Connection Type: |
Generation Interconnection
|
Point of Interconnection: | McNary 500 kV bus |
In-Service Date: | July 2003 |
Max Outputs: |
Summer: 1000, Winter: 1000
|
Request Date: | 02/15/01 03:51:00 PM |
Generation Facility Location: |
|
Type of Interconnection: | |
Type of Generating Facility: | |
Requestor Name: | Confed Tribes Umatilla Re |
Project Name: | Not Specified |
Status: | STUDY |
Related Transmission Request: | |
Comments: | (This was updated on 10/11/02 to study Status by Sweeney) |