57 579-91 S co2 359.510 ... S1 1996 01 22 09 28 -89.9800 -24.8000 2810.00 128583 SPO 1995 11 15 23 57 580-91 S co2 359.550 ... S1 1996 01 22 09 30 -89.9800 -24.8000 2810.00 128584 SPO 1995 11 16 00 10 1193-91 P co2 359.050 ... S1 1996 01 22 10 00 -89.9800 -24.8000 2810.00 128585 SPO 1995 11 16 00 10 1194-91 P co2 359.230 ... S1 1996 01 22 10 02 -89.9800 -24.8000 2810.00 128586 SPO 1995 11 21 06 54 1229-91 S co2 359.360 ... S1 1996 01 22 08 52 -89.9800 -24.8000 2810.00 128587 SPO 1995 11 21 06 54 1230-91 S co2 359.320 ... S1 1996 01 22 08 54 -89.9800 -24.8000 2810.00 128588 SPO 1995 11 28 01 58 1285-91 S co2 359.050 ... S1 1996 02 09 09 16 -89.9800 -24.8000 2810.00 128589 SPO 1995 11 28 01 58 1286-91 S co2 359.130 ... S1 1996 02 09 09 18 -89.9800 -24.8000 2810.00 128590 SPO 1995 12 01 02 56 1283-91 S co2 359.020 ... S1 1996 02 09 09 24 -89.9800 -24.8000 2810.00 128591 SPO 1995 12 01 02 56 1284-91 S co2 359.040 ... S1 1996 02 09 09 26 -89.9800 -24.8000 2810.00 128592 SPO 1995 12 01 03 32 1183-91 P co2 359.130 ... S1 1996 02 09 09 20 -89.9800 -24.8000 2810.00 128593 SPO 1995 12 01 03 32 1184-91 P co2 359.420 ... S1 1996 02 09 09 22 -89.9800 -24.8000 2810.00 128594 SPO 1995 12 05 00 57 1185-91 S co2 359.080 ... S1 1996 02 07 09 28 -89.9800 -24.8000 2810.00 128595 SPO 1995 12 05 00 57 1186-91 S co2 359.050 ... S1 1996 02 07 09 30 -89.9800 -24.8000 2810.00 128596 SPO 1995 12 19 00 59 573-91 S co2 358.900 ... S1 1996 02 07 09 32 -89.9800 -24.8000 2810.00 128597 SPO 1995 12 19 00 59 574-91 S co2 358.820 ... S1 1996 02 07 09 34 -89.9800 -24.8000 2810.00 128598 SPO 1995 12 19 01 54 641-91 P co2 359.380 ... S1 1996 02 07 08 12 -89.9800 -24.8000 2810.00 128599 SPO 1995 12 19 01 54 642-91 P co2 359.350 ... S1 1996 02 07 08 14 -89.9800 -24.8000 2810.00 128600 SPO 1995 12 26 03 56 575-91 S co2 359.120 ... S1 1996 02 07 08 52 -89.9800 -24.8000 2810.00 128601 SPO 1995 12 26 03 56 576-91 S co2 359.080 ... S1 1996 02 07 08 54 -89.9800 -24.8000 2810.00 128602 SPO 1996 01 10 20 59 577-91 S co2 359.240 ... S1 1996 02 07 08 28 -89.9800 -24.8000 2810.00 128603 SPO 1996 01 10 20 59 578-91 S co2 359.200 ... S1 1996 02 07 08 30 -89.9800 -24.8000 2810.00 128604 SPO 1996 01 10 21 45 1217-91 P co2 358.950 ... S1 1997 01 22 14 20 -89.9800 -24.8000 2810.00 128605 SPO 1996 01 10 21 45 1218-91 P co2 359.080 ... S1 1997 01 22 14 21 -89.9800 -24.8000 2810.00 128606 SPO 1996 01 16 00 55 1225-91 S co2 358.740 ... S1 1997 01 22 15 37 -89.9800 -24.8000 2810.00 128607 SPO 1996 01 16 00 55 1226-91 S co2 358.730 ... S1 1997 01 22 15 38 -89.9800 -24.8000 2810.00 128608 SPO 1996 01 23 06 55 1195-91 S co2 358.540 .X. S1 1997 01 22 15 13 -89.9800 -24.8000 2810.00 128609 SPO 1996 01 23 06 55 1196-91 S co2 358.500 .X. S1 1997 01 22 15 14 -89.9800 -24.8000 2810.00 128610 SPO 1996 01 28 20 19 1201-91 P co2 359.580 +.. S1 1997 01 22 15 06 -89.9800 -24.8000 2810.00 128611 SPO 1996 01 28 20 19 1202-91 P co2 359.040 -.. S1 1997 01 22 15 08 -89.9800 -24.8000 2810.00 128612 SPO 1996 01 28 20 59 219-91 S co2 359.040 ... S1 1997 01 22 15 39 -89.9800 -24.8000 2810.00 128613 SPO 1996 01 28 20 59 220-91 S co2 359.250 ... S1 1997 01 22 15 40 -89.9800 -24.8000 2810.00 128614 SPO 1996 02 05 20 59 655-91 S co2 356.750 -.. S1 1997 01 22 14 22 -89.9800 -24.8000 2810.00 128615 SPO 1996 02 05 20 59 656-91 S co2 357.460 +.. S1 1997 01 22 14 23 -89.9800 -24.8000 2810.00 128616 SPO 1996 02 05 23 34 1197-91 P co2 359.020 ... S1 1997 01 22 15 09 -89.9800 -24.8000 2810.00 128617 SPO 1996 02 05 23 34 1198-91 P co2 359.480 ... S1 1997 01 22 15 10 -89.9800 -24.8000 2810.00 128618 SPO 1996 02 18 03 57 1181-91 S co2 358.880 -.. S1 1997 01 22 15 11 -89.9800 -24.8000 2810.00 128619 SPO 1996 02 18 03 57 1182-91 S co2 362.490 +.. S1 1997 01 22 15 12 -89.9800 -24.8000 2810.00 128620 SPO 1996 02 18 04 22 1205-91 P co2 397.520 +.. S1 1997 01 22 14 49 -89.9800 -24.8000 2810.00 128621 SPO 1996 02 18 04 22 1206-91 P co2 359.610 -.. S1 1997 01 22 14 50 -89.9800 -24.8000 2810.00 128622 SPO 1996 02 27 04 55 1231-91 S co2 358.940 ... S1 1997 01 22 15 04 -89.9800 -24.8000 2810.00 128623 SPO 1996 02 27 04 55 1232-91 S co2 358.670 ... S1 1997 01 22 15 05 -89.9800 -24.8000 2810.00 128624 SPO 1996 03 01 01 57 1221-91 S co2 359.100 +.. S1 1997 01 14 15 49 -89.9800 -24.8000 2810.00 128625 SPO 1996 03 01 01 57 1222-91 S co2 356.970 -.. S1 1997 01 14 15 50 -89.9800 -24.8000 2810.00 128626 SPO 1996 03 01 03 58 1223-91 P co2 359.200 ... S1 1997 01 14 15 46 -89.9800 -24.8000 2810.00 128627 SPO 1996 03 01 03 58 1224-91 P co2 358.910 ... S1 1997 01 14 15 47 -89.9800 -24.8000 2810.00 128628 SPO 1996 03 06 06 55 1187-91 S co2 368.290 +.. S1 1997 01 14 16 40 -89.9800 -24.8000 2810.00 128629 SPO 1996 03 06 06 55 1188-91 S co2 358.230 -.. S1 1997 01 14 16 41 -89.9800 -24.8000 2810.00 128630 SPO 1996 03 12 03 55 1199-91 S co2 358.790 ... S1 1997 01 14 16 38 -89.9800 -24.8000 2810.00 128631 SPO 1996 03 12 03 55 1200-91 S co2 358.930 ... S1 1997 01 14 16 39 -89.9800 -24.8000 2810.00 128632 SPO 1996 03 15 00 55 1211-91 S co2 358.310 .X. S1 1997 01 14 16 36 -89.9800 -24.8000 2810.00 128633 SPO 1996 03 15 00 55 1212-91 S co2 358.270 .X. S1 1997 01 14 16 37 -89.9800 -24.8000 2810.00 128634 SPO 1996 03 15 01 20 1203-91 P co2 359.000 ... S1 1997 01 14 16 33 -89.9800 -24.8000 2810.00 128635 SPO 1996 03 15 01 20 1204-91 P co2 359.200 ... S1 1997 01 14 16 34 -89.9800 -24.8000 2810.00 128636 SPO 1996 03 20 05 55 1663-91 S co2 358.460 -.. S1 1997 01 23 15 15 -89.9800 -24.8000 2810.00 128637 SPO 1996 03 20 05 55 1664-91 S co2 359.010 +.. S1 1997 01 23 15 17 -89.9800 -24.8000 2810.00 128638 SPO 1996 03 26 02 55 1665-91 S co2 356.760 -.. S1 1997 01 23 15 35 -89.9800 -24.8000 2810.00 128639 SPO 1996 03 26 02 55 1666-91 S co2 359.640 +.. S1 1997 01 23 15 36 -89.9800 -24.8000 2810.00 128640 SPO 1996 04 01 03 56 1661-91 S co2 359.220 +.. S1 1997 02 13 14 31 -89.9800 -24.8000 2810.00 128641 SPO 1996 04 01 03 56 1662-91 S co2 358.380 -.. S1 1997 02 13 14 32 -89.9800 -24.8000 2810.00 128642 SPO 1996 04 01 04 26 1659-91 P co2 359.060 ... S1 1997 01 14 14 53 -89.9800 -24.8000 2810.00 128643 SPO 1996 04 01 04 26 1660-91 P co2 359.410 ... S1 1997 01 14 14 54 -89.9800 -24.8000 2810.00 128644 SPO 1996 04 09 03 55 1671-91 S co2 359.360 -.. S1 1997 01 22 14 40 -89.9800 -24.8000 2810.00 128645 SPO 1996 04 09 03 55 1672-91 S co2 359.880 +.. S1 1997 01 22 14 41 -89.9800 -24.8000 2810.00 128646 SPO 1996 04 17 22 55 1673-91 S co2 359.190 +.. S1 1997 01 23 15 18 -89.9800 -24.8000 2810.00 128647 SPO 1996 04 17 22 55 1674-91 S co2 358.670 -.. S1 1997 01 23 15 19 -89.9800 -24.8000 2810.00 128648 SPO 1996 04 17 23 38 1675-91 P co2 358.860 -.. S1 1997 01 22 14 45 -89.9800 -24.8000 2810.00 128649 SPO 1996 04 17 23 38 1676-91 P co2 359.740 +.. S1 1997 01 22 14 46 -89.9800 -24.8000 2810.00 128650 SPO 1996 04 23 20 55 1677-91 S co2 358.760 ... S1 1997 01 22 14 47 -89.9800 -24.8000 2810.00 128651 SPO 1996 04 23 20 55 1678-91 S co2 359.000 ... S1 1997 01 22 14 48 -89.9800 -24.8000 2810.00 128652 SPO 1996 05 01 02 56 1228-91 P co2 358.930 ... S1 1997 02 13 14 13 -89.9800 -24.8000 2810.00 128653 SPO 1996 05 01 04 55 1219-91 S co2 358.960 ... S1 1997 02 13 14 06 -89.9800 -24.8000 2810.00 128654 SPO 1996 05 01 04 55 1220-91 S co2 358.930 ... S1 1997 02 13 14 07 -89.9800 -24.8000 2810.00 128655 SPO 1996 05 07 17 55 211-91 S co2 359.020 ... S1 1997 01 22 15 15 -89.9800 -24.8000 2810.00 128656 SPO 1996 05 07 17 55 212-91 S co2 358.630 ... S1 1997 01 22 15 16 -89.9800 -24.8000 2810.00 128657 SPO 1996 05 15 20 57 549-91 S co2 358.950 ... S1 1997 01 22 16 07 -89.9800 -24.8000 2810.00 128658 SPO 1996 05 15 20 57 550-91 S co2 359.130 ... S1 1997 01 22 16 08 -89.9800 -24.8000 2810.00 128659 SPO 1996 05 15 21 20 485-91 P co2 359.840 .X. S1 1997 02 13 14 10 -89.9800 -24.8000 2810.00 128660 SPO 1996 05 15 21 20 486-91 P co2 360.280 .X. S1 1997 02 13 14 12 -89.9800 -24.8000 2810.00 128661 SPO 1996 05 21 04 57 1435-91 S co2 359.050 +.. S1 1997 02 13 14 08 -89.9800 -24.8000 2810.00 128662 SPO 1996 05 21 04 57 1436-91 S co2 357.760 -.. S1 1997 02 13 14 09 -89.9800 -24.8000 2810.00 128663 SPO 1996 05 28 04 55 501-91 S co2 358.930 -.. S1 1997 01 22 16 05 -89.9800 -24.8000 2810.00 128664 SPO 1996 05 28 04 55 502-91 S co2 414.240 +.. S1 1997 01 22 16 06 -89.9800 -24.8000 2810.00 128665 SPO 1996 06 01 13 45 669-91 P co2 359.560 .X. S1 1997 01 17 15 01 -89.9800 -24.8000 2810.00 128666 SPO 1996 06 01 13 45 670-91 P co2 359.600 .X. S1 1997 01 17 15 02 -89.9800 -24.8000 2810.00 128667 SPO 1996 06 01 14 55 833-91 S co2 359.050 ... S1 1997 01 22 15 30 -89.9800 -24.8000 2810.00 128668 SPO 1996 06 01 14 55 834-91 S co2 359.430 ... S1 1997 01 22 15 31 -89.9800 -24.8000 2810.00 128669 SPO 1996 06 05 19 55 1603-91 S co2 359.890 +.. S1 1997 01 17 15 03 -89.9800 -24.8000 2810.00 128670 SPO 1996 06 05 19 55 1604-91 S co2 359.050 -.. S1 1997 01 17 15 05 -89.9800 -24.8000 2810.00 128671 SPO 1996 06 18 05 34 499-91 P co2 359.640 +.. S1 1997 01 14 15 53 -89.9800 -24.8000 2810.00 128672 SPO 1996 06 18 05 34 500-91 P co2 358.920 -.. S1 1997 01 14 15 54 -89.9800 -24.8000 2810.00 128673 SPO 1996 06 18 05 56 1269-91 S co2 358.400 -.. S1 1997 01 14 15 51 -89.9800 -24.8000 2810.00 128674 SPO 1996 06 18 05 56 1270-91 S co2 379.590 +.. S1 1997 01 14 15 52 -89.9800 -24.8000 2810.00 128675 SPO 1996 06 25 10 55 845-91 S co2 358.960 ... S1 1997 01 17 14 57 -89.9800 -24.8000 2810.00 128676 SPO 1996 06 25 10 55 846-91 S co2 359.450 ... S1 1997 01 17 14 58 -89.9800 -24.8000 2810.00 128677 SPO 1996 07 01 01 47 1613-91 P co2 356.480 -.. S1 1997 01 17 14 59 -89.9800 -24.8000 2810.00 128678 SPO 1996 07 01 01 47 1614-91 P co2 359.600 +.. S1 1997 01 17 15 00 -89.9800 -24.8000 2810.00 128679 SPO 1996 07 01 12 55 765-91 S co2 359.660 ... S1 1997 01 17 14 54 -89.9800 -24.8000 2810.00 128680 SPO 1996 07 01 12 55 766-91 S co2 359.670 ... S1 1997 01 17 14 56 -89.9800 -24.8000 2810.00 128681 SPO 1996 07 09 03 58 1615-91 S co2 359.390 ... S1 1997 01 14 16 45 -89.9800 -24.8000 2810.00 128682 SPO 1996 07 09 03 58 1616-91 S co2 359.380 ... S1 1997 01 14 16 46 -89.9800 -24.8000 2810.00 128683 SPO 1996 07 17 19 55 597-91 S co2 359.670 ... S1 1997 01 22 14 18 -89.9800 -24.8000 2810.00 128684 SPO 1996 07 17 19 55 598-91 S co2 359.630 ... S1 1997 01 22 14 19 -89.9800 -24.8000 2810.00 128685 SPO 1996 07 17 20 29 1257-91 P co2 359.920 ... S1 1997 01 22 15 35 -89.9800 -24.8000 2810.00 128686 SPO 1996 07 17 20 29 1258-91 P co2 359.980 ... S1 1997 01 22 15 36 -89.9800 -24.8000 2810.00 128687 SPO 1996 07 24 08 55 1605-91 S co2 360.010 ... S1 1997 01 23 15 11 -89.9800 -24.8000 2810.00 128688 SPO 1996 07 24 08 55 1606-91 S co2 359.890 ... S1 1997 01 23 15 12 -89.9800 -24.8000 2810.00 128689 SPO 1996 08 02 07 11 1607-91 S co2 360.030 ... S1 1997 01 23 15 06 -89.9800 -24.8000 2810.00 128690 SPO 1996 08 02 07 11 1608-91 S co2 360.120 ... S1 1997 01 23 15 08 -89.9800 -24.8000 2810.00 128691 SPO 1996 08 02 08 58 1277-91 P co2 359.950 ... S1 1997 01 23 14 45 -89.9800 -24.8000 2810.00 128692 SPO 1996 08 02 08 58 1278-91 P co2 359.930 ... S1 1997 01 23 14 46 -89.9800 -24.8000 2810.00 128693 SPO 1996 08 07 05 56 1609-91 S co2 359.760 .X. S1 1997 01 22 15 41 -89.9800 -24.8000 2810.00 128694 SPO 1996 08 07 05 56 1610-91 S co2 359.460 .X. S1 1997 01 22 15 43 -89.9800 -24.8000 2810.00 128695 SPO 1996 08 15 20 55 1611-91 S co2 360.510 ... S1 1997 01 22 15 56 -89.9800 -24.8000 2810.00 128696 SPO 1996 08 15 20 55 1612-91 S co2 360.200 ... S1 1997 01 22 15 57 -89.9800 -24.8000 2810.00 128697 SPO 1996 08 15 21 46 1647-91 P co2 360.280 ... S1 1997 01 22 14 15 -89.9800 -24.8000 2810.00 128698 SPO 1996 08 15 21 46 1648-91 P co2 360.320 ... S1 1997 01 22 14 17 -89.9800 -24.8000 2810.00 128699 SPO 1996 08 20 04 58 1649-91 S co2 359.320 -.. S1 1997 01 23 15 09 -89.9800 -24.8000 2810.00 128700 SPO 1996 08 20 04 58 1650-91 S co2 360.500 +.. S1 1997 01 23 15 10 -89.9800 -24.8000 2810.00 128701 SPO 1996 08 27 13 55 1667-91 S co2 356.970 -.. S1 1997 01 22 14 38 -89.9800 -24.8000 2810.00 128702 SPO 1996 08 27 13 55 1668-91 S co2 360.390 +.. S1 1997 01 22 14 39 -89.9800 -24.8000 2810.00 128703 SPO 1996 09 01 12 46 1669-91 P co2 360.370 ... S1 1997 02 13 14 04 -89.9800 -24.8000 2810.00 128704 SPO 1996 09 01 12 46 1670-91 P co2 360.650 ... S1 1997 02 13 14 05 -89.9800 -24.8000 2810.00 128705 SPO 1996 09 01 13 55 1655-91 S co2 359.370 -.. S1 1997 01 22 15 32 -89.9800 -24.8000 2810.00 128706 SPO 1996 09 01 13 55 1656-91 S co2 360.930 +.. S1 1997 01 22 15 34 -89.9800 -24.8000 2810.00 128707 SPO 1996 09 10 04 55 1657-91 S co2 360.120 ... S1 1997 01 22 14 24 -89.9800 -24.8000 2810.00 128708 SPO 1996 09 10 04 55 1658-91 S co2 359.960 ... S1 1997 01 22 14 26 -89.9800 -24.8000 2810.00 128709 SPO 1996 09 15 05 24 1651-91 P co2 360.440 ... S1 1997 01 23 14 43 -89.9800 -24.8000 2810.00 128710 SPO 1996 09 15 05 24 1652-91 P co2 360.650 ... S1 1997 01 23 14 44 -89.9800 -24.8000 2810.00 128711 SPO 1996 09 15 05 55 1653-91 S co2 360.130 ... S1 1997 01 23 14 50 -89.9800 -24.8000 2810.00 128712 SPO 1996 09 15 05 55 1654-91 S co2 359.990 ... S1 1997 01 23 14 51 -89.9800 -24.8000 2810.00 128713 SPO 1996 09 19 23 55 1679-91 S co2 360.720 ... S1 1997 01 23 16 00 -89.9800 -24.8000 2810.00 128714 SPO 1996 09 19 23 55 1680-91 S co2 360.730 ... S1 1997 01 23 16 01 -89.9800 -24.8000 2810.00 128715 SPO 1996 09 24 05 55 1681-91 S co2 360.630 ... S1 1997 01 23 16 02 -89.9800 -24.8000 2810.00 128716 SPO 1996 09 24 05 55 1682-91 S co2 360.560 ... S1 1997 01 23 16 03 -89.9800 -24.8000 2810.00 128717 SPO 1996 10 01 03 56 1685-91 S co2 360.430 ... S1 1997 01 23 15 38 -89.9800 -24.8000 2810.00 128718 SPO 1996 10 01 03 56 1686-91 S co2 360.420 ... S1 1997 01 23 15 39 -89.9800 -24.8000 2810.00 128719 SPO 1996 10 01 04 14 1683-91 P co2 360.420 ... S1 1997 01 22 16 03 -89.9800 -24.8000 2810.00 128720 SPO 1996 10 01 04 14 1684-91 P co2 360.470 ... S1 1997 01 22 16 04 -89.9800 -24.8000 2810.00 128721 SPO 1996 10 08 04 55 1691-91 S co2 360.420 ... S1 1997 01 23 15 40 -89.9800 -24.8000 2810.00 128722 SPO 1996 10 08 04 55 1692-91 S co2 360.270 ... S1 1997 01 23 15 41 -89.9800 -24.8000 2810.00 128723 SPO 1996 10 17 01 30 1693-91 P co2 360.720 ... S1 1997 01 22 15 58 -89.9800 -24.8000 2810.00 128724 SPO 1996 10 17 01 30 1694-91 P co2 360.690 ... S1 1997 01 22 15 59 -89.9800 -24.8000 2810.00 128725 SPO 1996 10 17 01 55 1687-91 S co2 360.480 ... S1 1997 01 22 14 43 -89.9800 -24.8000 2810.00 128726 SPO 1996 10 17 01 55 1688-91 S co2 360.430 ... S1 1997 01 22 14 44 -89.9800 -24.8000 2810.00 128727 SPO 1996 10 22 02 55 1689-91 S co2 360.590 ... S1 1997 01 23 15 58 -89.9800 -24.8000 2810.00 128728 SPO 1996 10 22 02 55 1690-91 S co2 360.630 ... S1 1997 01 23 15 59 -89.9800 -24.8000 2810.00 128729 SPO 1996 10 29 04 55 1703-91 S co2 360.150 ... S1 1997 02 13 14 35 -89.9800 -24.8000 2810.00 128730 SPO 1996 10 29 04 55 1704-91 S co2 360.100 ... S1 1997 02 13 14 36 -89.9800 -24.8000 2810.00 128731 SPO 1996 11 03 21 02 1705-91 P co2 360.760 .X. S1 1997 01 14 14 51 -89.9800 -24.8000 2810.00 128732 SPO 1996 11 03 21 02 1706-91 P co2 360.690 .X. S1 1997 01 14 14 52 -89.9800 -24.8000 2810.00 128733 SPO 1996 11 03 21 55 1707-91 S co2 360.330 ... S1 1997 01 23 15 13 -89.9800 -24.8000 2810.00 128734 SPO 1996 11 03 21 55 1708-91 S co2 360.220 ... S1 1997 01 23 15 14 -89.9800 -24.8000 2810.00 128735 SPO 1996 11 07 02 55 1709-91 S co2 360.180 ... S1 1997 01 23 14 47 -89.9800 -24.8000 2810.00 128736 SPO 1996 11 07 02 55 1710-91 S co2 360.440 ... S1 1997 01 23 14 49 -89.9800 -24.8000 2810.00 128737 SPO 1996 11 12 01 05 1699-91 S co2 360.080 ... S1 1997 01 14 14 57 -89.9800 -24.8000 2810.00 128738 SPO 1996 11 12 01 05 1700-91 S co2 360.070 ... S1 1997 01 14 14 59 -89.9800 -24.8000 2810.00 128739 SPO 1996 11 15 22 05 1695-91 P co2 360.330 ... S1 1997 02 13 14 33 -89.9800 -24.8000 2810.00 128740 SPO 1996 11 15 22 05 1696-91 P co2 360.260 ... S1 1997 02 13 14 34 -89.9800 -24.8000 2810.00 128741 SPO 1996 11 24 20 50 1701-91 S co2 360.230 ... S1 1997 01 14 14 55 -89.9800 -24.8000 2810.00 128742 SPO 1996 11 24 20 50 1702-91 S co2 360.160 ... S1 1997 01 14 14 56 -89.9800 -24.8000 2810.00 128743 SPO 1996 12 02 22 55 1697-91 P co2 360.470 ... S1 1997 01 23 16 05 -89.9800 -24.8000 2810.00 128744 SPO 1996 12 02 22 55 1698-91 P co2 360.520 ... S1 1997 01 23 16 06 -89.9800 -24.8000 2810.00 128745 SPO 1996 12 02 22 55 1711-91 S co2 360.540 ... S1 1997 03 10 15 54 -89.9800 -24.8000 2810.00 128746 SPO 1996 12 02 22 55 1712-91 S co2 360.460 ... S1 1997 03 10 15 55 -89.9800 -24.8000 2810.00 128747 SPO 1996 12 14 03 57 1713-91 S co2 360.340 ... S1 1997 03 13 15 40 -89.9800 -24.8000 2810.00 128748 SPO 1996 12 14 03 57 1714-91 S co2 360.370 ... S1 1997 03 13 15 41 -89.9800 -24.8000 2810.00 128749 SPO 1996 12 14 04 14 1715-91 P co2 360.330 ... S1 1997 02 24 17 01 -89.9800 -24.8000 2810.00 128750 SPO 1996 12 14 04 14 1716-91 P co2 360.450 ... S1 1997 02 24 17 02 -89.9800 -24.8000 2810.00 128751 SPO 1996 12 18 02 01 1723-91 S co2 360.130 ... S1 1997 03 13 12 39 -89.9800 -24.8000 2810.00 128752 SPO 1996 12 18 02 01 1724-91 S co2 360.110 ... S1 1997 03 13 12 40 -89.9800 -24.8000 2810.00 128753 SPO 1996 12 23 04 07 1725-91 S co2 360.530 ... S1 1997 03 05 16 49 -89.9800 -24.8000 2810.00 128754 SPO 1996 12 23 04 07 1726-91 S co2 360.510 ... S1 1997 03 05 16 50 -89.9800 -24.8000 2810.00 128755 SPO 1997 01 02 02 00 1719-91 S co2 360.160 ... S1 1997 02 24 16 59 -89.9800 -24.8000 2810.00 128756 SPO 1997 01 02 02 00 1720-91 S co2 360.080 ... S1 1997 02 24 17 00 -89.9800 -24.8000 2810.00 128757 SPO 1997 01 02 03 02 1717-91 P co2 360.400 ... S1 1997 02 24 17 04 -89.9800 -24.8000 2810.00 128758 SPO 1997 01 02 03 02 1718-91 P co2 360.380 ... S1 1997 02 24 17 05 -89.9800 -24.8000 2810.00 128759 SPO 1997 01 07 03 57 1721-91 S co2 360.320 ... S1 1997 02 27 12 46 -89.9800 -24.8000 2810.00 128760 SPO 1997 01 07 03 57 1722-91 S co2 360.300 ... S1 1997 02 27 12 47 -89.9800 -24.8000 2810.00 128761 SPO 1997 01 16 20 57 1629-91 S co2 360.270 +.. L3 1997 12 31 11 47 -89.9800 -24.8000 2810.00 128762 SPO 1997 01 16 20 57 1630-91 S co2 359.280 -.. L3 1997 12 31 12 00 -89.9800 -24.8000 2810.00 128763 SPO 1997 01 16 23 02 1631-91 P co2 359.080 -.. L3 1997 12 31 12 13 -89.9800 -24.8000 2810.00 128764 SPO 1997 01 16 23 02 1632-91 P co2 360.380 +.. L3 1997 12 31 12 27 -89.9800 -24.8000 2810.00 128765 SPO 1997 02 16 03 32 1635-91 P co2 360.290 ... L3 1997 12 31 13 09 -89.9800 -24.8000 2810.00 128766 SPO 1997 02 16 03 32 1636-91 P co2 360.400 ... L3 1997 12 31 13 22 -89.9800 -24.8000 2810.00 128767 SPO 1997 02 16 04 13 1633-91 S co2 360.260 ... L3 1997 12 31 12 42 -89.9800 -24.8000 2810.00 128768 SPO 1997 02 16 04 13 1634-91 S co2 360.270 ... L3 1997 12 31 12 55 -89.9800 -24.8000 2810.00 128769 SPO 1997 03 01 00 55 1627-91 S co2 360.100 -.. L3 1998 01 02 09 26 -89.9800 -24.8000 2810.00 128770 SPO 1997 03 01 00 55 1628-91 S co2 361.310 +.. L3 1998 01 02 09 39 -89.9800 -24.8000 2810.00 128771 SPO 1997 03 01 01 09 1625-91 P co2 360.730 +.. L3 1998 01 02 11 15 -89.9800 -24.8000 2810.00 128772 SPO 1997 03 01 01 09 1626-91 P co2 360.080 -.. L3 1998 01 02 11 28 -89.9800 -24.8000 2810.00 128773 SPO 1997 03 07 22 53 727-91 S co2 350.250 -.. L3 1998 01 02 10 20 -89.9800 -24.8000 2810.00 128774 SPO 1997 03 07 22 53 728-91 S co2 358.730 +.. L3 1998 01 02 10 33 -89.9800 -24.8000 2810.00 128775 SPO 1997 03 15 02 54 1491-91 S co2 360.340 ... L3 1998 01 02 09 53 -89.9800 -24.8000 2810.00 128776 SPO 1997 03 15 02 54 1492-91 S co2 360.180 ... L3 1998 01 02 10 06 -89.9800 -24.8000 2810.00 128777 SPO 1997 03 15 03 10 1621-91 P co2 410.450 +.. L3 1998 01 06 14 13 -89.9800 -24.8000 2810.00 128778 SPO 1997 03 15 03 10 1622-91 P co2 361.200 -.. L3 1998 01 06 14 27 -89.9800 -24.8000 2810.00 128779 SPO 1997 03 21 03 00 1623-91 S co2 358.210 N.. L3 1998 01 07 09 22 -89.9800 -24.8000 2810.00 128780 SPO 1997 03 21 03 00 1624-91 S co2 357.980 N.. L3 1998 01 07 09 36 -89.9800 -24.8000 2810.00 128781 SPO 1997 03 28 01 54 1617-91 S co2 357.770 +.. L3 1998 01 07 10 17 -89.9800 -24.8000 2810.00 128782 SPO 1997 03 28 01 54 1618-91 S co2 356.720 -.. L3 1998 01 07 10 31 -89.9800 -24.8000 2810.00 128783 SPO 1997 04 01 21 58 1619-91 S co2 361.310 +.. L3 1998 01 07 09 50 -89.9800 -24.8000 2810.00 128784 SPO 1997 04 01 21 58 1620-91 S co2 360.640 -.. L3 1998 01 07 10 03 -89.9800 -24.8000 2810.00 128785 SPO 1997 04 02 00 03 1151-91 P co2 360.300 ... L3 1997 12 29 15 04 -89.9800 -24.8000 2810.00 128786 SPO 1997 04 02 00 03 1152-91 P co2 360.200 ... L3 1997 12 29 15 17 -89.9800 -24.8000 2810.00 128787 SPO 1997 04 11 02 56 557-91 S co2 360.840 +.. L3 1997 12 29 15 31 -89.9800 -24.8000 2810.00 128788 SPO 1997 04 11 02 56 558-91 S co2 360.310 -.. L3 1997 12 29 15 44 -89.9800 -24.8000 2810.00 128789 SPO 1997 04 15 03 52 1443-91 S co2 360.360 ... L3 1997 12 29 12 17 -89.9800 -24.8000 2810.00 128790 SPO 1997 04 15 03 52 1444-91 S co2 360.330 ... L3 1997 12 29 12 31 -89.9800 -24.8000 2810.00 128791 SPO 1997 04 15 05 10 447-91 P co2 360.350 +.. L3 1998 01 02 11 50 -89.9800 -24.8000 2810.00 128792 SPO 1997 04 15 05 10 448-91 P co2 359.250 -.. L3 1998 01 02 12 03 -89.9800 -24.8000 2810.00 128793 SPO 1997 04 25 13 52 1745-91 S co2 354.360 -.. L3 1998 01 02 13 10 -89.9800 -24.8000 2810.00 128794 SPO 1997 04 25 13 52 1746-91 S co2 360.450 +.. L3 1998 01 02 13 23 -89.9800 -24.8000 2810.00 128795 SPO 1997 05 01 05 02 1453-91 S co2 354.400 -.. L3 1998 01 05 12 05 -89.9800 -24.8000 2810.00 128796 SPO 1997 05 01 05 02 1454-91 S co2 382.340 +.. L3 1998 01 05 12 19 -89.9800 -24.8000 2810.00 128797 SPO 1997 05 01 05 22 163-91 P co2 361.130 +.. L3 1998 01 05 10 43 -89.9800 -24.8000 2810.00 128798 SPO 1997 05 01 05 22 164-91 P co2 355.940 -.. L3 1998 01 05 10 57 -89.9800 -24.8000 2810.00 128799 SPO 1997 05 10 23 58 1511-91 S co2 354.680 N.. L3 1998 01 02 12 43 -89.9800 -24.8000 2810.00 128800 SPO 1997 05 10 23 58 1512-91 S co2 355.050 N.. L3 1998 01 02 12 57 -89.9800 -24.8000 2810.00 128801 SPO 1997 05 15 03 55 45-91 S co2 358.320 +.. L3 1998 01 02 10 48 -89.9800 -24.8000 2810.00 128802 SPO 1997 05 15 03 55 46-91 S co2 351.110 -.. L3 1998 01 02 11 01 -89.9800 -24.8000 2810.00 128803 SPO 1997 05 15 05 40 101-91 P co2 360.560 ... L3 1998 01 05 11 38 -89.9800 -24.8000 2810.00 128804 SPO 1997 05 15 05 40 102-91 P co2 360.540 ... L3 1998 01 05 11 52 -89.9800 -24.8000 2810.00 128805 SPO 1997 05 24 15 56 4079-91 S co2 360.850 ... L3 1998 01 05 11 11 -89.9800 -24.8000 2810.00 128806 SPO 1997 05 24 15 56 4080-91 S co2 360.910 ... L3 1998 01 05 11 24 -89.9800 -24.8000 2810.00 128807 SPO 1997 06 01 22 58 1573-91 S co2 360.200 -.. L3 1998 01 02 13 39 -89.9800 -24.8000 2810.00 128808 SPO 1997 06 01 22 58 1574-91 S co2 360.750 +.. L3 1998 01 02 13 52 -89.9800 -24.8000 2810.00 128809 SPO 1997 06 02 00 04 1845-91 P co2 356.780 -.. L3 1998 01 05 09 47 -89.9800 -24.8000 2810.00 128810 SPO 1997 06 02 00 04 1846-91 P co2 358.000 +.. L3 1998 01 05 10 00 -89.9800 -24.8000 2810.00 128811 SPO 1997 06 06 03 54 1461-91 S co2 358.060 -.. L3 1998 01 05 09 19 -89.9800 -24.8000 2810.00 128812 SPO 1997 06 06 03 54 1462-91 S co2 359.730 +.. L3 1998 01 05 09 33 -89.9800 -24.8000 2810.00 128813 SPO 1997 06 15 13 52 1329-91 P co2 357.070 -.. L3 1998 01 05 15 48 -89.9800 -24.8000 2810.00 128814 SPO 1997 06 15 13 52 1330-91 P co2 360.880 +.. L3 1998 01 05 16 01 -89.9800 -24.8000 2810.00 128815 SPO 1997 06 15 15 58 1371-91 S co2 357.650 -.. L3 1998 01 05 10 14 -89.9800 -24.8000 2810.00 128816 SPO 1997 06 15 15 58 1372-91 S co2 361.110 +.. L3 1998 01 05 10 28 -89.9800 -24.8000 2810.00 128817 SPO 1997 06 21 15 56 1137-91 S co2 360.920 ... L3 1998 01 05 14 26 -89.9800 -24.8000 2810.00 128818 SPO 1997 06 21 15 56 1138-91 S co2 360.950 ... L3 1998 01 05 14 39 -89.9800 -24.8000 