Cape Lambert Special - User Selected MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 DEFICIENCIES REPORT - DETAILED Report Date: 02/26/04 Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 1 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Lambert C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-WMG - Wilmington, NC R-Status: 10/OR - 10-Day (Outported)(2-men Retention Crew) Region..: SAR - South Atlantic Region Surveyor: MBG - Marvin B. Gordon SM/GA...: CLS - Crowley Liner Services COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== E012T 04/22/03 SMDRP EGD80 0100-00000-000 6811 10/01/03 / / 04 04-03-C-02 03 $1000.00 $0.00 SP / / DESCRIPTION: INTERIOR LIGHTING RENEWAL-E lights IN VARIOUS LOCATIONS THROUGH OUT THE ACCOMODATION AREA SEVERAL OF THE 8" SQUARE RECESSED OVERHEAD INCANDESENT LIGHTING FIXTURES ARE MISSING THE FROSTED GLASS AND HAVE EITHER CLEAR GLASS INSTALLED OR SOME EXTERIOR FRAMES TURNED UP MISSING DURING LAST YARD PERIOD. ALLOW FOR THE CHANGE OUT OF APPROXIMATELY 6 FIXTURES TO CHANGE E014T 04/22/03 SMDRP EGD80 0100-00000-000 6830 10/01/03 / / 04 04-03-C-02 03 $1000.00 $0.00 SP / / DESCRIPTION: EMERGENGY LIGHTING ON THE BRIDGE On the navigation bridge at the front bulkhead on the port and stbd. sides of the main consoles are four retangular lights that are powered from and emergency lighting circuit the recessed lighting covers are approximately 6 X 12 inches in size. Remove the trim covers and reinstall red colored glass in lieu of the frosted glass in order to not interfere with night vision. G004C 08/05/03 SCGJB HAB00 0100-00000-000 3315 10/01/03 / / 03 04-03-B-02 03 $10000.00 $0.00 SK / / DESCRIPTION: Renew, repair accommodation joinery Renew and repair as required accommodation joinery including but not limited to closet doors, shelving, settees, desks, bunks, and drawers. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 2 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Lambert C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-WMG - Wilmington, NC R-Status: 10/OR - 10-Day (Outported)(2-men Retention Crew) Region..: SAR - South Atlantic Region Surveyor: MBG - Marvin B. Gordon SM/GA...: CLS - Crowley Liner Services COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G008T 04/21/03 SMDRP HUL70 0100-00000-000 1106 10/01/03 / / 04 04-03-C-02 03 $75000.00 $0.00 KY / / DESCRIPTION: UHP AND PAINT THE FORWARD RAMP AREA The forward cargo hold ramp area is very dingy and needs to be ultra high pressure washed with detergent from the overhead including the port and stbd. bulkheads and the tide bridge and self leveling platform. after pressure cleaning to remove oil and dirt film the surfaces are to spot prime coated in way of any bare metal areas. allow for 5% for this coverage. Apply two coats of surface tolerant high solids Deveran 230 epoxy coatings of contrasting colors, with a stripe coat in way of sharp edges or inside or outside corners in way of frames. the top coat to match the existing color scheme having a total dft of 8 mils. total approximate coverage is approximately 20,000 S.F. G010T 04/22/03 SMDRP HUL70 0100-00000-000 4307 10/01/03 / / 03 04-03-B-02 03 $2000.00 $0.00 KY / / DESCRIPTION: COAT P&S INTERMEDIATE SHAFTS The port and stbd. propeller intermediate shafts SKF couplings section of tail shafts just fwd. of the stern tube oil seals and the after shaft coupling flange of the port and stbd. reduction gears. The coatings were removed or disturbed during the removals of the port and stbd. shafts during the 02/03 drydocking at BMI. Recommend that these areas be cleaned off the surfaces prepared any chipp out pain areas are to be prepared by feathering adjacent edges. The surfaces are to be coated by coating any bare areas with primer followed by two coats of surface tolarant total minimum of 8 mils. Dft. of high solids epoxy having a top coat matching the existing color scheme. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 3 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Lambert C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-WMG - Wilmington, NC R-Status: 10/OR - 10-Day (Outported)(2-men Retention Crew) Region..: SAR - South Atlantic Region Surveyor: MBG - Marvin B. Gordon SM/GA...: CLS - Crowley Liner Services COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G012T 04/22/03 SMDRP NAV90 0100-00000-000 3325 10/01/03 / / 04 04-03-C-02 03 $3000.00 $0.00 KY / / DESCRIPTION: Replace missing CHART cabinet In the after stbd. corner of the Bridge remove the plywood counter and install a standard chart cabinet, metal chest of drawers for holding charts. This is to be securred to the deck fit and renew any disturbed floor tile in way of installation. H020T 04/22/03 SMDRP HAB00 0100-00000-000 1109 10/01/03 / / 04 04-03-C-00 03 $12000.00 $0.00 KY / / DESCRIPTION: JOINER BULKHEAD OFF.LOUNGE/STORE RM The purpose of this item is to increase