Bonneville Power Administration
Transmission Services
http://www.transmission.bpa.gov

TBL Home Page Skip Primary Navigation
Transmission Services Home Page
  BPA Home Triangle Bullet Point Transmission Services Triangle Bullet Point Business Triangle Bullet Point Reserve and schedule transmission Triangle Bullet Point GI Request Queue
This is a spacer graphic
This is a spacer graphic Triangle bullet point OASIS

This is a spacer graphic Triangle bullet point Doing Business

This is a spacer graphic Triangle bullet point Transmission Availability

This is a spacer graphic Triangle bullet point System Planning

This is a spacer graphic Triangle bullet point Operations Information

This is a spacer graphic Triangle bullet point Standards of Conduct

This is a spacer graphic Triangle bullet point Customer Involvement


Adjust your View!


  Link to USA.gov


Interconnection Queue



The Interconnection request queue shows the interconnection requests submitted to BPA.

For more information about interconnection to the BPA Transmission System see the Interconnection page.

To sort the requests by a column, click the up and down arrows ( and ) at the top of the column. Click a request to view the details.

The status of a request will be Received, Study, Confirmed or Withdrawn.

View current requests...
View all requests...
View archived requests...
View planning studies...

CURRENT REQUESTS
Request
Number
Sort Request Numbers ascendingSort Request Numbers descending
Requestor

Sort Requestors ascendingSort Requestors descending
Project
Name
Sort Projects ascendingSort Projects descending
Point of
Interconnection
Sort POI ascendingSort POI descending
Request
Date
Sort Request Date ascendingSort Request Date descending
Status
 