2810.00 128819 SPO 1997 07 01 02 59 171-91 S co2 361.280 ... L3 1998 01 05 15 20 -89.9800 -24.8000 2810.00 128820 SPO 1997 07 01 02 59 172-91 S co2 361.190 ... L3 1998 01 05 15 34 -89.9800 -24.8000 2810.00 128821 SPO 1997 07 01 04 12 1319-91 P co2 360.990 ... L3 1998 01 05 14 53 -89.9800 -24.8000 2810.00 128822 SPO 1997 07 01 04 12 1320-91 P co2 360.940 ... L3 1998 01 05 15 07 -89.9800 -24.8000 2810.00 128823 SPO 1997 07 12 04 55 4095-91 S co2 361.190 +.. L3 1997 12 19 16 40 -89.9800 -24.8000 2810.00 128824 SPO 1997 07 12 04 55 4096-91 S co2 358.100 -.. L3 1997 12 19 16 54 -89.9800 -24.8000 2810.00 128825 SPO 1997 07 15 03 57 4097-91 S co2 361.120 +.. L3 1997 12 19 15 20 -89.9800 -24.8000 2810.00 128826 SPO 1997 07 15 03 57 4098-91 S co2 354.510 -.. L3 1997 12 19 15 33 -89.9800 -24.8000 2810.00 128827 SPO 1997 07 15 04 28 4065-91 P co2 361.090 ... L3 1997 12 17 12 35 -89.9800 -24.8000 2810.00 128828 SPO 1997 07 15 04 28 4066-91 P co2 361.140 ... L3 1997 12 17 12 48 -89.9800 -24.8000 2810.00 128829 SPO 1997 07 25 02 55 313-91 S co2 361.190 +.. L3 1997 12 17 13 02 -89.9800 -24.8000 2810.00 128830 SPO 1997 07 25 02 55 314-91 S co2 359.360 -.. L3 1997 12 17 13 15 -89.9800 -24.8000 2810.00 128831 SPO 1997 08 01 22 25 4093-91 S co2 354.350 -.. L3 1997 12 31 09 58 -89.9800 -24.8000 2810.00 128832 SPO 1997 08 01 22 25 4094-91 S co2 361.420 +.. L3 1997 12 31 10 11 -89.9800 -24.8000 2810.00 128833 SPO 1997 08 01 23 49 4091-91 P co2 356.130 -.. L3 1997 12 31 10 25 -89.9800 -24.8000 2810.00 128834 SPO 1997 08 01 23 49 4092-91 P co2 360.110 +.. L3 1997 12 31 10 38 -89.9800 -24.8000 2810.00 128835 SPO 1997 08 08 04 02 4051-91 S co2 360.240 .X. L3 1997 12 24 11 37 -89.9800 -24.8000 2810.00 128836 SPO 1997 08 08 04 02 4052-91 S co2 360.680 .X. L3 1997 12 24 11 50 -89.9800 -24.8000 2810.00 128837 SPO 1997 08 15 02 52 4081-91 P co2 361.560 ... L3 1997 12 24 12 03 -89.9800 -24.8000 2810.00 128838 SPO 1997 08 15 02 52 4082-91 P co2 361.510 ... L3 1997 12 24 12 17 -89.9800 -24.8000 2810.00 128839 SPO 1997 08 15 05 01 103-91 S co2 361.300 ... L3 1997 12 30 16 07 -89.9800 -24.8000 2810.00 128840 SPO 1997 08 15 05 01 104-91 S co2 361.560 ... L3 1997 12 30 16 21 -89.9800 -24.8000 2810.00 128841 SPO 1997 08 23 03 59 325-91 S co2 361.760 ... L3 1997 12 31 09 31 -89.9800 -24.8000 2810.00 128842 SPO 1997 08 23 03 59 326-91 S co2 361.730 ... L3 1997 12 31 09 45 -89.9800 -24.8000 2810.00 128843 SPO 1997 08 30 07 58 1167-91 S co2 361.730 ... L3 1997 12 19 16 14 -89.9800 -24.8000 2810.00 128844 SPO 1997 08 30 07 58 1168-91 S co2 361.730 ... L3 1997 12 19 16 27 -89.9800 -24.8000 2810.00 128845 SPO 1997 09 01 22 54 1813-91 S co2 361.640 ... L3 1997 12 24 11 10 -89.9800 -24.8000 2810.00 128846 SPO 1997 09 01 22 54 1814-91 S co2 361.810 ... L3 1997 12 24 11 23 -89.9800 -24.8000 2810.00 128847 SPO 1997 09 01 23 51 647-91 P co2 361.770 ... L3 1997 12 19 15 47 -89.9800 -24.8000 2810.00 128848 SPO 1997 09 01 23 51 648-91 P co2 361.720 ... L3 1997 12 19 16 00 -89.9800 -24.8000 2810.00 128849 SPO 1997 09 12 04 52 819-91 S co2 351.860 -.. L3 1997 12 24 10 43 -89.9800 -24.8000 2810.00 128850 SPO 1997 09 12 04 52 820-91 S co2 361.740 +.. L3 1997 12 24 10 57 -89.9800 -24.8000 2810.00 128851 SPO 1997 09 15 20 00 1323-91 S co2 361.850 ... L3 1997 12 30 12 03 -89.9800 -24.8000 2810.00 128852 SPO 1997 09 15 20 00 1324-91 S co2 361.920 ... L3 1997 12 30 12 16 -89.9800 -24.8000 2810.00 128853 SPO 1997 09 15 21 51 4101-91 P co2 361.870 ... L3 1997 12 17 13 55 -89.9800 -24.8000 2810.00 128854 SPO 1997 09 15 21 51 4102-91 P co2 361.870 ... L3 1997 12 17 14 09 -89.9800 -24.8000 2810.00 128855 SPO 1997 09 26 01 59 1917-91 S co2 362.030 ... L3 1997 12 30 14 45 -89.9800 -24.8000 2810.00 128856 SPO 1997 09 26 01 59 1918-91 S co2 362.060 ... L3 1997 12 30 14 59 -89.9800 -24.8000 2810.00 128857 SPO 1997 10 04 05 59 4103-91 S co2 358.420 -.. L3 1997 12 17 13 29 -89.9800 -24.8000 2810.00 128858 SPO 1997 10 04 05 59 4104-91 S co2 361.960 +.. L3 1997 12 17 13 42 -89.9800 -24.8000 2810.00 128859 SPO 1997 10 04 06 46 4089-91 P co2 361.920 ... L3 1998 01 02 12 17 -89.9800 -24.8000 2810.00 128860 SPO 1997 10 04 06 46 4090-91 P co2 361.930 ... L3 1998 01 02 12 30 -89.9800 -24.8000 2810.00 128861 SPO 1997 10 10 21 59 1439-91 S co2 361.960 +.. L3 1997 12 30 12 56 -89.9800 -24.8000 2810.00 128862 SPO 1997 10 10 21 59 1440-91 S co2 360.990 -.. L3 1997 12 30 13 10 -89.9800 -24.8000 2810.00 128863 SPO 1997 10 15 02 58 4087-91 S co2 349.880 -.. L3 1998 01 02 14 32 -89.9800 -24.8000 2810.00 128864 SPO 1997 10 15 02 58 4088-91 S co2 361.930 +.. L3 1998 01 02 14 46 -89.9800 -24.8000 2810.00 128865 SPO 1997 10 15 03 48 4099-91 P co2 362.000 ... L3 1997 12 30 12 29 -89.9800 -24.8000 2810.00 128866 SPO 1997 10 15 03 48 4100-91 P co2 361.970 ... L3 1997 12 30 12 43 -89.9800 -24.8000 2810.00 128867 SPO 1997 10 26 21 54 4085-91 S co2 362.020 ... L3 1998 01 02 14 05 -89.9800 -24.8000 2810.00 128868 SPO 1997 10 26 21 54 4086-91 S co2 361.970 ... L3 1998 01 02 14 19 -89.9800 -24.8000 2810.00 128869 SPO 1997 11 09 23 05 4083-91 S co2 361.940 ... L3 1998 01 02 14 59 -89.9800 -24.8000 2810.00 128870 SPO 1997 11 09 23 05 4084-91 S co2 361.990 ... L3 1998 01 02 15 12 -89.9800 -24.8000 2810.00 128871 SPO 1997 11 09 23 36 1791-91 P co2 362.000 ... L3 1998 01 26 14 54 -89.9800 -24.8000 2810.00 128872 SPO 1997 11 09 23 36 1792-91 P co2 362.040 ... L3 1998 01 26 15 07 -89.9800 -24.8000 2810.00 128873 SPO 1997 11 15 00 55 1789-91 S co2 362.070 ... L3 1998 01 26 15 48 -89.9800 -24.8000 2810.00 128874 SPO 1997 11 15 00 55 1790-91 S co2 362.040 ... L3 1998 01 26 16 02 -89.9800 -24.8000 2810.00 128875 SPO 1997 11 15 03 01 25-91 P co2 362.170 ... L3 1998 01 27 11 21 -89.9800 -24.8000 2810.00 128876 SPO 1997 11 15 03 01 26-91 P co2 362.210 ... L3 1998 01 27 11 35 -89.9800 -24.8000 2810.00 128877 SPO 1997 11 22 03 18 279-91 S co2 362.290 ... L3 1998 01 27 10 54 -89.9800 -24.8000 2810.00 128878 SPO 1997 11 22 03 18 280-91 S co2 362.270 ... L3 1998 01 27 11 07 -89.9800 -24.8000 2810.00 128879 SPO 1997 12 01 19 53 4075-91 S co2 362.160 ... L3 1998 01 27 09 30 -89.9800 -24.8000 2810.00 128880 SPO 1997 12 01 19 53 4076-91 S co2 362.160 ... L3 1998 01 27 09 44 -89.9800 -24.8000 2810.00 128881 SPO 1997 12 01 23 57 4071-91 P co2 362.150 ... L3 1998 01 27 09 57 -89.9800 -24.8000 2810.00 128882 SPO 1997 12 01 23 57 4072-91 P co2 362.160 ... L3 1998 01 27 10 11 -89.9800 -24.8000 2810.00 128883 SPO 1997 12 08 23 53 4077-91 S co2 362.030 ... L3 1998 01 26 14 26 -89.9800 -24.8000 2810.00 128884 SPO 1997 12 08 23 53 4078-91 S co2 362.090 ... L3 1998 01 26 14 40 -89.9800 -24.8000 2810.00 128885 SPO 1997 12 15 04 54 4073-91 S co2 362.090 ... L3 1998 01 26 15 21 -89.9800 -24.8000 2810.00 128886 SPO 1997 12 15 04 54 4074-91 S co2 362.090 ... L3 1998 01 26 15 34 -89.9800 -24.8000 2810.00 128887 SPO 1997 12 15 19 46 677-91 P co2 362.050 ... L3 1998 02 13 09 37 -89.9800 -24.8000 2810.00 128888 SPO 1997 12 15 19 46 678-91 P co2 362.040 ... L3 1998 02 13 09 50 -89.9800 -24.8000 2810.00 128889 SPO 1997 12 23 03 55 65-91 S co2 362.070 ... L3 1998 02 13 10 32 -89.9800 -24.8000 2810.00 128890 SPO 1997 12 23 03 55 66-91 S co2 362.050 ... L3 1998 02 13 10 45 -89.9800 -24.8000 2810.00 128891 SPO 1998 01 01 22 54 661-91 S co2 362.140 ... L3 1998 02 13 10 04 -89.9800 -24.8000 2810.00 128892 SPO 1998 01 01 22 54 662-91 S co2 362.110 ... L3 1998 02 13 10 18 -89.9800 -24.8000 2810.00 128893 SPO 1998 01 01 23 48 751-91 P co2 362.320 ... L3 1998 02 12 15 35 -89.9800 -24.8000 2810.00 128894 SPO 1998 01 01 23 48 752-91 P co2 362.140 ... L3 1998 02 12 15 49 -89.9800 -24.8000 2810.00 128895 SPO 1998 01 10 02 27 825-91 P co2 361.950 ... L3 1998 02 12 12 44 -89.9800 -24.8000 2810.00 128896 SPO 1998 01 10 02 27 826-91 P co2 361.970 ... L3 1998 02 12 12 58 -89.9800 -24.8000 2810.00 128897 SPO 1998 01 15 02 56 1177-91 S co2 362.150 ... L3 1998 02 12 16 02 -89.9800 -24.8000 2810.00 128898 SPO 1998 01 15 02 56 1178-91 S co2 362.090 ... L3 1998 02 12 16 16 -89.9800 -24.8000 2810.00 128899 SPO 1998 01 15 05 56 379-91 P co2 362.070 ... L3 1998 02 12 13 12 -89.9800 -24.8000 2810.00 128900 SPO 1998 01 15 05 56 380-91 P co2 362.070 ... L3 1998 02 12 13 25 -89.9800 -24.8000 2810.00 128901 SPO 1998 01 22 02 15 749-91 P co2 362.000 ... L3 1998 03 05 13 41 -89.9800 -24.8000 2810.00 128902 SPO 1998 01 22 02 15 750-91 P co2 362.030 ... L3 1998 03 05 13 54 -89.9800 -24.8000 2810.00 128903 SPO 1998 02 01 22 52 1215-91 S co2 362.380 ... L3 1998 03 05 15 32 -89.9800 -24.8000 2810.00 128904 SPO 1998 02 01 22 52 1216-91 S co2 362.320 ... L3 1998 03 05 15 45 -89.9800 -24.8000 2810.00 128905 SPO 1998 02 01 23 53 4115-91 P co2 362.230 ... L3 1998 03 17 09 24 -89.9800 -24.8000 2810.00 128906 SPO 1998 02 01 23 53 4116-91 P co2 362.250 ... L3 1998 03 17 09 38 -89.9800 -24.8000 2810.00 128907 SPO 1998 02 08 12 21 4113-91 P co2 362.130 ... L3 1998 03 17 09 52 -89.9800 -24.8000 2810.00 128908 SPO 1998 02 08 12 21 4114-91 P co2 362.110 ... L3 1998 03 17 10 05 -89.9800 -24.8000 2810.00 128909 SPO 1998 02 13 02 15 4109-91 P co2 362.250 ... L3 1998 12 22 16 15 -89.9800 -24.8000 2810.00 128910 SPO 1998 02 13 02 15 4110-91 P co2 362.220 ... L3 1998 12 22 16 28 -89.9800 -24.8000 2810.00 128911 SPO 1998 02 16 23 58 4105-91 P co2 362.220 ... L3 1998 12 22 15 47 -89.9800 -24.8000 2810.00 128912 SPO 1998 02 16 23 58 4106-91 P co2 362.210 ... L3 1998 12 22 16 01 -89.9800 -24.8000 2810.00 128913 SPO 1998 02 24 22 26 4107-91 P co2 362.300 ... L3 1998 12 23 09 25 -89.9800 -24.8000 2810.00 128914 SPO 1998 02 24 22 26 4108-91 P co2 362.540 ... L3 1998 12 23 09 38 -89.9800 -24.8000 2810.00 128915 SPO 1998 03 01 23 50 273-91 S co2 362.560 ... L3 1998 12 23 09 52 -89.9800 -24.8000 2810.00 128916 SPO 1998 03 01 23 50 274-91 S co2 362.430 ... L3 1998 12 23 10 06 -89.9800 -24.8000 2810.00 128917 SPO 1998 03 01 23 58 4111-91 P co2 362.620 ... L3 1999 01 07 13 34 -89.9800 -24.8000 2810.00 128918 SPO 1998 03 01 23 58 4112-91 P co2 362.430 ... L3 1999 01 07 13 48 -89.9800 -24.8000 2810.00 128919 SPO 1998 03 08 23 20 1821-91 P co2 362.370 -.. L3 1999 01 07 12 10 -89.9800 -24.8000 2810.00 128920 SPO 1998 03 08 23 20 1822-91 P co2 363.140 +.. L3 1999 01 07 12 24 -89.9800 -24.8000 2810.00 128921 SPO 1998 03 15 04 51 119-91 S co2 359.280 -.. L3 1998 12 29 09 38 -89.9800 -24.8000 2810.00 128922 SPO 1998 03 15 04 51 120-91 S co2 362.350 +.. L3 1998 12 29 09 52 -89.9800 -24.8000 2810.00 128923 SPO 1998 03 15 06 08 1297-91 P co2 362.330 ... L3 1998 12 28 17 35 -89.9800 -24.8000 2810.00 128924 SPO 1998 03 15 06 08 1298-91 P co2 362.530 ... L3 1998 12 28 17 48 -89.9800 -24.8000 2810.00 128925 SPO 1998 03 23 02 50 761-91 P co2 356.730 N.. L3 1998 12 28 16 40 -89.9800 -24.8000 2810.00 128926 SPO 1998 03 23 02 50 762-91 P co2 356.650 N.. L3 1998 12 28 16 54 -89.9800 -24.8000 2810.00 128927 SPO 1998 04 01 21 53 637-91 S co2 359.800 -.. L3 1998 12 28 16 13 -89.9800 -24.8000 2810.00 128928 SPO 1998 04 01 21 53 638-91 S co2 362.540 +.. L3 1998 12 28 16 26 -89.9800 -24.8000 2810.00 128929 SPO 1998 04 01 23 56 111-91 P co2 359.530 -.. L3 1999 01 07 11 43 -89.9800 -24.8000 2810.00 128930 SPO 1998 04 01 23 56 112-91 P co2 362.550 +.. L3 1999 01 07 11 57 -89.9800 -24.8000 2810.00 128931 SPO 1998 04 08 23 30 319-91 P co2 362.730 ... L3 1999 01 07 13 05 -89.9800 -24.8000 2810.00 128932 SPO 1998 04 08 23 30 320-91 P co2 362.830 ... L3 1999 01 07 13 19 -89.9800 -24.8000 2810.00 128933 SPO 1998 04 15 21 56 4063-91 S co2 362.860 ... L3 1998 12 23 16 33 -89.9800 -24.8000 2810.00 128934 SPO 1998 04 15 21 56 4064-91 S co2 362.390 ... L3 1998 12 23 16 47 -89.9800 -24.8000 2810.00 128935 SPO 1998 04 15 23 55 4061-91 P co2 361.450 -.. L3 1998 12 23 16 06 -89.9800 -24.8000 2810.00 128936 SPO 1998 04 15 23 55 4062-91 P co2 362.570 +.. L3 1998 12 23 16 19 -89.9800 -24.8000 2810.00 128937 SPO 1998 04 22 23 45 4059-91 P co2 361.740 -.. L3 1998 12 22 14 23 -89.9800 -24.8000 2810.00 128938 SPO 1998 04 22 23 45 4060-91 P co2 362.760 +.. L3 1998 12 22 14 37 -89.9800 -24.8000 2810.00 128939 SPO 1998 05 05 20 52 4067-91 S co2 362.900 -.. L3 1998 12 22 14 51 -89.9800 -24.8000 2810.00 128940 SPO 1998 05 05 20 52 4068-91 S co2 674.260 +.. L3 1998 12 22 15 04 -89.9800 -24.8000 2810.00 128941 SPO 1998 05 05 23 25 4047-91 P co2 363.030 +.. L3 1998 12 24 09 51 -89.9800 -24.8000 2810.00 128942 SPO 1998 05 05 23 25 4048-91 P co2 360.540 -.. L3 1998 12 24 10 04 -89.9800 -24.8000 2810.00 128943 SPO 1998 05 08 15 20 4049-91 P co2 364.400 .X. L3 1998 12 23 14 15 -89.9800 -24.8000 2810.00 128944 SPO 1998 05 15 00 46 4069-91 P co2 361.410 -.. L3 1998 12 22 13 56 -89.9800 -24.8000 2810.00 128945 SPO 1998 05 15 00 46 4070-91 P co2 363.080 +.. L3 1998 12 22 14 10 -89.9800 -24.8000 2810.00 128946 SPO 1998 05 15 09 59 4053-91 S co2 363.230 ... L3 1998 12 22 15 18 -89.9800 -24.8000 2810.00 128947 SPO 1998 05 15 09 59 4054-91 S co2 363.090 ... L3 1998 12 22 15 32 -89.9800 -24.8000 2810.00 128948 SPO 1998 05 23 06 59 4739-91 P co2 362.560 -.. L3 1999 01 08 15 05 -89.9800 -24.8000 2810.00 128949 SPO 1998 05 23 06 59 4740-91 P co2 363.580 +.. L3 1999 01 08 15 19 -89.9800 -24.8000 2810.00 128950 SPO 1998 06 01 15 55 1205-91 S co2 363.300 ... L3 1999 01 07 16 47 -89.9800 -24.8000 2810.00 128951 SPO 1998 06 01 15 55 1206-91 S co2 363.310 ... L3 1999 01 07 17 00 -89.9800 -24.8000 2810.00 128952 SPO 1998 06 01 18 36 1593-91 P co2 363.730 ... L3 1999 01 07 16 19 -89.9800 -24.8000 2810.00 128953 SPO 1998 06 01 18 36 1594-91 P co2 363.390 ... L3 1999 01 07 16 33 -89.9800 -24.8000 2810.00 128954 SPO 1998 06 08 18 19 1669-91 P co2 363.610 +.. L3 1999 01 07 15 52 -89.9800 -24.8000 2810.00 128955 SPO 1998 06 08 18 19 1670-91 P co2 357.090 -.. L3 1999 01 07 16 06 -89.9800 -24.8000 2810.00 128956 SPO 1998 06 16 17 56 1373-91 S co2 358.230 -.. L3 1999 01 06 10 10 -89.9800 -24.8000 2810.00 128957 SPO 1998 06 16 17 56 1374-91 S co2 363.540 +.. L3 1999 01 06 10 23 -89.9800 -24.8000 2810.00 128958 SPO 1998 06 16 20 12 1477-91 P co2 359.780 -.. L3 1999 01 08 14 38 -89.9800 -24.8000 2810.00 128959 SPO 1998 06 16 20 12 1478-91 P co2 363.100 +.. L3 1999 01 08 14 51 -89.9800 -24.8000 2810.00 128960 SPO 1998 06 24 00 40 1139-91 P co2 363.570 ... L3 1999 01 06 09 42 -89.9800 -24.8000 2810.00 128961 SPO 1998 06 24 00 40 1140-91 P co2 363.650 ... L3 1999 01 06 09 56 -89.9800 -24.8000 2810.00 128962 SPO 1998 07 01 03 57 129-91 S co2 356.590 -.. L3 1999 01 06 09 15 -89.9800 -24.8000 2810.00 128963 SPO 1998 07 01 03 57 130-91 S co2 363.700 +.. L3 1999 01 06 09 29 -89.9800 -24.8000 2810.00 128964 SPO 1998 07 01 05 48 4587-91 P co2 363.660 ... L3 1998 12 23 13 17 -89.9800 -24.8000 2810.00 128965 SPO 1998 07 01 05 48 4588-91 P co2 363.720 ... L3 1998 12 23 13 31 -89.9800 -24.8000 2810.00 128966 SPO 1998 07 09 14 46 1993-91 P co2 363.820 +.. L3 1998 12 23 10 59 -89.9800 -24.8000 2810.00 128967 SPO 1998 07 09 14 46 1994-91 P co2 361.510 -.. L3 1998 12 23 11 12 -89.9800 -24.8000 2810.00 128968 SPO 1998 07 15 10 18 1353-91 S co2 364.670 ... L3 1999 01 07 12 38 -89.9800 -24.8000 2810.00 128969 SPO 1998 07 15 10 18 1354-91 S co2 364.280 ... L3 1999 01 07 12 51 -89.9800 -24.8000 2810.00 128970 SPO 1998 07 15 12 42 4559-91 P co2 363.920 ... L3 1999 01 07 11 14 -89.9800 -24.8000 2810.00 128971 SPO 1998 07 15 12 42 4560-91 P co2 363.770 ... L3 1999 01 07 11 28 -89.9800 -24.8000 2810.00 128972 SPO 1998 07 23 21 12 1955-91 P co2 364.140 ... L3 1999 01 07 10 47 -89.9800 -24.8000 2810.00 128973 SPO 1998 07 23 21 12 1956-91 P co2 364.210 ... L3 1999 01 07 11 01 -89.9800 -24.8000 2810.00 128974 SPO 1998 07 28 14 30 283-91 P co2 364.340 ... L3 1999 01 06 12 57 -89.9800 -24.8000 2810.00 128975 SPO 1998 07 28 14 30 284-91 P co2 364.200 ... L3 1999 01 06 13 10 -89.9800 -24.8000 2810.00 128976 SPO 1998 08 01 05 36 4231-91 S co2 365.630 N.. L3 1998 12 23 11 26 -89.9800 -24.8000 2810.00 128977 SPO 1998 08 01 05 36 4232-91 S co2 365.720 N.. L3 1998 12 23 11 40 -89.9800 -24.8000 2810.00 128978 SPO 1998 08 01 10 14 1291-91 P co2 364.350 ... L3 1998 12 23 10 19 -89.9800 -24.8000 2810.00 128979 SPO 1998 08 01 10 14 1292-91 P co2 364.310 ... L3 1998 12 23 10 33 -89.9800 -24.8000 2810.00 128980 SPO 1998 08 11 22 15 237-91 P co2 364.900 ... L3 1999 01 07 10 18 -89.9800 -24.8000 2810.00 128981 SPO 1998 08 11 22 15 238-91 P co2 364.880 ... L3 1999 01 07 10 32 -89.9800 -24.8000 2810.00 128982 SPO 1998 08 17 21 59 529-91 S co2 365.560 N.. L3 1999 01 07 09 23 -89.9800 -24.8000 2810.00 128983 SPO 1998 08 17 21 59 530-91 S co2 365.510 N.. L3 1999 01 07 09 37 -89.9800 -24.8000 2810.00 128984 SPO 1998 08 17 23 35 1781-91 P co2 364.760 ... L3 1999 01 06 11 33 -89.9800 -24.8000 2810.00 128985 SPO 1998 08 17 23 35 1782-91 P co2 364.740 ... L3 1999 01 06 11 47 -89.9800 -24.8000 2810.00 128986 SPO 1998 08 25 23 55 827-91 P co2 357.710 -.. L3 1999 01 06 12 00 -89.9800 -24.8000 2810.00 128987 SPO 1998 08 25 23 55 828-91 P co2 364.840 +.. L3 1999 01 06 12 14 -89.9800 -24.8000 2810.00 128988 SPO 1998 09 02 22 35 1975-91 S co2 365.690 N.. L3 1999 01 06 11 06 -89.9800 -24.8000 2810.00 128989 SPO 1998 09 02 22 35 1976-91 S co2 365.720 N.. L3 1999 01 06 11 19 -89.9800 -24.8000 2810.00 128990 SPO 1998 09 02 23 44 503-91 P co2 364.950 ... L3 1999 01 06 10 38 -89.9800 -24.8000 2810.00 128991 SPO 1998 09 02 23 44 504-91 P co2 364.940 ... L3 1999 01 06 10 52 -89.9800 -24.8000 2810.00 128992 SPO 1998 09 08 10 11 1919-91 P co2 364.330 -.. L3 1999 01 07 09 51 -89.9800 -24.8000 2810.00 128993 SPO 1998 09 08 10 11 1920-91 P co2 364.950 +.. L3 1999 01 07 10 04 -89.9800 -24.8000 2810.00 128994 SPO 1998 09 16 03 09 4227-91 P co2 365.100 ... L3 1998 12 16 10 40 -89.9800 -24.8000 2810.00 128995 SPO 1998 09 16 03 09 4228-91 P co2 365.020 ... L3 1998 12 16 10 54 -89.9800 -24.8000 2810.00 128996 SPO 1998 09 16 11 27 619-91 S co2 357.550 -.. L3 1999 01 06 16 11 -89.9800 -24.8000 2810.00 128997 SPO 1998 09 16 11 27 620-91 S co2 361.870 +.. L3 1999 01 06 16 25 -89.9800 -24.8000 2810.00 128998 SPO 1998 09 24 18 00 4759-91 P co2 365.100 ... L3 1998 12 16 10 08 -89.9800 -24.8000 2810.00 128999 SPO 1998 09 24 18 00 4760-91 P co2 365.050 ... L3 1998 12 16 10 22 -89.9800 -24.8000 2810.00 129000 SPO 1998 10 01 01 46 4437-91 P co2 364.940 ... L3 1998 12 16 12 31 -89.9800 -24.8000 2810.00 129001 SPO 1998 10 01 01 46 4438-91 P co2 365.030 ... L3 1998 12 16 12 45 -89.9800 -24.8000 2810.00 129002 SPO 1998 10 01 02 00 1599-91 S co2 365.890 N.. L3 1998 12 16 11 07 -89.9800 -24.8000 2810.00 129003 SPO 1998 10 01 02 00 1600-91 S co2 365.840 N.. L3 1998 12 16 11 21 -89.9800 -24.8000 2810.00 129004 SPO 1998 10 09 23 55 765-91 P co2 365.130 ... L3 1998 12 16 12 02 -89.9800 -24.8000 2810.00 129005 SPO 1998 10 09 23 55 766-91 P co2 365.110 ... L3 1998 12 16 12 16 -89.9800 -24.8000 2810.00 129006 SPO 1998 10 15 19 33 763-91 S co2 365.740 N.. L3 1998 12 16 11 35 -89.9800 -24.8000 2810.00 129007 SPO 1998 10 15 19 33 764-91 S co2 365.690 N.. L3 1998 12 16 11 48 -89.9800 -24.8000 2810.00 129008 SPO 1998 10 15 21 49 1447-91 P co2 365.150 ... L3 1998 12 16 09 41 -89.9800 -24.8000 2810.00 129009 SPO 1998 10 15 21 49 1448-91 P co2 365.160 ... L3 1998 12 16 09 54 -89.9800 -24.8000 2810.00 129010 SPO 1998 10 25 03 52 207-91 P co2 365.210 ... L3 1998 12 16 09 14 -89.9800 -24.8000 2810.00 129011 SPO 1998 10 25 03 52 208-91 P co2 365.220 ... L3 1998 12 16 09 27 -89.9800 -24.8000 2810.00 129012 SPO 1998 11 01 02 06 465-91 S co2 366.730 N.. L3 1999 01 06 14 20 -89.9800 -24.8000 2810.00 129013 SPO 1998 11 01 02 06 466-91 S co2 366.790 N.. L3 1999 01 06 14 34 -89.9800 -24.8000 2810.00 129014 SPO 1998 11 01 04 45 4249-91 P co2 365.150 ... L3 1999 01 06 15 42 -89.9800 -24.8000 2810.00 129015 SPO 1998 11 01 04 45 4250-91 P co2 365.220 ... L3 1999 01 06 15 56 -89.9800 -24.8000 2810.00 129016 SPO 1998 11 06 21 30 675-91 P co2 365.090 ... L3 1998 12 28 09 17 -89.9800 -24.8000 2810.00 129017 SPO 1998 11 06 21 30 676-91 P co2 365.030 ... L3 1998 12 28 09 30 -89.9800 -24.8000 2810.00 129018 SPO 1998 11 16 21 25 4331-91 S co2 366.450 N.. L3 1999 01 06 13 24 -89.9800 -24.8000 2810.00 129019 SPO 1998 11 16 21 25 4332-91 S co2 366.320 N.. L3 1999 01 06 13 38 -89.9800 -24.8000 2810.00 129020 SPO 1998 11 16 23 19 4253-91 P co2 365.050 ... L3 1998 12 28 10 11 -89.9800 -24.8000 2810.00 129021 SPO 1998 11 16 23 19 4254-91 P co2 365.080 ... L3 1998 12 28 10 25 -89.9800 -24.8000 2810.00 129022 SPO 1998 11 21 03 40 1689-91 P co2 365.220 ... L3 1998 12 28 09 44 -89.9800 -24.8000 2810.00 129023 SPO 1998 11 21 03 40 1690-91 P co2 365.090 ... L3 1998 12 28 09 57 -89.9800 -24.8000 2810.00 129024 SPO 1998 11 29 04 10 771-91 S co2 365.040 ... L3 1999 01 06 14 47 -89.9800 -24.8000 2810.00 129025 SPO 1998 11 29 04 10 772-91 S co2 365.040 ... L3 1999 01 06 15 01 -89.9800 -24.8000 2810.00 129026 SPO 1998 11 30 02 23 1275-91 S co2 365.050 ... L3 1999 01 06 15 15 -89.9800 -24.8000 2810.00 129027 SPO 1998 11 30 02 23 1276-91 S co2 365.060 ... L3 1999 01 06 15 28 -89.9800 -24.8000 2810.00 129028 SPO 1998 11 30 04 36 4305-91 P co2 365.020 ... L3 1999 02 05 14 29 -89.9800 -24.8000 2810.00 129029 SPO 1998 11 30 04 36 4306-91 P co2 365.050 ... L3 1999 02 05 14 42 -89.9800 -24.8000 2810.00 129030 SPO 1998 12 07 23 12 197-91 P co2 365.040 ... L3 1999 02 05 11 43 -89.9800 -24.8000 2810.00 129031 SPO 1998 12 07 23 12 198-91 P co2 365.020 ... L3 1999 02 05 11 57 -89.9800 -24.8000 2810.00 129032 SPO 1998 12 07 23 21 439-91 S co2 364.970 ... L3 1999 02 02 15 13 -89.9800 -24.8000 2810.00 129033 SPO 1998 12 07 23 21 440-91 S co2 365.060 ... L3 1999 02 02 15 26 -89.9800 -24.8000 2810.00 129034 SPO 1998 12 15 02 12 4245-91 P co2 365.010 ... L3 1999 02 03 14 43 -89.9800 -24.8000 2810.00 129035 SPO 1998 12 15 02 12 4246-91 P co2 365.020 ... L3 1999 02 03 14 56 -89.9800 -24.8000 2810.00 129036 SPO 1998 12 15 02 20 243-91 S co2 365.050 ... L3 1999 02 02 15 40 -89.9800 -24.8000 2810.00 129037 SPO 1998 12 15 02 20 244-91 S co2 365.030 ... L3 1999 02 02 15 54 -89.9800 -24.8000 2810.00 129038 SPO 1998 12 21 21 16 4751-91 S co2 364.940 ... L3 1999 02 02 16 07 -89.9800 -24.8000 2810.00 129039 SPO 1998 12 21 21 16 4752-91 S co2 364.990 ... L3 1999 02 02 16 21 -89.9800 -24.8000 2810.00 129040 SPO 1998 12 21 21 18 4247-91 P co2 364.970 ... L3 1999 02 05 14 01 -89.9800 -24.8000 2810.00 129041 SPO 1998 12 21 21 18 4248-91 P co2 364.920 ... L3 1999 02 05 14 15 -89.9800 -24.8000 2810.00 129042 SPO 1999 01 02 03 19 4733-91 P co2 365.170 ... L3 1999 02 17 09 37 -89.9800 -24.8000 2810.00 129043 SPO 1999 01 02 03 19 4734-91 P co2 365.220 ... L3 1999 02 17 09 51 -89.9800 -24.8000 2810.00 129044 SPO 1999 01 02 03 24 4741-91 S co2 365.220 ... L3 1999 02 17 09 10 -89.9800 -24.8000 2810.00 129045 SPO 1999 01 02 03 24 4742-91 S co2 365.310 ... L3 1999 02 17 09 23 -89.9800 -24.8000 2810.00 129046 SPO 1999 01 10 22 09 1657-91 P co2 364.880 ... L3 1999 02 11 13 46 -89.9800 -24.8000 2810.00 129047 SPO 1999 01 10 22 09 1658-91 P co2 364.990 ... L3 1999 02 11 14 00 -89.9800 -24.8000 2810.00 129048 SPO 1999 01 10 22 20 515-91 S co2 364.970 ... L3 1999 02 11 14 13 -89.9800 -24.8000 2810.00 129049 SPO 1999 01 10 22 20 516-91 S co2 364.910 ... L3 1999 02 11 14 27 -89.9800 -24.8000 2810.00 129050 SPO 1999 01 16 05 14 309-91 P co2 365.650 .X. L3 1999 02 17 10 38 -89.9800 -24.8000 2810.00 129051 SPO 1999 01 16 05 14 310-91 P co2 365.610 .X. L3 1999 02 17 10 51 -89.9800 -24.8000 2810.00 129052 SPO 1999 01 16 05 22 4743-91 S co2 365.040 ... L3 1999 02 17 10 04 -89.9800 -24.8000 2810.00 129053 SPO 1999 01 16 05 22 4744-91 S co2 365.050 ... L3 1999 02 17 10 18 -89.9800 -24.8000 2810.00 129054 SPO 1999 01 23 02 09 4621-91 P co2 365.020 ... L3 1999 02 11 15 37 -89.9800 -24.8000 2810.00 129055 SPO 1999 01 23 02 09 4622-91 P co2 365.050 ... L3 1999 02 11 15 50 -89.9800 -24.8000 