9/7/01 17:00 add 24 T*2's to RS TDC 9/14/01 17:30 43513 add 3 new scalers 9/15/01 08:25 43535 fix broken 90D coincidence fix Ck_n (was L0) ungate Live scaler (now just spill gated) change KB*(T.2DT) to KB*T.2_bar setup KB*L1.nDT 10kHz*beam in #3,#4,#60 are 1msec 10kHz*beam in #49 and downstairs are 100usec 9/16/01 00:30 43553 LB5p17 high EC temperature 9/16/01 13:10 43577 LB5p20 new RS HV hv.rs.43565 9/16/01 18:00 43582-4 LB5p21 B4U/V removed km21 9/16/01 18:45 43585-93 LB5p22 L19 veto delay curve 9/16/01 19:00 43587 LB5p22 swap #13<-->#14 in RSTDC 9/16/01 20:45 43596 LB5p22 remove 1ns from B4V (look at KB) 9/16/01 20:00 43594 LB5p22 work on KB*T.2 and KB*L1.nDT scalers 9/16/01 20:50 43596 LB5p22 MCR plan is to increase intensity and then lower energy from 24->21 GeV. (Need D-line magnet stability work) 9/17/01 15:30 43627 LB5p27 bad TD control board jumpers found 9/17/01 16:40 43628 LB5p27 added ext_con(7) and scaler for T*2>=2 9/18/01 5:45 43660-6 LB5p32 L19 veto delay curve 9/18/01 10:30 43675 LB5p34 T*2 MALU to new ECL/NIM converter 9/18/01 12:40 43689 LB5p36 set RSSC current trip to 1mA 9/18/01 14:00 43694 LB5p36 reduce Csec counts by x10 9/18/01 20:00 43710 LB5p40 large event size, CCDPED problems, L1.1 RC problems 9/19/01 08:40 43732 LB5p42 SEB setup for 21.5 GeV 9/19/01 10:30 43732 LB5p43 new QOD 9/19/01 13:40 43745 LB5p44 L2 trim 9/19/01 15:00 43748 LB5p45 CCD problems 9/20/01 01:00 43759-70 LB5p47 pibeam,kbeam beam delay curves 9/20/01 02:00 43771-808 LB5p47-52 km21 RS delay curve 9/20/01 04:40 43787 LB5p50 fanout power to 16MT 9/20/01 06:00 43796 LB5p51 new predet file (beam 250ms late, 1.5 sec spill) 9/20/01 06:30 43799 LB5p51 16P19 not connected in cable tray 9/20/01 07:00 43804 LB5p52 move B0 to splitter from FO 9/20/01 08:00 43809 LB5p52 remove 2ns from B4 in piB 9/20/01 11:00 43817 LB5p54 adjust B4 DC offsets 9/18-20 Trim RS cables 9/20/01 LB5p56 AGS back on at 21 GeV 9/20/01 16:00 43824 LB5p56 CCDPED work 9/20/01 18:00 43828 LB5p57 wrong .dwf.rs.p10, write kbeam mons to disk 9/20/01 17:00 43825-47 LB5p57-8 Bulk RS trim data 9/21/01 11:00 LB5p61 work on RSSc power in cave, on RS trim upstairs 9/21/01 14:45 43888 LB5p63 AGS skipping beam over C target 9/21/01 14:45 43089-?? LB5p63 kbeam without Ck 9/21/01 16:00 43893 LB5p64 fanout preamp power to 12PT 9/21/01 16:20 43896 LB5p64 remove 10ns from RS Fera gate (.dwf.010921), summary of RS bulk trim data #2 9/21/01 20:45 43899 LB5p65 correct Fast Clear cable 9/21/01 20:45 43899 LB5p65 new QOD 9/21/01 21:30 43898 LB5p66 lots of Radiation Interlocks Ck=2M 9/22/01 01:30 43914 LB5p67 Power Dip 9/22/01 17:47 43935 LB5p70 new hv.rs.43913 9/22/01 18:20 43936 LB5p71 Dick adjusts CCD peds 9/22/01 23:30 43944 LB5p75 funny collar peaks in cosmics 9/23/01 08:20 43953 LB5p76 beam skipping over target 9/23/01 10:15 43964 LB5p77 inverted T*2 RC strobe for sector 14 was corrected 9/23/01 14:25 43987-44013 LB579-80 