Sort Status ascendingSort Status descending
G1 PG&E Generation Not Specified McNary 230 kv Substation 06/09/00 WITHDRAWN
G2 Goldendale Energy Center Not Specified Harvalum 230 kV Substation 06/23/00 CONFIRMED
G3 Enron Power Marketing Not Specified Longview 230 kV Substation 07/28/00 CONFIRMED
G4 Mint Farm Energy Center Not Specified Longview 230 kV Substation 07/28/00 CONFIRMED
G5 Energy Northwest, Inc. Nine Canyon Wind Project Nine Canyon Substation through Benton County PUD 115kV tap line to BPA's McNary-Badger Canyon line. 08/02/00 CONFIRMED
G6 Continental Energy Svcs Not Specified Silver Bow 230 kV Substation 08/22/00 WITHDRAWN
G7 Pacific Winds, Inc. Not Specified at a new POR in the vicinity of the Hanford-Mapbton 230 kV line 08/25/00 WITHDRAWN
G8 Cogentrix Energy Not Specified Troutdale kV Substation 08/28/00 WITHDRAWN
G9 Cogentrix Energy Not Specified Paul 500 kV Substation 08/28/00 WITHDRAWN
G10 Cogentrix Energy Not Specified Grizzly 500 kV Substation 08/28/00 WITHDRAWN
G12 Oregon Energy Company Not Specified a new POR in the vicinity of the Albany-Eugene 115 kV line near Halsey, OR 09/08/00 WITHDRAWN
G11 Pacific Winds, Inc. Not Specified a new POR in the vicinity of the Franklin-McNary 230 kV line 09/13/00 WITHDRAWN
G13 TransAlta Utilities Corp. Centralia Generation C.W. Paul 500 kV Substation 10/31/00 CONFIRMED
G14 Florida Power & Ligh-FPL Stateline Wind Farm on BPA's Franklin-Walla Walla line in the vicinity of Touchet, WA 11/30/00 CONFIRMED
G15 Oregon Energy Company Not Specified on BPA's 115 kV Allston-St. Helens line in the vicinity of St. Helens, OR 12/18/00 RETRACTED
G16 Cogentrix Energy Not Specified BPA's Taft-Bell 500 kV line in the vicinity of Kootenaid County, ID 12/22/00 WITHDRAWN
G17 J. P. Saylor & Associates Not Specified BPA's Fairview-Rogue 230 kV line in the vicinity of Curry County, OR 12/24/00 WITHDRAWN
G18 FPL Energy, Inc. Not Specified Snohomish 115 kV Substation 01/10/01 WITHDRAWN
G19 FPL Energy, Inc. Not Specified Initially BPA's 115 kV Snohomish Substation, subsequently at Bonneville's Snohomish Substation at both 115 kV and 230kV 01/18/01 WITHDRAWN
G19-01 Summit PNW Project Not Specified Allston 230 KV 01/25/01 CONFIRMED
G20 TransAlta Utilities Corp. Centralia Generation Addition In the vicinity of the Centralia Gen Station and C.W. Paul 500 kV SS, tapping the Centralia-Paul 500 kV line. 02/05/01 CONFIRMED
G21 SeaWest WindPower Condon Wind Farm At the Demoss-Fossil 69 kV line in the vicinity of Condon, OR 02/05/01 CONFIRMED
G22 Calpine Energy Services Not Specified In the vicinity of Vancouver, WA on BPA's Alcoa-St. Johns 115 kV line 02/15/01 WITHDRAWN
G23 Calpine Energy Services Not Specified In the vicinity of Vancouver, WA on BPA's St. Johns-Ross 230 kV line 02/15/01 WITHDRAWN
G24 Calpine Energy Services Not Specified In the vicinity of Ferndale, WA on BPA's Custer - Intalco/Portal Way 230 kV transmission line 02/15/01 WITHDRAWN
G25 Calpine Energy Services Not Specified In the vicinity of Ferndale, WA on BPA's Custer-Inalco/Portal Way 230 kV transmission line 02/15/01 WITHDRAWN
G26 Confed Tribes Umatilla Re Not Specified McNary 500 kV bus 02/15/01 STUDY
G27 Benton PUD Not Specified Unocal Finley Substation 02/15/01 WITHDRAWN
G27-01 BP Energy Company Cherry Point Refinery Custer Substation 02/20/01 CONFIRMED
G28 Clark Public Utilities Not Specified Alcoa Substation 02/22/01 WITHDRAWN
G29 BP Energy Company Not Specified John Day 02/23/01 WITHDRAWN
G30 Pacific Winds, Inc. Not Specified on BPA 230 kV Hanford-Mabton transmission line in the Rattlesnake Hills are of S. Central WA, specifically in Benton CO, R24E, T11N, Section 7 03/01/01 WITHDRAWN
G31 Pacific Winds, Inc. Not Specified on BPA 230 kV Franklin-McNary transmission line in the Horse Heaven Hills area of SW WA, approximately seven miles SW of Kennewick, specifically in or near Benton Co, R29E, T7N, Section 16 03/01/01 WITHDRAWN
G32 Kootenai Generation Not Specified In the vicinity of Kootenai county, WA, on BPA's Taft-Bell 500 kV line 03/05/01 WITHDRAWN
G33 Tenaska, Inc. Not Specified at or near BPA's Captain Jack 500 kV Substation, in the vicinity of Klamath County, OR 03/06/01 WITHDRAWN
G34 Competitive Power Venture Not Specified at or near BPA's Intalco 500 kV Substation, in the vicinity of Whatcom county, WA 03/06/01 WITHDRAWN
G35 Grant Generation Not Specified on BPA's Grand Coulee-Schultz 500 kV line in the vicinity of Grant County, WA 03/06/01 WITHDRAWN
G36 Frontier Technology Not Specified in the vicinity of Coburg, OR on BPA's Marion-Lane No. 1 500 kV transmission line 03/16/01 WITHDRAWN
G37 Nordic Energy Barge #1 Not Specified Cowlitz Substation 03/20/01 WITHDRAWN
G38 Calpine Energy Services Not Specified on the Monroe-Custer 500 kV transmission line in the vicinity of Sedro Wooley/Mount Vernon, WA 03/22/01 WITHDRAWN
G46-02 Avista Power, LLC Not Specified a tap to the Cowlitz PUD BHP at Kalama 115 kV line adjuacent to the Port of Kalama Industrial Park 04/01/01 WITHDRAWN