2810.00 129056 SPO 1999 01 23 02 15 4629-91 S co2 365.090 ... L3 1999 02 11 15 08 -89.9800 -24.8000 2810.00 129057 SPO 1999 01 23 02 15 4630-91 S co2 365.070 ... L3 1999 02 11 15 22 -89.9800 -24.8000 2810.00 129058 SPO 1999 02 01 02 11 247-91 P co2 364.700 ... L3 1999 12 03 09 58 -89.9800 -24.8000 2810.00 129059 SPO 1999 02 01 02 11 248-91 P co2 364.990 ... L3 1999 12 03 10 11 -89.9800 -24.8000 2810.00 129060 SPO 1999 02 01 02 17 4715-91 S co2 365.010 +.. L3 1999 12 09 12 46 -89.9800 -24.8000 2810.00 129061 SPO 1999 02 01 02 17 4716-91 S co2 364.240 -.. L3 1999 12 09 13 00 -89.9800 -24.8000 2810.00 129062 SPO 1999 02 16 05 13 1003-91 P co2 364.690 ... L3 1999 12 09 11 50 -89.9800 -24.8000 2810.00 129063 SPO 1999 02 16 05 13 1004-91 P co2 364.810 ... L3 1999 12 09 12 04 -89.9800 -24.8000 2810.00 129064 SPO 1999 02 16 05 17 4519-91 S co2 364.660 ... L3 1999 12 03 10 25 -89.9800 -24.8000 2810.00 129065 SPO 1999 02 16 05 17 4520-91 S co2 364.780 ... L3 1999 12 03 10 39 -89.9800 -24.8000 2810.00 129066 SPO 1999 02 23 21 08 4383-91 P co2 364.960 ... L3 1999 12 03 09 31 -89.9800 -24.8000 2810.00 129067 SPO 1999 02 23 21 08 4384-91 P co2 364.780 ... L3 1999 12 03 09 44 -89.9800 -24.8000 2810.00 129068 SPO 1999 02 23 21 20 4699-91 S co2 364.850 ... L3 1999 12 09 11 23 -89.9800 -24.8000 2810.00 129069 SPO 1999 02 23 21 20 4700-91 S co2 364.930 ... L3 1999 12 09 11 37 -89.9800 -24.8000 2810.00 129070 SPO 1999 03 01 21 16 4395-91 P co2 363.910 -.. L3 1999 12 09 12 19 -89.9800 -24.8000 2810.00 129071 SPO 1999 03 01 21 16 4396-91 P co2 364.960 +.. L3 1999 12 09 12 33 -89.9800 -24.8000 2810.00 129072 SPO 1999 03 01 21 20 1071-91 S co2 364.840 ... L3 1999 12 03 10 54 -89.9800 -24.8000 2810.00 129073 SPO 1999 03 01 21 20 1072-91 S co2 364.960 ... L3 1999 12 03 11 08 -89.9800 -24.8000 2810.00 129074 SPO 1999 03 08 21 09 27-91 P co2 364.840 ... L3 1999 12 08 09 36 -89.9800 -24.8000 2810.00 129075 SPO 1999 03 08 21 09 28-91 P co2 364.660 ... L3 1999 12 08 09 49 -89.9800 -24.8000 2810.00 129076 SPO 1999 03 16 00 13 606-91 P co2 364.770 +.. L3 1999 12 08 10 17 -89.9800 -24.8000 2810.00 129077 SPO 1999 03 16 00 13 1901-91 P co2 361.480 -.. L3 1999 12 08 10 03 -89.9800 -24.8000 2810.00 129078 SPO 1999 03 16 00 19 1225-91 S co2 365.120 ... L3 1999 12 08 09 08 -89.9800 -24.8000 2810.00 129079 SPO 1999 03 16 00 19 1226-91 S co2 364.710 ... L3 1999 12 08 09 22 -89.9800 -24.8000 2810.00 129080 SPO 1999 04 01 22 18 1847-91 S co2 365.560 +.. L3 1999 12 03 12 19 -89.9800 -24.8000 2810.00 129081 SPO 1999 04 01 22 18 1848-91 S co2 364.860 -.. L3 1999 12 03 12 33 -89.9800 -24.8000 2810.00 129082 SPO 1999 04 02 20 30 1701-91 P co2 365.030 ... L3 1999 12 03 11 25 -89.9800 -24.8000 2810.00 129083 SPO 1999 04 02 20 30 1702-91 P co2 364.820 ... L3 1999 12 03 11 38 -89.9800 -24.8000 2810.00 129084 SPO 1999 04 08 22 27 4329-91 P co2 364.920 ... L3 1999 12 03 12 46 -89.9800 -24.8000 2810.00 129085 SPO 1999 04 08 22 27 4330-91 P co2 364.820 ... L3 1999 12 03 13 00 -89.9800 -24.8000 2810.00 129086 SPO 1999 04 15 21 09 353-91 P co2 364.970 ... L3 1999 12 13 11 46 -89.9800 -24.8000 2810.00 129087 SPO 1999 04 15 21 09 354-91 P co2 364.980 ... L3 1999 12 13 12 00 -89.9800 -24.8000 2810.00 129088 SPO 1999 04 15 21 15 1467-91 S co2 364.150 .X. L3 1999 12 03 11 52 -89.9800 -24.8000 2810.00 129089 SPO 1999 04 15 21 15 1468-91 S co2 363.810 .X. L3 1999 12 03 12 06 -89.9800 -24.8000 2810.00 129090 SPO 1999 04 24 21 16 983-91 P co2 365.170 ... L3 1999 12 13 12 14 -89.9800 -24.8000 2810.00 129091 SPO 1999 04 24 21 16 984-91 P co2 364.900 ... L3 1999 12 13 12 27 -89.9800 -24.8000 2810.00 129092 SPO 1999 05 01 11 14 1389-91 P co2 362.090 -.. L3 1999 12 13 13 10 -89.9800 -24.8000 2810.00 129093 SPO 1999 05 01 11 14 1390-91 P co2 365.130 +.. L3 1999 12 13 13 24 -89.9800 -24.8000 2810.00 129094 SPO 1999 05 01 11 19 67-91 S co2 364.900 -.. L3 1999 12 13 12 41 -89.9800 -24.8000 2810.00 129095 SPO 1999 05 01 11 19 68-91 S co2 365.430 +.. L3 1999 12 13 12 55 -89.9800 -24.8000 2810.00 129096 SPO 1999 05 09 20 53 4573-91 P co2 363.430 -.. L3 1999 12 03 16 02 -89.9800 -24.8000 2810.00 129097 SPO 1999 05 09 20 53 4574-91 P co2 365.820 +.. L3 1999 12 03 16 15 -89.9800 -24.8000 2810.00 129098 SPO 1999 05 15 23 13 4393-91 P co2 365.130 ... L3 1999 12 03 15 07 -89.9800 -24.8000 2810.00 129099 SPO 1999 05 15 23 13 4394-91 P co2 365.090 ... L3 1999 12 03 15 21 -89.9800 -24.8000 2810.00 129100 SPO 1999 05 15 23 19 1627-91 S co2 365.150 ... L3 1999 12 03 15 34 -89.9800 -24.8000 2810.00 129101 SPO 1999 05 15 23 19 1628-91 S co2 365.180 ... L3 1999 12 03 15 48 -89.9800 -24.8000 2810.00 129102 SPO 1999 05 24 04 08 1845-91 P co2 363.040 +.. L3 1999 12 07 11 47 -89.9800 -24.8000 2810.00 129103 SPO 1999 05 24 04 08 1846-91 P co2 361.280 -.. L3 1999 12 07 12 01 -89.9800 -24.8000 2810.00 129104 SPO 1999 06 02 23 18 641-91 P co2 365.350 ... L3 1999 12 07 11 20 -89.9800 -24.8000 2810.00 129105 SPO 1999 06 02 23 18 642-91 P co2 365.450 ... L3 1999 12 07 11 34 -89.9800 -24.8000 2810.00 129106 SPO 1999 06 02 23 24 227-91 S co2 365.350 ... L3 1999 12 06 13 54 -89.9800 -24.8000 2810.00 129107 SPO 1999 06 02 23 24 228-91 S co2 365.380 ... L3 1999 12 06 14 08 -89.9800 -24.8000 2810.00 129108 SPO 1999 06 08 23 47 4451-91 P co2 365.280 ... L3 1999 12 06 13 27 -89.9800 -24.8000 2810.00 129109 SPO 1999 06 08 23 47 4452-91 P co2 365.300 ... L3 1999 12 06 13 41 -89.9800 -24.8000 2810.00 129110 SPO 1999 06 15 20 18 1513-91 P co2 365.460 ... L3 1999 12 07 10 53 -89.9800 -24.8000 2810.00 129111 SPO 1999 06 15 20 18 1514-91 P co2 365.370 ... L3 1999 12 07 11 06 -89.9800 -24.8000 2810.00 129112 SPO 1999 06 15 20 24 497-91 S co2 365.320 ... L3 1999 12 06 13 00 -89.9800 -24.8000 2810.00 129113 SPO 1999 06 15 20 24 498-91 S co2 365.480 ... L3 1999 12 06 13 14 -89.9800 -24.8000 2810.00 129114 SPO 1999 06 24 07 34 1856-91 P co2 365.800 ... L3 1999 12 06 16 13 -89.9800 -24.8000 2810.00 129115 SPO 1999 07 01 12 16 4255-91 P co2 365.490 ... L3 1999 12 06 15 46 -89.9800 -24.8000 2810.00 129116 SPO 1999 07 01 12 16 4256-91 P co2 365.450 ... L3 1999 12 06 16 00 -89.9800 -24.8000 2810.00 129117 SPO 1999 07 01 12 22 463-91 S co2 365.490 ... L3 1999 12 07 09 29 -89.9800 -24.8000 2810.00 129118 SPO 1999 07 01 12 22 464-91 S co2 365.010 ... L3 1999 12 07 09 43 -89.9800 -24.8000 2810.00 129119 SPO 1999 07 09 23 28 1211-91 P co2 365.490 ... L3 1999 12 06 15 19 -89.9800 -24.8000 2810.00 129120 SPO 1999 07 09 23 28 1212-91 P co2 365.500 ... L3 1999 12 06 15 32 -89.9800 -24.8000 2810.00 129121 SPO 1999 07 15 22 18 607-91 P co2 365.690 ... L3 1999 12 06 14 51 -89.9800 -24.8000 2810.00 129122 SPO 1999 07 15 22 18 608-91 P co2 365.750 ... L3 1999 12 06 15 05 -89.9800 -24.8000 2810.00 129123 SPO 1999 07 15 22 23 1351-91 S co2 365.690 ... L3 1999 12 06 14 22 -89.9800 -24.8000 2810.00 129124 SPO 1999 07 15 22 23 1352-91 S co2 365.790 ... L3 1999 12 06 14 35 -89.9800 -24.8000 2810.00 129125 SPO 1999 07 24 20 50 1463-91 P co2 365.740 ... L3 1999 12 09 13 14 -89.9800 -24.8000 2810.00 129126 SPO 1999 07 24 20 50 1464-91 P co2 365.790 ... L3 1999 12 09 13 27 -89.9800 -24.8000 2810.00 129127 SPO 1999 08 02 15 13 4157-91 P co2 365.930 ... L3 1999 12 09 14 10 -89.9800 -24.8000 2810.00 129128 SPO 1999 08 02 15 13 4158-91 P co2 365.920 ... L3 1999 12 09 14 24 -89.9800 -24.8000 2810.00 129129 SPO 1999 08 02 15 19 131-91 S co2 365.950 ... L3 1999 12 09 13 41 -89.9800 -24.8000 2810.00 129130 SPO 1999 08 02 15 19 132-91 S co2 365.890 ... L3 1999 12 09 13 55 -89.9800 -24.8000 2810.00 129131 SPO 1999 08 10 00 04 4277-91 P co2 365.900 ... L3 1999 12 09 14 37 -89.9800 -24.8000 2810.00 129132 SPO 1999 08 10 00 04 4278-91 P co2 365.820 ... L3 1999 12 09 14 51 -89.9800 -24.8000 2810.00 129133 SPO 1999 08 17 16 13 751-91 P co2 365.940 ... L3 1999 12 02 15 57 -89.9800 -24.8000 2810.00 129134 SPO 1999 08 17 16 13 752-91 P co2 366.100 ... L3 1999 12 02 16 10 -89.9800 -24.8000 2810.00 129135 SPO 1999 08 17 16 19 277-91 S co2 366.050 ... L3 1999 12 07 09 56 -89.9800 -24.8000 2810.00 129136 SPO 1999 08 17 16 19 278-91 S co2 366.120 ... L3 1999 12 07 10 10 -89.9800 -24.8000 2810.00 129137 SPO 1999 08 25 22 01 1743-91 P co2 366.330 ... L3 1999 12 07 10 25 -89.9800 -24.8000 2810.00 129138 SPO 1999 08 25 22 01 1744-91 P co2 366.220 ... L3 1999 12 07 10 39 -89.9800 -24.8000 2810.00 129139 SPO 1999 09 02 22 13 4215-91 P co2 366.250 ... L3 1999 12 02 16 24 -89.9800 -24.8000 2810.00 129140 SPO 1999 09 02 22 13 4216-91 P co2 366.160 ... L3 1999 12 02 16 37 -89.9800 -24.8000 2810.00 129141 SPO 1999 09 02 22 19 1341-91 S co2 366.380 ... L3 1999 12 06 10 40 -89.9800 -24.8000 2810.00 129142 SPO 1999 09 02 22 19 1342-91 S co2 366.410 ... L3 1999 12 06 10 54 -89.9800 -24.8000 2810.00 129143 SPO 1999 09 09 19 40 19-91 P co2 366.290 ... L3 1999 12 06 09 46 -89.9800 -24.8000 2810.00 129144 SPO 1999 09 09 19 40 20-91 P co2 366.280 ... L3 1999 12 06 09 59 -89.9800 -24.8000 2810.00 129145 SPO 1999 09 16 22 15 4449-91 P co2 366.780 ... L3 1999 12 03 16 29 -89.9800 -24.8000 2810.00 129146 SPO 1999 09 16 22 15 4450-91 P co2 366.280 ... L3 1999 12 03 16 43 -89.9800 -24.8000 2810.00 129147 SPO 1999 09 16 22 21 1717-91 S co2 366.360 ... L3 1999 12 06 10 13 -89.9800 -24.8000 2810.00 129148 SPO 1999 09 16 22 21 1718-91 S co2 366.400 ... L3 1999 12 06 10 27 -89.9800 -24.8000 2810.00 129149 SPO 1999 09 24 23 42 701-91 P co2 366.520 ... L3 2000 02 16 09 54 -89.9800 -24.8000 2810.00 129150 SPO 1999 09 24 23 42 702-91 P co2 366.520 ... L3 2000 02 16 10 08 -89.9800 -24.8000 2810.00 129151 SPO 1999 10 02 20 15 4317-91 P co2 366.450 ... L3 2000 02 16 09 27 -89.9800 -24.8000 2810.00 129152 SPO 1999 10 02 20 15 4318-91 P co2 366.390 ... L3 2000 02 16 09 40 -89.9800 -24.8000 2810.00 129153 SPO 1999 10 02 20 19 1493-91 S co2 366.510 ... L3 2000 02 15 15 57 -89.9800 -24.8000 2810.00 129154 SPO 1999 10 02 20 19 1494-91 S co2 366.500 ... L3 2000 02 15 16 10 -89.9800 -24.8000 2810.00 129155 SPO 1999 10 09 01 51 4691-91 P co2 366.490 ... L3 2000 02 15 14 35 -89.9800 -24.8000 2810.00 129156 SPO 1999 10 09 01 51 4692-91 P co2 366.520 ... L3 2000 02 15 14 48 -89.9800 -24.8000 2810.00 129157 SPO 1999 10 17 01 12 1965-91 P co2 366.650 ... L3 2000 02 15 15 02 -89.9800 -24.8000 2810.00 129158 SPO 1999 10 17 01 12 1966-91 P co2 366.560 ... L3 2000 02 15 15 16 -89.9800 -24.8000 2810.00 129159 SPO 1999 10 17 01 20 1943-91 S co2 366.550 ... L3 2000 02 15 14 19 -89.9800 -24.8000 2810.00 129160 SPO 1999 10 24 22 31 1605-91 P co2 366.560 ... L3 2000 02 15 15 29 -89.9800 -24.8000 2810.00 129161 SPO 1999 10 24 22 31 1606-91 P co2 366.560 ... L3 2000 02 15 15 43 -89.9800 -24.8000 2810.00 129162 SPO 1999 11 06 02 50 19-98 P co2 366.530 ... L3 2000 02 14 12 39 -89.9800 -24.8000 2810.00 129163 SPO 1999 11 06 02 50 20-98 P co2 366.600 ... L3 2000 02 14 12 53 -89.9800 -24.8000 2810.00 129164 SPO 1999 11 06 03 16 755-91 S co2 366.830 ... L3 2000 02 15 09 30 -89.9800 -24.8000 2810.00 129165 SPO 1999 11 06 03 16 756-91 S co2 366.720 ... L3 2000 02 15 09 43 -89.9800 -24.8000 2810.00 129166 SPO 1999 11 11 11 05 4193-91 P co2 366.620 ... L3 2000 02 15 10 24 -89.9800 -24.8000 2810.00 129167 SPO 1999 11 11 11 05 4194-91 P co2 366.670 ... L3 2000 02 15 10 38 -89.9800 -24.8000 2810.00 129168 SPO 1999 11 19 03 10 251-91 S co2 366.640 ... L3 2000 02 14 14 02 -89.9800 -24.8000 2810.00 129169 SPO 1999 11 19 03 10 252-91 S co2 366.710 ... L3 2000 02 14 14 16 -89.9800 -24.8000 2810.00 129170 SPO 1999 11 19 03 35 4263-91 P co2 366.670 ... L3 2000 02 14 11 44 -89.9800 -24.8000 2810.00 129171 SPO 1999 11 19 03 35 4264-91 P co2 366.660 ... L3 2000 02 14 11 58 -89.9800 -24.8000 2810.00 129172 SPO 1999 12 07 08 10 4007-91 S co2 366.690 ... L3 2000 02 15 09 57 -89.9800 -24.8000 2810.00 129173 SPO 1999 12 07 08 10 4008-91 S co2 366.750 ... L3 2000 02 15 10 11 -89.9800 -24.8000 2810.00 129174 SPO 1999 12 07 09 55 219-91 P co2 366.760 ... L3 2000 02 14 13 35 -89.9800 -24.8000 2810.00 129175 SPO 1999 12 07 09 55 220-91 P co2 366.640 ... L3 2000 02 14 13 49 -89.9800 -24.8000 2810.00 129176 SPO 1999 12 17 23 14 1169-91 P co2 366.650 ... L3 2000 02 14 13 08 -89.9800 -24.8000 2810.00 129177 SPO 1999 12 17 23 14 1170-91 P co2 366.630 ... L3 2000 02 14 13 22 -89.9800 -24.8000 2810.00 129178 SPO 1999 12 21 14 15 4301-91 S co2 366.420 ... L3 2000 02 14 14 30 -89.9800 -24.8000 2810.00 129179 SPO 1999 12 21 14 15 4302-91 S co2 366.440 ... L3 2000 02 14 14 43 -89.9800 -24.8000 2810.00 129180 SPO 1999 12 21 16 47 987-91 P co2 366.430 ... L3 2000 02 17 10 36 -89.9800 -24.8000 2810.00 129181 SPO 1999 12 21 16 47 988-91 P co2 366.480 ... L3 2000 02 17 10 50 -89.9800 -24.8000 2810.00 129182 SPO 1999 12 31 02 35 257-91 P co2 366.620 ... L3 2000 02 17 11 33 -89.9800 -24.8000 2810.00 129183 SPO 1999 12 31 02 35 258-91 P co2 366.460 ... L3 2000 02 17 11 46 -89.9800 -24.8000 2810.00 129184 SPO 2000 01 10 14 11 4469-91 S co2 366.420 ... L3 2000 02 17 12 56 -89.9800 -24.8000 2810.00 129185 SPO 2000 01 10 14 11 4470-91 S co2 366.490 ... L3 2000 02 17 13 10 -89.9800 -24.8000 2810.00 129186 SPO 2000 01 10 14 42 255-91 P co2 366.460 ... L3 2000 02 17 11 05 -89.9800 -24.8000 2810.00 129187 SPO 2000 01 10 14 42 256-91 P co2 366.530 ... L3 2000 02 17 11 19 -89.9800 -24.8000 2810.00 129188 SPO 2000 01 17 22 15 1231-91 S co2 366.430 ... L3 2000 02 16 16 12 -89.9800 -24.8000 2810.00 129189 SPO 2000 01 17 22 15 1232-91 S co2 366.470 ... L3 2000 02 16 16 25 -89.9800 -24.8000 2810.00 129190 SPO 2000 01 17 23 25 4887-91 P co2 366.430 ... L3 2000 02 17 10 09 -89.9800 -24.8000 2810.00 129191 SPO 2000 01 17 23 25 4888-91 P co2 366.460 ... L3 2000 02 17 10 23 -89.9800 -24.8000 2810.00 129192 SPO 2000 01 23 16 40 4885-91 P co2 366.460 ... L3 2000 02 16 15 44 -89.9800 -24.8000 2810.00 129193 SPO 2000 01 23 16 40 4886-91 P co2 366.480 ... L3 2000 02 16 15 58 -89.9800 -24.8000 2810.00 129194 SPO 2000 01 23 17 10 161-91 S co2 366.550 ... L3 2000 02 16 15 17 -89.9800 -24.8000 2810.00 129195 SPO 2000 01 23 17 10 162-91 S co2 366.550 ... L3 2000 02 16 15 31 -89.9800 -24.8000 2810.00 129196 SPO 2000 01 31 09 55 4907-91 P co2 366.250 ... L3 2000 12 04 10 33 -89.9800 -24.8000 2810.00 129197 SPO 2000 01 31 09 55 4908-91 P co2 366.250 ... L3 2000 12 04 10 46 -89.9800 -24.8000 2810.00 129198 SPO 2000 01 31 10 15 4897-91 S co2 366.320 ... L3 2000 12 04 10 59 -89.9800 -24.8000 2810.00 129199 SPO 2000 01 31 10 15 4898-91 S co2 366.250 ... L3 2000 12 04 11 12 -89.9800 -24.8000 2810.00 129200 SPO 2000 02 05 02 15 4921-91 S co2 367.370 +.. L3 2000 12 04 12 19 -89.9800 -24.8000 2810.00 129201 SPO 2000 02 05 02 15 4922-91 S co2 366.120 -.. L3 2000 12 04 12 32 -89.9800 -24.8000 2810.00 129202 SPO 2000 02 05 03 35 4919-91 P co2 366.070 -.. L3 2000 12 04 12 45 -89.9800 -24.8000 2810.00 129203 SPO 2000 02 05 03 35 4920-91 P co2 366.850 +.. L3 2000 12 04 12 58 -89.9800 -24.8000 2810.00 129204 SPO 2000 02 18 12 55 4507-91 P co2 366.090 ... L3 2000 12 04 09 39 -89.9800 -24.8000 2810.00 129205 SPO 2000 02 18 12 55 4508-91 P co2 366.150 ... L3 2000 12 04 09 52 -89.9800 -24.8000 2810.00 129206 SPO 2000 02 18 13 15 1677-91 S co2 366.200 ... L3 2000 12 04 10 05 -89.9800 -24.8000 2810.00 129207 SPO 2000 02 18 13 15 1678-91 S co2 366.270 ... L3 2000 12 04 10 18 -89.9800 -24.8000 2810.00 129208 SPO 2000 02 22 15 15 4673-91 S co2 366.100 -.. L3 2000 12 04 11 25 -89.9800 -24.8000 2810.00 129209 SPO 2000 02 22 15 15 4674-91 S co2 379.180 +.. L3 2000 12 04 11 38 -89.9800 -24.8000 2810.00 129210 SPO 2000 02 22 15 45 4411-91 P co2 366.070 ... L3 2000 12 04 11 51 -89.9800 -24.8000 2810.00 129211 SPO 2000 02 22 15 45 4412-91 P co2 365.990 ... L3 2000 12 04 12 04 -89.9800 -24.8000 2810.00 129212 SPO 2000 03 04 05 15 1977-91 S co2 365.920 ... L3 2000 12 13 14 30 -89.9800 -24.8000 2810.00 129213 SPO 2000 03 04 05 15 1978-91 S co2 366.180 ... L3 2000 12 13 14 43 -89.9800 -24.8000 2810.00 129214 SPO 2000 03 04 05 55 1575-91 P co2 366.080 ... L3 2000 12 13 14 04 -89.9800 -24.8000 2810.00 129215 SPO 2000 03 04 05 55 1576-91 P co2 366.030 ... L3 2000 12 13 14 17 -89.9800 -24.8000 2810.00 129216 SPO 2000 03 10 19 00 4763-91 P co2 375.720 +.. L3 2000 12 13 11 52 -89.9800 -24.8000 2810.00 129217 SPO 2000 03 10 19 00 4764-91 P co2 365.980 -.. L3 2000 12 13 12 05 -89.9800 -24.8000 2810.00 129218 SPO 2000 03 10 19 15 1049-91 S co2 366.050 ... L3 2000 12 13 13 12 -89.9800 -24.8000 2810.00 129219 SPO 2000 03 10 19 15 1050-91 S co2 366.070 ... L3 2000 12 13 13 25 -89.9800 -24.8000 2810.00 129220 SPO 2000 03 19 18 10 4083-91 S co2 365.940 ... L3 2000 12 13 12 18 -89.9800 -24.8000 2810.00 129221 SPO 2000 03 19 18 10 4084-91 S co2 365.950 ... L3 2000 12 13 12 31 -89.9800 -24.8000 2810.00 129222 SPO 2000 03 19 18 15 4529-91 P co2 365.870 ... L3 2000 12 13 12 44 -89.9800 -24.8000 2810.00 129223 SPO 2000 03 19 18 15 4530-91 P co2 365.830 ... L3 2000 12 13 12 57 -89.9800 -24.8000 2810.00 129224 SPO 2000 03 25 01 10 2025-91 S co2 365.970 ... L3 2000 12 13 13 38 -89.9800 -24.8000 2810.00 129225 SPO 2000 03 25 01 10 2026-91 S co2 365.950 ... L3 2000 12 13 13 51 -89.9800 -24.8000 2810.00 129226 SPO 2000 03 25 01 45 4527-91 P co2 366.110 ... L3 2000 12 13 11 26 -89.9800 -24.8000 2810.00 129227 SPO 2000 03 25 01 45 4528-91 P co2 366.120 ... L3 2000 12 13 11 39 -89.9800 -24.8000 2810.00 129228 SPO 2000 03 31 23 15 303-91 S co2 366.160 ... L3 2000 12 01 14 07 -89.9800 -24.8000 2810.00 129229 SPO 2000 03 31 23 15 304-91 S co2 366.110 ... L3 2000 12 01 14 20 -89.9800 -24.8000 2810.00 129230 SPO 2000 03 31 23 50 845-91 P co2 366.120 ... L3 2000 12 04 14 05 -89.9800 -24.8000 2810.00 129231 SPO 2000 03 31 23 50 846-91 P co2 366.270 ... L3 2000 12 04 14 18 -89.9800 -24.8000 2810.00 129232 SPO 2000 04 02 23 15 4653-91 S co2 365.940 ... L3 2000 12 01 14 33 -89.9800 -24.8000 2810.00 129233 SPO 2000 04 02 23 15 4654-91 S co2 366.010 ... L3 2000 12 01 14 46 -89.9800 -24.8000 2810.00 129234 SPO 2000 04 02 23 55 4133-91 P co2 366.050 ... L3 2000 12 04 14 31 -89.9800 -24.8000 2810.00 129235 SPO 2000 04 02 23 55 4134-91 P co2 365.960 ... L3 2000 12 04 14 44 -89.9800 -24.8000 2810.00 129236 SPO 2000 04 09 23 15 493-91 S co2 366.230 ... L3 2000 12 04 08 32 -89.9800 -24.8000 2810.00 129237 SPO 2000 04 09 23 15 494-91 S co2 366.140 ... L3 2000 12 04 08 45 -89.9800 -24.8000 2810.00 129238 SPO 2000 04 09 23 50 205-91 P co2 366.110 ... L3 2000 12 04 13 37 -89.9800 -24.8000 2810.00 129239 SPO 2000 04 09 23 50 206-91 P co2 366.030 ... L3 2000 12 04 13 50 -89.9800 -24.8000 2810.00 129240 SPO 2000 04 15 01 15 97-98 S co2 366.130 ... L3 2000 12 04 08 58 -89.9800 -24.8000 2810.00 129241 SPO 2000 04 15 01 15 98-98 S co2 366.150 ... L3 2000 12 04 09 11 -89.9800 -24.8000 2810.00 129242 SPO 2000 04 15 02 40 1649-91 P co2 365.970 ... L3 2000 12 04 13 11 -89.9800 -24.8000 2810.00 129243 SPO 2000 04 15 02 40 1650-91 P co2 365.920 ... L3 2000 12 04 13 24 -89.9800 -24.8000 2810.00 129244 SPO 2000 04 23 18 15 4903-91 S co2 366.100 ... L3 2000 12 12 14 28 -89.9800 -24.8000 2810.00 129245 SPO 2000 04 23 18 15 4904-91 S co2 366.130 ... L3 2000 12 12 14 41 -89.9800 -24.8000 2810.00 129246 SPO 2000 04 23 19 20 4889-91 P co2 366.130 ... L3 2000 12 12 14 02 -89.9800 -24.8000 2810.00 129247 SPO 2000 04 23 19 20 4890-91 P co2 366.070 ... L3 2000 12 12 14 15 -89.9800 -24.8000 2810.00 129248 SPO 2000 05 04 04 15 4165-91 S co2 366.120 ... L3 2000 12 14 10 47 -89.9800 -24.8000 2810.00 129249 SPO 2000 05 04 04 55 4891-91 P co2 366.080 ... L3 2000 12 14 09 29 -89.9800 -24.8000 2810.00 129250 SPO 2000 05 04 04 55 4892-91 P co2 366.080 ... L3 2000 12 14 09 42 -89.9800 -24.8000 2810.00 129251 SPO 2000 05 11 22 10 4047-91 S co2 366.260 ... L3 2000 12 14 10 21 -89.9800 -24.8000 2810.00 129252 SPO 2000 05 11 22 10 4048-91 S co2 366.260 ... L3 2000 12 14 10 34 -89.9800 -24.8000 2810.00 129253 SPO 2000 05 11 23 00 4265-91 P co2 366.170 ... L3 2000 12 14 09 55 -89.9800 -24.8000 2810.00 129254 SPO 2000 05 11 23 00 4266-91 P co2 366.110 ... L3 2000 12 14 10 08 -89.9800 -24.8000 2810.00 129255 SPO 2000 05 15 19 15 1005-91 S co2 366.240 ... L3 2000 12 12 13 36 -89.9800 -24.8000 2810.00 129256 SPO 2000 05 15 19 15 1006-91 S co2 366.220 ... L3 2000 12 12 13 49 -89.9800 -24.8000 2810.00 129257 SPO 2000 05 15 19 55 4305-91 P co2 366.240 ... L3 2000 12 08 15 20 -89.9800 -24.8000 2810.00 129258 SPO 2000 05 15 19 55 4306-91 P co2 366.180 ... L3 2000 12 08 15 33 -89.9800 -24.8000 2810.00 129259 SPO 2000 05 29 16 10 4899-91 S co2 366.310 ... L3 2000 12 08 12 11 -89.9800 -24.8000 2810.00 129260 SPO 2000 05 29 16 10 4900-91 S co2 366.300 ... L3 2000 12 08 12 24 -89.9800 -24.8000 2810.00 129261 SPO 2000 05 29 16 45 4489-91 P co2 366.210 ... L3 2000 12 08 14 23 -89.9800 -24.8000 2810.00 129262 SPO 2000 05 29 16 45 4490-91 P co2 366.240 ... L3 2000 12 08 14 36 -89.9800 -24.8000 2810.00 129263 SPO 2000 06 01 16 15 4079-91 S co2 366.290 ... L3 2000 12 08 12 37 -89.9800 -24.8000 2810.00 129264 SPO 2000 06 01 16 15 4080-91 S co2 366.340 ... L3 2000 12 08 12 50 -89.9800 -24.8000 2810.00 129265 SPO 2000 06 01 16 55 439-91 P co2 366.460 ... L3 2000 12 08 13 57 -89.9800 -24.8000 2810.00 129266 SPO 2000 06 01 16 55 440-91 P co2 366.360 ... L3 2000 12 08 14 10 -89.9800 -24.8000 2810.00 129267 SPO 2000 06 10 04 15 389-91 S co2 366.370 ... L3 2000 12 08 13 05 -89.9800 -24.8000 2810.00 129268 SPO 2000 06 10 04 15 390-91 S co2 366.360 ... L3 2000 12 08 13 18 -89.9800 -24.8000 2810.00 129269 SPO 2000 06 10 04 55 827-91 P co2 366.660 ... L3 2000 12 08 13 31 -89.9800 -24.8000 2810.00 129270 SPO 2000 06 10 04 55 828-91 P co2 366.400 ... L3 2000 12 08 13 44 -89.9800 -24.8000 2810.00 129271 SPO 2000 06 16 15 10 4687-91 S co2 381.950 +.. L3 2000 12 13 08 58 -89.9800 -24.8000 2810.00 129272 SPO 2000 06 16 15 10 4688-91 S co2 366.470 -.. L3 2000 12 13 09 11 -89.9800 -24.8000 2810.00 129273 SPO 2000 06 16 15 55 1051-91 P co2 366.490 ... L3 2000 12 14 11 00 -89.9800 -24.8000 2810.00 129274 SPO 2000 06 26 23 10 2023-91 S co2 366.560 ... L3 2000 12 12 14 56 -89.9800 -24.8000 2810.00 129275 SPO 2000 06 26 23 10 2024-91 S co2 366.620 ... L3 2000 12 12 15 09 -89.9800 -24.8000 2810.00 129276 SPO 2000 06 26 23 55 1063-91 P co2 366.890 ... L3 2000 12 13 08 06 -89.9800 -24.8000 2810.00 129277 SPO 2000 06 26 23 55 1064-91 P co2 366.550 ... L3 2000 12 13 08 19 -89.9800 -24.8000 2810.00 129278 SPO 2000 07 04 12 15 635-91 S co2 366.790 +.. L3 2000 12 13 08 32 -89.9800 -24.8000 2810.00 129279 SPO 2000 07 04 12 15 636-91 S co2 366.250 -.. L3 2000 12 13 08 45 -89.9800 -24.8000 2810.00 129280 SPO 2000 07 04 12 50 4399-91 P co2 366.260 ... L3 2000 12 12 15 22 -89.9800 -24.8000 2810.00 129281 SPO 2000 07 04 12 50 4400-91 P co2 366.720 ... L3 2000 12 12 15 35 -89.9800 -24.8000 2810.00 129282 SPO 2000 07 13 15 15 101-91 S co2 366.700 ... L3 2000 12 11 13 19 -89.9800 -24.8000 2810.00 129283 SPO 2000 07 13 15 15 102-91 S co2 366.730 ... L3 2000 12 11 13 32 -89.9800 -24.8000 2810.00 129284 SPO 2000 07 13 15 50 1593-91 P co2 366.990 ... L3 2000 12 11 12 26 -89.9800 -24.8000 2810.00 129285 SPO 2000 07 13 15 50 1594-91 P co2 366.660 ... L3 2000 12 11 12 39 -89.9800 -24.8000 2810.00 129286 SPO 2000 07 15 19 15 4895-91 S co2 366.730 ... L3 2000 12 11 12 52 -89.9800 -24.8000 2810.00 129287 SPO 2000 07 15 19 15 4896-91 S co2 366.750 ... L3 2000 12 11 13 06 -89.9800 -24.8000 2810.00 129288 SPO 2000 07 15 19 50 1639-91 P co2 366.910 ... L3 2000 12 11 12 00 -89.9800 -24.8000 2810.00 129289 SPO 2000 07 15 19 50 1640-91 P co2 366.820 ... L3 2000 12 11 12 13 -89.9800 -24.8000 2810.00 129290 SPO 2000 07 21 22 15 4663-91 S co2 367.250 ... L3 2000 12 14 08 09 -89.9800 -24.8000 2810.00 129291 SPO 2000 07 21 22 15 4664-91 S co2 366.930 ... L3 2000 12 14 08 22 -89.9800 -24.8000 2810.00 129292 SPO 2000 07 21 23 00 4053-91 P co2 366.950 ... L3 2000 12 13 14 58 -89.9800 -24.8000 2810.00 129293 SPO 2000 07 21 23 00 4054-91 P co2 366.950 ... L3 2000 12 13 15 12 -89.9800 -24.8000 2810.00 129294 SPO 2000 07 28 11 15 427-91 S co2 366.820 ... L3 2000 12 14 08 35 -89.9800 -24.8000 2810.00 129295 SPO 2000 07 28 11 15 428-91 S co2 367.110 ... L3 2000 12 14 08 48 -89.9800 -24.8000 2810.00 129296 SPO 2000 07 28 11 55 1647-91 P co2 367.000 ... L3 2000 12 13 15 25 -89.9800 -24.8000 2810.00 129297 SPO 2000 07 28 11 55 1648-91 P co2 367.130 ... L3 2000 12 13 15 38 -89.9800 -24.8000 2810.00 129298 SPO 2000 08 02 19 15 53-91 S co2 367.130 ... L3 2000 12 12 11 23 -89.9800 -24.8000 2810.00 129299 SPO 2000 08 02 19 15 54-91 S co2 367.280 ... L3 2000 12 12 11 37 -89.9800 -24.8000 2810.00 129300 SPO 2000 08 02 19 50 4361-91 P co2 367.130 ... L3 2000 12 12 10 52 -89.9800 -24.8000 2810.00 129301 SPO 2000 08 02 19 50 4362-91 P co2 367.110 ... L3 2000 12 12 11 05 -89.9800 -24.8000 2810.00 129302 SPO 2000 08 09 18 15 4743-91 S co2 367.210 ... L3 2000 12 13 09 55 -89.9800 -24.8000 2810.00 129303 SPO 2000 08 09 18 15 4744-91 S co2 367.190 ... L3 2000 12 13 10 08 -89.9800 -24.8000 2810.00 129304 SPO 2000 08 09 18 50 1047-91 P co2 367.430 ... L3 2000 12 12 10 26 -89.9800 -24.8000 2810.00 129305 SPO 2000 08 09 18 50 1048-91 P co2 367.390 ... L3 2000 12 12 10 39 -89.9800 -24.8000 2810.00 129306 SPO 2000 08 15 20 15 479-91 S co2 367.310 ... L3 2000 12 13 10 21 -89.9800 -24.8000 2810.00 129307 SPO 2000 08 15 20 15 480-91 S co2 367.580 ... L3 2000 12 13 10 34 -89.9800 -24.8000 2810.00 129308 SPO 2000 08 15 20 50 4901-91 P co2 367.250 ... L3 2000 12 12 10 00 -89.9800 -24.8000 2810.00 129309 SPO 2000 08 15 20 50 4902-91 P co2 367.220 ... L3 2000 12 12 10 13 -89.9800 -24.8000 2810.00 129310 SPO 2000 08 30 22 15 171-91 S co2 367.430 ... L3 2000 12 13 10 47 -89.9800 -24.8000 2810.00 129311 SPO 2000 08 30 22 15 172-91 S co2 367.480 ... L3 2000 12 13 11 00 -89.9800 -24.8000 2810.00 129312 SPO 2000 08 30 22 55 4905-91 P co2 367.410 ... L3 2000 12 13 09 29 -89.9800 -24.8000 2810.00 129313 SPO 2000 08 30 22 55 4906-91 P co2 367.420 ... L3 2000 12 13 09 42 -89.9800 -24.8000 2810.00 129314 SPO 2000 09 02 21 15 1567-91 S co2 367.450 ... L3 2000 12 12 09 34 -89.9800 -24.8000 2810.00 129315 SPO 2000 09 02 21 15 1568-91 S co2 367.480 ... L3 2000 12 12 09 47 -89.9800 -24.8000 2810.00 129316 SPO 2000 09 02 21 50 4761-91 P co2 367.470 ... L3 2000 12 12 11 50 -89.9800 -24.8000 2810.00 129317 SPO 2000 09 02 21 50 4762-91 P co2 367.410 ... L3 2000 12 12 12 03 -89.9800 -24.8000 2810.00 129318 SPO 2000 09 09 05 55 17-98 P co2 367.450 ... L3 2000 12 12 08 58 -89.9800 -24.8000 2810.00 129319 SPO 2000 09 09 05 55 18-98 P co2 367.450 ... L3 2000 12 12 09 11 -89.9800 -24.8000 2810.00 129320 SPO 2000 09 09 06 15 4619-91 S co2 367.710 ... L3 2000 12 12 12 16 -89.9800 -24.8000 2810.00 129321 SPO 2000 09 09 06 15 4620-91 S co2 367.720 ... L3 2000 12 12 12 29 -89.9800 -24.8000 2810.00 129322 SPO 2000 09 15 08 15 2033-91 S co2 367.490 ... L3 2000 12 12 13 10 -89.9800 -24.8000 2810.00 129323 SPO 2000 09 15 08 15 2034-91 S co2 367.460 ... L3 2000 12 12 13 23 -89.9800 -24.8000 2810.00 129324 SPO 2000 09 15 09 00 4093-91 P co2 367.230 ... L3 2000 12 12 08 32 -89.9800 -24.8000 2810.00 129325 SPO 2000 09 15 09 00 4094-91 P co2 367.660 ... L3 2000 12 12 08 45 -89.9800 -24.8000 2810.00 129326 SPO 2000 09 22 00 57 17-91 P co2 367.500 ... L3 2000 12 12 12 42 -89.9800 -24.8000 2810.00 129327 SPO 2000 09 22 00 57 18-91 P co2 367.620 ... L3 2000 12 12 12 55 -89.9800 -24.8000 2810.00 129328 SPO 2000 09 22 01 10 1997-91 P co2 367.600 ... L3 2000 12 12 08 06 -89.9800 -24.8000 2810.00 129329 SPO 2000 09 22 01 10 1998-91 P co2 367.530 ... L3 2000 12 12 08 19 -89.9800 -24.8000 2810.00 129330 SPO 2000 09 22 02 15 709-91 S co2 367.500 ... L3 2000 12 11 15 33 -89.9800 -24.8000 2810.00 129331 SPO 2000 09 22 02 15 710-91 S co2 367.780 ... L3 2000 12 11 15 46 -89.9800 -24.8000 2810.00 129332 SPO 2000 09 26 14 50 45-91 P co2 367.570 ... L3 2000 12 08 11 45 -89.9800 -24.8000 2810.00 129333 SPO 2000 09 26 14 50 46-91 P co2 367.540 ... L3 2000 12 08 11 58 -89.9800 -24.8000 2810.00 129334 SPO 2000 09 26 14 50 546-91 P co2 367.600 ... L3 2000 12 08 15 07 -89.9800 -24.8000 2810.00 129335 SPO 2000 09 26 14 50 1077-91 P co2 367.640 ... L3 2000 12 08 14 54 -89.9800 -24.8000 2810.00 129336 SPO 2000 10 01 22 15 433-91 S co2 367.630 ... L3 2000 11 29 11 49 -89.9800 -24.8000 2810.00 129337 SPO 2000 10 01 22 15 434-91 S co2 367.600 ... L3 2000 11 29 12 02 -89.9800 -24.8000 2810.00 129338 SPO 2000 10 01 23 00 157-91 P co2 367.590 ... L3 2000 11 29 09 26 -89.9800 -24.8000 2810.00 129339 SPO 2000 10 01 23 00 158-91 P co2 367.550 ... L3 2000 11 29 09 39 -89.9800 -24.8000 2810.00 129340 SPO 2000 10 15 03 15 4917-91 S co2 367.590 ... L3 2000 11 29 12 15 -89.9800 -24.8000 2810.00 129341 SPO 2000 10 15 03 15 4918-91 S co2 367.630 ... L3 2000 11 29 12 28 -89.9800 -24.8000 2810.00 129342 SPO 2000 10 15 03 45 177-91 P co2 367.680 ... L3 2000 11 29 09 52 -89.9800 -24.8000 2810.00 129343 SPO 2000 10 15 03 45 178-91 P co2 367.630 ... L3 2000 11 29 10 05 -89.9800 -24.8000 2810.00 129344 SPO 2000 10 23 08 15 4565-91 S co2 367.670 ... L3 2000 11 29 10 18 -89.9800 -24.8000 2810.00 129345 SPO 2000 10 23 08 15 4566-91 S co2 367.550 ... L3 2000 11 29 10 31 -89.9800 -24.8000 2810.00 129346 SPO 2000 10 30 19 18 129-98 S co2 367.670 ... L3 2000 11 29 12 41 -89.9800 -24.8000 2810.00 129347 SPO 2000 10 30 19 18 130-98 S co2 367.730 ... L3 2000 11 29 12 54 -89.9800 -24.8000 2810.00 129348 SPO 2000 10 30 20 23 4575-91 P co2 367.670 ... L3 2000 11 29 11 22 -89.9800 -24.8000 2810.00 129349 SPO 2000 10 30 20 23 4576-91 P co2 367.670 ... L3 2000 11 29 11 36 -89.9800 -24.8000 2810.00 129350 SPO 2000 11 01 07 10 4713-91 S co2 367.750 ... L3 2000 12 21 11 31 -89.9800 -24.8000 2810.00 129351 SPO 2000 11 01 07 10 4714-91 S co2 367.770 ... L3 2000 12 21 11 44 -89.9800 -24.8000 2810.00 129352 SPO 2000 11 01 08 22 4117-91 P co2 367.640 ... L3 2000 12 21 12 52 -89.9800 -24.8000 2810.00 129353 SPO 2000 11 01 08 22 4118-91 P co2 367.680 ... L3 2000 12 21 13 05 -89.9800 -24.8000 2810.00 129354 SPO 2000 11 07 01 23 1659-91 S co2 367.740 ... L3 2000 12 21 11 59 -89.9800 -24.8000 2810.00 129355 SPO 2000 11 07 01 23 1660-91 S co2 367.780 ... L3 2000 12 21 12 12 -89.9800 -24.8000 2810.00 129356 SPO 2000 11 07 02 07 729-91 P co2 367.760 ... L3 2000 12 21 12 25 -89.9800 -24.8000 2810.00 129357 SPO 2000 11 07 02 07 730-91 P co2 367.720 ... L3 2000 12 21 12 38 -89.9800 -24.8000 2810.00 129358 SPO 2000 11 16 02 23 4927-91 S co2 367.730 ... L3 2000 12 21 08 25 -89.9800 -24.8000 2810.00 129359 SPO 2000 11 16 02 23 4928-91 S co2 367.770 ... L3 2000 12 21 08 38 -89.9800 -24.8000 2810.00 129360 SPO 2000 11 16 02 42 1425-91 P co2 367.750 ... L3 2000 12 21 09 18 -89.9800 -24.8000 2810.00 129361 SPO 2000 11 16 02 42 1426-91 P co2 367.730 ... L3 2000 12 21 09 32 -89.9800 -24.8000 2810.00 129362 SPO 2000 11 22 00 22 43-98 S co2 367.660 ... L3 2000 12 21 07 59 -89.9800 -24.8000 2810.00 129363 SPO 2000 11 22 00 22 44-98 S co2 367.720 ... L3 2000 12 21 08 12 -89.9800 -24.8000 2810.00 129364 SPO 2000 11 22 00 40 4909-91 P co2 367.730 ... L3 2000 12 21 08 51 -89.9800 -24.8000 2810.00 129365 SPO 2000 11 22 00 40 4910-91 P co2 367.720 ... L3 2000 12 21 09 04 -89.9800 -24.8000 2810.00 129366 SPO 2000 12 02 02 19 4911-91 S co2 367.780 ... L3 2001 01 17 11 54 -89.9800 -24.8000 2810.00 129367 SPO 2000 12 02 02 19 4912-91 S co2 367.710 ... L3 2001 01 17 12 07 -89.9800 -24.8000 2810.00 129368 SPO 2000 12 02 02 23 4915-91 P co2 367.700 ... L3 2001 01 17 12 46 -89.9800 -24.8000 2810.00 129369 SPO 2000 12 02 02 23 4916-91 P co2 367.690 ... L3 2001 01 17 12 59 -89.9800 -24.8000 2810.00 129370 SPO 2000 12 07 21 24 4913-91 S co2 367.810 ... L3 2001 01 17 12 20 -89.9800 -24.8000 2810.00 129371 SPO 2000 12 07 21 24 4914-91 S co2 367.830 ... L3 2001 01 17 12 33 -89.9800 -24.8000 2810.00 129372 SPO 2000 12 07 22 01 4893-91 P co2 367.830 ... L3 2001 01 17 10 34 -89.9800 -24.8000 2810.00 129373 SPO 2000 12 07 22 01 4894-91 P co2 367.820 ... L3 2001 01 17 10 47 -89.9800 -24.8000 2810.00 129374 SPO 2000 12 15 18 15 4924-91 S co2 367.770 ... L3 2001 01 17 11 13 -89.9800 -24.8000 2810.00 129375 SPO 2000 12 15 18 43 4929-91 P co2 367.780 ... L3 2001 01 17 11 28 -89.9800 -24.8000 2810.00 129376 SPO 2000 12 15 18 43 4930-91 P co2 367.740 ... L3 2001 01 17 11 41 -89.9800 -24.8000 2810.00 129377 SPO 2000 12 20 21 15 135-91 S co2 367.780 ... L3 2001 01 17 10 08 -89.9800 -24.8000 2810.00 129378 SPO 2000 12 20 21 15 1174-91 S co2 367.790 ... L3 2001 01 17 10 21 -89.9800 -24.8000 2810.00 129379 SPO 2000 12 20 21 20 4925-91 P co2 367.790 ... L3 2001 01 17 14 06 -89.9800 -24.8000 2810.00 129380 SPO 2000 12 20 21 20 4926-91 P co2 367.770 ... L3 2001 01 17 14 19 -89.9800 -24.8000 2810.00 129381 SPO 2000 12 29 03 49 100-99 P co2 367.630 ... L3 2001 02 23 13 56 -89.9800 -24.8000 2810.00 129382 SPO 2000 12 29 03 49 101-99 P co2 367.590 ... L3 2001 02 23 13 43 -89.9800 -24.8000 2810.00 129383 SPO 2001 01 01 01 21 97-99 S co2 367.700 ... L3 2001 02 23 11 03 -89.9800 -24.8000 2810.00 129384 SPO 2001 01 01 01 21 98-99 S co2 367.800 ... L3 2001 02 23 11 16 -89.9800 -24.8000 2810.00 129385 SPO 2001 01 01 02 36 95-99 P co2 367.660 ... L3 2001 02 23 11 29 -89.9800 -24.8000 2810.00 129386 SPO 2001 01 01 02 36 96-99 P co2 367.710 ... L3 2001 02 23 11 42 -89.9800 -24.8000 2810.00 129387 SPO 2001 01 09 20 23 99-99 P co2 367.710 ... L3 2001 02 23 14 09 -89.9800 -24.8000 2810.00 129388 SPO 2001 01 09 20 23 102-99 P co2 367.690 ... L3 2001 02 23 14 22 -89.9800 -24.8000 2810.00 129389 SPO 2001 01 15 19 19 43-99 S co2 367.630 ... L3 2001 02 23 13 15 -89.9800 -24.8000 2810.00 129390 SPO 2001 01 15 19 19 44-99 S co2 367.700 ... L3 2001 02 23 13 28 -89.9800 -24.8000 2810.00 129391 SPO 2001 01 15 19 40 41-99 P co2 367.720 ... L3 2001 02 23 12 49 -89.9800 -24.8000 2810.00 129392 SPO 2001 01 15 19 40 42-99 P co2 367.690 ... L3 2001 02 23 13 02 -89.9800 -24.8000 2810.00 129393 SPO 2001 01 23 05 14 47-99 S co2 367.690 ... L3 2001 02 23 11 57 -89.9800 -24.8000 2810.00 129394 SPO 2001 01 23 05 14 48-99 S co2 367.690 ... L3 2001 02 23 12 10 -89.9800 -24.8000 2810.00 129395 SPO 2001 01 23 05 35 45-99 P co2 367.720 ... L3 2001 02 23 10 37 -89.9800 -24.8000 2810.00 129396 SPO 2001 01 23 05 35 46-99 P co2 367.630 ... L3 2001 02 23 10 50 -89.9800 -24.8000 2810.00 129397 SPO 2001 02 01 16 22 89-99 P co2 367.070 N.. L3 2001 11 30 12 40 -89.9800 -24.8000 2810.00 129398 SPO 2001 02 01 16 22 90-99 P co2 367.120 N.. L3 2001 11 30 12 53 -89.9800 -24.8000 2810.00 129399 SPO 2001 02 01 17 17 87-99 S co2 367.140 N.. L3 2001 11 30 14 00 -89.9800 -24.8000 2810.00 129400 SPO 2001 02 01 17 17 88-99 S co2 367.200 N.. L3 2001 11 30 14 13 -89.9800 -24.8000 2810.00 129401 SPO 2001 02 07 20 54 91-99 P co2 367.000 N.. L3 2001 11 30 14 26 -89.9800 -24.8000 2810.00 129402 SPO 2001 02 07 20 54 92-99 P co2 367.130 N.. L3 2001 11 30 14 39 -89.9800 -24.8000 2810.00 129403 SPO 2001 02 15 19 24 109-99 S co2 367.210 N.. L3 2001 12 04 16 07 -89.9800 -24.8000 2810.00 129404 SPO 2001 02 15 19 24 110-99 S co2 367.210 N.. L3 2001 12 04 16 20 -89.9800 -24.8000 2810.00 129405 SPO 2001 02 15 19 54 93-99 P co2 367.210 N.. L3 2001 12 04 15 15 -89.9800 -24.8000 2810.00 129406 SPO 2001 02 15 19 54 94-99 P co2 367.140 N.. L3 2001 12 04 15 28 -89.9800 -24.8000 2810.00 129407 SPO 2001 02 26 21 08 111-99 P co2 367.220 N.. L3 2001 11 30 11 22 -89.9800 -24.8000 2810.00 129408 SPO 2001 02 26 21 08 112-99 P co2 367.260 N.. L3 2001 11 30 11 35 -89.9800 -24.8000 2810.00 129409 SPO 2001 03 01 19 19 115-99 S co2 367.250 N.. L3 2001 12 04 15 41 -89.9800 -24.8000 2810.00 129410 SPO 2001 03 01 19 19 116-99 S co2 367.250 N.. L3 2001 12 04 15 54 -89.9800 -24.8000 2810.00 129411 SPO 2001 03 01 20 47 113-99 P co2 367.410 N.. L3 2001 12 04 14 48 -89.9800 -24.8000 2810.00 129412 SPO 2001 03 01 20 47 114-99 P co2 367.120 N.. L3 2001 12 04 15 01 -89.9800 -24.8000 2810.00 129413 SPO 2001 03 09 21 18 453-91 P co2 369.300 +.. L3 2001 11 30 12 14 -89.9800 -24.8000 2810.00 129414 SPO 2001 03 09 21 18 4028-91 P co2 367.410 -.. L3 2001 11 30 12 27 -89.9800 -24.8000 2810.00 129415 SPO 2001 03 15 19 21 4167-91 S co2 367.140 N.. L3 2001 12 04 13 28 -89.9800 -24.8000 2810.00 129416 SPO 2001 03 15 19 21 4168-91 S co2 367.200 N.. L3 2001 12 04 13 41 -89.9800 -24.8000 2810.00 129417 SPO 2001 03 15 19 27 1597-91 P co2 367.150 N.. L3 2001 12 04 13 54 -89.9800 -24.8000 2810.00 129418 SPO 2001 03 15 19 27 1598-91 P co2 367.310 N.. L3 2001 12 04 14 08 -89.9800 -24.8000 2810.00 129419 SPO 2001 03 22 00 30 169-91 P co2 367.330 N.. L3 2001 11 30 09 35 -89.9800 -24.8000 2810.00 129420 SPO 2001 03 22 00 30 170-91 P co2 367.190 N.. L3 2001 11 30 09 48 -89.9800 -24.8000 2810.00 129421 SPO 2001 04 01 02 19 4767-91 S co2 368.070 N.. L3 2001 12 04 14 21 -89.9800 -24.8000 2810.00 129422 SPO 2001 04 01 02 19 4768-91 S co2 367.780 N.. L3 2001 12 04 14 34 -89.9800 -24.8000 2810.00 129423 SPO 2001 04 01 03 09 1519-91 P co2 367.790 +.. L3 2001 12 04 13 02 -89.9800 -24.8000 2810.00 129424 SPO 2001 04 01 03 09 1520-91 P co2 367.160 -.. L3 2001 12 04 13 15 -89.9800 -24.8000 2810.00 129425 SPO 2001 04 08 23 56 1563-91 P co2 367.480 N.. L3 2001 11 30 11 48 -89.9800 -24.8000 2810.00 129426 SPO 2001 04 08 23 56 1564-91 P co2 367.270 N.. L3 2001 11 30 12 01 -89.9800 -24.8000 2810.00 129427 SPO 2001 04 16 03 14 129-99 S co2 370.330 -.. L3 2001 11 30 15 34 -89.9800 -24.8000 2810.00 129428 SPO 2001 04 16 03 14 130-99 S co2 371.670 +.. L3 2001 11 30 15 47 -89.9800 -24.8000 2810.00 129429 SPO 2001 04 16 03 57 131-99 P co2 368.130 N.. L3 2001 11 30 16 00 -89.9800 -24.8000 2810.00 129430 SPO 2001 04 16 03 57 132-99 P co2 368.050 N.. L3 2001 11 30 16 13 -89.9800 -24.8000 2810.00 129431 SPO 2001 04 22 23 27 127-99 P co2 369.400 N.. L3 2001 12 03 12 49 -89.9800 -24.8000 2810.00 129432 SPO 2001 04 22 23 27 128-99 P co2 368.940 N.. L3 2001 12 03 13 02 -89.9800 -24.8000 2810.00 129433 SPO 2001 05 01 04 16 125-99 S co2 367.870 N.. L3 2001 11 30 15 08 -89.9800 -24.8000 2810.00 129434 SPO 2001 05 01 04 16 126-99 S co2 367.850 N.. L3 2001 11 30 15 21 -89.9800 -24.8000 2810.00 129435 SPO 2001 05 01 04 35 123-99 P co2 369.210 +.. L3 2001 12 03 10 02 -89.9800 -24.8000 2810.00 129436 SPO 2001 05 01 04 35 124-99 P co2 368.180 -.. L3 2001 12 03 10 15 -89.9800 -24.8000 2810.00 129437 SPO 2001 05 07 09 18 121-99 P co2 368.260 N.. L3 2001 12 03 14 36 -89.9800 -24.8000 2810.00 129438 SPO 2001 05 07 09 18 122-99 P co2 367.880 N.. L3 2001 12 03 14 49 -89.9800 -24.8000 2810.00 129439 SPO 2001 05 15 04 17 119-99 S co2 368.800 N.. L3 2001 12 03 15 02 -89.9800 -24.8000 2810.00 129440 SPO 2001 05 15 04 17 120-99 S co2 368.740 N.. L3 2001 12 03 15 15 -89.9800 -24.8000 2810.00 129441 SPO 2001 05 15 04 36 117-99 P co2 368.740 N.. L3 2001 12 03 15 28 -89.9800 -24.8000 2810.00 129442 SPO 2001 05 15 04 36 118-99 P co2 368.550 N.. L3 2001 12 03 15 41 -89.9800 -24.8000 2810.00 129443 SPO 2001 05 23 05 17 4201-91 P co2 367.890 N.. L3 2001 11 29 17 18 -89.9800 -24.8000 2810.00 129444 SPO 2001 05 23 05 17 4202-91 P co2 368.180 N.. L3 2001 11 29 17 31 -89.9800 -24.8000 2810.00 129445 SPO 2001 06 01 01 16 1859-91 S co2 368.030 N.. L3 2001 11 29 16 00 -89.9800 -24.8000 2810.00 129446 SPO 2001 06 01 01 16 1860-91 S co2 368.070 N.. L3 2001 11 29 16 13 -89.9800 -24.8000 2810.00 129447 SPO 2001 06 01 01 27 1353-91 P co2 368.040 N.. L3 2001 11 29 16 52 -89.9800 -24.8000 2810.00 129448 SPO 2001 06 01 01 27 1354-91 P co2 368.170 N.. L3 2001 11 29 17 05 -89.9800 -24.8000 2810.00 129449 SPO 2001 06 07 10 40 4043-91 P co2 368.470 N.. L3 2001 11 29 16 26 -89.9800 -24.8000 2810.00 129450 SPO 2001 06 07 10 40 4044-91 P co2 368.630 N.. L3 2001 11 29 16 39 -89.9800 -24.8000 2810.00 129451 SPO 2001 06 15 04 20 1495-91 S co2 368.160 -.. L3 2001 12 07 12 42 -89.9800 -24.8000 2810.00 129452 SPO 2001 06 15 04 20 1496-91 S co2 368.840 +.. L3 2001 12 07 12 55 -89.9800 -24.8000 2810.00 129453 SPO 2001 06 15 05 20 4221-91 P co2 369.350 +.. L3 2001 12 07 11 22 -89.9800 -24.8000 2810.00 129454 SPO 2001 06 15 05 20 4222-91 P co2 367.790 -.. L3 2001 12 07 11 35 -89.9800 -24.8000 2810.00 129455 SPO 2001 06 15 05 20 4222-91 P co2 367.830 -.. L3 2001 12 07 14 54 -89.9800 -24.8000 2810.00 129455 SPO 2001 06 21 04 26 387-91 P co2 368.260 N.. L3 2001 12 07 10 56 -89.9800 -24.8000 2810.00 129456 SPO 2001 06 21 04 26 388-91 P co2 368.380 N.. L3 2001 12 07 11 09 -89.9800 -24.8000 2810.00 129457 SPO 2001 07 01 05 24 19-99 S co2 368.260 N.. L3 2001 12 03 11 00 -89.9800 -24.8000 2810.00 129458 SPO 2001 07 01 05 24 20-99 S co2 368.230 N.. L3 2001 12 03 11 13 -89.9800 -24.8000 2810.00 129459 SPO 2001 07 01 06 17 15-99 P co2 368.210 N.. L3 2001 12 03 11 54 -89.9800 -24.8000 2810.00 129460 SPO 2001 07 01 06 17 18-99 P co2 368.120 N.. L3 2001 12 03 12 07 -89.9800 -24.8000 2810.00 129461 SPO 2001 07 08 13 32 21-99 P co2 368.330 N.. L3 2001 12 03 09 36 -89.9800 -24.8000 2810.00 129462 SPO 2001 07 08 13 32 22-99 P co2 368.190 N.. L3 2001 12 03 09 49 -89.9800 -24.8000 2810.00 129463 SPO 2001 07 16 02 16 25-99 S co2 368.660 ... L3 2001 12 03 12 23 -89.9800 -24.8000 2810.00 129464 SPO 2001 07 16 02 16 26-99 S co2 368.700 ... L3 2001 12 03 12 36 -89.9800 -24.8000 2810.00 129465 SPO 2001 07 16 02 58 23-99 P co2 368.570 ... L3 2001 12 03 13 42 -89.9800 -24.8000 2810.00 129466 SPO 2001 07 16 02 58 24-99 P co2 368.630 ... L3 2001 12 03 13 55 -89.9800 -24.8000 2810.00 129467 SPO 2001 07 24 05 51 51-99 P co2 368.780 ... L3 2001 12 03 10 28 -89.9800 -24.8000 2810.00 129468 SPO 2001 07 24 05 51 52-99 P co2 368.760 ... L3 2001 12 03 10 41 -89.9800 -24.8000 2810.00 129469 SPO 2001 08 01 03 14 17-99 S co2 368.790 -.. L3 2001 12 03 11 28 -89.9800 -24.8000 2810.00 129470 SPO 2001 08 01 03 14 1173-91 S co2 369.410 +.. L3 2001 12 03 11 41 -89.9800 -24.8000 2810.00 129471 SPO 2001 08 01 04 50 29-99 P co2 368.850 ... L3 2001 12 03 13 16 -89.9800 -24.8000 2810.00 129472 SPO 2001 08 01 04 50 30-99 P co2 368.810 ... L3 2001 12 03 13 29 -89.9800 -24.8000 2810.00 129473 SPO 2001 08 08 11 20 39-99 P co2 368.990 ... L3 2001 12 04 12 34 -89.9800 -24.8000 2810.00 129474 SPO 2001 08 08 11 20 40-99 P co2 369.010 ... L3 2001 12 04 12 47 -89.9800 -24.8000 2810.00 129475 SPO 2001 08 15 02 28 37-99 S co2 369.040 ... L3 2001 11 30 10 01 -89.9800 -24.8000 2810.00 129476 SPO 2001 08 15 02 28 38-99 S co2 369.110 ... L3 2001 11 30 10 14 -89.9800 -24.8000 2810.00 129477 SPO 2001 08 15 03 05 1-99 P co2 369.070 ... L3 2001 11 30 10 54 -89.9800 -24.8000 2810.00 129478 SPO 2001 08 15 03 05 2-99 P co2 368.920 ... L3 2001 11 30 11 07 -89.9800 -24.8000 2810.00 129479 SPO 2001 08 22 04 55 49-99 P co2 369.240 ... L3 2001 12 04 11 16 -89.9800 -24.8000 2810.00 129480 SPO 2001 08 22 04 55 50-99 P co2 369.140 ... L3 2001 12 04 11 29 -89.9800 -24.8000 2810.00 129481 SPO 2001 09 01 06 13 55-99 S co2 369.320 ... L3 2001 11 30 10 28 -89.9800 -24.8000 2810.00 129482 SPO 2001 09 01 06 13 56-99 S co2 369.290 ... L3 2001 11 30 10 41 -89.9800 -24.8000 2810.00 129483 SPO 2001 09 01 07 35 53-99 P co2 369.300 ... L3 2001 11 30 09 07 -89.9800 -24.8000 2810.00 129484 SPO 2001 09 01 07 35 54-99 P co2 369.280 ... L3 2001 11 30 09 21 -89.9800 -24.8000 2810.00 129485 SPO 2001 09 08 07 25 57-99 P co2 369.270 ... L3 2001 12 04 11 42 -89.9800 -24.8000 2810.00 129486 SPO 2001 09 08 07 25 58-99 P co2 369.290 ... L3 2001 12 04 11 55 -89.9800 -24.8000 2810.00 129487 SPO 2001 09 15 10 18 61-99 S co2 369.150 ... L3 2001 12 03 14 09 -89.9800 -24.8000 2810.00 129488 SPO 2001 09 15 10 18 62-99 S co2 369.330 ... L3 2001 12 03 14 23 -89.9800 -24.8000 2810.00 129489 SPO 2001 09 15 12 05 73-99 P co2 369.300 ... L3 2001 12 03 15 56 -89.9800 -24.8000 2810.00 129490 SPO 2001 09 15 12 05 74-99 P co2 369.280 ... L3 2001 12 03 16 09 -89.9800 -24.8000 2810.00 129491 SPO 2001 09 21 08 45 77-99 P co2 369.490 ... L3 2001 12 04 16 35 -89.9800 -24.8000 2810.00 129492 SPO 2001 09 21 08 45 78-99 P co2 369.510 ... L3 2001 12 04 16 48 -89.9800 -24.8000 2810.00 129493 SPO 2001 10 01 09 26 107-99 S co2 369.860 ... L3 2001 12 03 16 22 -89.9800 -24.8000 2810.00 129494 SPO 2001 10 01 09 26 108-99 S co2 369.830 ... L3 2001 12 03 16 35 -89.9800 -24.8000 2810.00 129495 SPO 2001 10 01 10 52 75-99 P co2 369.800 ... L3 2001 12 04 12 08 -89.9800 -24.8000 2810.00 129496 SPO 2001 10 01 10 52 76-99 P co2 369.770 ... L3 2001 12 04 12 21 -89.9800 -24.8000 2810.00 129497 SPO 2001 10 08 12 47 71-99 P co2 369.790 ... L3 2001 12 04 17 01 -89.9800 -24.8000 2810.00 129498 SPO 2001 10 08 12 47 72-99 P co2 369.660 ... L3 2001 12 04 17 14 -89.9800 -24.8000 2810.00 129499 SPO 2001 10 15 02 13 103-99 S co2 369.720 ... L3 2001 12 05 09 49 -89.9800 -24.8000 2810.00 129500 SPO 2001 10 15 02 13 104-99 S co2 369.740 ... L3 2001 12 05 10 02 -89.9800 -24.8000 2810.00 129501 SPO 2001 10 15 04 05 105-99 P co2 369.620 ... L3 2001 12 05 10 15 -89.9800 -24.8000 2810.00 129502 SPO 2001 10 15 04 05 106-99 P co2 369.640 ... L3 2001 12 05 10 28 -89.9800 -24.8000 2810.00 129503 SPO 2001 10 22 03 43 101-99 P co2 369.890 ... L3 2001 12 07 10 28 -89.9800 -24.8000 2810.00 129504 SPO 2001 10 22 03 43 102-99 P co2 369.880 ... L3 2001 12 07 10 41 -89.9800 -24.8000 2810.00 129505 SPO 2001 10 30 23 20 67-99 S co2 369.920 ... L3 2002 01 11 09 44 -89.9800 -24.8000 2810.00 129506 SPO 2001 10 30 23 20 68-99 S co2 369.970 ... L3 2002 01 11 09 57 -89.9800 -24.8000 2810.00 129507 SPO 2001 10 31 00 21 69-99 P co2 369.920 ... L3 2002 01 11 09 18 -89.9800 -24.8000 2810.00 129508 SPO 2001 10 31 00 21 70-99 P co2 369.730 ... L3 2002 01 11 09 31 -89.9800 -24.8000 2810.00 129509 SPO 2001 11 15 23 17 35-99 S co2 369.810 ... L3 2002 01 11 12 24 -89.9800 -24.8000 2810.00 129510 SPO 2001 11 15 23 17 36-99 S co2 369.840 ... L3 2002 01 11 12 37 -89.9800 -24.8000 2810.00 129511 SPO 2001 11 15 23 33 27-99 P co2 369.760 ... L3 2002 01 11 11 32 -89.9800 -24.8000 2810.00 129512 SPO 2001 11 15 23 33 28-99 P co2 369.820 ... L3 2002 01 11 11 45 -89.9800 -24.8000 2810.00 129513 SPO 2001 11 22 20 52 31-99 P co2 369.830 ... L3 2002 01 11 11 58 -89.9800 -24.8000 2810.00 129514 SPO 2001 11 22 20 52 32-99 P co2 369.710 ... L3 2002 01 11 12 11 -89.9800 -24.8000 2810.00 129515 SPO 2001 11 30 00 52 63-99 P co2 369.650 ... L3 2002 01 11 10 10 -89.9800 -24.8000 2810.00 129516 SPO 2001 11 30 00 52 64-99 P co2 369.670 ... L3 2002 01 11 10 23 -89.9800 -24.8000 2810.00 129517 SPO 2001 11 30 01 09 65-99 S co2 369.710 ... L3 2002 01 11 10 38 -89.9800 -24.8000 2810.00 129518 SPO 2001 11 30 01 09 66-99 S co2 369.740 ... L3 2002 01 11 10 51 -89.9800 -24.8000 2810.00 129519 SPO 2001 12 08 21 24 85-99 P co2 369.530 ... L3 2002 02 19 13 04 -89.9800 -24.8000 2810.00 129520 SPO 2001 12 08 21 24 86-99 P co2 369.550 ... L3 2002 02 19 13 17 -89.9800 -24.8000 2810.00 129521 SPO 2001 12 15 20 22 7-99 S co2 369.620 ... L3 2002 02 19 10 51 -89.9800 -24.8000 2810.00 129522 SPO 2001 12 15 20 22 8-99 S co2 369.670 ... L3 2002 02 19 11 04 -89.9800 -24.8000 2810.00 129523 SPO 2001 12 15 20 29 83-99 P co2 369.590 ... L3 2002 02 19 11 44 -89.9800 -24.8000 2810.00 129524 SPO 2001 12 15 20 29 84-99 P co2 369.640 ... L3 2002 02 19 11 57 -89.9800 -24.8000 2810.00 129525 SPO 2001 12 21 11 00 59-99 P co2 369.660 ... L3 2002 02 14 12 48 -89.9800 -24.8000 2810.00 129526 SPO 2001 12 21 11 00 60-99 P co2 369.640 ... L3 2002 02 14 13 01 -89.9800 -24.8000 2810.00 129527 SPO 2001 12 28 08 20 79-99 P co2 369.560 ... L3 2002 02 19 11 17 -89.9800 -24.8000 2810.00 129528 SPO 2001 12 28 08 20 80-99 P co2 369.550 ... L3 2002 02 19 11 30 -89.9800 -24.8000 2810.00 129529 SPO 2002 01 02 08 20 5-99 S co2 369.410 ... L3 2002 02 14 10 36 -89.9800 -24.8000 2810.00 129530 SPO 2002 01 02 08 20 6-99 S co2 369.400 ... L3 