beam delay curve 9/23/01 17:15 44015 LB5p80 add 0.5ns to IC1 and IC2 9/23/01 19:00 44017 LB5p80 fix T*2#24 into RSTDC, fix T*2 MALU 9/23/01 23:00 44032 LB5p83 Fera gate study (kill Ren/Pass) 9/24/01 11:00 44048 LB5p85 RS,BV ADC delay curves 9/24/01 15:00 44051 LB5p86 adjust BM,B4 ADC gate timing 9/25/01 00:25 44068 LB5P88 fix 1PT preamp power 9/25/01 02:45 44082 LBp90 kbeam with target removed 9/25/01 19:00 44107 LB5p92 fast clear work 9/25/01 21:30 44109-15 LB5p93 kbeam with B4 removed 9/26/01 05:00 44124-8 LB5p95 kbeam with B4 removed 9/26/01 17:00 44146 LB5p97 raise B4 CFD 30-->50mV, adjust zero-cross 9/26/01 21:00 4412-7 LB5p98 one Ck at a time, threshold to 300mV (not 265mV) 9/27/01 13:00 44173-6 LB5p100 L19_veto study 9/28/01 10:15 44224 LB6p7 discovered B4U removed (how long?) 9/28/01 11:45 44225-6 LB6p7-8 B4V removed 9/28/01 13:15 44235-8 LB6p9 L1.1 works 9/28/01 03:10 44246-8 LB6p10 kbeam with B4 removed 9/29/01 18:45 44304-19 LB6p20 kp22 delay curve 9/30/01 4:10 44345 LB6p22 start smx 9/30/01 5:10 44353 LB6p23 create B0 trigger (D01) 9/30/01 7:15 44360 LB6p23 add Hex_MT,BV_MT,BVL_MT trigger bits 9/30/01 11:00 44370 LB6p24 correct Cksum<-->Cpisum swap at ADC 9/30/01 12:45 44374 LB6p25 add B0 bit to DAQ, enable data to disk 9/30/01 13:10 44374-6 LB6p25 L1.2 enabled 10/1/01 13:30 44429 LB6p33 increase pnn1or2 prescale to disk 1-->10 10/1/01 19:25 44446 LB6p35 correct UTC cable swap 155A,155B,156A 10/1/01 20:30 44451 LB6p36 correct another UTC cable swap 107A<-->108A 10/1/01 21:30 44451 LB6p36 add x10 amp to B0, increase HV to 2100, add 1ns to B4 into pibeam 10/1/01 23:00 44458 LB6p36 exchange T*2 from PB-1A and RS-TDC 10/2/01 01:00 44457 LB6p37 QOD plot of VHF structure 10/2/01 12:00 44472 LB6p39 New DPV cables (190ns, not 225ns) 10/2/01 12:00 44472 LB6p40 FTDC trim in Sect 1-2, 5P13,5M13 10/2/01 14:00 LB6p40 analysis of EOR causes 10/2/01 14:00 LB6p40 fix DUI error logging 10/2/01 18:00 44486 LB6p42 measure 90DMon resolving time 10/2/01 22:45 44495 LB6p43 MCR skips beam to C3 10/3/01 2:00 44498-503 LB6p43 bulk RS trim of Sect 1-2 (Sasha) 10/3/01 2:45 44498-9 LB6p43 B4U removed from kbeam trigger 10/3/01 6-14 44504-xx LB6p44 off for RHIC studies 10/3-5/01 44510-87 LB6p45-55 techs trim bulk RS sectors 3-24 10/3/01 13:00 44508 LB6p46 DeToX and csihvmon auto with Demon 10/3/01 17:30 44515 LB6p46 MCR puts SEB stuff on CH25 10/3/01 23:00 44523 LB6p47 lose magnets to cooling tower problem, unplug "tdmon enable" cable? 10/4/01 00:15 44528-31 LB6p47 Bulk RS trim data 10/4/01 10:20 44541 LB6p50 Study RD 1-4 13 M/P for dbl pulsing 10/4/01 10:50 44541 LB6p50 put B0 CCD into x10 amp 10/4/01 12:50 44544 LB6p51 fix B0 output stream, fixed FB errors w/o PPC reboot 10/4/01 13:50 44544 LB6p51 put x10 amps on RV, UPV, AD 10/4/01 13:50 44544-61 LB6p51-3 B4 NIM amp crate voltage bad (-6V = -1.5V) 10/4/01 15:50 44545 LB6p51 IC NIM/ECl found to be unplugged 10/4/01 