G39 Grant Generation Not Specified in the vicinity of Grant county, WA on the Vantage-Hanford 500 kV line 04/04/01 WITHDRAWN
G40 Calpine Energy Services Not Specified 230 kV on FCRTS at BPA's 230 kV Covington-Chehalis and/or Tacoma-Olympia lines in the vicinity of Fredrickson, WA 04/06/01 WITHDRAWN
G41 Calpine Energy Services Not Specified McNary Substation 04/06/01 WITHDRAWN
G42 Calpine Energy Services Not Specified Alcoa Substation 230 kV in the vicinity of Vancouver, WA 04/06/01 WITHDRAWN
G43 Clatskanie Not Specified Alcoa Substation 115 kV 04/06/01 WITHDRAWN
G44 Avista Power, LLC Not Specified BPA's Longview Substation 04/11/01 WITHDRAWN
G45 Avista Power, LLC Not Specified BPA's Longview Substation 04/11/01 WITHDRAWN
G46 Coburg Power Not Specified in the vicinity of Coburg, OR on BPA's Marion-Lane No. 1 500 kV line 04/16/01 WITHDRAWN
G46-01 Clark Public Utilities Not Specified 115 kV bus at BPA Alcoa Substation 04/17/01 WITHDRAWN
G46-03 Avista Power, LLC Not Specified tap to the BPA Cowlitz-Cardwell 115 kV line immediately south of the Cowlitz River crossing 04/18/01 WITHDRAWN
G47 Nordic Energy Barge #2 Not Specified Trojan Switching Station at 71760 Columbia River Hwy, OR 04/19/01 WITHDRAWN
G49 Washington Winds Not Specified 230 kV Big Eddy-Midway line and/or the 500 kV Hanford-John Day line 04/23/01 RETRACTED
G50 Pacific Winds, Inc. Not Specified 230/kV McNary - Horse Heaven BPA transmission line and/or the 345 kV McNary - Ross BPA transmission line 04/23/01 WITHDRAWN
G48-01 Washington Winds Not Specified 230 kV Big Eddy-Midway line and/or the 500 kV Hanford-John Day line 04/23/01 RETRACTED
G48 Washington Winds Not Specified 230 kV Big Eddy-Midway line and/or the 500 kV Hanford-John Day line 04/23/01 RETRACTED
G51 Duke Energy NA Not Specified South Tacoma 230 kV Substation 05/03/01 RETRACTED
G52 Duke Energy NA Not Specified South Tacoma 230 kV Substation 05/03/01 RETRACTED
G53 Tacoma Power TC/PSE Not Specified new interconnection point on BPA's 230 kV Sedro Wooley-Bellingham line 05/04/01 WITHDRAWN
G54 Klondike Wind Power Not Specified De Moss 69 kV Substation 05/09/01 CONFIRMED
G55 Cedar Hills Energy, LLC Not Specified Maple Valley 230 kV Substation 05/11/01 RETRACTED
G56 GNA Energy Not Specified Harvalum 230 kV Substation 05/11/01 STUDY
G57 SeaWest WindPower Not Specified Big Eddy-DeMoss 115 kV line 05/22/01 RETRACTED
G58 SeaWest WindPower Not Specified McNary-Roundup 230 kV line 05/23/01 WITHDRAWN
G59 Calpine Energy Services Not Specified Sickler-Schultz 500 kV 05/31/01 WITHDRAWN
G60 Calpine Energy Services Not Specified Sickler-Schultz 500 kV 05/31/01 WITHDRAWN
G61 Black Hills Energy Not Specified Hay Mill 138 kV Substation, via dedicated line owned by City of Rupert (IPC Load Control) 06/05/01 WITHDRAWN
G62 FPL Energy, Inc. Not Specified Vansycle Tap on Walla Walla-Pendleton 69 kV transmission line (Duroc) 06/07/01 WITHDRAWN
G63 FPL Energy, Inc. Not Specified Nine Mile Tap on the Walla Walla-Franklin 115 kV line 06/07/01 WITHDRAWN
G64 US Elect Power Corp. Not Specified The generation will be in the Cherry Point section of Whatcom County, Washington with an interconnection at Custer Substation 06/21/01 WITHDRAWN
G65 Cogentrix Energy Not Specified Cardwell Substation 06/22/01 WITHDRAWN
G66 ABB Equity Ventures Not Specified Harvalum Substation 06/29/01 WITHDRAWN
G67 ABB Equity Ventures Not Specified BPA's Tap into Midway-Bonneville 230 kV line in the vicinity of Goldendale, Klickitat County, WA 06/29/01 WITHDRAWN
G68 Clatskanie Not Specified The Wauna Substation 07/05/01 RECEIVED
G69 National Energy & Gas Tx Not Specified A new looped tap on the existing Coyote Springs loop on the McNary/Slatt 500 kV 07/12/01 WITHDRAWN
G70 Frederickson Power LP Not Specified South Tacoma Substation. 07/24/01 WITHDRAWN
G70-01 Effective Energy Not Specified The project will connect at BPA's Connell Substation 08/14/01 WITHDRAWN
G70-02 Effective Energy Not Specified The project will connect to BPA through Franklin PUD's new Oregon Street Substation and the 115 kV Franklin Riverview transmission line 08/14/01 WITHDRAWN
G71 AES Pacific Inc. Not Specified BPA's Canby 230 kV Substation in Modoc County, CA. 08/17/01 WITHDRAWN
G71-01 GNA Energy Not Specified BPA's Harvalum 230 kV Substation in Goldendal WA. 08/20/01 STUDY
G72 AES Pacific Inc. Not Specified BPA's Proposed Wallula 500 kV Substation 08/20/01 WITHDRAWN
G73 OR-CAL Power Not Specified LaPine Substation 09/12/01 RETRACTED
G73-01 Energy NW (WPPSS) Not Specified Nine Canyon Wind McNary-Badger Canyon #1 Line approximately 10 miles SE of Badger Canyon Substation 115 kV. 09/18/01 CONFIRMED
G74 Cielo Wind Power Not Specified Big Eddy 230 kV line South of Goldendale. 09/19/01 WITHDRAWN
G75 RES North America, LLC Not Specified BPA's 115 kV line connecting the North Lewiston and Walla Walla Substation. 09/19/01 RETRACTED
G76 RES North America, LLC Not Specified BPA's 115 kV line connecting the North Lewiston and Walla Walla Substation. 09/19/01 RETRACTED