2002 02 14 10 49 -89.9800 -24.8000 2810.00 129531 SPO 2002 01 02 09 13 81-99 P co2 369.470 ... L3 2002 02 14 11 28 -89.9800 -24.8000 2810.00 129532 SPO 2002 01 02 09 13 82-99 P co2 369.400 ... L3 2002 02 14 11 41 -89.9800 -24.8000 2810.00 129533 SPO 2002 01 15 22 38 4439-91 P co2 369.160 ... L3 2002 12 23 10 57 -89.9800 -24.8000 2810.00 129534 SPO 2002 01 15 22 38 4440-91 P co2 369.390 ... L3 2002 12 23 11 10 -89.9800 -24.8000 2810.00 129535 SPO 2002 01 15 23 23 489-99 S co2 369.070 ... L3 2002 12 23 11 25 -89.9800 -24.8000 2810.00 129536 SPO 2002 01 15 23 23 490-99 S co2 369.170 ... L3 2002 12 23 11 38 -89.9800 -24.8000 2810.00 129537 SPO 2002 01 22 08 26 471-99 P co2 369.180 ... L3 2002 12 23 10 05 -89.9800 -24.8000 2810.00 129538 SPO 2002 01 22 08 26 472-99 P co2 369.140 ... L3 2002 12 23 10 18 -89.9800 -24.8000 2810.00 129539 SPO 2002 02 03 02 27 473-99 S co2 369.220 ... L3 2002 12 31 13 33 -89.9800 -24.8000 2810.00 129540 SPO 2002 02 03 02 27 474-99 S co2 369.160 ... L3 2002 12 31 13 46 -89.9800 -24.8000 2810.00 129541 SPO 2002 02 03 02 35 487-91 P co2 369.120 ... L3 2002 12 23 10 31 -89.9800 -24.8000 2810.00 129542 SPO 2002 02 03 02 35 488-91 P co2 369.240 ... L3 2002 12 23 10 44 -89.9800 -24.8000 2810.00 129543 SPO 2002 02 08 04 20 4379-91 P co2 369.270 ... L3 2002 12 31 13 59 -89.9800 -24.8000 2810.00 129544 SPO 2002 02 08 04 20 4380-91 P co2 369.250 ... L3 2002 12 31 14 12 -89.9800 -24.8000 2810.00 129545 SPO 2002 02 13 04 15 1935-91 S co2 369.260 ... L3 2002 12 31 13 05 -89.9800 -24.8000 2810.00 129546 SPO 2002 02 13 04 15 1936-91 S co2 369.280 ... L3 2002 12 31 13 18 -89.9800 -24.8000 2810.00 129547 SPO 2002 02 13 04 30 487-99 P co2 369.200 ... L3 2002 12 31 14 25 -89.9800 -24.8000 2810.00 129548 SPO 2002 02 13 04 30 488-99 P co2 369.180 ... L3 2002 12 31 14 38 -89.9800 -24.8000 2810.00 129549 SPO 2002 02 23 22 58 1297-91 P co2 369.110 ... L3 2002 12 31 11 47 -89.9800 -24.8000 2810.00 129550 SPO 2002 02 23 22 58 1298-91 P co2 369.040 ... L3 2002 12 31 12 00 -89.9800 -24.8000 2810.00 129551 SPO 2002 02 23 23 58 217-99 P co2 369.100 ... L3 2002 12 31 12 13 -89.9800 -24.8000 2810.00 129552 SPO 2002 02 23 23 58 218-99 P co2 369.080 ... L3 2002 12 31 12 26 -89.9800 -24.8000 2810.00 129553 SPO 2002 03 01 08 01 17-91 P co2 369.110 ... L3 2002 12 31 12 39 -89.9800 -24.8000 2810.00 129554 SPO 2002 03 01 08 01 18-91 P co2 369.160 ... L3 2002 12 31 12 52 -89.9800 -24.8000 2810.00 129555 SPO 2002 03 01 08 16 291-91 S co2 369.000 ... L3 2002 12 31 11 19 -89.9800 -24.8000 2810.00 129556 SPO 2002 03 01 08 16 292-91 S co2 369.190 ... L3 2002 12 31 11 32 -89.9800 -24.8000 2810.00 129557 SPO 2002 03 08 08 25 1637-91 P co2 369.120 ... L3 2002 12 20 10 35 -89.9800 -24.8000 2810.00 129558 SPO 2002 03 08 08 25 1638-91 P co2 369.190 ... L3 2002 12 20 10 48 -89.9800 -24.8000 2810.00 129559 SPO 2002 03 16 05 15 1851-91 S co2 369.390 ... L3 2002 12 20 10 07 -89.9800 -24.8000 2810.00 129560 SPO 2002 03 16 05 15 1852-91 S co2 369.340 ... L3 2002 12 20 10 20 -89.9800 -24.8000 2810.00 129561 SPO 2002 03 16 05 27 59-91 P co2 369.510 ... L3 2002 12 20 09 15 -89.9800 -24.8000 2810.00 129562 SPO 2002 03 16 05 27 60-91 P co2 369.310 ... L3 2002 12 20 09 28 -89.9800 -24.8000 2810.00 129563 SPO 2002 03 23 07 40 703-91 P co2 369.340 -.. L3 2002 12 20 09 41 -89.9800 -24.8000 2810.00 129564 SPO 2002 03 23 07 40 704-91 P co2 372.130 +.. L3 2002 12 20 09 54 -89.9800 -24.8000 2810.00 129565 SPO 2002 03 30 10 00 1603-91 P co2 369.510 ... L3 2002 12 20 13 26 -89.9800 -24.8000 2810.00 129566 SPO 2002 03 30 10 00 1604-91 P co2 369.460 ... L3 2002 12 20 13 39 -89.9800 -24.8000 2810.00 129567 SPO 2002 04 01 18 12 395-99 P co2 369.270 ... L3 2002 12 20 11 29 -89.9800 -24.8000 2810.00 129568 SPO 2002 04 01 18 12 396-99 P co2 369.240 ... L3 2002 12 20 11 42 -89.9800 -24.8000 2810.00 129569 SPO 2002 04 01 18 15 4019-91 S co2 369.410 ... L3 2002 12 18 16 53 -89.9800 -24.8000 2810.00 129570 SPO 2002 04 01 18 15 4020-91 S co2 369.530 ... L3 2002 12 18 17 06 -89.9800 -24.8000 2810.00 129571 SPO 2002 04 12 18 50 491-99 P co2 369.270 ... L3 2003 01 03 09 32 -89.9800 -24.8000 2810.00 129572 SPO 2002 04 12 18 50 492-99 P co2 369.150 ... L3 2003 01 03 09 45 -89.9800 -24.8000 2810.00 129573 SPO 2002 04 18 16 14 495-99 S co2 369.420 ... L3 2003 01 02 16 32 -89.9800 -24.8000 2810.00 129574 SPO 2002 04 18 16 14 496-99 S co2 369.360 ... L3 2003 01 02 16 45 -89.9800 -24.8000 2810.00 129575 SPO 2002 04 18 16 27 265-99 P co2 369.370 ... L3 2003 01 03 09 58 -89.9800 -24.8000 2810.00 129576 SPO 2002 04 18 16 27 266-99 P co2 369.430 ... L3 2003 01 03 10 11 -89.9800 -24.8000 2810.00 129577 SPO 2002 04 28 13 25 359-99 P co2 369.540 ... L3 2003 01 03 09 06 -89.9800 -24.8000 2810.00 129578 SPO 2002 04 28 13 25 360-99 P co2 369.620 ... L3 2003 01 03 09 19 -89.9800 -24.8000 2810.00 129579 SPO 2002 05 01 15 13 107-98 P co2 369.640 ... L3 2002 12 19 14 45 -89.9800 -24.8000 2810.00 129580 SPO 2002 05 01 15 13 108-98 P co2 369.710 ... L3 2002 12 19 14 58 -89.9800 -24.8000 2810.00 129581 SPO 2002 05 01 15 30 4325-91 P co2 369.580 ... L3 2002 12 19 13 52 -89.9800 -24.8000 2810.00 129582 SPO 2002 05 01 15 30 4326-91 P co2 369.540 ... L3 2002 12 19 14 05 -89.9800 -24.8000 2810.00 129583 SPO 2002 05 11 03 05 777-91 P co2 369.780 ... L3 2002 12 19 11 12 -89.9800 -24.8000 2810.00 129584 SPO 2002 05 11 03 05 778-91 P co2 369.770 ... L3 2002 12 19 11 25 -89.9800 -24.8000 2810.00 129585 SPO 2002 05 16 09 13 1703-91 S co2 369.720 ... L3 2002 12 31 15 19 -89.9800 -24.8000 2810.00 129586 SPO 2002 05 16 09 13 1704-91 S co2 369.790 ... L3 2002 12 31 15 32 -89.9800 -24.8000 2810.00 129587 SPO 2002 05 16 09 35 4531-91 P co2 369.700 ... L3 2002 12 19 11 38 -89.9800 -24.8000 2810.00 129588 SPO 2002 05 16 09 35 4532-91 P co2 369.670 ... L3 2002 12 19 11 51 -89.9800 -24.8000 2810.00 129589 SPO 2002 05 27 16 25 4733-91 P co2 369.790 ... L3 2003 01 02 10 48 -89.9800 -24.8000 2810.00 129590 SPO 2002 05 27 16 25 4734-91 P co2 369.920 ... L3 2003 01 02 11 01 -89.9800 -24.8000 2810.00 129591 SPO 2002 06 01 21 13 377-91 S co2 370.040 ... L3 2002 12 31 14 51 -89.9800 -24.8000 2810.00 129592 SPO 2002 06 01 21 13 378-91 S co2 370.100 ... L3 2002 12 31 15 04 -89.9800 -24.8000 2810.00 129593 SPO 2002 06 01 21 30 151-99 P co2 369.970 ... L3 2002 12 18 12 24 -89.9800 -24.8000 2810.00 129594 SPO 2002 06 01 21 30 152-99 P co2 369.880 ... L3 2002 12 18 12 38 -89.9800 -24.8000 2810.00 129595 SPO 2002 06 07 07 15 4821-91 P co2 370.000 ... L3 2002 12 18 11 58 -89.9800 -24.8000 2810.00 129596 SPO 2002 06 07 07 15 4822-91 P co2 370.030 ... L3 2002 12 18 12 11 -89.9800 -24.8000 2810.00 129597 SPO 2002 06 15 15 10 517-91 S co2 370.280 ... L3 2002 12 18 11 31 -89.9800 -24.8000 2810.00 129598 SPO 2002 06 15 15 10 518-91 S co2 370.290 ... L3 2002 12 18 11 44 -89.9800 -24.8000 2810.00 129599 SPO 2002 06 15 15 30 4485-91 P co2 370.330 ... L3 2002 12 18 12 51 -89.9800 -24.8000 2810.00 129600 SPO 2002 06 15 15 30 4486-91 P co2 370.360 ... L3 2002 12 18 13 04 -89.9800 -24.8000 2810.00 129601 SPO 2002 06 21 17 10 4329-91 P co2 370.320 ... L3 2002 12 19 15 39 -89.9800 -24.8000 2810.00 129602 SPO 2002 06 21 17 10 4330-91 P co2 370.310 ... L3 2002 12 19 15 52 -89.9800 -24.8000 2810.00 129603 SPO 2002 06 29 07 45 79-98 P co2 370.440 ... L3 2002 12 19 16 05 -89.9800 -24.8000 2810.00 129604 SPO 2002 06 29 07 45 80-98 P co2 370.420 ... L3 2002 12 19 16 18 -89.9800 -24.8000 2810.00 129605 SPO 2002 07 01 05 25 413-99 S co2 370.400 ... L3 2002 12 19 14 19 -89.9800 -24.8000 2810.00 129606 SPO 2002 07 01 05 25 414-99 S co2 370.380 ... L3 2002 12 19 14 32 -89.9800 -24.8000 2810.00 129607 SPO 2002 07 01 05 45 1815-91 P co2 370.460 ... L3 2002 12 19 15 11 -89.9800 -24.8000 2810.00 129608 SPO 2002 07 01 05 45 1816-91 P co2 370.510 ... L3 2002 12 19 15 24 -89.9800 -24.8000 2810.00 129609 SPO 2002 07 05 02 45 275-99 P co2 370.490 ... L3 2002 12 18 13 45 -89.9800 -24.8000 2810.00 129610 SPO 2002 07 05 02 45 276-99 P co2 370.480 ... L3 2002 12 18 13 58 -89.9800 -24.8000 2810.00 129611 SPO 2002 07 15 14 12 483-91 S co2 370.830 ... L3 2002 12 18 14 11 -89.9800 -24.8000 2810.00 129612 SPO 2002 07 15 14 12 484-91 S co2 370.770 ... L3 2002 12 18 14 24 -89.9800 -24.8000 2810.00 129613 SPO 2002 07 15 14 20 379-99 P co2 370.710 ... L3 2002 12 18 13 17 -89.9800 -24.8000 2810.00 129614 SPO 2002 07 15 14 20 380-99 P co2 370.670 ... L3 2002 12 18 13 30 -89.9800 -24.8000 2810.00 129615 SPO 2002 07 19 19 50 315-99 P co2 370.730 ... L3 2002 12 18 14 37 -89.9800 -24.8000 2810.00 129616 SPO 2002 07 19 19 50 316-99 P co2 370.760 ... L3 2002 12 18 14 50 -89.9800 -24.8000 2810.00 129617 SPO 2002 07 26 22 55 467-99 P co2 370.910 ... L3 2002 12 18 15 35 -89.9800 -24.8000 2810.00 129618 SPO 2002 07 26 22 55 468-99 P co2 370.830 ... L3 2002 12 18 15 48 -89.9800 -24.8000 2810.00 129619 SPO 2002 08 01 09 02 465-99 S co2 371.010 ... L3 2002 12 18 16 01 -89.9800 -24.8000 2810.00 129620 SPO 2002 08 01 09 02 466-99 S co2 370.930 ... L3 2002 12 18 16 14 -89.9800 -24.8000 2810.00 129621 SPO 2002 08 01 09 15 469-99 P co2 371.000 ... L3 2002 12 18 16 27 -89.9800 -24.8000 2810.00 129622 SPO 2002 08 01 09 15 470-99 P co2 370.970 ... L3 2002 12 18 16 40 -89.9800 -24.8000 2810.00 129623 SPO 2002 08 10 04 45 463-99 P co2 371.090 ... L3 2002 12 18 15 03 -89.9800 -24.8000 2810.00 129624 SPO 2002 08 10 04 45 464-99 P co2 371.140 ... L3 2002 12 18 15 16 -89.9800 -24.8000 2810.00 129625 SPO 2002 08 15 03 04 1459-91 S co2 371.470 ... L3 2003 01 02 15 14 -89.9800 -24.8000 2810.00 129626 SPO 2002 08 15 03 04 1460-91 S co2 371.450 ... L3 2003 01 02 15 27 -89.9800 -24.8000 2810.00 129627 SPO 2002 08 15 03 15 1011-91 P co2 371.470 ... L3 2003 01 02 15 40 -89.9800 -24.8000 2810.00 129628 SPO 2002 08 15 03 15 1012-91 P co2 371.450 ... L3 2003 01 02 15 53 -89.9800 -24.8000 2810.00 129629 SPO 2002 08 23 03 45 287-91 P co2 376.350 +.. L3 2003 01 02 14 46 -89.9800 -24.8000 2810.00 129630 SPO 2002 08 23 03 45 288-91 P co2 371.300 -.. L3 2003 01 02 14 59 -89.9800 -24.8000 2810.00 129631 SPO 2002 08 30 06 50 4265-91 P co2 371.540 ... L3 2003 01 02 16 06 -89.9800 -24.8000 2810.00 129632 SPO 2002 08 30 06 50 4266-91 P co2 371.560 ... L3 2003 01 02 16 19 -89.9800 -24.8000 2810.00 129633 SPO 2002 09 02 22 11 4431-91 S co2 371.580 ... L3 2003 01 02 12 08 -89.9800 -24.8000 2810.00 129634 SPO 2002 09 02 22 11 4432-91 S co2 371.560 ... L3 2003 01 02 12 21 -89.9800 -24.8000 2810.00 129635 SPO 2002 09 02 22 23 355-99 P co2 371.400 ... L3 2003 01 02 11 42 -89.9800 -24.8000 2810.00 129636 SPO 2002 09 02 22 23 356-99 P co2 371.500 ... L3 2003 01 02 11 55 -89.9800 -24.8000 2810.00 129637 SPO 2002 09 09 23 55 695-91 P co2 371.560 ... L3 2003 01 02 11 14 -89.9800 -24.8000 2810.00 129638 SPO 2002 09 09 23 55 696-91 P co2 371.490 ... L3 2003 01 02 11 27 -89.9800 -24.8000 2810.00 129639 SPO 2002 09 17 02 51 85-91 S co2 371.700 ... L3 2003 01 03 13 07 -89.9800 -24.8000 2810.00 129640 SPO 2002 09 17 02 51 86-91 S co2 371.770 ... L3 2003 01 03 13 20 -89.9800 -24.8000 2810.00 129641 SPO 2002 09 17 03 08 1689-91 P co2 371.660 ... L3 2003 01 02 12 34 -89.9800 -24.8000 2810.00 129642 SPO 2002 09 17 03 08 1690-91 P co2 371.670 ... L3 2003 01 02 12 47 -89.9800 -24.8000 2810.00 129643 SPO 2002 09 20 09 45 1697-91 P co2 371.680 ... L3 2003 01 03 13 33 -89.9800 -24.8000 2810.00 129644 SPO 2002 09 20 09 45 1698-91 P co2 371.710 ... L3 2003 01 03 13 46 -89.9800 -24.8000 2810.00 129645 SPO 2002 09 27 08 15 4195-91 P co2 371.840 ... L3 2003 01 03 10 26 -89.9800 -24.8000 2810.00 129646 SPO 2002 09 27 08 15 4196-91 P co2 371.840 ... L3 2003 01 03 10 39 -89.9800 -24.8000 2810.00 129647 SPO 2002 10 01 16 11 4835-91 S co2 371.820 ... L3 2003 01 02 13 28 -89.9800 -24.8000 2810.00 129648 SPO 2002 10 01 16 11 4836-91 S co2 371.870 ... L3 2003 01 02 13 41 -89.9800 -24.8000 2810.00 129649 SPO 2002 10 01 16 15 4611-91 P co2 371.870 ... L3 2003 01 03 10 52 -89.9800 -24.8000 2810.00 129650 SPO 2002 10 01 16 15 4612-91 P co2 371.800 ... L3 2003 01 03 11 05 -89.9800 -24.8000 2810.00 129651 SPO 2002 10 06 05 45 4253-91 P co2 371.900 ... L3 2003 01 02 14 20 -89.9800 -24.8000 2810.00 129652 SPO 2002 10 06 05 45 4254-91 P co2 371.940 ... L3 2003 01 02 14 33 -89.9800 -24.8000 2810.00 129653 SPO 2002 10 11 07 36 1133-91 P co2 371.940 ... L3 2003 01 02 13 00 -89.9800 -24.8000 2810.00 129654 SPO 2002 10 11 07 36 1134-91 P co2 371.930 ... L3 2003 01 02 13 13 -89.9800 -24.8000 2810.00 129655 SPO 2002 10 15 06 01 97-91 S co2 371.990 ... L3 2002 12 30 12 28 -89.9800 -24.8000 2810.00 129656 SPO 2002 10 15 06 01 98-91 S co2 371.950 ... L3 2002 12 30 12 41 -89.9800 -24.8000 2810.00 129657 SPO 2002 10 15 06 12 4663-91 P co2 371.810 ... L3 2003 01 02 13 54 -89.9800 -24.8000 2810.00 129658 SPO 2002 10 15 06 12 4664-91 P co2 371.810 ... L3 2003 01 02 14 07 -89.9800 -24.8000 2810.00 129659 SPO 2002 10 25 06 26 389-99 P co2 371.990 ... L3 2002 12 30 11 08 -89.9800 -24.8000 2810.00 129660 SPO 2002 10 25 06 26 390-99 P co2 371.990 ... L3 2002 12 30 11 21 -89.9800 -24.8000 2810.00 129661 SPO 2002 11 02 23 21 461-99 S co2 372.040 ... L3 2002 12 30 11 34 -89.9800 -24.8000 2810.00 129662 SPO 2002 11 02 23 21 462-99 S co2 371.980 ... L3 2002 12 30 11 47 -89.9800 -24.8000 2810.00 129663 SPO 2002 11 02 23 38 1639-91 P co2 372.390 ... L3 2002 12 30 12 02 -89.9800 -24.8000 2810.00 129664 SPO 2002 11 02 23 38 1640-91 P co2 371.900 ... L3 2002 12 30 12 15 -89.9800 -24.8000 2810.00 129665 SPO 2002 11 08 03 54 4559-91 P co2 371.830 ... L3 2002 12 30 10 24 -89.9800 -24.8000 2810.00 129666 SPO 2002 11 08 03 54 4560-91 P co2 371.960 ... L3 2002 12 30 10 37 -89.9800 -24.8000 2810.00 129667 SPO 2002 11 18 23 23 4455-91 S co2 372.000 ... L3 2002 12 30 09 32 -89.9800 -24.8000 2810.00 129668 SPO 2002 11 18 23 23 4456-91 S co2 371.920 ... L3 2002 12 30 09 45 -89.9800 -24.8000 2810.00 129669 SPO 2002 11 18 23 26 4753-91 P co2 371.920 ... L3 2002 12 30 13 20 -89.9800 -24.8000 2810.00 129670 SPO 2002 11 18 23 26 4754-91 P co2 371.970 ... L3 2002 12 30 13 33 -89.9800 -24.8000 2810.00 129671 SPO 2002 11 24 00 35 631-91 P co2 371.900 ... L3 2002 12 30 12 54 -89.9800 -24.8000 2810.00 129672 SPO 2002 11 24 00 35 632-91 P co2 371.920 ... L3 2002 12 30 13 07 -89.9800 -24.8000 2810.00 129673 SPO 2002 11 29 04 26 1277-91 P co2 371.880 ... L3 2003 01 24 13 14 -89.9800 -24.8000 2810.00 129674 SPO 2002 11 29 04 26 1278-91 P co2 371.850 ... L3 2003 01 24 13 27 -89.9800 -24.8000 2810.00 129675 SPO 2002 12 03 03 39 1005-91 P co2 371.800 ... L3 2003 01 24 13 40 -89.9800 -24.8000 2810.00 129676 SPO 2002 12 03 03 39 1006-91 P co2 371.830 ... L3 2003 01 24 13 53 -89.9800 -24.8000 2810.00 129677 SPO 2002 12 03 04 10 357-99 S co2 371.800 ... L3 2003 01 24 12 21 -89.9800 -24.8000 2810.00 129678 SPO 2002 12 03 04 10 358-99 S co2 371.880 ... L3 2003 01 24 12 34 -89.9800 -24.8000 2810.00 129679 SPO 2002 12 14 07 58 401-99 P co2 371.740 ... L3 2003 01 24 12 47 -89.9800 -24.8000 2810.00 129680 SPO 2002 12 14 07 58 402-99 P co2 371.710 ... L3 2003 01 24 13 00 -89.9800 -24.8000 2810.00 129681 SPO 2002 12 17 02 05 445-99 S co2 371.770 ... L3 2003 01 23 12 49 -89.9800 -24.8000 2810.00 129682 SPO 2002 12 17 02 05 446-99 S co2 371.730 ... L3 2003 01 23 13 02 -89.9800 -24.8000 2810.00 129683 SPO 2002 12 17 02 32 385-99 P co2 371.650 ... L3 2003 01 23 14 35 -89.9800 -24.8000 2810.00 129684 SPO 2002 12 17 02 32 386-99 P co2 371.630 ... L3 2003 01 23 14 48 -89.9800 -24.8000 2810.00 129685 SPO 2002 12 27 03 21 4313-91 P co2 371.670 ... L3 2003 01 23 11 55 -89.9800 -24.8000 2810.00 129686 SPO 2002 12 27 03 21 4314-91 P co2 371.650 ... L3 2003 01 23 12 08 -89.9800 -24.8000 2810.00 129687 SPO 2003 01 04 07 52 383-99 S co2 372.240 ... L3 2003 01 23 14 09 -89.9800 -24.8000 2810.00 129688 SPO 2003 01 04 07 52 384-99 S co2 371.960 ... L3 2003 01 23 14 22 -89.9800 -24.8000 2810.00 129689 SPO 2003 01 04 08 10 6047-66 P co2 371.960 ... L3 2003 02 27 17 34 -89.9800 -24.8000 2810.00 129690 SPO 2003 01 04 08 10 6048-66 P co2 371.940 ... L3 2003 02 27 17 48 -89.9800 -24.8000 2810.00 129691 SPO 2003 01 11 00 51 6345-66 P co2 372.040 ... L3 2003 02 27 16 42 -89.9800 -24.8000 2810.00 129692 SPO 2003 01 11 00 51 6346-66 P co2 371.960 ... L3 2003 02 27 16 55 -89.9800 -24.8000 2810.00 129693 SPO 2003 01 16 02 12 6899-66 S co2 372.020 ... L3 2003 02 27 16 16 -89.9800 -24.8000 2810.00 129694 SPO 2003 01 16 02 12 6900-66 S co2 372.080 ... L3 2003 02 27 16 29 -89.9800 -24.8000 2810.00 129695 SPO 2003 01 16 02 17 6183-66 P co2 372.100 ... L3 2003 02 27 17 08 -89.9800 -24.8000 2810.00 129696 SPO 2003 01 16 02 17 6184-66 P co2 372.030 ... L3 2003 02 27 17 21 -89.9800 -24.8000 2810.00 129697 SPO 2003 01 16 04 32 1105-91 P co2 371.960 ... L3 2003 02 27 13 59 -89.9800 -24.8000 2810.00 129698 SPO 2003 01 16 04 32 1106-91 P co2 371.950 ... L3 2003 02 27 14 13 -89.9800 -24.8000 2810.00 129699 SPO 2003 01 23 04 24 661-91 P co2 371.900 ... L3 2003 02 27 12 41 -89.9800 -24.8000 2810.00 129700 SPO 2003 01 23 04 24 662-91 P co2 371.900 ... L3 2003 02 27 12 54 -89.9800 -24.8000 2810.00 129701 SPO 2003 01 23 04 58 1007-91 P co2 371.960 ... L3 2003 02 27 13 07 -89.9800 -24.8000 2810.00 129702 SPO 2003 01 23 04 58 1008-91 P co2 371.910 ... L3 2003 02 27 13 20 -89.9800 -24.8000 2810.00 129703 SPO 2003 02 01 03 17 6637-66 S co2 372.010 ... L3 2003 02 27 13 33 -89.9800 -24.8000 2810.00 129704 SPO 2003 02 01 03 17 6638-66 S co2 372.210 ... L3 2003 02 27 13 46 -89.9800 -24.8000 2810.00 129705 SPO 2003 02 01 03 21 1945-91 P co2 273.920 -.. L3 2003 12 11 10 37 -89.9800 -24.8000 2810.00 129706 SPO 2003 02 01 03 21 1945-91 P co2 379.890 +.. L3 2003 12 17 14 28 -89.9800 -24.8000 2810.00 129706 SPO 2003 02 01 03 21 1946-91 P co2 371.730 +.. L3 2003 12 11 10 50 -89.9800 -24.8000 2810.00 129707 SPO 2003 02 01 03 21 1946-91 P co2 371.900 -.. L3 2003 12 17 14 41 -89.9800 -24.8000 2810.00 129707 SPO 2003 02 07 07 00 6577-66 P co2 371.740 ... L3 2003 12 11 11 55 -89.9800 -24.8000 2810.00 129708 SPO 2003 02 07 07 00 6578-66 P co2 371.710 ... L3 2003 12 11 12 08 -89.9800 -24.8000 2810.00 129709 SPO 2003 02 14 05 50 6279-66 P co2 371.990 ... L3 2003 12 11 11 29 -89.9800 -24.8000 2810.00 129710 SPO 2003 02 14 05 50 6280-66 P co2 372.020 ... L3 2003 12 11 11 42 -89.9800 -24.8000 2810.00 129711 SPO 2003 02 15 12 01 4117-91 S co2 371.170 -.. L3 2003 12 10 09 09 -89.9800 -24.8000 2810.00 129712 SPO 2003 02 15 12 01 4118-91 S co2 377.670 +.. L3 2003 12 10 09 22 -89.9800 -24.8000 2810.00 129713 SPO 2003 02 15 12 30 17-99 P co2 277.170 -.. L3 2003 12 10 09 35 -89.9800 -24.8000 2810.00 129714 SPO 2003 02 15 12 30 18-99 P co2 371.800 +.. L3 2003 12 10 09 48 -89.9800 -24.8000 2810.00 129715 SPO 2003 02 21 07 45 6263-66 P co2 371.760 ... L3 2003 12 11 11 03 -89.9800 -24.8000 2810.00 129716 SPO 2003 02 21 07 45 6264-66 P co2 371.650 ... L3 2003 12 11 11 16 -89.9800 -24.8000 2810.00 129717 SPO 2003 03 01 02 50 6023-66 P co2 371.670 ... L3 2003 12 10 10 29 -89.9800 -24.8000 2810.00 129718 SPO 2003 03 01 02 50 6024-66 P co2 371.720 ... L3 2003 12 10 10 42 -89.9800 -24.8000 2810.00 129719 SPO 2003 03 01 02 55 149-98 S co2 371.650 ... L3 2003 12 10 10 01 -89.9800 -24.8000 2810.00 129720 SPO 2003 03 01 02 55 150-98 S co2 371.800 ... L3 2003 12 10 10 14 -89.9800 -24.8000 2810.00 129721 SPO 2003 03 07 13 20 6025-66 P co2 372.180 ... L3 2003 12 16 09 36 -89.9800 -24.8000 2810.00 129722 SPO 2003 03 07 13 20 6026-66 P co2 372.220 ... L3 2003 12 16 09 49 -89.9800 -24.8000 2810.00 129723 SPO 2003 03 14 07 05 6091-66 P co2 372.010 ... L3 2003 12 16 10 02 -89.9800 -24.8000 2810.00 129724 SPO 2003 03 14 07 05 6092-66 P co2 372.040 ... L3 2003 12 16 10 15 -89.9800 -24.8000 2810.00 129725 SPO 2003 03 17 12 00 6423-66 S co2 372.010 ... L3 2003 12 15 18 30 -89.9800 -24.8000 2810.00 129726 SPO 2003 03 17 12 00 6424-66 S co2 371.980 ... L3 2003 12 15 18 43 -89.9800 -24.8000 2810.00 129727 SPO 2003 03 17 12 25 6761-66 P co2 372.020 ... L3 2003 12 16 09 09 -89.9800 -24.8000 2810.00 129728 SPO 2003 03 17 12 25 6762-66 P co2 371.870 ... L3 2003 12 16 09 22 -89.9800 -24.8000 2810.00 129729 SPO 2003 03 22 13 27 6121-66 P co2 371.940 ... L3 2003 12 15 12 45 -89.9800 -24.8000 2810.00 129730 SPO 2003 03 22 13 27 6122-66 P co2 371.920 ... L3 2003 12 15 12 58 -89.9800 -24.8000 2810.00 129731 SPO 2003 03 28 13 22 6203-66 P co2 372.170 ... L3 2003 12 15 12 19 -89.9800 -24.8000 2810.00 129732 SPO 2003 03 28 13 22 6204-66 P co2 372.210 ... L3 2003 12 15 12 32 -89.9800 -24.8000 2810.00 129733 SPO 2003 04 01 09 58 6443-66 S co2 370.120 .Z. L3 2003 12 15 11 25 -89.9800 -24.8000 2810.00 129734 SPO 2003 04 01 09 58 6444-66 S co2 370.200 .Z. L3 2003 12 15 11 38 -89.9800 -24.8000 2810.00 129735 SPO 2003 04 01 10 18 6231-66 P co2 371.790 ... L3 2003 12 15 11 51 -89.9800 -24.8000 2810.00 129736 SPO 2003 04 01 10 18 6232-66 P co2 371.850 ... L3 2003 12 15 12 04 -89.9800 -24.8000 2810.00 129737 SPO 2003 04 04 08 38 561-99 P co2 372.060 +.. L3 2003 12 15 14 31 -89.9800 -24.8000 2810.00 129738 SPO 2003 04 04 08 38 562-99 P co2 366.130 -.. L3 2003 12 15 14 44 -89.9800 -24.8000 2810.00 129739 SPO 2003 04 11 09 02 1499-91 P co2 372.060 ... L3 2003 12 10 14 54 -89.9800 -24.8000 2810.00 129740 SPO 2003 04 11 09 02 1500-91 P co2 372.040 ... L3 2003 12 10 15 07 -89.9800 -24.8000 2810.00 129741 SPO 2003 04 16 10 00 379-91 S co2 345.720 -.. L3 2003 12 15 13 37 -89.9800 -24.8000 2810.00 129742 SPO 2003 04 16 10 00 379-91 S co2 345.790 -.. L3 2003 12 17 14 54 -89.9800 -24.8000 2810.00 129742 SPO 2003 04 16 10 00 380-91 S co2 372.080 +.. L3 2003 12 15 13 50 -89.9800 -24.8000 2810.00 129743 SPO 2003 04 16 10 00 380-91 S co2 372.110 +.. L3 2003 12 17 15 07 -89.9800 -24.8000 2810.00 129743 SPO 2003 04 16 10 00 4787-91 P co2 372.020 ... L3 2003 12 15 14 05 -89.9800 -24.8000 2810.00 129744 SPO 2003 04 16 10 00 4788-91 P co2 372.090 ... L3 2003 12 15 14 18 -89.9800 -24.8000 2810.00 129745 SPO 2003 04 25 06 06 1429-91 P co2 372.420 +.. L3 2003 12 15 13 11 -89.9800 -24.8000 2810.00 129746 SPO 2003 04 25 06 06 1429-91 P co2 372.520 +.. L3 2003 12 17 14 02 -89.9800 -24.8000 2810.00 129746 SPO 2003 04 25 06 06 1430-91 P co2 355.400 -.. L3 2003 12 17 14 15 -89.9800 -24.8000 2810.00 129747 SPO 2003 04 25 06 06 1430-91 P co2 355.440 -.. L3 2003 12 15 13 24 -89.9800 -24.8000 2810.00 129747 SPO 2003 05 01 04 52 1485-91 S co2 372.210 +.. L3 2003 12 17 13 36 -89.9800 -24.8000 2810.00 129748 SPO 2003 05 01 04 52 1485-91 S co2 372.250 +.. L3 2003 12 10 15 20 -89.9800 -24.8000 2810.00 129748 SPO 2003 05 01 04 52 1486-91 S co2 357.940 -.. L3 2003 12 10 15 33 -89.9800 -24.8000 2810.00 129749 SPO 2003 05 01 04 52 1486-91 S co2 358.090 -.. L3 2003 12 17 13 49 -89.9800 -24.8000 2810.00 129749 SPO 2003 05 01 06 46 1613-91 P co2 372.290 +.. L3 2003 12 10 14 28 -89.9800 -24.8000 2810.00 129750 SPO 2003 05 01 06 46 1614-91 P co2 366.610 -.. L3 2003 12 10 14 41 -89.9800 -24.8000 2810.00 129751 SPO 2003 05 09 08 35 6825-66 P co2 372.220 ... L3 2003 12 10 15 48 -89.9800 -24.8000 2810.00 129752 SPO 2003 05 09 08 35 6826-66 P co2 372.280 ... L3 2003 12 10 16 01 -89.9800 -24.8000 2810.00 129753 SPO 2003 05 15 09 55 61-99 P co2 372.320 ... L3 2003 12 17 15 22 -89.9800 -24.8000 2810.00 129754 SPO 2003 05 15 09 55 62-99 P co2 372.410 ... L3 2003 12 17 15 35 -89.9800 -24.8000 2810.00 129755 SPO 2003 05 15 09 55 1521-91 S co2 364.860 -.. L3 2003 12 17 16 40 -89.9800 -24.8000 2810.00 129756 SPO 2003 05 15 09 55 1522-91 S co2 370.840 +.. L3 2003 12 17 16 54 -89.9800 -24.8000 2810.00 129757 SPO 2003 05 23 09 45 1519-91 P co2 372.570 ... L3 2003 12 15 18 04 -89.9800 -24.8000 2810.00 129758 SPO 2003 05 23 09 45 1520-91 P co2 372.490 ... L3 2003 12 15 18 17 -89.9800 -24.8000 2810.00 129759 SPO 2003 06 01 07 50 1739-91 S co2 358.640 -.. L3 2003 12 15 17 10 -89.9800 -24.8000 