the size of the existing store-room by eliminating an area that is not presently used. Remove the wet bar from the Officer's lounge Install a new bulkhead in line with the rest of the Officer's lounge inboard bulkhead. Remove the rear alcove bulkhead behind the wetbar. This will increase the size of the existing store room in order to create additional storage. H063C 08/05/03 SCGJB CGO10 0100-00000-000 1271 10/01/03 / / 03 04-03-B-02 03 $5000.00 $0.00 KY / / DESCRIPTION: Remew all yard arm halyard staples and blocks M002C 08/05/03 SCGJB HAB30 5915-10855-046 3825 10/01/03 / / 04 04-03-C-02 03 $20000.00 $0.00 SK / / DESCRIPTION: Renew wheelhouse A/C system M004C 08/05/03 SCGJB FLD20 5701-71871-023 5701 10/01/03 / / 03 04-03-C-02 03 $10000.00 $0.00 SK / / DESCRIPTION: L/O & F/O purifier breakover alarms Procure and install breakover alarms for all purifiers. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 4 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Lambert C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-WMG - Wilmington, NC R-Status: 10/OR - 10-Day (Outported)(2-men Retention Crew) Region..: SAR - South Atlantic Region Surveyor: MBG - Marvin B. Gordon SM/GA...: CLS - Crowley Liner Services COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== M006C 08/05/03 SCGJB EGD40 5701-71871-023 4024 10/01/03 / / 03 04-03-B-02 03 $7500.00 $0.00 SK / / DESCRIPTION: SSDG Lube oil sump purification Install valves and piping from SSDG oil sumps to L/O purifiers to allow batch purification of SSDG lube oil sumps. M010T 04/21/03 SMDRP HAB20 0100-00000-000 5995 10/01/03 / / 03 04-03-B-02 03 $20000.00 $0.00 KY / / DESCRIPTION: REEFER FREEZE BOX EVAPORATOR CONV. The reefer freeze box is large and irregular shaped with small evaporators and fans at one end. Once the box is loaded the box is hard to keep evenly cold. Recommend that a small evaporator fan unit be installed in the small corner of the box to work in parallel in order to get better circulation of cold air. M012T 04/22/03 SMDRP FLD80 0100-00000-000 5720 10/01/03 / / 03 04-03-B-02 03 $25000.00 $0.00 KY / / DESCRIPTION: CONVERT NON-POTABLE WATER TANK Recommend that the present non-use Non-Potable water double bottom tank that was a previous feed water tank when the vessel used to have a boiler into a bilge water collection tank. Install a new Oily water seperator suction pipe line with isolation valve and piping to extend down near the bottom of the tank in order to give the bilge water to seperate and more easily pump off excess water. This would also require a section of piping with isolation valves off of the vessel bilge pump to discharge into this tank. This would help while transiting no discharge or discharge sensitive areas. This mod would need drawings revised and regulatory approval prior to change. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 5 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Lambert C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-WMG - Wilmington, NC R-Status: 10/OR - 10-Day (Outported)(2-men Retention Crew) Region..: SAR - South Atlantic Region Surveyor: MBG - Marvin B. Gordon SM/GA...: CLS - Crowley Liner Services COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== M018T 04/22/03 SMDRP HUL10 0100-00000-000 3330 10/01/03 / / 04 04-03-C-02 03 $8000.00 $0.00 KY / / DESCRIPTION: MACHINERY SPACE LABEL PLATES Several pieces of equipment in the engine room is not properly identified. fabricate ponelic label plates in black with white engraved lettering to identify the equipment. allow for approximately 50 labels which are to be installed by drilling and securing with cres fasteners. Several of the hand valve wheel are missing the identification medallon. Fabricate approximately 40 3 inch in dia. brass plates which are to be stamped or engraved with the system nomenclature. M019T 04/22/03 SMDRP FLD00 0100-00000-000 4801 10/01/03 / / 04 04-03-C-02 03 $55000.00 $0.00 KY / / DESCRIPTION: COLOR SCHEME IDENT. PIPING SYSTEMS None of the machinery system piping is marked or identified in the machinery space. The piping is to be stenciled to show the direction of flow and all fluid systems in the machinery space that conveys liquids shall be marked with a shipboard standart identification color marking scheme that identifies the liquid carried in that pipe. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 6 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Lambert C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-WMG - Wilmington, NC R-Status: 10/OR - 10-Day (Outported)(2-men Retention Crew) Region..: SAR - South Atlantic Region Surveyor: MBG - Marvin B. Gordon SM/GA...: CLS - Crowley Liner Services COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== Total of Estimated Costs...: $ 254,500.00 Total of OBLG/ACT Costs......: $ 0.00 Total Cost of Printed Items: $ 254,500.00 **** End of Report ****