G77 RES North America, LLC Not Specified BPA's proposed Lower Monumental - Starbuck 500 kV line. 09/21/01 RETRACTED
G78 Horizon Wind Energy-Wheat Not Specified BPA's Big Eddy - Maupin 230kV transmission line in the vicinity of Dufur, Oregon 09/27/01 WITHDRAWN
G79 Horizon Wind Energy-WRidg Not Specified BPA's N. Lewiston - Franklin 115kV transmission line in the vicinity of Clarkston, Washington 09/27/01 WITHDRAWN
G80 Horizon Wind Energy-Sageb Kittitas Valley Wind Columbia Covington 230kV in the vicinity of Cle Elum, Washington 09/28/01 STUDY
G81 Clipper Windpower Not Specified BPA's 115kV transmission line in the vicinity of Langlois Substation 10/10/01 RETRACTED
G82 Northwestern Wind Power Klondike 1 Wind Interconnection is BPA's De Moss 115 kV Substation 10/18/01 CONFIRMED
G83 Sempra Generation Not Specified BPA's Pearl - Marion 500 kV line in the vicinity of Aurora, OR 10/24/01 WITHDRAWN
G84 Winds Over Washington Not Specified BPA's 500 kV Lower Monumental - McNary transmission line in the vicinity of Wallula, WA. 10/29/01 WITHDRAWN
G85 Winds Over Washington Not Specified BPA's 500 kV Lower Monumental Substation 10/29/01 WITHDRAWN
G86 Winds Over Washington Not Specified BPA's 500 kV Lower Monumental McNary transmission line in the vicinity of Eureka, WA 10/29/01 WITHDRAWN
G87 Peoples Energy Resources Not Specified BPA’s 500 kV Grizzly – Malin transmission line approximately 30 miles north of Malin Substation 10/31/01 STUDY
G88 FPL Energy LLC Not Specified Is to the existing BPA Sacajawea Substation 11/21/01 WITHDRAWN
G89 Enron Power Marketing Not Specified Approximately 7 miles east of BPA's Maple Valley 230 kV Substation 11/23/01 WITHDRAWN
G90 Cal Geo Not Specified Cedarville Junction Substation 11/29/01 WITHDRAWN
G91 Duke Energy NA Not Specified BPA's 230 kV transmission line between Redmond and Pilot Butte substations in Deschutes Co., OR 12/20/01 WITHDRAWN
G92 Plymouth Energy Not Specified BPA’s McNary - John Day 500kV Line in the vicinity of Plymouth, WA. 01/04/02 WITHDRAWN
G93 Duke Energy NA Not Specified Between Santiam and Wren Tap at 230kV Line. 01/09/02 WITHDRAWN
G94 Peoples Energy Resources Not Specified BPA’s 500 kV Grizzly – Malin transmission line approximately 30 miles north of Malin Substation 02/08/02 STUDY
G95 Horizon Wind Energy LLC Not Specified Jones Canyon Substation 02/15/02 CONFIRMED
G96 Klondike Wind Power II Klondike 2 Wind BPA's DeMoss 115kV Substation 03/08/02 CONFIRMED
G97 FPL Energy LLC Not Specified The project is South of the Columbia River between Phillippi Canyon and Blalock Canyon. 03/19/02 WITHDRAWN
G98 FPL Energy LLC Not Specified The project is to be East of Big Eddy Substation to the Deschutes River. Then extending South from Columbia River about 7 miles. 03/19/02 WITHDRAWN
G98-01 SeaWest WindPower Not Specified On the Big Eddy – DeMoss 115 kV transmission line approximately 8-9 miles east of The Dalles, Oregon. 04/05/02 WITHDRAWN
G98-02 White Creek Wind I LLC Not Specified Rock Creek 230kV 04/05/02 STUDY
G99 Portland General Electric Biglow Canyon Wind Biglow Canyon 04/05/02 STUDY
G100 Puget Sound Energy Hopkins Ridge Wind BPA's 115 kV line Connecting the North Lewiston and Walla Walla Substations 05/06/02 CONFIRMED
G101 FPL Energy LLC Not Specified Interconnection to the existing BPA 500kV McNary to Lower Monumental Line where the line crosses Highway 12. 06/03/02 WITHDRAWN
G103 Calpine Energy Services Not Specified BPA's 230kV Malin-Hilltop line 06/07/02 STUDY
G104 Calpine Energy Services Not Specified The BPA's 230kV Malin-Hilltop line 06/07/02 STUDY
G102 Energy Northwest, Inc. Not Specified Interconnection with the Mabton-Big Eddy 230kV Transmission line. Associated with the proposed Wind Project in Klickitat County. 06/10/02 WITHDRAWN
G105 enXco Northwest Not Specified Covington-Columbia 230kV transmission line 06/20/02 STUDY
G108 SDS Lumber Company Not Specified Midway- North Bonneville 230kV Transmission line approximately five miles West of the BPA's Underwood Substation. 06/24/02 STUDY
G106 Iberdrola Renewables Inc Leaning Juniper Wind McNary-Santiam 230kV Transmission line approximately 5-10 miles SW of Arlington 06/24/02 CONFIRMED
G107 Iberdrola Renewables Inc Not Specified Slatt 500kV Substation approximately 5-10 miles SW of Arlington 06/24/02 WITHDRAWN
G109 Eurus Energy America Not Specified Walla Walla-Pendleton 69kV line 07/24/02 STUDY
G109-01 Iberdrola Renewables Inc Not Specified Slatt 500kV Substation approximately 5-10 miles SW of Arlington 09/16/02 WITHDRAWN
G110 Caithness Shepherds Flat Shepherds Flat Wind BPA Slatt 500 kV Substation 09/18/02 WITHDRAWN
G112 Iberdrola Renewables Inc Not Specified Hanford-JohnDay 500 kV Transmission Line·Will be approximately eight miles southwest of Bickleton, Washington in Klickitat County. 11/01/02 WITHDRAWN
G111 Iberdrola Renewables Inc Not Specified Midway – Big Eddy 230 kV Transmission Line·Will be approximately eight miles southwest of Bickleton, Washington in Klickitat County. 11/04/02 WITHDRAWN