2810.00 129760 SPO 2003 06 01 07 50 1740-91 S co2 378.360 +.. L3 2003 12 15 17 23 -89.9800 -24.8000 2810.00 129761 SPO 2003 06 01 07 55 4653-91 P co2 372.460 ... L3 2003 12 15 17 37 -89.9800 -24.8000 2810.00 129762 SPO 2003 06 01 07 55 4654-91 P co2 372.790 ... L3 2003 12 15 17 51 -89.9800 -24.8000 2810.00 129763 SPO 2003 06 07 14 36 707-99 P co2 372.630 -.. L3 2003 12 15 16 43 -89.9800 -24.8000 2810.00 129764 SPO 2003 06 07 14 36 708-99 P co2 374.210 +.. L3 2003 12 15 16 57 -89.9800 -24.8000 2810.00 129765 SPO 2003 06 15 10 45 263-99 P co2 376.970 +.. L3 2003 12 17 15 48 -89.9800 -24.8000 2810.00 129766 SPO 2003 06 15 10 45 264-99 P co2 376.400 -.. L3 2003 12 17 16 01 -89.9800 -24.8000 2810.00 129767 SPO 2003 06 15 10 55 555-91 S co2 357.870 -.. L3 2003 12 17 16 14 -89.9800 -24.8000 2810.00 129768 SPO 2003 06 15 10 55 556-91 S co2 366.160 +.. L3 2003 12 17 16 27 -89.9800 -24.8000 2810.00 129769 SPO 2003 06 20 14 16 1269-91 P co2 372.810 +.. L3 2003 12 18 10 56 -89.9800 -24.8000 2810.00 129770 SPO 2003 06 20 14 16 1270-91 P co2 371.450 -.. L3 2003 12 18 11 09 -89.9800 -24.8000 2810.00 129771 SPO 2003 06 27 06 32 4819-91 P co2 373.070 ... L3 2003 12 18 11 22 -89.9800 -24.8000 2810.00 129772 SPO 2003 06 27 06 32 4820-91 P co2 372.940 ... L3 2003 12 18 11 35 -89.9800 -24.8000 2810.00 129773 SPO 2003 07 02 03 50 6681-66 P co2 372.890 ... L3 2003 12 15 16 17 -89.9800 -24.8000 2810.00 129774 SPO 2003 07 02 03 50 6682-66 P co2 372.850 ... L3 2003 12 15 16 30 -89.9800 -24.8000 2810.00 129775 SPO 2003 07 02 03 55 1403-91 S co2 372.970 ... L3 2003 12 15 15 51 -89.9800 -24.8000 2810.00 129776 SPO 2003 07 02 03 55 1404-91 S co2 372.730 ... L3 2003 12 15 16 04 -89.9800 -24.8000 2810.00 129777 SPO 2003 07 11 09 35 6035-66 P co2 372.980 ... L3 2003 12 18 12 42 -89.9800 -24.8000 2810.00 129778 SPO 2003 07 11 09 35 6036-66 P co2 373.010 ... L3 2003 12 18 12 55 -89.9800 -24.8000 2810.00 129779 SPO 2003 07 18 03 56 6565-66 S co2 373.140 ... L3 2003 12 15 15 23 -89.9800 -24.8000 2810.00 129780 SPO 2003 07 18 03 56 6566-66 S co2 373.260 ... L3 2003 12 15 15 36 -89.9800 -24.8000 2810.00 129781 SPO 2003 07 18 04 10 6903-66 P co2 373.220 ... L3 2003 12 15 14 57 -89.9800 -24.8000 2810.00 129782 SPO 2003 07 18 04 10 6904-66 P co2 373.280 ... L3 2003 12 15 15 10 -89.9800 -24.8000 2810.00 129783 SPO 2003 07 26 12 55 2041-91 P co2 373.330 ... L3 2003 12 10 10 55 -89.9800 -24.8000 2810.00 129784 SPO 2003 07 26 12 55 2042-91 P co2 373.330 ... L3 2003 12 10 11 08 -89.9800 -24.8000 2810.00 129785 SPO 2003 08 01 05 45 6571-66 P co2 373.280 ... L3 2003 12 10 12 15 -89.9800 -24.8000 2810.00 129786 SPO 2003 08 01 05 45 6572-66 P co2 373.260 ... L3 2003 12 10 12 28 -89.9800 -24.8000 2810.00 129787 SPO 2003 08 01 05 48 6469-66 S co2 373.170 ... L3 2003 12 12 15 09 -89.9800 -24.8000 2810.00 129788 SPO 2003 08 01 05 48 6470-66 S co2 373.320 ... L3 2003 12 12 15 22 -89.9800 -24.8000 2810.00 129789 SPO 2003 08 08 09 00 6363-66 P co2 373.410 ... L3 2003 12 12 13 10 -89.9800 -24.8000 2810.00 129790 SPO 2003 08 15 08 50 6375-66 P co2 373.480 ... L3 2003 12 10 11 47 -89.9800 -24.8000 2810.00 129791 SPO 2003 08 15 08 50 6376-66 P co2 373.510 ... L3 2003 12 10 12 00 -89.9800 -24.8000 2810.00 129792 SPO 2003 08 15 08 50 6509-66 S co2 373.770 ... L3 2003 12 10 11 21 -89.9800 -24.8000 2810.00 129793 SPO 2003 08 15 08 50 6510-66 S co2 373.610 ... L3 2003 12 10 11 34 -89.9800 -24.8000 2810.00 129794 SPO 2003 08 24 11 25 6197-66 P co2 373.690 ... L3 2003 12 12 15 35 -89.9800 -24.8000 2810.00 129795 SPO 2003 08 24 11 25 6198-66 P co2 373.760 ... L3 2003 12 12 15 48 -89.9800 -24.8000 2810.00 129796 SPO 2003 09 01 05 46 665-99 P co2 373.820 ... L3 2003 12 12 14 43 -89.9800 -24.8000 2810.00 129797 SPO 2003 09 01 05 46 666-99 P co2 373.840 ... L3 2003 12 12 14 56 -89.9800 -24.8000 2810.00 129798 SPO 2003 09 01 05 48 1853-91 S co2 373.960 ... L3 2003 12 15 09 13 -89.9800 -24.8000 2810.00 129799 SPO 2003 09 01 05 48 1854-91 S co2 373.850 ... L3 2003 12 15 09 26 -89.9800 -24.8000 2810.00 129800 SPO 2003 09 17 09 50 213-99 P co2 373.540 -.. L3 2003 12 10 13 34 -89.9800 -24.8000 2810.00 129801 SPO 2003 09 17 09 50 214-99 P co2 374.060 +.. L3 2003 12 10 13 47 -89.9800 -24.8000 2810.00 129802 SPO 2003 09 17 09 50 6247-66 S co2 374.000 ... L3 2003 12 15 09 39 -89.9800 -24.8000 2810.00 129803 SPO 2003 09 17 09 50 6248-66 S co2 374.060 ... L3 2003 12 15 09 52 -89.9800 -24.8000 2810.00 129804 SPO 2003 09 22 13 52 4089-91 P co2 374.030 ... L3 2003 12 10 14 01 -89.9800 -24.8000 2810.00 129805 SPO 2003 09 22 13 52 4090-91 P co2 374.000 ... L3 2003 12 10 14 14 -89.9800 -24.8000 2810.00 129806 SPO 2003 09 27 07 20 6735-66 P co2 373.800 ... L3 2003 12 15 10 05 -89.9800 -24.8000 2810.00 129807 SPO 2003 09 27 07 20 6736-66 P co2 373.860 ... L3 2003 12 15 10 18 -89.9800 -24.8000 2810.00 129808 SPO 2003 10 01 05 40 6139-66 P co2 374.050 ... L3 2003 12 10 12 41 -89.9800 -24.8000 2810.00 129809 SPO 2003 10 01 05 40 6140-66 P co2 374.070 ... L3 2003 12 10 12 54 -89.9800 -24.8000 2810.00 129810 SPO 2003 10 01 05 42 6413-66 S co2 374.070 ... L3 2003 12 10 13 07 -89.9800 -24.8000 2810.00 129811 SPO 2003 10 01 05 42 6414-66 S co2 374.090 ... L3 2003 12 10 13 20 -89.9800 -24.8000 2810.00 129812 SPO 2003 10 10 10 55 6393-66 P co2 374.040 ... L3 2003 12 15 10 33 -89.9800 -24.8000 2810.00 129813 SPO 2003 10 10 10 55 6394-66 P co2 373.930 ... L3 2003 12 15 10 46 -89.9800 -24.8000 2810.00 129814 SPO 2003 10 17 04 10 6595-66 P co2 373.940 ... L3 2004 01 29 14 55 -89.9800 -24.8000 2810.00 129815 SPO 2003 10 17 04 10 6596-66 P co2 373.930 ... L3 2004 01 29 15 09 -89.9800 -24.8000 2810.00 129816 SPO 2003 10 17 04 15 6085-66 S co2 373.930 ... L3 2004 01 29 15 49 -89.9800 -24.8000 2810.00 129817 SPO 2003 10 17 04 15 6086-66 S co2 374.020 ... L3 2004 01 29 16 02 -89.9800 -24.8000 2810.00 129818 SPO 2003 10 24 07 05 4211-91 P co2 373.940 ... L3 2004 02 03 17 37 -89.9800 -24.8000 2810.00 129819 SPO 2003 10 24 07 05 4212-91 P co2 373.950 ... L3 2004 02 03 17 50 -89.9800 -24.8000 2810.00 129820 SPO 2003 11 01 03 14 163-98 S co2 373.840 ... L3 2004 02 03 16 15 -89.9800 -24.8000 2810.00 129821 SPO 2003 11 01 03 14 164-98 S co2 373.840 ... L3 2004 02 03 16 28 -89.9800 -24.8000 2810.00 129822 SPO 2003 11 01 03 30 4843-98 P co2 373.770 ... L3 2004 02 03 17 11 -89.9800 -24.8000 2810.00 129823 SPO 2003 11 01 03 30 4844-98 P co2 373.790 ... L3 2004 02 03 17 24 -89.9800 -24.8000 2810.00 129824 SPO 2003 11 08 04 19 4911-91 P co2 373.850 ... L3 2004 02 03 16 45 -89.9800 -24.8000 2810.00 129825 SPO 2003 11 08 04 19 4912-91 P co2 373.860 ... L3 2004 02 03 16 58 -89.9800 -24.8000 2810.00 129826 SPO 2003 11 16 04 15 6493-66 S co2 374.050 ... L3 2004 01 29 14 29 -89.9800 -24.8000 2810.00 129827 SPO 2003 11 16 04 15 6494-66 S co2 374.060 ... L3 2004 01 29 14 42 -89.9800 -24.8000 2810.00 129828 SPO 2003 11 16 04 21 6445-66 P co2 373.870 -.. L3 2004 01 29 15 22 -89.9800 -24.8000 2810.00 129829 SPO 2003 11 16 04 21 6446-66 P co2 386.860 +.. L3 2004 01 29 15 35 -89.9800 -24.8000 2810.00 129830 SPO 2003 11 22 21 29 6537-66 P co2 373.850 ... L3 2004 01 29 16 42 -89.9800 -24.8000 2810.00 129831 SPO 2003 11 22 21 29 6538-66 P co2 373.860 ... L3 2004 01 29 16 55 -89.9800 -24.8000 2810.00 129832 SPO 2003 11 30 03 19 1165-91 P co2 373.930 ... L3 2004 01 29 17 08 -89.9800 -24.8000 2810.00 129833 SPO 2003 11 30 03 19 1166-91 P co2 373.840 ... L3 2004 01 29 17 21 -89.9800 -24.8000 2810.00 129834 SPO 2003 12 01 22 15 679-99 S co2 373.830 ... L3 2004 02 02 11 47 -89.9800 -24.8000 2810.00 129835 SPO 2003 12 01 22 15 680-99 S co2 373.900 ... L3 2004 02 02 12 00 -89.9800 -24.8000 2810.00 129836 SPO 2003 12 01 22 19 681-99 P co2 378.040 +.. L3 2004 02 02 13 59 -89.9800 -24.8000 2810.00 129837 SPO 2003 12 01 22 19 682-99 P co2 373.820 -.. L3 2004 02 02 14 12 -89.9800 -24.8000 2810.00 129838 SPO 2003 12 05 01 12 6663-66 P co2 373.930 ... L3 2004 01 29 16 16 -89.9800 -24.8000 2810.00 129839 SPO 2003 12 05 01 12 6664-66 P co2 373.820 ... L3 2004 01 29 16 29 -89.9800 -24.8000 2810.00 129840 SPO 2003 12 13 03 38 1683-91 P co2 373.790 ... L3 2004 02 02 13 05 -89.9800 -24.8000 2810.00 129841 SPO 2003 12 13 03 38 1684-91 P co2 373.880 ... L3 2004 02 02 13 18 -89.9800 -24.8000 2810.00 129842 SPO 2003 12 16 09 15 6501-66 S co2 373.950 ... L3 2004 02 02 13 33 -89.9800 -24.8000 2810.00 129843 SPO 2003 12 16 09 15 6502-66 S co2 373.920 ... L3 2004 02 02 13 46 -89.9800 -24.8000 2810.00 129844 SPO 2003 12 16 09 33 1929-99 P co2 373.900 ... L3 2004 03 11 12 18 -89.9800 -24.8000 2810.00 129845 SPO 2003 12 16 09 33 1930-99 P co2 373.820 ... L3 2004 03 11 12 31 -89.9800 -24.8000 2810.00 129846 SPO 2003 12 26 10 19 1941-99 P co2 374.080 ... L3 2004 03 10 11 07 -89.9800 -24.8000 2810.00 129847 SPO 2003 12 26 10 19 1942-99 P co2 374.060 ... L3 2004 03 10 11 20 -89.9800 -24.8000 2810.00 129848 SPO 2004 01 03 02 15 1903-99 S co2 374.490 +.. L3 2004 03 09 17 05 -89.9800 -24.8000 2810.00 129849 SPO 2004 01 03 02 15 1904-99 S co2 373.890 -.. L3 2004 03 09 17 18 -89.9800 -24.8000 2810.00 129850 SPO 2004 01 03 02 16 1925-99 P co2 373.980 ... L3 2004 03 09 17 59 -89.9800 -24.8000 2810.00 129851 SPO 2004 01 03 02 16 1926-99 P co2 373.880 ... L3 2004 03 09 18 12 -89.9800 -24.8000 2810.00 129852 SPO 2004 01 10 04 30 1931-99 P co2 373.960 ... L3 2004 03 11 12 44 -89.9800 -24.8000 2810.00 129853 SPO 2004 01 10 04 30 1932-99 P co2 373.900 ... L3 2004 03 11 12 57 -89.9800 -24.8000 2810.00 129854 SPO 2004 01 15 22 15 1923-99 P co2 373.920 -.. L3 2004 03 11 11 44 -89.9800 -24.8000 2810.00 129855 SPO 2004 01 15 22 15 1924-99 P co2 375.560 +.. L3 2004 03 11 11 58 -89.9800 -24.8000 2810.00 129856 SPO 2004 01 15 23 29 1927-99 S co2 379.700 +.. L3 2004 03 11 11 18 -89.9800 -24.8000 2810.00 129857 SPO 2004 01 15 23 29 1928-99 S co2 374.010 -.. L3 2004 03 11 11 31 -89.9800 -24.8000 2810.00 129858 SPO 2004 01 31 02 52 1919-99 P co2 373.720 ... L3 2004 03 09 17 33 -89.9800 -24.8000 2810.00 129859 SPO 2004 01 31 02 52 1920-99 P co2 373.690 ... L3 2004 03 09 17 46 -89.9800 -24.8000 2810.00 129860 SPO 2004 02 06 17 16 1631-99 P co2 373.080 .X. L3 2004 12 20 12 06 -89.9600 -24.8000 2810.00 193191 SPO 2004 02 06 17 16 1632-99 P co2 373.020 .X. L3 2004 12 20 12 20 -89.9600 -24.8000 2810.00 193192 SPO 2004 02 16 07 15 1571-99 S co2 373.510 ... L3 2004 12 20 13 31 -89.9600 -24.8000 2810.00 193193 SPO 2004 02 16 07 15 1572-99 S co2 373.400 ... L3 2004 12 20 13 45 -89.9600 -24.8000 2810.00 193194 SPO 2004 02 16 07 21 1601-99 P co2 373.640 ... L3 2004 12 20 13 03 -89.9600 -24.8000 2810.00 193195 SPO 2004 02 16 07 21 1602-99 P co2 373.540 ... L3 2004 12 20 13 17 -89.9600 -24.8000 2810.00 193196 SPO 2004 02 23 01 06 515-99 P co2 373.530 ... L3 2004 12 20 12 34 -89.9600 -24.8000 2810.00 193197 SPO 2004 02 23 01 06 516-99 P co2 373.470 ... L3 2004 12 20 12 49 -89.9600 -24.8000 2810.00 193198 SPO 2004 02 28 07 48 111-99 P co2 373.730 ... L3 2004 12 17 11 16 -89.9600 -24.8000 2810.00 193036 SPO 2004 02 28 07 48 112-99 P co2 373.840 ... L3 2004 12 17 11 30 -89.9600 -24.8000 2810.00 193037 SPO 2004 03 03 22 15 1963-99 S co2 374.050 .X. L3 2004 12 17 11 44 -89.9600 -24.8000 2810.00 193038 SPO 2004 03 03 22 15 1964-99 S co2 373.990 .X. L3 2004 12 17 11 58 -89.9600 -24.8000 2810.00 193039 SPO 2004 03 03 22 22 1969-99 P co2 373.710 ... L3 2004 12 17 12 14 -89.9600 -24.8000 2810.00 193040 SPO 2004 03 03 22 22 1970-99 P co2 373.760 ... L3 2004 12 17 12 28 -89.9600 -24.8000 2810.00 193041 SPO 2004 03 06 03 37 91-99 P co2 373.490 ... L3 2004 12 17 12 43 -89.9600 -24.8000 2810.00 193042 SPO 2004 03 06 03 37 92-99 P co2 373.550 ... L3 2004 12 17 12 57 -89.9600 -24.8000 2810.00 193043 SPO 2004 03 14 23 06 1243-99 P co2 373.550 ... L3 2004 12 22 11 48 -89.9600 -24.8000 2810.00 193124 SPO 2004 03 14 23 06 1244-99 P co2 373.540 ... L3 2004 12 22 12 02 -89.9600 -24.8000 2810.00 193125 SPO 2004 03 17 22 15 1947-99 S co2 373.700 ... L3 2004 12 22 10 52 -89.9600 -24.8000 2810.00 193120 SPO 2004 03 17 22 15 1948-99 S co2 373.710 ... L3 2004 12 22 11 06 -89.9600 -24.8000 2810.00 193121 SPO 2004 03 17 22 28 1953-99 P co2 373.680 ... L3 2004 12 21 12 36 -89.9600 -24.8000 2810.00 193153 SPO 2004 03 17 22 28 1954-99 P co2 373.700 ... L3 2004 12 21 12 51 -89.9600 -24.8000 2810.00 193154 SPO 2004 03 30 05 47 1949-99 P co2 373.580 ... L3 2004 12 21 12 08 -89.9600 -24.8000 2810.00 193151 SPO 2004 03 30 05 47 1950-99 P co2 373.580 ... L3 2004 12 21 12 22 -89.9600 -24.8000 2810.00 193152 SPO 2004 04 03 00 15 1653-99 S co2 373.740 ... L3 2004 12 22 12 16 -89.9600 -24.8000 2810.00 193122 SPO 2004 04 03 00 15 1654-99 S co2 373.790 ... L3 2004 12 22 12 30 -89.9600 -24.8000 2810.00 193123 SPO 2004 04 03 00 30 1951-99 P co2 373.760 ... L3 2004 12 21 13 08 -89.9600 -24.8000 2810.00 193155 SPO 2004 04 03 00 30 1952-99 P co2 373.820 ... L3 2004 12 21 13 22 -89.9600 -24.8000 2810.00 193156 SPO 2004 04 12 05 43 1657-99 P co2 373.630 ... L3 2004 12 22 11 20 -89.9600 -24.8000 2810.00 193126 SPO 2004 04 12 05 43 1658-99 P co2 373.640 ... L3 2004 12 22 11 34 -89.9600 -24.8000 2810.00 193127 SPO 2004 04 19 05 17 789-99 S co2 373.920 ... L3 2005 01 04 11 32 -89.9600 -24.8000 2810.00 193048 SPO 2004 04 19 05 17 790-99 S co2 374.030 ... L3 2005 01 04 11 46 -89.9600 -24.8000 2810.00 193049 SPO 2004 04 19 05 34 903-99 P co2 373.810 ... L3 2005 01 04 10 07 -89.9600 -24.8000 2810.00 193044 SPO 2004 04 19 05 34 904-99 P co2 373.940 ... L3 2005 01 04 10 22 -89.9600 -24.8000 2810.00 193045 SPO 2004 04 24 02 46 1157-99 P co2 373.990 ... L3 2004 12 23 11 07 -89.9600 -24.8000 2810.00 193116 SPO 2004 04 24 02 46 1158-99 P co2 374.070 ... L3 2004 12 23 11 21 -89.9600 -24.8000 2810.00 193117 SPO 2004 05 03 03 15 1943-99 S co2 373.870 ... L3 2004 12 23 10 11 -89.9600 -24.8000 2810.00 193112 SPO 2004 05 03 03 15 1944-99 S co2 373.840 ... L3 2004 12 23 10 25 -89.9600 -24.8000 2810.00 193113 SPO 2004 05 03 03 31 1945-99 P co2 373.840 -.. L3 2004 12 23 09 14 -89.9600 -24.8000 2810.00 193114 SPO 2004 05 03 03 31 1946-99 P co2 374.510 +.. L3 2004 12 23 09 28 -89.9600 -24.8000 2810.00 193115 SPO 2004 05 10 06 39 93-99 P co2 373.970 ... L3 2004 12 23 10 39 -89.9600 -24.8000 2810.00 193118 SPO 2004 05 10 06 39 94-99 P co2 374.030 ... L3 2004 12 23 10 53 -89.9600 -24.8000 2810.00 193119 SPO 2004 05 16 22 15 945-99 S co2 374.180 ... L3 2005 01 04 09 11 -89.9600 -24.8000 2810.00 193046 SPO 2004 05 16 22 15 946-99 S co2 374.180 ... L3 2005 01 04 09 25 -89.9600 -24.8000 2810.00 193047 SPO 2004 05 16 22 33 647-99 P co2 374.070 ... L3 2005 01 04 11 04 -89.9600 -24.8000 2810.00 193050 SPO 2004 05 16 22 33 648-99 P co2 374.010 ... L3 2005 01 04 11 18 -89.9600 -24.8000 2810.00 193051 SPO 2004 05 23 23 54 23-99 P co2 374.230 ... L3 2004 12 29 14 36 -89.9600 -24.8000 2810.00 193142 SPO 2004 05 23 23 54 24-99 P co2 374.380 ... L3 2004 12 29 14 50 -89.9600 -24.8000 2810.00 193143 SPO 2004 05 30 23 35 1971-99 P co2 374.060 ... L3 2004 12 22 15 12 -89.9600 -24.8000 2810.00 193173 SPO 2004 05 30 23 35 1972-99 P co2 374.150 ... L3 2004 12 22 15 26 -89.9600 -24.8000 2810.00 193174 SPO 2004 06 02 03 15 501-99 S co2 374.510 -.. L3 2004 12 29 15 04 -89.9600 -24.8000 2810.00 193136 SPO 2004 06 02 03 15 502-99 S co2 375.460 +.. L3 2004 12 29 15 18 -89.9600 -24.8000 2810.00 193137 SPO 2004 06 02 03 30 1961-99 P co2 374.120 -.. L3 2004 12 22 13 41 -89.9600 -24.8000 2810.00 193171 SPO 2004 06 02 03 30 1962-99 P co2 379.310 +.. L3 2004 12 22 13 55 -89.9600 -24.8000 2810.00 193172 SPO 2004 06 07 23 54 1959-99 P co2 374.520 ... L3 2004 12 22 13 13 -89.9600 -24.8000 2810.00 193169 SPO 2004 06 07 23 54 1960-99 P co2 374.370 ... L3 2004 12 22 13 27 -89.9600 -24.8000 2810.00 193170 SPO 2004 06 15 04 16 1965-99 S co2 374.570 ... L3 2004 12 29 16 01 -89.9600 -24.8000 2810.00 193140 SPO 2004 06 15 04 16 1966-99 S co2 374.590 ... L3 2004 12 29 16 15 -89.9600 -24.8000 2810.00 193141 SPO 2004 06 15 04 35 1957-99 P co2 374.460 ... L3 2004 12 29 15 33 -89.9600 -24.8000 2810.00 193138 SPO 2004 06 15 04 35 1958-99 P co2 374.600 ... L3 2004 12 29 15 47 -89.9600 -24.8000 2810.00 193139 SPO 2004 06 25 23 46 1967-99 P co2 374.670 ... L3 2004 12 22 12 44 -89.9600 -24.8000 2810.00 193167 SPO 2004 06 25 23 46 1968-99 P co2 374.630 ... L3 2004 12 22 12 58 -89.9600 -24.8000 2810.00 193168 SPO 2004 06 30 23 50 2045-99 P co2 374.770 ... L3 2004 12 21 11 40 -89.9600 -24.8000 2810.00 193157 SPO 2004 06 30 23 50 2046-99 P co2 374.840 ... L3 2004 12 21 11 54 -89.9600 -24.8000 2810.00 193158 SPO 2004 07 04 22 16 449-91 S co2 374.650 ... L3 2004 12 20 14 29 -89.9600 -24.8000 2810.00 193177 SPO 2004 07 04 22 16 450-91 S co2 374.740 ... L3 2004 12 20 14 43 -89.9600 -24.8000 2810.00 193178 SPO 2004 07 04 22 33 1847-99 P co2 374.670 ... L3 2004 12 20 09 14 -89.9600 -24.8000 2810.00 193219 SPO 2004 07 04 22 33 1848-99 P co2 374.750 ... L3 2004 12 20 09 28 -89.9600 -24.8000 2810.00 193220 SPO 2004 07 15 03 17 827-91 S co2 375.500 +.. L3 2004 12 20 14 01 -89.9600 -24.8000 2810.00 193179 SPO 2004 07 15 03 17 828-91 S co2 374.770 -.. L3 2004 12 20 14 15 -89.9600 -24.8000 2810.00 193180 SPO 2004 07 15 03 35 973-99 P co2 374.810 ... L3 2004 12 20 14 57 -89.9600 -24.8000 2810.00 193181 SPO 2004 07 15 03 35 974-99 P co2 374.790 ... L3 2004 12 20 15 11 -89.9600 -24.8000 2810.00 193182 SPO 2004 07 26 22 26 824-99 P co2 374.950 ... L3 2004 12 20 15 25 -89.9600 -24.8000 2810.00 193176 SPO 2004 07 26 22 26 1408-99 P co2 375.040 ... L3 2004 12 20 15 39 -89.9600 -24.8000 2810.00 193175 SPO 2004 08 03 09 15 1105-99 S co2 375.260 ... L3 2004 12 17 13 11 -89.9600 -24.8000 2810.00 193008 SPO 2004 08 03 09 15 1106-99 S co2 375.370 ... L3 2004 12 17 13 25 -89.9600 -24.8000 2810.00 193009 SPO 2004 08 03 09 40 4883-91 P co2 375.380 ... L3 2004 12 17 13 39 -89.9600 -24.8000 2810.00 193010 SPO 2004 08 03 09 40 4884-91 P co2 375.200 ... L3 2004 12 17 13 53 -89.9600 -24.8000 2810.00 193011 SPO 2004 08 08 23 50 2051-99 P co2 375.380 ... L3 2004 12 17 14 07 -89.9600 -24.8000 2810.00 193012 SPO 2004 08 08 23 50 2052-99 P co2 375.370 ... L3 2004 12 17 14 21 -89.9600 -24.8000 2810.00 193013 SPO 2004 08 16 03 15 595-99 S co2 375.520 ... L3 2004 12 20 09 42 -89.9600 -24.8000 2810.00 193014 SPO 2004 08 16 03 15 596-99 S co2 375.600 ... L3 2004 12 20 09 56 -89.9600 -24.8000 2810.00 193015 SPO 2004 08 16 03 33 1447-91 P co2 375.550 ... L3 2004 12 17 10 20 -89.9600 -24.8000 2810.00 193034 SPO 2004 08 16 03 33 1448-91 P co2 375.430 ... L3 2004 12 17 10 34 -89.9600 -24.8000 2810.00 193035 SPO 2004 08 25 03 57 607-91 P co2 374.030 -.. L3 2004 12 17 10 48 -89.9600 -24.8000 2810.00 193032 SPO 2004 08 25 03 57 608-91 P co2 375.610 +.. L3 2004 12 17 11 02 -89.9600 -24.8000 2810.00 193033 SPO 2004 09 02 22 15 1137-99 S co2 375.690 ... L3 2004 12 17 09 51 -89.9600 -24.8000 2810.00 193028 SPO 2004 09 02 22 15 1138-99 S co2 375.680 ... L3 2004 12 17 10 06 -89.9600 -24.8000 2810.00 193029 SPO 2004 09 02 22 42 4889-91 P co2 375.660 +.. L3 2004 12 17 09 23 -89.9600 -24.8000 2810.00 193030 SPO 2004 09 02 22 42 4890-91 P co2 374.320 -.. L3 2004 12 17 09 37 -89.9600 -24.8000 2810.00 193031 SPO 2004 09 13 23 11 851-99 P co2 375.560 ... L3 2004 12 21 14 32 -89.9600 -24.8000 2810.00 193163 SPO 2004 09 13 23 11 852-99 P co2 375.670 ... L3 2004 12 21 14 46 -89.9600 -24.8000 2810.00 193164 SPO 2004 09 18 01 02 2001-99 P co2 375.570 ... L3 2004 12 22 14 44 -89.9600 -24.8000 2810.00 193187 SPO 2004 09 18 01 02 2002-99 P co2 375.540 ... L3 2004 12 22 14 58 -89.9600 -24.8000 2810.00 193188 SPO 2004 09 18 01 16 127-99 S co2 375.630 ... L3 2004 12 21 13 36 -89.9600 -24.8000 2810.00 193159 SPO 2004 09 18 01 16 128-99 S co2 375.720 ... L3 2004 12 21 13 50 -89.9600 -24.8000 2810.00 193160 SPO 2004 09 26 04 26 623-99 P co2 375.820 ... L3 2004 12 22 15 40 -89.9600 -24.8000 2810.00 193183 SPO 2004 09 26 04 26 624-99 P co2 375.810 ... L3 2004 12 22 15 54 -89.9600 -24.8000 2810.00 193184 SPO 2004 10 03 02 16 57-99 S co2 375.950 ... L3 2004 12 22 14 15 -89.9600 -24.8000 2810.00 193185 SPO 2004 10 03 02 16 58-99 S co2 375.780 ... L3 2004 12 22 14 29 -89.9600 -24.8000 2810.00 193186 SPO 2004 10 03 02 23 887-99 P co2 375.800 ... L3 2004 12 23 09 42 -89.9600 -24.8000 2810.00 193189 SPO 2004 10 03 02 23 888-99 P co2 375.880 ... L3 2004 12 23 09 56 -89.9600 -24.8000 2810.00 193190 SPO 2004 10 11 08 26 1997-99 P co2 375.600 ... L3 2004 12 21 14 04 -89.9600 -24.8000 2810.00 193161 SPO 2004 10 11 08 26 1998-99 P co2 375.560 ... L3 2004 12 21 14 18 -89.9600 -24.8000 2810.00 193162 SPO 2004 10 17 23 17 2005-99 S co2 375.960 ... L3 2004 12 21 15 11 -89.9600 -24.8000 2810.00 193165 SPO 2004 10 17 23 17 2006-99 S co2 375.950 ... L3 2004 12 21 15 25 -89.9600 -24.8000 2810.00 193166 SPO 2004 10 17 23 26 247-99 P co2 375.760 ... L3 2004 12 16 15 40 -89.9600 -24.8000 2810.00 192994 SPO 2004 10 17 23 26 248-99 P co2 375.800 ... L3 2004 12 16 15 54 -89.9600 -24.8000 2810.00 192995 SPO 2004 10 26 09 34 619-99 P co2 375.730 ... L3 2004 12 17 08 55 -89.9600 -24.8000 2810.00 192998 SPO 2004 10 26 09 34 620-99 P co2 375.650 ... L3 2004 12 17 09 09 -89.9600 -24.8000 2810.00 192999 SPO 2004 11 02 09 16 1669-99 P co2 375.790 ... L3 2004 12 20 10 41 -89.9600 -24.8000 2810.00 193006 SPO 2004 11 02 09 16 1670-99 P co2 375.760 ... L3 2004 12 20 10 56 -89.9600 -24.8000 2810.00 193007 SPO 2004 11 02 09 23 273-99 S co2 375.790 ... L3 2004 12 20 11 38 -89.9600 -24.8000 2810.00 193002 SPO 2004 11 02 09 23 274-99 S co2 375.920 ... L3 2004 12 20 11 52 -89.9600 -24.8000 2810.00 193003 SPO 2004 11 06 07 37 1671-99 P co2 375.690 ... L3 2004 12 16 15 12 -89.9600 -24.8000 2810.00 192992 SPO 2004 11 06 07 37 1672-99 P co2 375.770 ... L3 2004 12 16 15 26 -89.9600 -24.8000 2810.00 192993 SPO 2004 11 11 05 32 1391-99 P co2 375.730 ... L3 2004 12 16 16 08 -89.9600 -24.8000 2810.00 192996 SPO 2004 11 11 05 32 1392-99 P co2 375.740 ... L3 2004 12 16 16 22 -89.9600 -24.8000 2810.00 192997 SPO 2004 11 15 03 14 787-99 P co2 375.690 +.. L3 2004 12 20 11 10 -89.9600 -24.8000 2810.00 193004 SPO 2004 11 15 03 14 788-99 P co2 374.790 -.. L3 2004 12 20 11 24 -89.9600 -24.8000 2810.00 193005 SPO 2004 11 15 03 18 1213-99 S co2 375.700 ... L3 2004 12 20 10 10 -89.9600 -24.8000 2810.00 193000 SPO 2004 11 15 03 18 1214-99 S co2 375.740 ... L3 2004 12 20 10 25 -89.9600 -24.8000 2810.00 193001 SPO 2004 11 20 04 42 1415-99 P co2 375.620 ... L3 2005 02 25 15 41 -89.9600 -24.8000 2810.00 195580 SPO 2004 11 20 04 42 1416-99 P co2 375.620 ... L3 2005 02 25 15 55 -89.9600 -24.8000 2810.00 195581 SPO 2004 11 26 06 01 1921-99 P co2 375.550 ... L3 2005 02 25 14 44 -89.9600 -24.8000 2810.00 195575 SPO 2004 11 26 06 01 1922-99 P co2 375.600 ... L3 2005 02 25 14 58 -89.9600 -24.8000 2810.00 195576 SPO 2004 12 01 21 43 1899-99 P co2 375.350 ... L3 2005 02 25 10 59 -89.9600 -24.8000 2810.00 195582 SPO 2004 12 01 21 43 1900-99 P co2 375.310 ... L3 2005 02 25 11 13 -89.9600 -24.8000 2810.00 195583 SPO 2004 12 01 21 51 1897-99 S co2 375.480 ... L3 2005 02 25 12 23 -89.9600 -24.8000 2810.00 195598 SPO 2004 12 01 21 51 1898-99 S co2 375.390 ... L3 2005 02 25 12 37 -89.9600 -24.8000 2810.00 195599 SPO 2004 12 10 15 21 828-99 P co2 375.610 ... L3 2005 03 01 09 37 -89.9600 -24.8000 2810.00 195579 SPO 2004 12 17 01 06 1495-99 P co2 375.510 ... L3 2005 02 25 11 55 -89.9600 -24.8000 2810.00 195600 SPO 2004 12 17 01 06 1496-99 P co2 375.520 ... L3 2005 02 25 12 09 -89.9600 -24.8000 2810.00 195601 SPO 2004 12 17 01 17 1901-99 S co2 375.580 ... L3 2005 02 25 15 13 -89.9600 -24.8000 2810.00 195577 SPO 2004 12 17 01 17 1902-99 S co2 375.630 ... L3 2005 02 25 15 27 -89.9600 -24.8000 2810.00 195578 SPO 2004 12 26 23 03 857-99 P co2 375.560 ... L3 2005 02 25 11 27 -89.9600 -24.8000 2810.00 195584 SPO 2004 12 26 23 03 858-99 P co2 375.580 ... L3 2005 02 25 11 41 -89.9600 -24.8000 2810.00 195585 SPO 2005 01 03 23 52 315-99 P co2 375.510 ... L3 2005 02 25 13 20 -89.9600 -24.8000 2810.00 195557 SPO 2005 01 03 23 52 316-99 P co2 375.550 ... L3 2005 02 25 13 34 -89.9600 -24.8000 2810.00 195558 SPO 2005 01 04 02 30 2137-99 S co2 375.660 ... L3 2005 02 25 13 48 -89.9600 -24.8000 2810.00 195561 SPO 2005 01 04 02 30 2138-99 S co2 375.680 ... L3 2005 02 25 14 02 -89.9600 -24.8000 2810.00 195602 SPO 2005 01 07 02 44 2607-99 P co2 375.920 ... L3 2005 02 28 09 13 -89.9600 -24.8000 2810.00 195553 SPO 2005 01 07 02 44 2608-99 P co2 375.720 ... L3 2005 02 28 09 27 -89.9600 -24.8000 2810.00 195554 SPO 2005 01 15 01 14 2689-99 P co2 375.580 ... L3 2005 02 25 16 09 -89.9600 -24.8000 2810.00 195525 SPO 2005 01 15 01 14 2690-99 P co2 375.510 ... L3 2005 02 25 16 23 -89.9600 -24.8000 2810.00 195526 SPO 2005 01 15 01 19 189-99 S co2 375.560 ... L3 2005 02 25 14 16 -89.9600 -24.8000 2810.00 195562 SPO 2005 01 15 01 19 190-99 S co2 375.550 ... L3 2005 02 25 14 30 -89.9600 -24.8000 2810.00 195563 SPO 2005 01 21 11 00 1207-99 P co2 375.550 ... L3 2005 02 25 12 51 -89.9600 -24.8000 2810.00 195559 SPO 2005 01 21 11 00 1208-99 P co2 375.550 ... L3 2005 02 25 13 06 -89.9600 -24.8000 2810.00 195560 SPO 2005 01 28 06 25 3479-99 P co2 375.010 ... L3 2005 12 14 11 49 -89.9600 -24.8000 2810.00 210216 SPO 2005 01 28 06 25 3480-99 P co2 375.110 ... L3 2005 12 14 12 03 -89.9600 -24.8000 2810.00 210217 SPO 2005 02 01 10 14 2581-99 S co2 375.380 ... L3 2005 02 28 10 09 -89.9600 -24.8000 2810.00 195555 SPO 2005 02 01 10 14 2582-99 S co2 375.280 ... L3 2005 02 28 10 23 -89.9600 -24.8000 2810.00 195556 SPO 2005 02 01 10 30 1875-99 P co2 375.380 ... L3 2005 02 28 09 41 -89.9600 -24.8000 2810.00 195551 SPO 2005 02 01 10 30 1876-99 P co2 375.380 ... L3 2005 02 28 09 55 -89.9600 -24.8000 2810.00 195552 SPO 2005 02 11 03 41 1339-99 P co2 375.080 ... L3 2005 12 14 11 21 -89.9600 -24.8000 2810.00 210218 SPO 2005 02 11 03 41 1340-99 P co2 375.100 ... L3 2005 12 14 11 35 -89.9600 -24.8000 2810.00 210219 SPO 2005 02 15 22 15 3723-99 P co2 375.340 ... L3 2005 12 14 09 27 -89.9600 -24.8000 2810.00 210220 SPO 2005 02 15 22 15 3724-99 P co2 375.200 ... L3 2005 12 14 09 41 -89.9600 -24.8000 2810.00 210221 SPO 2005 02 15 22 19 2165-99 S co2 375.950 +.. L3 2005 12 14 10 52 -89.9600 -24.8000 2810.00 210214 SPO 2005 02 15 22 19 2166-99 S co2 375.190 -.. L3 2005 12 14 11 06 -89.9600 -24.8000 2810.00 210215 SPO 2005 02 17 22 31 135-99 P co2 374.890 ... L3 2005 12 14 17 03 -89.9600 -24.8000 2810.00 210226 SPO 2005 02 17 22 31 136-99 P co2 375.040 ... L3 2005 12 14 17 17 -89.9600 -24.8000 2810.00 210227 SPO 2005 02 24 21 31 2795-99 P co2 374.790 ... L3 2005 12 14 16 34 -89.9600 -24.8000 2810.00 210224 SPO 2005 02 24 21 31 2796-99 P co2 374.570 ... L3 2005 12 14 16 48 -89.9600 -24.8000 2810.00 210225 SPO 2005 03 01 02 14 1753-99 P co2 374.900 ... L3 2005 12 14 15 37 -89.9600 -24.8000 2810.00 210228 SPO 2005 03 01 02 14 1754-99 P co2 374.950 ... L3 2005 12 14 15 51 -89.9600 -24.8000 2810.00 210229 SPO 2005 03 01 02 19 2419-99 S co2 375.050 ... L3 2005 12 14 16 06 -89.9600 -24.8000 2810.00 210222 SPO 2005 03 01 02 19 2420-99 S co2 375.060 ... L3 2005 12 14 16 20 -89.9600 -24.8000 2810.00 210223 SPO 2005 03 04 01 43 3084-99 P co2 375.140 ... L3 2005 12 19 13 04 -89.9600 -24.8000 2810.00 210139 SPO 2005 03 11 02 20 2977-99 P co2 375.220 ... L3 2005 12 14 13 15 -89.9600 -24.8000 2810.00 210142 SPO 2005 03 11 02 20 2978-99 P co2 375.220 ... L3 2005 12 14 13 29 -89.9600 -24.8000 2810.00 210143 SPO 2005 03 15 03 10 6045-66 P co2 375.140 ... L3 2005 12 14 12 18 -89.9600 -24.8000 2810.00 210140 SPO 2005 03 15 03 10 6046-66 P co2 375.070 ... L3 2005 12 14 12 32 -89.9600 -24.8000 2810.00 210141 SPO 2005 03 15 03 16 3293-99 S co2 375.300 ... L3 2005 12 14 12 46 -89.9600 -24.8000 2810.00 210137 SPO 2005 03 15 03 16 3294-99 S co2 375.280 ... L3 2005 12 14 13 00 -89.9600 -24.8000 2810.00 210138 SPO 2005 03 18 03 10 6407-66 P co2 375.300 ... L3 2005 12 12 17 26 -89.9600 -24.8000 2810.00 210135 SPO 2005 03 18 03 10 6408-66 P co2 375.220 ... L3 2005 12 12 17 40 -89.9600 -24.8000 2810.00 210136 SPO 2005 03 25 03 36 1577-99 P co2 375.220 ... L3 2005 12 12 16 57 -89.9600 -24.8000 2810.00 210133 SPO 2005 03 25 03 36 1578-99 P co2 375.110 ... L3 2005 12 12 17 11 -89.9600 -24.8000 2810.00 210134 SPO 2005 04 01 07 13 2695-99 P co2 375.290 ... L3 2005 12 12 16 29 -89.9600 -24.8000 2810.00 210131 SPO 2005 04 01 07 13 2696-99 P co2 375.380 ... L3 2005 12 12 16 43 -89.9600 -24.8000 2810.00 210132 SPO 2005 04 01 07 18 3543-99 S co2 375.390 ... L3 2005 12 12 16 00 -89.9600 -24.8000 2810.00 210129 SPO 2005 04 01 07 18 3544-99 S co2 375.460 ... L3 2005 12 12 16 14 -89.9600 -24.8000 2810.00 210130 SPO 2005 04 08 02 21 6559-66 P co2 375.320 ... L3 2005 12 16 12 35 -89.9600 -24.8000 2810.00 210166 SPO 2005 04 08 02 21 6560-66 P co2 375.470 ... L3 2005 12 16 12 49 -89.9600 -24.8000 2810.00 210167 SPO 2005 04 15 22 09 6193-66 P co2 375.210 ... L3 2005 12 16 11 38 -89.9600 -24.8000 2810.00 210164 SPO 2005 04 15 22 09 6194-66 P co2 375.340 ... L3 2005 12 16 11 52 -89.9600 -24.8000 2810.00 210165 SPO 2005 04 15 22 16 3179-99 S co2 375.470 ... L3 2005 12 16 12 06 -89.9600 -24.8000 2810.00 210160 SPO 2005 04 15 22 16 3180-99 S co2 375.490 ... L3 2005 12 16 12 20 -89.9600 -24.8000 2810.00 210161 SPO 2005 04 23 03 42 2589-99 P co2 375.660 ... L3 2005 12 16 11 09 -89.9600 -24.8000 2810.00 210162 SPO 2005 04 23 03 42 2590-99 P co2 375.600 ... L3 2005 12 16 11 24 -89.9600 -24.8000 2810.00 210163 SPO 2005 04 29 05 17 2411-99 P co2 375.580 ... L3 2005 12 13 12 05 -89.9600 -24.8000 2810.00 210184 SPO 2005 04 29 05 17 2412-99 P co2 375.680 ... L3 2005 12 13 12 19 -89.9600 -24.8000 2810.00 210185 SPO 2005 05 02 03 12 3135-99 P co2 375.650 ... L3 2005 12 13 11 08 -89.9600 -24.8000 2810.00 210186 SPO 2005 05 02 03 12 3136-99 P co2 375.560 ... L3 2005 12 13 11 22 -89.9600 -24.8000 2810.00 210187 SPO 2005 05 02 03 17 3533-99 S co2 375.790 ... L3 2005 12 13 11 37 -89.9600 -24.8000 2810.00 210182 SPO 2005 05 02 03 17 3534-99 S co2 375.820 ... L3 2005 12 13 11 51 -89.9600 -24.8000 2810.00 210183 SPO 2005 05 06 02 20 3553-99 P co2 375.630 ... L3 2005 12 13 10 40 -89.9600 -24.8000 2810.00 210188 SPO 2005 05 06 02 20 3554-99 P co2 375.660 ... L3 2005 12 13 10 54 -89.9600 -24.8000 2810.00 210189 SPO 2005 05 13 23 59 3037-99 P co2 375.940 ... L3 2005 12 14 15 09 -89.9600 -24.8000 2810.00 210111 SPO 2005 05 13 23 59 3038-99 P co2 375.870 ... L3 2005 12 14 15 23 -89.9600 -24.8000 2810.00 210112 SPO 2005 05 16 04 00 3301-99 S co2 375.970 ... L3 2005 12 14 14 12 -89.9600 -24.8000 2810.00 210107 SPO 2005 05 16 04 00 3302-99 S co2 376.070 ... L3 2005 12 14 14 26 -89.9600 -24.8000 2810.00 210108 SPO 2005 05 16 04 10 3013-99 P co2 375.810 ... L3 2005 12 14 14 40 -89.9600 -24.8000 2810.00 210109 SPO 2005 05 16 04 10 3014-99 P co2 375.870 ... L3 2005 12 14 14 54 -89.9600 -24.8000 2810.00 210110 SPO 2005 05 20 03 33 6195-66 P co2 375.890 ... L3 2005 12 14 13 43 -89.9600 -24.8000 2810.00 210105 SPO 2005 05 20 03 33 6196-66 P co2 375.990 ... L3 2005 12 14 13 57 -89.9600 -24.8000 2810.00 210106 SPO 2005 05 27 04 24 6047-66 P co2 375.980 ... L3 2005 12 15 13 08 -89.9600 -24.8000 2810.00 210119 SPO 2005 05 27 04 24 6048-66 P co2 376.030 ... L3 2005 12 15 13 22 -89.9600 -24.8000 2810.00 210120 SPO 2005 06 01 02 16 531-99 P co2 376.300 ... L3 2005 12 15 12 40 -89.9600 -24.8000 2810.00 210117 SPO 2005 06 01 02 16 532-99 P co2 376.150 ... L3 2005 12 15 12 54 -89.9600 -24.8000 2810.00 210118 SPO 2005 06 01 02 19 1299-99 S co2 376.310 ... L3 2005 12 15 12 11 -89.9600 -24.8000 2810.00 210115 SPO 2005 06 01 02 19 1300-99 S co2 376.280 ... L3 2005 12 15 12 25 -89.9600 -24.8000 2810.00 210116 SPO 2005 06 03 03 48 1151-99 P co2 376.260 ... L3 2005 12 15 11 43 -89.9600 -24.8000 2810.00 210113 SPO 2005 06 03 03 48 1152-99 P co2 376.200 ... L3 2005 12 15 11 57 -89.9600 -24.8000 2810.00 210114 SPO 2005 06 10 23 12 17-99 P co2 376.450 ... L3 2005 12 12 11 43 -89.9600 -24.8000 2810.00 210204 SPO 2005 06 10 23 12 18-99 P co2 376.300 ... L3 2005 12 12 11 58 -89.9600 -24.8000 2810.00 210205 SPO 2005 06 15 22 13 3971-99 P co2 376.450 ... L3 2005 12 12 10 46 -89.9600 -24.8000 2810.00 210202 SPO 2005 06 15 22 13 3972-99 P co2 376.380 ... L3 2005 12 12 11 01 -89.9600 -24.8000 2810.00 210203 SPO 2005 06 15 22 17 245-99 S co2 376.550 ... L3 2005 12 12 11 15 -89.9600 -24.8000 2810.00 210198 SPO 2005 06 15 22 17 246-99 S co2 376.560 ... L3 2005 12 12 11 29 -89.9600 -24.8000 2810.00 210199 SPO 2005 06 18 03 30 3973-99 P co2 376.570 ... L3 2005 12 12 09 21 -89.9600 -24.8000 2810.00 210200 SPO 2005 06 18 03 30 3974-99 P co2 376.380 ... L3 2005 12 12 09 35 -89.9600 -24.8000 2810.00 210201 SPO 2005 06 26 02 40 3427-99 P co2 376.650 ... L3 2005 12 12 15 31 -89.9600 -24.8000 2810.00 210212 SPO 2005 06 26 02 40 3428-99 P co2 376.720 ... L3 2005 12 12 15 46 -89.9600 -24.8000 2810.00 210213 SPO 2005 06 30 22 11 6681-66 P co2 376.590 ... L3 2005 12 12 14 34 -89.9600 -24.8000 2810.00 210208 SPO 2005 06 30 22 11 6682-66 P co2 376.650 ... L3 2005 12 12 14 49 -89.9600 -24.8000 2810.00 210209 SPO 2005 06 30 22 17 2713-99 S co2 376.780 ... L3 2005 12 12 15 03 -89.9600 -24.8000 2810.00 210210 SPO 2005 06 30 22 17 2714-99 S co2 376.750 ... L3 2005 12 12 15 17 -89.9600 -24.8000 2810.00 210211 SPO 2005 07 05 00 29 3299-99 P co2 377.290 ... L3 2005 12 13 14 56 -89.9600 -24.8000 2810.00 210154 SPO 2005 07 05 00 29 3300-99 P co2 377.160 ... L3 2005 12 13 15 10 -89.9600 -24.8000 2810.00 210155 SPO 2005 07 10 02 28 3981-99 P co2 376.710 ... L3 2005 12 12 14 06 -89.9600 -24.8000 2810.00 210206 SPO 2005 07 10 02 28 3982-99 P co2 376.710 ... L3 2005 12 12 14 20 -89.9600 -24.8000 2810.00 210207 SPO 2005 07 15 02 10 3141-99 P co2 376.910 ... L3 2005 12 16 14 00 -89.9600 -24.8000 2810.00 210180 SPO 2005 07 15 02 10 3142-99 P co2 377.020 ... L3 2005 12 16 14 14 -89.9600 -24.8000 2810.00 210181 SPO 2005 07 15 02 15 6249-66 S co2 378.180 +.. L3 2005 12 16 13 32 -89.9600 -24.8000 2810.00 210176 SPO 2005 07 15 02 15 6250-66 S co2 377.100 -.. L3 2005 12 16 13 46 -89.9600 -24.8000 2810.00 210177 SPO 2005 07 22 08 16 6313-66 P co2 376.960 ... L3 2005 12 16 13 03 -89.9600 -24.8000 2810.00 210178 SPO 2005 07 22 08 16 6314-66 P co2 377.000 ... L3 2005 12 16 13 17 -89.9600 -24.8000 2810.00 210179 SPO 2005 07 29 04 13 1273-99 P co2 377.200 ... L3 2005 12 13 16 21 -89.9600 -24.8000 2810.00 210158 SPO 2005 07 29 04 13 1274-99 P co2 377.190 ... L3 2005 12 13 16 36 -89.9600 -24.8000 2810.00 210159 SPO 2005 08 02 21 11 1035-99 P co2 377.300 ... L3 2005 12 13 15 53 -89.9600 -24.8000 2810.00 210156 SPO 2005 08 02 21 11 1036-99 P co2 377.230 ... L3 2005 12 13 16 07 -89.9600 -24.8000 2810.00 210157 SPO 2005 08 02 21 16 2015-99 S co2 377.250 ... L3 2005 12 13 15 24 -89.9600 -24.8000 2810.00 210152 SPO 2005 08 02 21 16 2016-99 S co2 377.320 ... L3 2005 12 13 15 39 -89.9600 -24.8000 2810.00 210153 SPO 2005 08 12 03 23 2829-99 P co2 379.850 +.. L3 2005 12 16 10 12 -89.9600 -24.8000 2810.00 210174 SPO 2005 08 12 03 23 2830-99 P co2 377.370 -.. L3 2005 12 16 10 27 -89.9600 -24.8000 2810.00 210175 SPO 2005 08 15 22 10 2359-99 P co2 377.490 ... L3 2005 12 16 14 57 -89.9600 -24.8000 2810.00 210194 SPO 2005 08 15 22 10 2360-99 P co2 377.430 ... L3 2005 12 16 15 11 -89.9600 -24.8000 2810.00 210195 SPO 2005 08 15 22 16 3053-99 S co2 377.550 ... L3 2005 12 16 09 15 -89.9600 -24.8000 2810.00 210168 SPO 2005 08 15 22 16 3054-99 S co2 377.430 ... L3 2005 12 16 09 30 -89.9600 -24.8000 2810.00 210169 SPO 2005 08 26 03 18 3177-99 P co2 377.520 ... L3 2005 12 16 14 29 -89.9600 -24.8000 2810.00 210196 SPO 2005 08 26 03 18 3178-99 P co2 377.500 ... L3 2005 12 16 14 43 -89.9600 -24.8000 2810.00 210197 SPO 2005 09 01 03 11 3213-99 P co2 377.580 ... L3 2005 12 16 09 44 -89.9600 -24.8000 2810.00 210172 SPO 2005 09 01 03 11 3214-99 P co2 377.620 ... L3 2005 12 16 09 58 -89.9600 -24.8000 2810.00 210173 SPO 2005 09 01 03 15 3045-99 S co2 377.640 ... L3 2005 12 16 10 41 -89.9600 -24.8000 2810.00 210170 SPO 2005 09 01 03 15 3046-99 S co2 377.620 ... L3 2005 12 16 10 55 -89.9600 -24.8000 2810.00 210171 SPO 2005 09 09 23 33 2295-99 P co2 377.670 ... L3 2005 12 19 09 59 -89.9600 -24.8000 2810.00 210192 SPO 2005 09 09 23 33 2296-99 P co2 377.660 ... L3 2005 12 19 10 13 -89.9600 -24.8000 2810.00 210193 SPO 2005 09 15 02 11 3315-99 P co2 377.760 ... L3 2005 12 15 13 37 -89.9600 -24.8000 2810.00 210146 SPO 2005 09 15 02 11 3316-99 P co2 377.660 ... L3 2005 12 15 13 51 -89.9600 -24.8000 2810.00 210147 SPO 2005 09 15 02 16 755-99 S co2 377.660 ... L3 2005 12 16 15 26 -89.9600 -24.8000 2810.00 210190 SPO 2005 09 15 02 16 756-99 S co2 377.750 ... L3 2005 12 16 15 40 -89.9600 -24.8000 2810.00 210191 SPO 2005 09 23 02 50 1789-99 P co2 377.990 ... L3 2005 12 15 14 05 -89.9600 -24.8000 2810.00 210148 SPO 2005 09 23 02 50 1790-99 P co2 377.880 ... L3 2005 12 15 14 19 -89.9600 -24.8000 2810.00 210149 SPO 2005 10 02 21 11 81-99 P co2 377.960 ... L3 2005 12 15 14 33 -89.9600 -24.8000 2810.00 210150 SPO 2005 10 02 21 11 82-99 P co2 377.870 ... L3 2005 12 15 14 48 -89.9600 -24.8000 2810.00 210151 SPO 2005 10 02 21 16 2919-99 S co2 377.870 ... L3 2005 12 15 15 02 -89.9600 -24.8000 2810.00 210144 SPO 2005 10 02 21 16 2920-99 S co2 377.920 ... L3 2005 12 15 15 16 -89.9600 -24.8000 2810.00 210145 SPO 2005 10 07 02 46 2063-99 P co2 377.680 +.. L3 2005 12 13 12 34 -89.9600 -24.8000 2810.00 210123 SPO 2005 10 07 02 46 2064-99 P co2 375.650 -.. L3 2005 12 13 12 48 -89.9600 -24.8000 2810.00 210124 SPO 2005 10 19 01 11 2697-99 P co2 377.940 ... L3 2005 12 13 13 31 -89.9600 -24.8000 2810.00 210125 SPO 2005 10 19 01 11 2698-99 P co2 377.990 ... L3 2005 12 13 13 45 -89.9600 -24.8000 2810.00 210126 SPO 2005 10 19 01 16 2029-99 S co2 378.030 ... L3 2005 12 13 13 02 -89.9600 -24.8000 2810.00 210121 SPO 2005 10 19 01 16 2030-99 S co2 378.090 ... L3 2005 12 13 13 16 -89.9600 -24.8000 2810.00 210122 SPO 2005 10 22 03 24 1171-99 P co2 377.920 ... L3 2005 12 13 13 59 -89.9600 -24.8000 2810.00 210127 SPO 2005 10 22 03 24 1172-99 P co2 377.900 ... L3 2005 12 13 14 13 -89.9600 -24.8000 2810.00 210128 SPO 2005 10 28 02 25 2773-99 P co2 377.850 ... L3 2006 01 18 13 45 -89.9600 -24.8000 2810.00 211337 SPO 2005 10 28 02 25 2774-99 P co2 377.770 ... L3 2006 01 18 14 00 -89.9600 -24.8000 2810.00 211338 SPO 2005 11 01 21 15 2523-99 P co2 377.730 ... L3 2006 01 18 11 23 -89.9600 -24.8000 2810.00 211263 SPO 2005 11 01 21 15 2524-99 P co2 377.730 ... L3 2006 01 18 11 37 -89.9600 -24.8000 2810.00 211264 SPO 2005 11 01 21 18 3433-99 S co2 377.780 ... L3 2006 01 18 13 17 -89.9600 -24.8000 2810.00 211333 SPO 2005 11 01 21 18 3434-99 S co2 377.870 ... L3 2006 01 18 13 31 -89.9600 -24.8000 2810.00 211334 SPO 2005 11 06 03 50 1625-99 P co2 377.780 ... L3 2006 01 18 11 51 -89.9600 -24.8000 2810.00 211265 SPO 2005 11 06 03 50 1626-99 P co2 377.800 ... L3 2006 01 18 12 06 -89.9600 -24.8000 2810.00 211266 SPO 2005 11 11 04 48 2003-99 P co2 377.790 ... L3 2006 01 18 14 14 -89.9600 -24.8000 2810.00 211339 SPO 2005 11 11 04 48 2004-99 P co2 377.830 ... L3 2006 01 18 14 28 -89.9600 -24.8000 2810.00 211340 SPO 2005 11 15 01 10 3735-99 P co2 377.770 ... L3 2006 01 09 17 01 -89.9600 -24.8000 2810.00 211341 SPO 2005 11 15 01 10 3736-99 P co2 377.880 ... L3 2006 01 09 17 15 -89.9600 -24.8000 2810.00 211342 SPO 2005 11 15 01 15 1883-99 S co2 377.790 ... L3 2006 01 18 14 42 -89.9600 -24.8000 2810.00 211335 SPO 2005 11 15 01 15 1884-99 S co2 377.850 ... L3 2006 01 18 14 57 -89.9600 -24.8000 2810.00 211336 SPO 2005 11 21 20 10 719-99 P co2 377.870 ... L3 2006 01 10 10 22 -89.9600 -24.8000 2810.00 211343 SPO 2005 11 21 20 10 720-99 P co2 377.890 ... L3 2006 01 10 10 36 -89.9600 -24.8000 2810.00 211344 SPO 2005 11 27 03 06 4215-99 P co2 377.720 ... L3 2006 01 26 15 59 -89.9600 -24.8000 2810.00 211678 SPO 2005 11 27 03 06 4216-99 P co2 377.690 ... L3 2006 01 26 16 13 -89.9600 -24.8000 2810.00 211679 SPO 2005 12 01 00 14 4227-99 S co2 377.860 ... L3 2006 01 26 15 30 -89.9600 -24.8000 2810.00 211676 SPO 2005 12 01 00 14 4228-99 S co2 377.990 ... L3 2006 01 26 15 45 -89.9600 -24.8000 2810.00 211677 SPO 2005 12 01 01 09 83-99 P co2 377.850 ... L3 2006 01 27 10 55 -89.9600 -24.8000 2810.00 211666 SPO 2005 12 01 01 09 84-99 P co2 377.850 ... L3 2006 01 27 11 10 -89.9600 -24.8000 2810.00 211667 SPO 2005 12 04 06 21 2941-99 P co2 377.790 ... L3 2006 01 27 11 24 -89.9600 -24.8000 2810.00 211668 SPO 2005 12 04 06 21 2942-99 P co2 377.800 ... L3 2006 01 27 11 38 -89.9600 -24.8000 2810.00 211669 SPO 2005 12 08 18 38 4217-99 P co2 377.790 ... L3 2006 01 26 16 27 -89.9600 -24.8000 2810.00 211680 SPO 2005 12 08 18 38 4218-99 P co2 377.740 ... L3 2006 01 26 16 41 -89.9600 -24.8000 2810.00 211681 SPO 2005 12 16 04 08 4269-99 P co2 377.840 ... L3 2006 01 27 11 52 -89.9600 -24.8000 2810.00 211670 SPO 2005 12 16 04 08 4270-99 P co2 377.770 ... L3 2006 01 27 12 07 -89.9600 -24.8000 2810.00 211671 SPO 2005 12 16 04 16 2363-99 S co2 377.910 ... L3 2006 01 26 16 56 -89.9600 -24.8000 2810.00 211674 SPO 2005 12 16 04 16 2364-99 S co2 377.970 ... L3 2006 01 26 17 10 -89.9600 -24.8000 2810.00 211675 SPO 2005 12 22 04 28 4253-99 P co2 377.900 ... L3 2006 01 27 12 21 -89.9600 -24.8000 2810.00 211672 SPO 2005 12 22 04 28 4254-99 P co2 377.770 ... L3 2006 01 27 12 35 -89.9600 -24.8000 2810.00 211673 SPO 2005 12 28 03 02 4099-99 P co2 377.670 ... L3 2006 02 27 10 12 -89.9600 -24.8000 2810.00 213085 SPO 2005 12 28 03 02 4100-99 P co2 377.790 ... L3 2006 02 27 10 26 -89.9600 -24.8000 2810.00 213086 SPO 2006 01 02 09 10 4265-99 P co2 377.890 ... L3 2006 02 27 09 43 -89.9600 -24.8000 2810.00 213083 SPO 2006 01 02 09 10 4266-99 P co2 377.920 ... L3 2006 02 27 09 57 -89.9600 -24.8000 2810.00 213084 SPO 2006 01 02 09 16 4291-99 S co2 377.920 ... L3 2006 02 24 10 18 -89.9600 -24.8000 2810.00 213081 SPO 2006 01 02 09 16 4292-99 S co2 377.980 ... L3 2006 02 24 10 33 -89.9600 -24.8000 2810.00 213082 SPO 2006 01 08 07 47 4293-99 P co2 377.820 ... L3 2006 02 24 09 50 -89.9600 -24.8000 2810.00 213075 SPO 2006 01 08 07 47 4294-99 P co2 377.810 ... L3 2006 02 24 10 04 -89.9600 -24.8000 2810.00 213076 SPO 2006 01 15 01 10 4299-99 P co2 377.900 ... L3 2006 02 27 09 15 -89.9600 -24.8000 2810.00 213087 SPO 2006 01 15 01 10 4300-99 P co2 377.910 ... L3 2006 02 27 09 29 -89.9600 -24.8000 2810.00 213088 SPO 2006 01 15 01 14 1673-99 S co2 377.990 ... L3 2006 02 27 10 40 -89.9600 -24.8000 2810.00 213089 SPO 2006 01 15 01 14 1674-99 S co2 377.980 ... L3 2006 02 27 10 54 -89.9600 -24.8000 2810.00 213090 SPO 2006 01 26 02 06 4281-99 P co2 377.690 ... L3 2006 03 13 09 45 -89.9600 -24.8000 2810.00 213675 SPO 2006 01 26 02 06 4282-99 P co2 377.730 ... L3 2006 03 13 09 59 -89.9600 -24.8000 2810.00 213676 SPO 2006 02 01 04 08 1663-99 P co2 377.540 ... L3 2006 02 24 09 21 -89.9600 -24.8000 2810.00 213077 SPO 2006 02 01 04 08 1664-99 P co2 377.450 ... L3 2006 02 24 09 36 -89.9600 -24.8000 2810.00 213078 SPO 2006 02 01 04 12 4233-99 S co2 377.580 ... L3 2006 02 24 10 47 -89.9600 -24.8000 2810.00 213079 SPO 2006 02 01 04 12 4234-99 S co2 377.570 ... L3 2006 02 24 11 02 -89.9600 -24.8000 2810.00 213080 SPO 2006 02 08 02 46 983-99 P co2 377.350 ... L3 2006 12 11 14 03 -89.9600 -24.8000 2810.00 226113 SPO 2006 02 08 02 46 984-99 P co2 377.490 ... L3 2006 12 11 14 17 -89.9600 -24.8000 2810.00 226114 SPO 2006 02 15 03 09 1661-99 P co2 377.680 ... L3 2006 12 11 13 06 -89.9600 -24.8000 2810.00 226111 SPO 2006 02 15 03 09 1662-99 P co2 377.500 ... L3 2006 12 11 13 20 -89.9600 -24.8000 2810.00 226112 SPO 2006 02 15 03 12 681-99 S co2 377.520 ... L3 2006 12 11 13 34 -89.9600 -24.8000 2810.00 226115 SPO 2006 02 15 03 12 682-99 S co2 377.510 ... L3 2006 12 11 13 48 -89.9600 -24.8000 2810.00 226116 SPO 2006 02 22 02 11 3869-99 P co2 377.480 ... L3 2006 12 11 12 37 -89.9600 -24.8000 2810.00 226109 SPO 2006 02 22 02 11 3870-99 P co2 377.550 ... L3 2006 12 11 12 51 -89.9600 -24.8000 2810.00 226110 SPO 2006 03 01 00 08 1471-99 P co2 377.680 ... L3 2006 12 18 10 22 -89.9600 -24.8000 2810.00 226119 SPO 2006 03 01 00 08 1472-99 P co2 377.450 ... L3 2006 12 18 10 36 -89.9600 -24.8000 2810.00 226120 SPO 2006 03 01 00 17 3121-99 S co2 377.420 ... L3 2006 12 18 09 54 -89.9600 -24.8000 2810.00 226123 SPO 2006 03 01 00 17 3122-99 S co2 377.510 ... L3 2006 12 18 10 08 -89.9600 -24.8000 2810.00 226124 SPO 2006 03 08 00 32 1227-99 P co2 377.820 ... L3 2006 12 18 09 25 -89.9600 -24.8000 2810.00 226117 SPO 2006 03 08 00 32 1228-99 P co2 377.870 ... L3 2006 12 18 09 39 -89.9600 -24.8000 2810.00 226118 SPO 2006 03 15 01 06 335-99 P co2 377.590 ... L3 2006 12 13 12 36 -89.9600 -24.8000 2810.00 226192 SPO 2006 03 15 01 06 336-99 P co2 377.550 ... L3 2006 12 13 12 50 -89.9600 -24.8000 2810.00 226193 SPO 2006 03 15 01 11 2835-99 S co2 377.500 ... L3 2006 12 13 12 08 -89.9600 -24.8000 2810.00 226194 SPO 2006 03 15 01 11 2836-99 S co2 377.610 ... L3 2006 12 13 12 22 -89.9600 -24.8000 2810.00 226195 SPO 2006 03 22 01 24 1723-99 P co2 377.800 ... L3 2006 12 13 11 39 -89.9600 -24.8000 2810.00 226190 SPO 2006 03 22 01 24 1724-99 P co2 377.790 ... L3 2006 12 13 11 53 -89.9600 -24.8000 2810.00 226191 SPO 2006 03 29 00 55 397-99 P co2 377.840 ... L3 2006 12 13 11 11 -89.9600 -24.8000 2810.00 226188 SPO 2006 03 29 00 55 398-99 P co2 377.830 ... L3 2006 12 13 11 25 -89.9600 -24.8000 2810.00 226189 SPO 2006 04 03 21 10 1187-99 P co2 378.020 ... L3 2006 12 13 14 30 -89.9600 -24.8000 2810.00 226198 SPO 2006 04 03 21 10 1188-99 P co2 377.790 ... L3 2006 12 13 14 44 -89.9600 -24.8000 2810.00 226199 SPO 2006 04 03 21 15 1121-99 S co2 377.640 ... L3 2006 12 13 14 01 -89.9600 -24.8000 2810.00 226200 SPO 2006 04 03 21 15 1122-99 S co2 377.680 ... L3 2006 12 13 14 16 -89.9600 -24.8000 2810.00 226201 SPO 2006 04 09 23 38 3741-99 P co2 377.750 ... L3 2006 12 13 13 33 -89.9600 -24.8000 2810.00 226196 SPO 2006 04 09 23 38 3742-99 P co2 377.720 ... L3 2006 12 13 13 47 -89.9600 -24.8000 2810.00 226197 SPO 2006 04 15 00 07 999-99 P co2 378.070 ... L3 2006 12 12 13 04 -89.9600 -24.8000 2810.00 226161 SPO 2006 04 15 00 07 1000-99 P co2 377.980 ... L3 2006 12 12 13 18 -89.9600 -24.8000 2810.00 226162 SPO 2006 04 15 00 11 2635-99 S co2 377.850 ... L3 2006 12 13 13 05 -89.9600 -24.8000 2810.00 226202 SPO 2006 04 15 00 11 2636-99 S co2 377.900 ... L3 2006 12 13 13 19 -89.9600 -24.8000 2810.00 226203 SPO 2006 04 19 21 20 1927-99 P co2 377.810 ... L3 2006 12 12 13 32 -89.9600 -24.8000 2810.00 226159 SPO 2006 04 19 21 20 1928-99 P co2 377.950 ... L3 2006 12 12 13 47 -89.9600 -24.8000 2810.00 226160 SPO 2006 04 26 21 52 4255-99 P co2 377.900 ... L3 2006 12 12 12 35 -89.9600 -24.8000 2810.00 226157 SPO 2006 04 26 21 52 4256-99 P co2 377.930 ... L3 2006 12 12 12 50 -89.9600 -24.8000 2810.00 226158 SPO 2006 05 01 21 11 4245-99 P co2 378.070 ... L3 2006 12 15 13 07 -89.9600 -24.8000 2810.00 226167 SPO 2006 05 01 21 11 4246-99 P co2 378.040 ... L3 2006 12 15 13 21 -89.9600 -24.8000 2810.00 226168 SPO 2006 05 01 21 18 809-99 S co2 378.070 ... L3 2006 12 12 12 07 -89.9600 -24.8000 2810.00 226163 SPO 2006 05 01 21 18 810-99 S co2 378.430 ... L3 2006 12 12 12 21 -89.9600 -24.8000 2810.00 226164 SPO 2006 05 08 00 14 3269-99 P co2 378.130 ... L3 2006 12 15 12 38 -89.9600 -24.8000 2810.00 226165 SPO 2006 05 08 00 14 3270-99 P co2 378.130 ... L3 2006 12 15 12 53 -89.9600 -24.8000 2810.00 226166 SPO 2006 05 15 00 13 4259-99 P co2 378.090 ... L3 2006 12 15 11 41 -89.9600 -24.8000 2810.00 226169 SPO 2006 05 15 00 13 4260-99 P co2 378.090 ... L3 2006 12 15 11 56 -89.9600 -24.8000 2810.00 226170 SPO 2006 05 15 00 18 3733-99 S co2 378.080 ... L3 2006 12 15 12 10 -89.9600 -24.8000 2810.00 226171 SPO 2006 05 15 00 18 3734-99 