15:50 44546-61 LB6p51-68 screw up MT2A T#1-8 10/4/01 15:55 44547 LB6p51 rebuild DAQ etc with more FIFO's 10/4/01 16:00 44548 LB6p52 trim B4 cables 10/4/01 23:00 44557 LB6p53 finally fix B0 stream 10/4/01 23:15 44558 LB6p53 delay CCD-D stop by 200ns 10/4/01 23:25 44559-60 LB6p53 kbeam without B4U, B4V (B4 not working) 10/4/01 23:35 44560 LB6p53 increase spill gate by 150ms (leading edge) 10/5/01 00:15 44562 LB6p53 fix B4 problem (-6V), separator problems fixed 10/5/01 00:05 44561-70 LB6p53 bulk RS trim data 10/5/01 04:30 44571-4 LB6p54 kbeam w/o B4U,V 10/5/01 12:00 44587 LB6p55 RS trim finished 10/5/01 13:50 44590-7 LB6p56 Meantimer trimming 10/5/01 16:25 44602 LB6p57 Change RSTDC 32usec --> 12usec, drop trailing edges 10/5/01 21:30 44614 LB6p58 found BS unplugged in RSTDC (44581-44614) 10/6/01 00:55 44623-7 LB6p58 bulk RS trim data 10/6/01 03:00 44628 LB6p59 12M19 ADC cable loose at splitter 10/6/01 14:00 44632 LB6p61 TDDAc problems, 17M9 has low gain, BVL 24M problem 10/6/01 19:00 44636 LB6p62 BVL 24M fixed - cable loose at FERA 10/6/01 20:45 44637 LB6p62 kbeam w/o B4U 10/6/01 22:00 44638 LB6p62 new QOD 10/7/01 03:00 44643 LB6p65 notice problem with T*2's 10/7/01 16:00 44661 LB6p68 minbias without IC 10/7/01 16:10 44661 LB6p68 solution to T*2 problem (44546-61) 10/7/01 16:20 44662 LB6p68 All BM CCD OK except UPV2 10/7/01 17:40 44664 LB6p68 MCR tunes beam right to get 90D(3f)/csec to 1:1 from 1:3 Ck/Csec 250 --> 600 10/7/01 20:30 44668 LB6p69 New OTB (prompt,CEX,kp21,kp22,km21,km22,kp21n(1gamma),km21n(kp23) 10/7/01 20:30 44668 LB6p69 MCR tunes beam back left we lose 30%. 10/7/01 23:30 44675 LB6p69 modify do_tddac_dui for instructions 10/8/01 00:15 44676-81 LB6p69 Meantimer tests 10/8/01 09:45 44688 LB6p71 L19 into MT2A as veto 10/8/01 09:55 44689 LB6p71 L19 into MT2A as required 10/8/01 10:00 44689 LB6p71 remove Delco_10ns and isntall HEX_MT5 (ext_con(24) turned off TB prescales) 10/8/01 13:30 44701 LB6p72 Meantimer trim 10/8/01 14:40 44705 LB6p72 change run_log from 10min to 2min, change beam threshold 10/8/01 15:30 44705 LB6p72 RS 5M13 repaired by looking on scope 10/8/01 16:30 44705 LB6p73 replace NIM power supply to fix TDDAC problem 10/8/01 20:00 44715 LB6p74 FTDC trim 13-21, final bulk RS trim by Sasha 10/9/01 01:00 44728 LB6p75 bad RS TDC data, DYC wrong readout sequence 10/9/01 13:30 44745 LB6p78 change Isobutane bottle 10/9/01 13:30 44745 LB6p79 increase EB buffers from 10-->20 10/8-9/01 LB6p FTDC trim 10/9/01 13:30 44749 LB6p80 Time Meeting, SEB meeting 10/9/01 14:00 44745 LB6p79 replace TT H 13 PMT, clean contact on RS 1P6,18P6 10/9/01 19:45 44748 LB6p79 start_dp0 - start all during smx, pnn1or2 ps 10->100, km21n->kp23 kp21n->1gamma 10/9/01 21:00 44749 LB6p79 Trim L2 10/10/01 00:30 44754-68 LB6p80 new OTB data tests 10/10/01 06:10 44776 LB6p82 water tower off, D3 off, maintenance all day (AGS RF) 10/10/01 12:00 44776 LB6p82 access to check 90Dmon, T*2 