G113 RES North America, LLC Not Specified Interconnection shall be John Day Substation approximately sections 6 and 7 of Township 2N, Range 17E, Sherman County, Oregon 11/20/02 WITHDRAWN
G114 Horizon Wind Energy-WRidg Not Specified The location of Zilkha’s generating facilities will be approximately seven miles northeast of the town of Kittitas in Kittitas County, Washington 01/22/03 WITHDRAWN
G115 Windland, Inc. Not Specified Interconnect to either (1) Minidoka-Wendover 138 kV Line; or (2) Minidoka-Wendover and East Hills 138 kV Lines. 05/01/03 WITHDRAWN
G116 Oregon Wind Not Specified Hood River-The Dalles 115 KV Transmission Line.The exact location is Township/ Range 2N12E Section 27. 05/19/03 WITHDRAWN
G117 FPL Energy LLC Not Specified The point where the new 230kV Line from the Project terminates into BPA’s Big Eddy Substation at 230kV. 07/31/03 WITHDRAWN
G118 Caithness Shepherds Flat Not Specified BPA's Slatt 500kV Substation 09/17/03 STUDY
G119 LifeLine Renewable Energy Not Specified BPA's McNary - Santiam 230kV Line 5 to 10 miles West of Slatt Substation. 09/17/03 RETRACTED
G120 Invenergy Wind Developmnt Not Specified McNary – Santiam 230 kV transmission line 11/24/03 INVALID
G121 Invenergy Wind Developmnt Not Specified McNary – Santiam 230 kV transmission line 12/05/03 RETRACTED
G122 Cannon Power Corporation Windy Point 1 Wind Rock Creek 230kV 01/16/04 CONFIRMED
G124 Klondike Wind Power III Klondike 3 Wind Klondike Schoolhouse 230kV 02/12/04 CONFIRMED
G123 FPL Energy LLC Not Specified The Point of Interconnection for the existing Stateline Wind Project, which is a tap point on the Franklin-Walla Walla 115kVline. 02/13/04 WITHDRAWN
G125 USGeothermal Not Specified Bridge Substation, 34.5 kV ·or·138 kV Transmission line 2.5 miles SE of Bridge Substation (this line is not owned by BPA) 03/01/04 WITHDRAWN
G126 Iberdrola Renewables Inc Not Specified Big Eddy-Midway 230 kV line 03/04/04 CONFIRMED
G127 Orion Energy LLC Not Specified DeMoss Substation 03/04/04 WITHDRAWN
G128 Summit PNW Project Not Specified BPA’s Driscoll 230kV switchyard 03/08/04 CONFIRMED
G129 Clark Public Utilities River Road Generating Plant Interconnect between River Road Gen and BPA's Alcoa Sub 03/15/04 CONFIRMED
G130 Bonneville PBL Not Specified McNary 230 kV 04/02/04 WITHDRAWN
G131 Windtricity Ventures, LLC Not Specified Rock Creek 230kV 04/27/04 CONFIRMED
L0220 Monmouth Monmouth Tap Salem-Albeni 115 05/17/04 STUDY
G132 Sea Breeze Olympic Conv Not Specified Port Angeles 230 kV 06/07/04 WITHDRAWN
G133 Sea Breeze Olympic Conv Not Specified Port Angeles 230 kV or Fairmount 230 kV 06/07/04 WITHDRAWN
G134 Sea Breeze Olympic Conv Not Specified Port Angeles 230 kV or Fairmount 230 kV 06/07/04 WITHDRAWN
G135 White Creek Wind I LLC Not Specified Rock Creek 06/23/04 CONFIRMED
L0201 Sea Breeze Olympic Conv Port Angeles 230 kV 04/04/05 STUDY
L0202 Sea Breeze Olympic Conv Fairmount 230 kV 04/04/05 STUDY
G0203 LGIA Not Executed LGIA Not Executed Rock Creek 05/26/05 STUDY
G0204 LGIA Not Executed LGIA Not Executed Rock Creek Substation 230 kV. 05/26/05 STUDY
G0205 Grays Harbor Energy LLC Not Specified Satsop Substation 06/16/05 CONFIRMED
G0206 LGIA Not Executed LGIA Not Executed Lagrande Substation 230 kV 06/24/05 STUDY
G0207 LGIA Not Executed LGIA Not Executed John Day Substation 230 kV 06/29/05 WITHDRAWN
G0208 Windy Point Partners, LLC Not Specified Rock Creek Substation 230 kV 07/18/05 CONFIRMED
G0209 LGIA Not Executed LGIA Not Executed Grand Coulee-Rocky Ford 230 kV line 08/22/05 WITHDRAWN
L0215 Flathead Montanore Mine Libby-Noxon 230 08/23/05 STUDY
G0210 LGIA Not Executed LGIA Not Executed Grand Coulee-Bell 115 kV line, north of Reardan, WA. 09/15/05 WITHDRAWN
L0216 PacifiCorp Vintage Valley Midway-Mabton 230 09/22/05 STUDY
L0217 PacifiCorp Yew Ave. Sub Redmond-Harney 115 09/22/05 STUDY
L0218 PacifiCorp Bradwood Tap Cathlamet Tap-Cathlamet 115 09/22/05 STUDY
L0221 Sea Breeze PWC Cable Pacific West Coast Cable Allston 500 kV 11/01/05 WITHDRAWN
G0211 LGIA Not Executed LGIA Not Executed to be determined 11/14/05 WITHDRAWN
G0212 LGIA Not Executed LGIA Not Executed To Be determined 11/15/05 WITHDRAWN
L0219 Portland General Electric Sunset Substation Keeler Substation 11/17/05 STUDY
G0213 LGIA Not Executed LGIA Not Executed Longview Substation 230kV 12/21/05 STUDY
G0214 LGIA Not Executed LGIA Not Executed Lapine Substation 230kV 01/05/06 STUDY
L0254 Clallam Joyce Substation Port Angeles-Sappho 115 kV Line 03/13/06 RECEIVED
G0222 LGIA Not Executed LGIA Not Executed Rock Creek Substation 03/24/06 STUDY
G0223 LGIA Not Executed LGIA Not Executed John Day Substation 04/19/06 STUDY
G0224 LGIA Not Executed LGIA Not Executed Spring Creek Substation 05/09/06 STUDY
G0225 LGIA Not Executed LGIA Not Executed to be determind 05/18/06 WITHDRAWN
G0226 LGIA Not Executed LGIA Not Executed Jones Canyon Substation 05/24/06 STUDY
L0227 Benton PUD Zephyr Heights Franklin-Badger Canyon 115 kV 06/08/06 STUDY
G0228 LGIA Not Executed LGIA Not Executed Hood River-The Dalles 115 KV Transmission Line 06/27/06 WITHDRAWN