S co2 378.200 ... L3 2006 12 15 12 24 -89.9600 -24.8000 2810.00 226172 SPO 2006 05 23 00 17 4275-99 P co2 378.220 ... L3 2006 12 13 08 48 -89.9600 -24.8000 2810.00 226097 SPO 2006 05 23 00 17 4276-99 P co2 378.150 ... L3 2006 12 13 09 03 -89.9600 -24.8000 2810.00 226098 SPO 2006 06 01 01 11 4277-99 P co2 378.270 ... L3 2006 12 12 14 29 -89.9600 -24.8000 2810.00 226095 SPO 2006 06 01 01 11 4278-99 P co2 378.170 ... L3 2006 12 12 14 43 -89.9600 -24.8000 2810.00 226096 SPO 2006 06 01 01 16 4247-99 S co2 378.120 ... L3 2006 12 12 14 58 -89.9600 -24.8000 2810.00 226099 SPO 2006 06 01 01 16 4248-99 S co2 378.180 ... L3 2006 12 12 15 12 -89.9600 -24.8000 2810.00 226100 SPO 2006 06 08 00 10 2495-99 P co2 378.340 ... L3 2006 12 12 14 01 -89.9600 -24.8000 2810.00 226093 SPO 2006 06 08 00 10 2496-99 P co2 378.400 ... L3 2006 12 12 14 15 -89.9600 -24.8000 2810.00 226094 SPO 2006 06 15 02 11 4267-99 P co2 378.390 ... L3 2006 12 12 09 16 -89.9600 -24.8000 2810.00 226101 SPO 2006 06 15 02 11 4268-99 P co2 378.360 ... L3 2006 12 12 09 30 -89.9600 -24.8000 2810.00 226102 SPO 2006 06 15 02 16 4271-99 S co2 378.250 ... L3 2006 12 12 09 45 -89.9600 -24.8000 2810.00 226107 SPO 2006 06 15 02 16 4272-99 S co2 378.210 ... L3 2006 12 12 09 59 -89.9600 -24.8000 2810.00 226108 SPO 2006 06 22 23 40 2753-99 P co2 378.600 ... L3 2006 12 11 14 59 -89.9600 -24.8000 2810.00 226103 SPO 2006 06 22 23 40 2754-99 P co2 378.520 ... L3 2006 12 11 15 14 -89.9600 -24.8000 2810.00 226104 SPO 2006 07 01 01 11 2351-99 P co2 378.670 ... L3 2006 12 11 14 31 -89.9600 -24.8000 2810.00 226105 SPO 2006 07 01 01 11 2352-99 P co2 378.510 ... L3 2006 12 11 14 45 -89.9600 -24.8000 2810.00 226106 SPO 2006 07 01 01 17 349-99 S co2 378.480 ... L3 2006 12 15 14 04 -89.9600 -24.8000 2810.00 226129 SPO 2006 07 01 01 17 350-99 S co2 378.460 ... L3 2006 12 15 14 18 -89.9600 -24.8000 2810.00 226130 SPO 2006 07 08 00 55 3319-99 P co2 378.780 ... L3 2006 12 15 14 32 -89.9600 -24.8000 2810.00 226125 SPO 2006 07 08 00 55 3320-99 P co2 378.630 ... L3 2006 12 15 14 46 -89.9600 -24.8000 2810.00 226126 SPO 2006 07 15 04 11 1439-99 P co2 378.770 ... L3 2006 12 15 15 01 -89.9600 -24.8000 2810.00 226127 SPO 2006 07 15 04 11 1440-99 P co2 378.760 ... L3 2006 12 15 15 15 -89.9600 -24.8000 2810.00 226128 SPO 2006 07 15 04 11 3647-99 S co2 378.730 ... L3 2006 12 15 09 19 -89.9600 -24.8000 2810.00 226137 SPO 2006 07 15 04 11 3648-99 S co2 378.750 ... L3 2006 12 15 09 33 -89.9600 -24.8000 2810.00 226138 SPO 2006 07 20 02 31 4303-99 P co2 378.860 ... L3 2006 12 15 08 51 -89.9600 -24.8000 2810.00 226135 SPO 2006 07 20 02 31 4304-99 P co2 378.780 ... L3 2006 12 15 09 05 -89.9600 -24.8000 2810.00 226136 SPO 2006 07 26 00 47 2467-99 P co2 378.920 ... L3 2006 12 14 14 58 -89.9600 -24.8000 2810.00 226133 SPO 2006 07 26 00 47 2468-99 P co2 378.920 ... L3 2006 12 14 15 13 -89.9600 -24.8000 2810.00 226134 SPO 2006 08 01 04 11 4261-99 S co2 379.180 ... L3 2006 12 14 14 30 -89.9600 -24.8000 2810.00 226139 SPO 2006 08 01 04 11 4262-99 S co2 379.130 ... L3 2006 12 14 14 44 -89.9600 -24.8000 2810.00 226140 SPO 2006 08 01 04 12 3931-99 P co2 379.190 ... L3 2006 12 15 11 13 -89.9600 -24.8000 2810.00 226208 SPO 2006 08 01 04 12 3932-99 P co2 379.210 ... L3 2006 12 15 11 27 -89.9600 -24.8000 2810.00 226209 SPO 2006 08 09 04 21 1013-99 P co2 379.250 ... L3 2006 12 15 10 45 -89.9600 -24.8000 2810.00 226206 SPO 2006 08 09 04 21 1014-99 P co2 379.320 ... L3 2006 12 15 10 59 -89.9600 -24.8000 2810.00 226207 SPO 2006 08 15 00 19 4213-99 S co2 379.240 ... L3 2006 12 15 10 16 -89.9600 -24.8000 2810.00 226210 SPO 2006 08 15 00 19 4214-99 S co2 379.150 ... L3 2006 12 15 10 30 -89.9600 -24.8000 2810.00 226211 SPO 2006 08 15 01 12 4241-99 P co2 379.180 ... L3 2006 12 15 09 48 -89.9600 -24.8000 2810.00 226204 SPO 2006 08 15 01 12 4242-99 P co2 379.260 ... L3 2006 12 15 10 02 -89.9600 -24.8000 2810.00 226205 SPO 2006 08 25 01 52 1029-99 P co2 379.200 ... L3 2006 12 14 14 02 -89.9600 -24.8000 2810.00 226216 SPO 2006 08 25 01 52 1030-99 P co2 379.310 ... L3 2006 12 14 14 16 -89.9600 -24.8000 2810.00 226217 SPO 2006 09 01 02 11 1009-99 P co2 379.390 ... L3 2006 12 14 13 05 -89.9600 -24.8000 2810.00 226214 SPO 2006 09 01 02 11 1010-99 P co2 379.320 ... L3 2006 12 14 13 19 -89.9600 -24.8000 2810.00 226215 SPO 2006 09 01 02 11 4279-99 S co2 379.270 ... L3 2006 12 14 13 33 -89.9600 -24.8000 2810.00 226218 SPO 2006 09 01 02 11 4280-99 S co2 379.340 ... L3 2006 12 14 13 47 -89.9600 -24.8000 2810.00 226219 SPO 2006 09 08 02 01 1955-99 P co2 379.410 ... L3 2006 12 14 12 36 -89.9600 -24.8000 2810.00 226212 SPO 2006 09 08 02 01 1956-99 P co2 379.420 ... L3 2006 12 14 12 50 -89.9600 -24.8000 2810.00 226213 SPO 2006 09 15 14 23 2275-99 P co2 379.550 ... L3 2006 12 14 09 17 -89.9600 -24.8000 2810.00 226173 SPO 2006 09 15 14 23 2276-99 P co2 379.610 ... L3 2006 12 14 09 31 -89.9600 -24.8000 2810.00 226174 SPO 2006 09 19 01 11 4205-99 P co2 379.470 ... L3 2006 12 14 09 45 -89.9600 -24.8000 2810.00 226175 SPO 2006 09 19 01 11 4206-99 P co2 379.430 ... L3 2006 12 14 09 59 -89.9600 -24.8000 2810.00 226176 SPO 2006 09 19 01 17 1609-99 S co2 379.420 ... L3 2006 12 13 14 58 -89.9600 -24.8000 2810.00 226178 SPO 2006 09 19 01 17 1610-99 S co2 379.500 ... L3 2006 12 13 15 13 -89.9600 -24.8000 2810.00 226179 SPO 2006 09 25 15 29 4226-99 P co2 379.520 ... L3 2006 12 14 10 28 -89.9600 -24.8000 2810.00 226177 SPO 2006 10 01 14 11 4219-99 P co2 379.690 ... L3 2006 12 14 11 39 -89.9600 -24.8000 2810.00 226180 SPO 2006 10 01 14 11 4220-99 P co2 379.630 ... L3 2006 12 14 11 53 -89.9600 -24.8000 2810.00 226181 SPO 2006 10 01 14 17 3-99 S co2 379.580 ... L3 2006 12 14 11 11 -89.9600 -24.8000 2810.00 226186 SPO 2006 10 01 14 17 4-99 S co2 379.650 ... L3 2006 12 14 11 25 -89.9600 -24.8000 2810.00 226187 SPO 2006 10 08 13 31 2397-99 P co2 379.600 ... L3 2006 12 18 08 57 -89.9600 -24.8000 2810.00 226121 SPO 2006 10 08 13 31 2398-99 P co2 379.590 ... L3 2006 12 18 09 11 -89.9600 -24.8000 2810.00 226122 SPO 2006 10 15 14 42 3831-99 P co2 379.550 ... L3 2007 01 10 12 18 -89.9600 -24.8000 2810.00 226786 SPO 2006 10 15 14 42 3832-99 P co2 379.570 ... L3 2007 01 10 12 33 -89.9600 -24.8000 2810.00 226787 SPO 2006 10 17 15 11 4231-99 S co2 379.500 ... L3 2006 12 14 12 08 -89.9600 -24.8000 2810.00 226184 SPO 2006 10 17 15 11 4232-99 S co2 379.500 ... L3 2006 12 14 12 22 -89.9600 -24.8000 2810.00 226185 SPO 2006 10 17 15 14 921-99 P co2 379.590 ... L3 2006 12 14 10 42 -89.9600 -24.8000 2810.00 226182 SPO 2006 10 17 15 14 922-99 P co2 379.600 ... L3 2006 12 14 10 56 -89.9600 -24.8000 2810.00 226183 SPO 2006 10 24 13 45 1923-99 P co2 379.710 ... L3 2007 01 10 11 50 -89.9600 -24.8000 2810.00 226784 SPO 2006 10 24 13 45 1924-99 P co2 379.600 ... L3 2007 01 10 12 04 -89.9600 -24.8000 2810.00 226785 SPO 2006 11 05 02 18 2469-99 S co2 379.610 ... L3 2007 01 10 12 47 -89.9600 -24.8000 2810.00 226788 SPO 2006 11 05 02 18 2470-99 S co2 379.610 ... L3 2007 01 10 13 01 -89.9600 -24.8000 2810.00 226789 SPO 2006 11 05 15 13 2053-99 P co2 379.650 ... L3 2006 12 26 15 29 -89.9600 -24.8000 2810.00 226792 SPO 2006 11 05 15 13 2054-99 P co2 379.610 ... L3 2006 12 26 15 43 -89.9600 -24.8000 2810.00 226793 SPO 2006 11 12 19 46 2283-99 P co2 379.730 ... L3 2006 12 27 09 40 -89.9600 -24.8000 2810.00 226796 SPO 2006 11 12 19 46 2284-99 P co2 379.650 ... L3 2006 12 27 09 54 -89.9600 -24.8000 2810.00 226797 SPO 2006 11 15 02 14 2563-99 S co2 379.560 ... L3 2006 12 26 15 57 -89.9600 -24.8000 2810.00 226794 SPO 2006 11 15 02 14 2564-99 S co2 379.600 ... L3 2006 12 26 16 12 -89.9600 -24.8000 2810.00 226795 SPO 2006 11 15 02 15 2267-99 P co2 379.630 ... L3 2006 12 27 10 08 -89.9600 -24.8000 2810.00 226790 SPO 2006 11 15 02 15 2268-99 P co2 379.590 ... L3 2006 12 27 10 22 -89.9600 -24.8000 2810.00 226791 SPO 2006 11 22 22 21 749-99 P co2 379.630 ... L3 2007 02 12 13 49 -89.9600 -24.8000 2810.00 228900 SPO 2006 11 22 22 21 750-99 P co2 379.670 ... L3 2007 02 12 14 03 -89.9600 -24.8000 2810.00 228901 SPO 2006 12 01 00 14 2791-99 S co2 379.500 ... L3 2007 02 12 12 52 -89.9600 -24.8000 2810.00 228902 SPO 2006 12 01 00 14 2792-99 S co2 379.550 ... L3 2007 02 12 13 06 -89.9600 -24.8000 2810.00 228903 SPO 2006 12 01 00 21 4243-99 P co2 379.550 ... L3 2007 02 12 13 20 -89.9600 -24.8000 2810.00 228904 SPO 2006 12 01 00 21 4244-99 P co2 379.580 ... L3 2007 02 12 13 34 -89.9600 -24.8000 2810.00 228905 SPO 2006 12 08 03 07 2663-99 P co2 379.650 ... L3 2007 02 13 15 08 -89.9600 -24.8000 2810.00 228894 SPO 2006 12 08 03 07 2664-99 P co2 379.570 ... L3 2007 02 13 15 22 -89.9600 -24.8000 2810.00 228895 SPO 2006 12 18 03 11 3995-99 P co2 379.700 ... L3 2007 02 13 14 39 -89.9600 -24.8000 2810.00 228892 SPO 2006 12 18 03 11 3996-99 P co2 379.730 ... L3 2007 02 13 14 53 -89.9600 -24.8000 2810.00 228893 SPO 2006 12 18 03 12 4287-99 S co2 379.730 ... L3 2007 02 13 14 11 -89.9600 -24.8000 2810.00 228896 SPO 2006 12 18 03 12 4288-99 S co2 379.760 ... L3 2007 02 13 14 25 -89.9600 -24.8000 2810.00 228897 SPO 2006 12 23 22 37 4289-99 P co2 375.270 +.. L3 2007 02 13 13 42 -89.9600 -24.8000 2810.00 228890 SPO 2006 12 23 22 37 4290-99 P co2 360.920 -.. L3 2007 02 13 13 56 -89.9600 -24.8000 2810.00 228891 SPO 2007 01 01 22 12 432-99 S co2 379.340 ... L3 2007 02 16 12 05 -89.9600 -24.8000 2810.00 228899 SPO 2007 01 01 22 12 3051-99 P co2 379.400 ... L3 2007 03 14 09 19 -89.9600 -24.8000 2810.00 230387 SPO 2007 01 01 22 12 3052-99 P co2 379.440 ... L3 2007 03 14 09 33 -89.9600 -24.8000 2810.00 230388 SPO 2007 01 09 20 26 2057-99 P co2 379.500 ... L3 2007 03 13 16 44 -89.9600 -24.8000 2810.00 230385 SPO 2007 01 09 20 26 2058-99 P co2 379.640 ... L3 2007 03 13 16 58 -89.9600 -24.8000 2810.00 230386 SPO 2007 01 15 22 15 4487-99 S co2 379.400 ... L3 2007 03 14 15 02 -89.9600 -24.8000 2810.00 230375 SPO 2007 01 15 22 15 4488-99 S co2 379.390 ... L3 2007 03 14 15 16 -89.9600 -24.8000 2810.00 230376 SPO 2007 01 15 22 37 1657-99 P co2 379.570 ... L3 2007 03 14 08 51 -89.9600 -24.8000 2810.00 230383 SPO 2007 01 15 22 37 1658-99 P co2 379.390 ... L3 2007 03 14 09 05 -89.9600 -24.8000 2810.00 230384 SPO 2007 01 24 05 00 835-99 P co2 379.560 ... L3 2007 03 14 09 48 -89.9600 -24.8000 2810.00 230381 SPO 2007 01 24 05 00 836-99 P co2 379.560 ... L3 2007 03 14 10 02 -89.9600 -24.8000 2810.00 230382 SPO 2007 02 01 04 12 1287-99 S co2 379.650 ... L3 2007 03 14 15 31 -89.9600 -24.8000 2810.00 230377 SPO 2007 02 01 04 12 1288-99 S co2 379.560 ... L3 2007 03 14 15 45 -89.9600 -24.8000 2810.00 230378 SPO 2007 02 01 04 12 2797-99 P co2 379.740 ... L3 2007 03 14 14 04 -89.9600 -24.8000 2810.00 230379 SPO 2007 02 01 04 12 2797-99 P co2 379.750 ... L3 2007 03 14 16 28 -89.9600 -24.8000 2810.00 230379 SPO 2007 02 01 04 12 2798-99 P co2 379.900 ... L3 2007 03 14 14 18 -89.9600 -24.8000 2810.00 230380 SPO 2007 02 01 04 12 2798-99 P co2 379.970 ... L3 2007 03 14 16 42 -89.9600 -24.8000 2810.00 230380 SPO 2007 02 08 20 20 2627-99 P co2 379.520 ... L3 2007 12 17 14 50 -89.9600 -24.8000 2810.00 246348 SPO 2007 02 08 20 20 2628-99 P co2 379.470 ... L3 2007 12 17 15 04 -89.9600 -24.8000 2810.00 246349 SPO 2007 02 15 02 19 1843-99 S co2 379.390 ... L3 2007 12 17 15 18 -89.9600 -24.8000 2810.00 246346 SPO 2007 02 15 02 19 1844-99 S co2 379.340 ... L3 2007 12 17 15 32 -89.9600 -24.8000 2810.00 246347 SPO 2007 02 15 20 12 385-99 P co2 379.390 ... L3 2007 12 21 12 49 -89.9600 -24.8000 2810.00 246368 SPO 2007 02 15 20 12 386-99 P co2 379.410 ... L3 2007 12 21 13 03 -89.9600 -24.8000 2810.00 246369 SPO 2007 02 25 00 09 4151-99 P co2 379.400 ... L3 2007 12 21 13 46 -89.9600 -24.8000 2810.00 246370 SPO 2007 02 25 00 09 4152-99 P co2 379.430 ... L3 2007 12 21 14 00 -89.9600 -24.8000 2810.00 246371 SPO 2007 03 01 01 11 323-99 P co2 379.310 ... L3 2007 12 17 14 21 -89.9600 -24.8000 2810.00 246350 SPO 2007 03 01 01 11 324-99 P co2 379.340 ... L3 2007 12 17 14 35 -89.9600 -24.8000 2810.00 246351 SPO 2007 03 01 01 18 3683-99 S co2 379.200 ... L3 2007 12 17 13 24 -89.9600 -24.8000 2810.00 246344 SPO 2007 03 01 01 18 3684-99 S co2 379.180 ... L3 2007 12 17 13 38 -89.9600 -24.8000 2810.00 246345 SPO 2007 03 08 05 00 27-99 P co2 379.550 ... L3 2007 12 21 12 20 -89.9600 -24.8000 2810.00 246366 SPO 2007 03 08 05 00 28-99 P co2 379.560 ... L3 2007 12 21 12 34 -89.9600 -24.8000 2810.00 246367 SPO 2007 03 15 02 17 1195-99 S co2 379.490 ... L3 2007 12 21 13 17 -89.9600 -24.8000 2810.00 246352 SPO 2007 03 15 02 17 1196-99 S co2 379.420 ... L3 2007 12 21 13 31 -89.9600 -24.8000 2810.00 246353 SPO 2007 03 15 12 34 1653-99 P co2 379.530 ... L3 2007 12 20 09 10 -89.9600 -24.8000 2810.00 246418 SPO 2007 03 15 12 34 1654-99 P co2 379.470 ... L3 2007 12 20 09 25 -89.9600 -24.8000 2810.00 246419 SPO 2007 03 24 04 12 1469-99 P co2 379.490 ... L3 2007 12 20 09 39 -89.9600 -24.8000 2810.00 246414 SPO 2007 03 24 04 12 1470-99 P co2 379.530 ... L3 2007 12 20 09 53 -89.9600 -24.8000 2810.00 246415 SPO 2007 04 02 04 12 1991-99 P co2 379.590 ... L3 2007 12 20 13 32 -89.9600 -24.8000 2810.00 246424 SPO 2007 04 02 04 12 1992-99 P co2 379.630 ... L3 2007 12 20 13 46 -89.9600 -24.8000 2810.00 246425 SPO 2007 04 02 04 16 2767-99 S co2 379.450 ... L3 2007 12 20 13 03 -89.9600 -24.8000 2810.00 246420 SPO 2007 04 02 04 16 2768-99 S co2 379.430 ... L3 2007 12 20 13 17 -89.9600 -24.8000 2810.00 246421 SPO 2007 04 11 00 12 2305-99 P co2 379.740 ... L3 2007 12 20 10 36 -89.9600 -24.8000 2810.00 246416 SPO 2007 04 11 00 12 2306-99 P co2 379.680 ... L3 2007 12 20 10 50 -89.9600 -24.8000 2810.00 246417 SPO 2007 04 16 03 11 2577-99 P co2 379.960 ... L3 2007 12 20 10 07 -89.9600 -24.8000 2810.00 246412 SPO 2007 04 16 03 11 2578-99 P co2 379.740 ... L3 2007 12 20 10 21 -89.9600 -24.8000 2810.00 246413 SPO 2007 04 16 03 17 1551-99 S co2 379.680 ... L3 2007 12 20 14 00 -89.9600 -24.8000 2810.00 246422 SPO 2007 04 16 03 17 1552-99 S co2 379.720 ... L3 2007 12 20 14 14 -89.9600 -24.8000 2810.00 246423 SPO 2007 04 24 03 16 3915-99 P co2 379.930 ... L3 2007 12 20 14 29 -89.9600 -24.8000 2810.00 246426 SPO 2007 04 24 03 16 3916-99 P co2 379.880 ... L3 2007 12 20 14 43 -89.9600 -24.8000 2810.00 246427 SPO 2007 05 01 03 10 245-99 P co2 380.020 ... L3 2007 12 26 11 24 -89.9600 -24.8000 2810.00 246791 SPO 2007 05 01 03 10 246-99 P co2 379.970 ... L3 2007 12 26 11 38 -89.9600 -24.8000 2810.00 246792 SPO 2007 05 01 03 15 973-99 S co2 379.950 ... L3 2007 12 26 14 15 -89.9600 -24.8000 2810.00 246789 SPO 2007 05 01 03 15 974-99 S co2 379.880 ... L3 2007 12 26 14 29 -89.9600 -24.8000 2810.00 246790 SPO 2007 05 08 05 05 3599-99 P co2 380.180 ... L3 2007 12 28 10 35 -89.9600 -24.8000 2810.00 246801 SPO 2007 05 08 05 05 3600-99 P co2 380.110 ... L3 2007 12 28 10 49 -89.9600 -24.8000 2810.00 246802 SPO 2007 05 15 01 11 3471-99 P co2 380.050 ... L3 2007 12 26 12 50 -89.9600 -24.8000 2810.00 246795 SPO 2007 05 15 01 11 3472-99 P co2 380.020 ... L3 2007 12 26 13 04 -89.9600 -24.8000 2810.00 246796 SPO 2007 05 15 01 17 355-99 S co2 380.040 ... L3 2007 12 28 11 04 -89.9600 -24.8000 2810.00 246797 SPO 2007 05 15 01 17 356-99 S co2 380.010 ... L3 2007 12 28 11 18 -89.9600 -24.8000 2810.00 246798 SPO 2007 05 24 02 11 261-99 P co2 380.170 ... L3 2007 12 26 13 47 -89.9600 -24.8000 2810.00 246793 SPO 2007 05 24 02 11 262-99 P co2 380.140 ... L3 2007 12 26 14 01 -89.9600 -24.8000 2810.00 246794 SPO 2007 06 01 02 13 2687-99 P co2 380.320 ... L3 2007 12 28 10 07 -89.9600 -24.8000 2810.00 246803 SPO 2007 06 01 02 13 2688-99 P co2 380.350 ... L3 2007 12 28 10 21 -89.9600 -24.8000 2810.00 246804 SPO 2007 06 01 02 19 127-99 S co2 380.270 ... L3 2007 12 28 11 32 -89.9600 -24.8000 2810.00 246799 SPO 2007 06 01 02 19 128-99 S co2 380.270 ... L3 2007 12 28 11 46 -89.9600 -24.8000 2810.00 246800 SPO 2007 06 08 05 06 1343-99 P co2 380.500 -.. L3 2007 12 19 10 30 -89.9600 -24.8000 2810.00 246386 SPO 2007 06 08 05 06 1344-99 P co2 381.530 +.. L3 2007 12 19 10 44 -89.9600 -24.8000 2810.00 246387 SPO 2007 06 15 04 12 2099-99 P co2 380.520 ... L3 2007 12 19 12 24 -89.9600 -24.8000 2810.00 246388 SPO 2007 06 15 04 12 2100-99 P co2 380.510 ... L3 2007 12 19 12 38 -89.9600 -24.8000 2810.00 246389 SPO 2007 06 15 04 17 4595-99 S co2 380.380 ... L3 2007 12 19 14 18 -89.9600 -24.8000 2810.00 246392 SPO 2007 06 15 04 17 4596-99 S co2 380.320 ... L3 2007 12 19 14 32 -89.9600 -24.8000 2810.00 246393 SPO 2007 06 24 04 08 2453-99 P co2 380.720 ... L3 2007 12 19 16 40 -89.9600 -24.8000 2810.00 246398 SPO 2007 06 24 04 08 2454-99 P co2 380.740 ... L3 2007 12 19 16 54 -89.9600 -24.8000 2810.00 246399 SPO 2007 07 01 01 10 2709-99 P co2 380.720 ... L3 2007 12 19 11 55 -89.9600 -24.8000 2810.00 246390 SPO 2007 07 01 01 10 2710-99 P co2 380.590 ... L3 2007 12 19 12 09 -89.9600 -24.8000 2810.00 246391 SPO 2007 07 01 01 15 2455-99 S co2 380.680 ... L3 2007 12 19 12 52 -89.9600 -24.8000 2810.00 246384 SPO 2007 07 01 01 15 2456-99 S co2 380.680 ... L3 2007 12 19 13 06 -89.9600 -24.8000 2810.00 246385 SPO 2007 07 09 21 09 895-99 P co2 380.840 ... L3 2007 12 19 15 43 -89.9600 -24.8000 2810.00 246396 SPO 2007 07 09 21 09 896-99 P co2 380.810 ... L3 2007 12 19 15 57 -89.9600 -24.8000 2810.00 246397 SPO 2007 07 17 22 10 3123-99 P co2 380.980 ... L3 2007 12 19 16 12 -89.9600 -24.8000 2810.00 246394 SPO 2007 07 17 22 10 3124-99 P co2 380.940 ... L3 2007 12 19 16 26 -89.9600 -24.8000 2810.00 246395 SPO 2007 07 17 22 15 1613-99 S co2 380.790 ... L3 2007 12 19 14 46 -89.9600 -24.8000 2810.00 246456 SPO 2007 07 17 22 15 1614-99 S co2 380.860 ... L3 2007 12 19 15 00 -89.9600 -24.8000 2810.00 246457 SPO 2007 07 24 04 06 709-99 P co2 380.940 ... L3 2007 12 19 13 49 -89.9600 -24.8000 2810.00 246458 SPO 2007 07 24 04 06 710-99 P co2 380.940 ... L3 2007 12 19 14 03 -89.9600 -24.8000 2810.00 246459 SPO 2007 08 01 03 11 3965-99 P co2 381.210 ... L3 2007 12 17 16 15 -89.9600 -24.8000 2810.00 246470 SPO 2007 08 01 03 11 3966-99 P co2 381.160 ... L3 2007 12 17 16 29 -89.9600 -24.8000 2810.00 246471 SPO 2007 08 01 03 14 2919-99 S co2 381.240 ... L3 2007 12 17 16 43 -89.9600 -24.8000 2810.00 246466 SPO 2007 08 01 03 14 2920-99 S co2 381.120 ... L3 2007 12 17 16 58 -89.9600 -24.8000 2810.00 246467 SPO 2007 08 08 02 11 437-99 P co2 381.400 ... L3 2007 12 19 13 21 -89.9600 -24.8000 2810.00 246462 SPO 2007 08 08 02 11 438-99 P co2 381.190 ... L3 2007 12 19 13 35 -89.9600 -24.8000 2810.00 246463 SPO 2007 08 15 05 11 329-99 P co2 381.450 ... L3 2007 12 19 15 15 -89.9600 -24.8000 2810.00 246460 SPO 2007 08 15 05 11 330-99 P co2 381.400 ... L3 2007 12 19 15 29 -89.9600 -24.8000 2810.00 246461 SPO 2007 08 15 05 16 2425-99 S co2 381.370 ... L3 2007 12 17 15 47 -89.9600 -24.8000 2810.00 246464 SPO 2007 08 15 05 16 2426-99 S co2 381.380 ... L3 2007 12 17 16 01 -89.9600 -24.8000 2810.00 246465 SPO 2007 08 24 03 14 2785-99 P co2 381.470 ... L3 2007 12 17 13 53 -89.9600 -24.8000 2810.00 246468 SPO 2007 08 24 03 14 2786-99 P co2 381.390 ... L3 2007 12 17 14 07 -89.9600 -24.8000 2810.00 246469 SPO 2007 09 03 03 11 3679-99 P co2 381.610 ... L3 2007 12 26 14 44 -89.9600 -24.8000 2810.00 246779 SPO 2007 09 03 03 11 3680-99 P co2 381.570 ... L3 2007 12 26 14 58 -89.9600 -24.8000 2810.00 246780 SPO 2007 09 03 03 15 865-99 S co2 381.430 ... L3 2007 12 26 15 12 -89.9600 -24.8000 2810.00 246773 SPO 2007 09 03 03 15 866-99 S co2 381.530 ... L3 2007 12 26 15 26 -89.9600 -24.8000 2810.00 246774 SPO 2007 09 10 03 14 3187-99 P co2 381.760 ... L3 2007 12 21 14 43 -89.9600 -24.8000 2810.00 246785 SPO 2007 09 10 03 14 3188-99 P co2 381.650 ... L3 2007 12 21 14 57 -89.9600 -24.8000 2810.00 246786 SPO 2007 09 15 11 10 4587-99 P co2 381.810 ... L3 2007 12 26 10 27 -89.9600 -24.8000 2810.00 246783 SPO 2007 09 15 11 10 4588-99 P co2 381.790 ... L3 2007 12 26 10 41 -89.9600 -24.8000 2810.00 246784 SPO 2007 09 15 11 14 1851-99 S co2 381.710 ... L3 2007 12 26 13 18 -89.9600 -24.8000 2810.00 246775 SPO 2007 09 15 11 14 1852-99 S co2 381.790 ... L3 2007 12 26 13 32 -89.9600 -24.8000 2810.00 246776 SPO 2007 09 24 03 18 4047-99 P co2 381.980 ... L3 2007 12 26 15 40 -89.9600 -24.8000 2810.00 246777 SPO 2007 09 24 03 18 4048-99 P co2 381.880 ... L3 2007 12 26 15 55 -89.9600 -24.8000 2810.00 246778 SPO 2007 10 01 02 10 3301-99 P co2 381.890 ... L3 2007 12 21 14 14 -89.9600 -24.8000 2810.00 246787 SPO 2007 10 01 02 10 3302-99 P co2 381.900 ... L3 2007 12 21 14 28 -89.9600 -24.8000 2810.00 246788 SPO 2007 10 01 02 19 3487-99 S co2 381.760 ... L3 2007 12 21 15 11 -89.9600 -24.8000 2810.00 246781 SPO 2007 10 01 02 19 3488-99 S co2 381.810 ... L3 2007 12 21 15 25 -89.9600 -24.8000 2810.00 246782 SPO 2007 10 08 07 07 1201-99 P co2 381.920 ... L3 2008 01 10 13 33 -89.9600 -24.8000 2810.00 247620 SPO 2007 10 08 07 07 1202-99 P co2 381.960 ... L3 2008 01 10 13 47 -89.9600 -24.8000 2810.00 247621 SPO 2007 10 15 03 10 2307-99 P co2 382.080 ... L3 2008 01 15 12 47 -89.9600 -24.8000 2810.00 247628 SPO 2007 10 15 03 10 2308-99 P co2 381.770 ... L3 2008 01 15 13 01 -89.9600 -24.8000 2810.00 247629 SPO 2007 10 15 03 13 2073-99 S co2 381.790 ... L3 2008 01 15 09 56 -89.9600 -24.8000 2810.00 247624 SPO 2007 10 15 03 13 2074-99 S co2 381.740 ... L3 2008 01 15 10 10 -89.9600 -24.8000 2810.00 247625 SPO 2007 10 24 04 10 907-99 P co2 381.780 ... L3 2008 01 14 14 48 -89.9600 -24.8000 2810.00 247632 SPO 2007 10 24 04 10 908-99 P co2 381.820 ... L3 2008 01 14 15 02 -89.9600 -24.8000 2810.00 247633 SPO 2007 11 01 03 14 847-99 S co2 381.850 ... L3 2008 01 15 12 19 -89.9600 -24.8000 2810.00 247626 SPO 2007 11 01 03 14 848-99 S co2 381.840 ... L3 2008 01 15 12 33 -89.9600 -24.8000 2810.00 247627 SPO 2007 11 01 04 44 619-99 P co2 381.920 ... L3 2008 01 10 13 05 -89.9600 -24.8000 2810.00 247622 SPO 2007 11 01 04 44 620-99 P co2 381.930 ... L3 2008 01 10 13 19 -89.9600 -24.8000 2810.00 247623 SPO 2007 11 09 23 08 2387-99 P co2 381.780 ... L3 2008 01 15 11 22 -89.9600 -24.8000 2810.00 247630 SPO 2007 11 09 23 08 2388-99 P co2 381.830 ... L3 2008 01 15 11 36 -89.9600 -24.8000 2810.00 247631 SPO 2007 11 17 21 15 2233-99 S co2 381.850 ... L3 2008 02 11 11 03 -89.9700 -24.8000 2810.00 249127 SPO 2007 11 17 21 15 2234-99 S co2 381.810 ... L3 2008 02 11 11 18 -89.9700 -24.8000 2810.00 249128 SPO 2007 11 17 22 15 2427-99 P co2 381.970 ... L3 2008 01 14 14 19 -89.9600 -24.8000 2810.00 247634 SPO 2007 11 17 22 15 2428-99 P co2 381.900 ... L3 2008 01 14 14 34 -89.9600 -24.8000 2810.00 247635 SPO 2007 11 26 23 16 989-99 P co2 381.990 ... L3 2008 02 11 09 38 -89.9700 -24.8000 2810.00 249131 SPO 2007 11 26 23 16 990-99 P co2 382.020 ... L3 2008 02 11 09 52 -89.9700 -24.8000 2810.00 249132 SPO 2007 12 02 23 13 429-99 S co2 381.910 ... L3 2008 02 11 10 07 -89.9700 -24.8000 2810.00 249125 SPO 2007 12 02 23 13 430-99 S co2 381.980 ... L3 2008 02 11 10 21 -89.9700 -24.8000 2810.00 249126 SPO 2007 12 02 23 18 2929-99 P co2 381.920 ... L3 2008 02 11 10 35 -89.9700 -24.8000 2810.00 249129 SPO 2007 12 02 23 18 2930-99 P co2 382.000 ... L3 2008 02 11 10 49 -89.9700 -24.8000 2810.00 249130 SPO 2007 12 08 00 20 3393-99 P co2 381.890 ... L3 2008 02 07 13 21 -89.9700 -24.8000 2810.00 249123 SPO 2007 12 08 00 20 3394-99 P co2 381.910 ... L3 2008 02 07 13 35 -89.9700 -24.8000 2810.00 249124 SPO 2007 12 15 03 20 1519-99 P co2 381.860 ... L3 2008 02 07 12 52 -89.9700 -24.8000 2810.00 249121 SPO 2007 12 15 03 20 1520-99 P co2 381.950 ... L3 2008 02 07 13 07 -89.9700 -24.8000 2810.00 249122 SPO 2007 12 15 04 13 1617-99 S co2 381.730 ... L3 2008 02 07 12 24 -89.9700 -24.8000 2810.00 249117 SPO 2007 12 15 04 13 1618-99 S co2 381.750 ... L3 2008 02 07 12 38 -89.9700 -24.8000 2810.00 249118 SPO 2007 12 25 01 18 3857-99 P co2 381.880 ... L3 2008 02 07 11 54 -89.9700 -24.8000 2810.00 249119 SPO 2007 12 25 01 18 3858-99 P co2 381.780 ... L3 2008 02 07 12 08 -89.9700 -24.8000 2810.00 249120