L0229 PacifiCorp Bradwood Tap Allston -Astoria #1 115 kV Line near Cathlamet Tap 06/28/06 WITHDRAWN
G0230 LGIA Not Executed LGIA Not Executed Jones Canyon 230 kV Substation 07/19/06 WITHDRAWN
L0274 Kittitas Lauderdale Project Columbia-Ellensburg 115kV Line 07/20/06 RECEIVED
L0231 Consumers Power Inc Tap on Albany-Lebanon 115 kV line 08/23/06 RECEIVED
G0232 LGIA Not Executed LGIA Not Executed Big Eddy-DeMoss 115 kV Line 08/25/06 WITHDRAWN
G0233 LGIA Not Executed LGIA Not Executed Rock Creek Substation 09/05/06 STUDY
G0234 LGIA Not Executed LGIA Not Executed Station Z 230kV 09/05/06 WITHDRAWN
G0235 LGIA Not Executed LGIA Not Executed John Day 500kV Substation 09/25/06 STUDY
L0236 Clatskanie Clatskanie Tap 10/06/06 RECEIVED
G0237 LGIA Not Executed LGIA Not Executed John Day 500kV Substation 10/10/06 STUDY
G0240 LGIA Not Executed LGIA Not Executed Boardman Substation 10/10/06 WITHDRAWN
G0241 LGIA Not Executed LGIA Not Executed Boardman Substation 10/10/06 WITHDRAWN
G0238 LGIA Not Executed LGIA Not Executed Slatt Substation 10/10/06 STUDY
G0239 LGIA Not Executed LGIA Not Executed Slatt Substation 10/10/06 STUDY
G0242 LGIA Not Executed LGIA Not Executed Horse Heaven-Harvalum 230 kV line 10/10/06 STUDY
L0243 Tacoma Power TC/PSE Canyon Substation South Tacoma Substation 10/26/06 STUDY
G0245 LGIA Not Executed LGIA Not Executed Idahome Substation 11/01/06 STUDY
G0246 LGIA Not Executed LGIA Not Executed Idahome Substation 11/01/06 STUDY
G0247 LGIA Not Executed LGIA Not Executed Idahome Substation 11/01/06 STUDY
G0248 LGIA Not Executed LGIA Not Executed Idahome Substation 11/01/06 STUDY
L0244 Puget Sound Energy PSE Alderton Substation Olympia-White River 230 kV 11/01/06 RECEIVED
G0249 LGIA Not Executed LGIA Not Executed Midway-Big Eddy 230 kV 12/07/06 WITHDRAWN
L0250 United Electric Pacific Ethnanol Tap Unity-West Burley 138 kV 12/13/06 RECEIVED
G0251 LGIA Not Executed LGIA Not Executed Ashe-Marion 500 kV 12/14/06 STUDY
G0253 LGIA Not Executed LGIA Not Executed Horse Heaven Substation 115 kV 12/19/06 WITHDRAWN
G0252 LGIA Not Executed LGIA Not Executed Wautoma 500 kV Substation 12/19/06 WITHDRAWN
L0256 Fall River Targhee Substation Targhee Substation 01/12/07 RECEIVED
L0257 Wells REC West Wendover West Wendover POD 01/18/07 RECEIVED
L0260 Midstate Electric Midstate LaPine Addition LaPine Substation 01/18/07 RECEIVED
G0255 LGIA Not Executed LGIA Not Executed Boardman-Alkali 115 kV Line 01/25/07 STUDY
G0258 LGIA Not Executed LGIA Not Executed Cardwell Substation 02/02/07 STUDY
L0259 Wahkiakum Wahkiakum PUD 115kV Tap Naselle Tap to Allston-Astoria #1 115kV 02/06/07 STUDY
G0261 LGIA Not Executed LGIA Not Executed Ashe-Marion 500 kV 02/22/07 WITHDRAWN
G0262 LGIA Not Executed LGIA Not Executed Big Eddy-DeMoss 115 kV Line 03/07/07 WITHDRAWN
G0263 LGIA Not Executed LGIA Not Executed N/A 03/08/07 WITHDRAWN
L0271 Midstate Electric Brothers Tap Upgrade Christmas Valley 115 kV 03/29/07 RECEIVED
G0271 LGIA Not Executed LGIA Not Executed BPA's Wautoma 230 kV Line 05/04/07 WITHDRAWN
G0272 LGIA Not Executed LGIA Not Executed BPA's Wautoma 230kV Line 05/04/07 WITHDRAWN
L0272 Douglas PUD Columbia Substation BPA's Columbia Substation 05/17/07 STUDY
L0273 Snohomish Beverly Park Expansion Snohomish Substation 05/25/07 RECEIVED
G0273 LGIA Not Executed LGIA Not Executed Vantage Substation 06/14/07 WITHDRAWN
G0274 Puget Sound Energy Hopkins Ridge Addition Tucannon River Switching Station 06/29/07 CONFIRMED
G0275 LGIA Not Executed LGIA Not Executed 20Miles West of Milton-Freewater 07/03/07 STUDY
L0275 Green Pacific Highway Merchant Transmission Line Allston Substation 07/06/07 RECEIVED
G0276 LGIA Not Executed LGIA Not Executed Grand Coulee-Columbia 230kV Line 07/06/07 WITHDRAWN
G0277 LGIA Not Executed LGIA Not Executed to be determined 07/10/07 STUDY
G0278 LGIA Not Executed LGIA Not Executed Midway-North Bonneville 230kV Line 07/12/07 STUDY
G0281 LGIA Not Executed LGIA Not Executed Lower Monumental-McNary 500kV line in vicinity of Wallula, WA. 07/17/07 WITHDRAWN
G0279 LGIA Not Executed LGIA Not Executed To be determined 07/17/07 STUDY
G0280 LGIA Not Executed LGIA Not Executed To be determined 07/17/07 STUDY
L0276 Puget Sound Energy Network Connection, 230 kV loop line St Clair or Spurgeon Creek Substation 07/25/07 STUDY
L0277 Tillamook Oceanside Tillamook Substation 08/03/07 STUDY
G0282 LGIA Not Executed LGIA Not Executed Chandler 115 kV line 08/10/07 STUDY
G0283 LGIA Not Executed LGIA Not Executed DeMoss Springs 08/10/07 STUDY
G0284 LGIA Not Executed LGIA Not Executed Little Goose Substation 08/13/07 STUDY
G0285 LGIA Not Executed LGIA Not Executed Little Goose Substation 08/13/07 STUDY
G0286 LGIA Not Executed LGIA Not Executed Little Goose Substation 08/13/07 STUDY
G0287 LGIA Not Executed LGIA Not Executed Midway-N. Bonneville 230 kV line north of Goldendale, Wa. 08/17/07 WITHDRAWN
L0278 Idaho Falls Power North Loop Westside Substation 08/22/07 RECEIVED
L0279 Fall River Victor Transformer Victor Substation 08/23/07 STUDY
G0288 LGIA Not Executed LGIA Not Executed One mile from Naselle 115 kV Substation 08/24/07 STUDY
G0289 LGIA Not Executed LGIA Not Executed Satsop Substation 08/28/07 STUDY
G0290 LGIA Not Executed LGIA Not Executed Wasco Co., Oregon 09/06/07 WITHDRAWN
L0281 Grant PUD Grant Rocky Ford Columbia 115/230kV Substation 09/14/07 STUDY
L0282 Tacoma Power TC/PSE Cowlitz Substation Reterminate BPA's South Tacoma-Cowlitz 230kV Line 09/26/07 STUDY
G0291 LGIA Not Executed LGIA Not Executed Slatt 500 kV Substation 10/15/07 STUDY
G0292 LGIA Not Executed LGIA Not Executed Prosser 115 kV Substation 10/17/07 STUDY
G0293 LGIA Not Executed LGIA Not Executed BPA's LaGrande 230 kV Substation 10/24/07 STUDY
G0294 LGIA Not Executed LGIA Not Executed A new 230/500 kV substation on BPA’s Lower Granite-Little Goose transmission line. 10/25/07 STUDY
G0295 LGIA Not Executed LGIA Not Executed A new 230/500 kV substation on BPA’s Lower Granite-Little Goose transmission line. 10/25/07 STUDY
G0296 LGIA Not Executed LGIA Not Executed BPA's McNary-Roundup 230 kV line 10/29/07 WITHDRAWN
G0297 LGIA Not Executed LGIA Not Executed 11/01/07 STUDY
G0298 LGIA Not Executed LGIA Not Executed Little Goose 500 kV Substation 11/19/07 WITHDRAWN
G0299 LGIA Not Executed LGIA Not Executed BPA’s Lower Granite/Little Goose 500 kV line 11/19/07 WITHDRAWN
G0331 LGIA Not Executed LGIA Not Executed On BPA's Harney/Brasada 115 kV line at or near to the Hampton Substation 12/17/07 STUDY
L0283 Flathead Kalispell Substation BPA Kalispell Substation 115kV Bay #9 12/17/07 STUDY
G0300 LGIA Not Executed LGIA Not Executed At a point on BPA's Brasada-Harney 115 kV transmission line 12/18/07 STUDY
G0301 LGIA Not Executed LGIA Not Executed At a point on BPA's Harney/Redmond transmission line close to Harney Electric Cooperative's interconnection to BPA 01/08/08 STUDY
G0302 LGIA Not Executed LGIA Not Executed At a point on BPA's Harney/Redmond transmission line close to Harney Electric Cooperative's interconnection to BPA 01/08/08 STUDY
G0303 LGIA Not Executed LGIA Not Executed At a point on BPA's Harney/Redmond transmission line close to Harney Electric Cooperative's interconnection to BPA 01/08/08 STUDY
L0284 Green Pacific Highway Merchant Transmission Line Merchant Transmission Line 01/09/08 STUDY
G0304 LGIA Not Executed LGIA Not Executed At a point on BPA's Harney/Redmond transmission line close to Harney Electric Cooperative's interconnection to BPA 01/09/08 STUDY
L0285 PacifiCorp McNary Substation McNary Substation 01/15/08 STUDY
G0305 LGIA Not Executed LGIA Not Executed BPA's 230 kV LaGrande Substation 01/18/08 STUDY
G0306 LGIA Not Executed LGIA Not Executed At a point on BPA's Harney/Redmond transmission line close to Harney Electric Cooperative's interconnection to BPA. 01/24/08 WITHDRAWN
G0307 LGIA Not Executed LGIA Not Executed A 500 kV interconnection in Gilliam County, Oregon 01/28/08 STUDY
G0308 LGIA Not Executed LGIA Not Executed A 500 kV interconnection in Gilliam County, Oregon 01/28/08 STUDY
G0309 LGIA Not Executed LGIA Not Executed A new substation on BPA's 500 kV McNary-John Day line near Alderdale, Washington 01/29/08 STUDY
G0310 LGIA Not Executed LGIA Not Executed A new substation on BPA's 500 kV McNary-John Day line near Alderdale, Washington 01/29/08 STUDY
G0311 LGIA Not Executed LGIA Not Executed A new substation on BPA's 500 kV McNary-John Day line near Roosevelt and Alderdale, Washington 01/29/08 STUDY
G0312 LGIA Not Executed LGIA Not Executed A new substation on BPA's 500 kV McNary-John Day line near Alderdale, Washington 01/29/08 STUDY
L0286 Puget Sound Energy Transm Mt. Si Tanner 115 kV Tap 02/05/08 STUDY
L0287 Puget Sound Energy Transm Novelty Substation Monroe-Sammamish 230 kV Line 02/05/08 WITHDRAWN
G0313 LGIA Not Executed LGIA Not Executed BPA's 115 kV line at Pe Ell Substation, Lewis County, Wash. 02/07/08 STUDY
G0314 LGIA Not Executed LGIA Not Executed At a point on BPA's Noxon-Hot Springs 230 kV line near Thompson Falls, Montana 02/29/08 STUDY
G0315 LGIA Not Executed LGIA Not Executed BPA's 115 kV line at Pe Ell Substation, Lewis County, Wash. 03/03/08 WITHDRAWN
G0316 LGIA Not Executed LGIA Not Executed At a point on BPA's 230 kV Tillamook/Carlton line near T2S, R6W, Section 32 in Yamhill County, Oregon 03/12/08 WITHDRAWN
L0288 Columbia REA Industrial Park Franklin-Walla Walla 115 kV/Sacajawea Sub 03/14/08 STUDY
L0289 Central Lincoln PUD Gardiner-Reedsport Gardiner Substation 03/17/08 STUDY
G0317 Bonneville PBL Libby 6th Unit Exiting T-3 at the Libby Project 03/17/08 STUDY
G0335 LGIA Not Executed LGIA Not Executed Roosevelt 115 kV 03/20/08 RECEIVED
L0290 Franklin Ethanol Facility Franklin Substation 03/27/08 RECEIVED
G0318 LGIA Not Executed LGIA Not Executed Goldendale 115 kV 03/27/08 STUDY
G0319 LGIA Not Executed LGIA Not Executed Goldendale 115 kV 03/27/08 STUDY
G0320 LGIA Not Executed LGIA Not Executed Goldendale 115 kV 03/27/08 STUDY
L0291 Northern Wasco Chenowith Tap Big Eddy - Chenowith 115 kV 03/27/08 STUDY
G0321 LGIA Not Executed LGIA Not Executed Satsop 230 kV 03/27/08 STUDY
L0292 Cowlitz Bakers Corner Tap Lexington-Longview 115 kV Line 04/01/08 STUDY
G0322 LGIA Not Executed LGIA Not Executed At a point in BPA's Harvalum Substation, at 230 kV 04/07/08 WITHDRAWN
L0293 PacifiCorp Vantage Substation BPA Vantage Substation 04/08/08 STUDY
G0323 LGIA Not Executed LGIA Not Executed John Day 500 kV Substation 04/08/08 STUDY
G0324 LGIA Not Executed LGIA Not Executed BPA's Tucannon River-North Lewiston No. 1 115 kV transmission line 04/08/08 STUDY
L0294 Blachly-Lane New Commercial/Industrial Substation Between BPA Parker and Junction City Substations 04/14/08 STUDY
L0295 Columbia River PUD St.Johns-Allston Interconnection St.Johns-Allston 115kV Line 04/17/08 STUDY
L0296 Midstate Electric Sunriver BPA LaPine-Pilot Butte 230kV Line 04/18/08 STUDY
L0297 Umatilla Data Center BPA's McNary, Hatrock or Boardman Substation 04/24/08 STUDY
G0325 LGIA Not Executed LGIA Not Executed A point on BPA’s Midway-Rocky Ford 230kV line 04/29/08 STUDY
G0326 LGIA Not Executed LGIA Not Executed At BPA's 138 kV Bridge Substation 05/05/08 STUDY
G0327 LGIA Not Executed LGIA Not Executed At or near Alkali Substation 05/09/08 STUDY
G0328 LGIA Not Executed LGIA Not Executed At a point on BPA's 500 kV Little Goose-Lower Granite Transmission line in Garfield Co, Wash. 05/12/08 STUDY
G0329 LGIA Not Executed LGIA Not Executed At a point on BPA's 500 kV Little Goose-Lower Granite Transmission line in Garfield Co, Wash. 05/12/08 STUDY
G0330 LGIA Not Executed LGIA Not Executed At a point on BPA's 500 kV Little Goose-Lower Granite Transmission line in Garfield Co, Wash. 05/12/08 STUDY
L0298 NorthernLights Transmissi NorthernLights Transmission Project BPA's Buckley Substation 05/14/08 STUDY
G0332 LGIA Not Executed LGIA Not Executed Integrating in Lane Electric Coop's system at Fox Hollow Substation, thence to BPA's Eugene Substation. 05/19/08 RECEIVED
G0333 LGIA Not Executed LGIA Not Executed At a point on BPA's Big Eddy - Maupin 230 kV line, approximately 15 miles south of Big Eddy. 05/20/08 STUDY
G0334 LGIA Not Executed LGIA Not Executed At BPA's 230 kV Slatt Substation 05/30/08 RECEIVED
L0299 Skamania Skamania PUD Transmission Reinforcement BPA's Midway-N.Bonneville 230kV line in the vicinity of Underwood Substation. 06/18/08 RECEIVED
L0300 Okanogan PUD Pinecreek Substation Omak-Tonasket #1 & #2 Txm Line, Twr 11/1 06/20/08 STUDY
L0301 Klickitat Spearfish Substation Expansion BPA's Chenoweth-Goldendale 115kV Line 07/03/08 RECEIVED
G0336 LGIA Not Executed LGIA Not Executed At a point on BPA's McNary-John Day 500 kV line in the vicinity of Crow Butte, near Alderdale, Wash. 07/11/08 STUDY
G0337 LGIA Not Executed LGIA Not Executed At a point on BPA's McNary-John Day 500 kV line in the vicinity of Crow Butte, near Alderdale, Wash. 07/11/08 STUDY
G0338 LGIA Not Executed LGIA Not Executed At a point on BPA's Walla Walla-Pendleton 69 kV line near Milton Freewater, Ore. 07/28/08 STUDY
G0339 LGIA Not Executed LGIA Not Executed At a point on BPA's Walla Walla-Pendleton 69 kV line near Milton Freewater, Ore. 07/28/08 STUDY
G0340 LGIA Not Executed LGIA Not Executed At a point on BPA's Midway-Rocky Ford 230 kV Transmission line near Mattawa, Wash. 08/07/08 RECEIVED
G0341 LGIA Not Executed LGIA Not Executed At a point on BPA's Boardman to Ione 69 kV line approximately 6 miles south of Boardman, Ore. 08/27/08 RECEIVED
G0342 LGIA Not Executed LGIA Not Executed At a point on BPA's Ashe-Marion 500 kV transmission line. 08/27/08 RECEIVED
G0343 LGIA Not Executed LGIA Not Executed At a point on BPA's Big Eddy-Maupin 230 kV transmission line approximately 20 miles south of Big Eddy 09/02/08 STUDY
L0302 Umatilla Tower Road Substation BPA's Boardman-Alkali 115kV Line 09/03/08 RECEIVED
L0303 Umatilla Port of Morrow Substation BPA's Boardman-Tower Rd 115kV Line 09/03/08 RECEIVED
G0344 LGIA Not Executed LGIA Not Executed At BPA's Slatt Substation 09/04/08 STUDY
G0345 LGIA Not Executed LGIA Not Executed TBA 09/16/08 STUDY
L0304 Klickitat Saddleback Mountain Interconnection BPA's Midway-North Bonneville 230kV Line 09/24/08 RECEIVED
G0346 LGIA Not Executed LGIA Not Executed At a point on Harney Electric Cooperative's Harney-Fields 115 kV transmission line 09/24/08 RECEIVED
G0347 LGIA Not Executed LGIA Not Executed At a point on Harney Electric Cooperative's Harney-Fields 115 kV transmission line 09/24/08 RECEIVED
G0348 LGIA Not Executed LGIA Not Executed Umatilla Electric Cooperative’s Existing 12.47kV Line, Pole #3N 27E 138000 10/23/08 RECEIVED
G0349 LGIA Not Executed LGIA Not Executed Blachly Lane Substation of BPA 11/18/08 RECEIVED
G0350 LGIA Not Executed LGIA Not Executed BPA's Harvalum 230 kV substation 12/02/08 WITHDRAWN
G0351 LGIA Not Executed LGIA Not Executed BPA's Rock Creek substation 12/02/08 RECEIVED
G0352 LGIA Not Executed LGIA Not Executed TBA 01/26/09 RECEIVED
L0305 Idaho Falls Power Westside Phase II BPA's Westside Substation 02/06/09 RECEIVED