efficiency plot 10/10/01 15:30 44791 LB6p83 replace Trigger Transmitter Ntgt>20 with L0_ZFRF 10/10/01 12:00 44776-91 LB6p83 retrim B4 to correct mistake 10/10/01 18:00 44781 LB6p83 BVL 28P broken and fixed 10/10/01 22:30 44787-8 LB6p84 kbeam w/o B4U for B4 timing 10/10/01 23:20 44789-93 LB6p84 bulk RS trim data 10/11/01 01:00 44794 LB6p84 increase Event Builders from 2-->4 10/11/01 03:10 44798-9 LB6p85 kbeam w/o B4V for B4 timing 10/11/01 10:20 44803 LB6p86 fix RS 1M4, 10M4 10/11/01 12:30 44813 LB6p87 replace broken Cpi shaping discriminator 10/11/01 11:20 44808-31 LB6p87 pnnL0/piscat for L1.1 calibration 10/11/01 12:45 44814-28 LB6p87 study of BS delay in piscat, gate_faults? 10/11/01 15:00 44831 LB6p88 write to 2 tapes, then start cycling 10/11/01 16:15 44839 LB6p89 DAQ new, DAQ thruput studies 10/11/01 16:30 44840-53 LB6p89 Bulk RS trim data 10/11/01 21:15 44864-5 LB6p92 Prompt data 10/11/01 20:35 44861-6 LB6p91-2 new TB data 10/11/01 22:00 44871 LB6p92 BVL 28P repaired again, RS 11P5 weak 10/11/01 23:00 44877 LB6p92 retrim B4 cables 10/11/01 23:00 44877-80 LB6p92 kbeam w/o B4U/V 10/12/01 15:00 44892 LB6p94 new AD HV 10/12/01 17:15 44892 LB6p95 TD 2M16 reflection, trim B4 cables 10/12/01 21:40 44893-4 LB6p95 kbeam w/o B4U/V 10/12/01 10:30 44912 LB6p98 ccdped/fbped problems 10/13/01 23:45 44928 LB6p101 bad TD pulse shapes 10/14/01 05:20 44945 LB7p3 bnlku7 hang, no CAMAC 10/14/01 06:00 44948 LB7p4 /e787cal full, ped problems 10/14/01 12:45 44963 LB7p6-7 change .andor=.andor.011014 apply L1.1 to 1gamma 10/14/01 13:35 44964 LB7p7 Dick fixes reflection on TT I 22 CCD 10/14/01 14:35 44966 LB7p7 add 0.5ns to B4V6 10/14/01 15:00 44967 LB7p7 I-Hung tunes C-line, KB goes from 200k->600k 10/14/01 19:00 44974-7 LB7p8 IC/DC work, Delco trim 10/14/01 01:00 44980 LB7p10 add CEX to smx 10/15/01 11:00 44990 LB7p11 light for C-target flag replaced, camera aligned 10/15/01 12:00 44993 LB7p11 RS HV summary 10/15/01 16:00 44998 LB7p12 (5-8)P4 double pulsing 10/15/01 20:00 45002 LB7p13 Yury studies T-counter pulses 10/16/01 02:00 45008 LB7p15 replace CCD-D SSP (bad hybrid) 10/16/01 05:30 45010 LB7p15 5M13 looks dead at splitter 10/16/01 10:00 45024 LB7p17 trigger hang studies 10/16/01 13:00 45031 LB7p18 new CCDPED 10/16/01 13:30 45032 LB7p18 add 4ns to 2MT 10/16/01 13:30 45032 LB7p18 techs work on 17M9,5M13,11P5,17P17,BV-21M3 10/16/01 13:30 45032 LB7p18 T-counter ineff plots for 6,11 (92%) 10/16/01 14:00 45032 LB7p19 BV M-21-3 and M-22-3 fed from M-22-3, no cable on M-21-3 10/16/01 14:30 45033 LB7p19 clean contacts on 11P5, 17M9, replace base on 5M13,17P17; wiggle PMT on 6MT,11MT 10/16/01 18:30 45049 LB7p20 Woody tunes C-line 10/16/01 20:20 45050 LB7p20 replace CCD-A 10/17/01 04:30 45065 LB7p21 Beam off for 14 hours of studies. 10/17/01 07:05 45066 LB7p22 replace TD 612-6 10/17/01 12:00 45068 LB7p22 new RS HV hv.rs.45010 10/17/01 15:30 45069 LB7p22 new AD HV hv.bm.2001_13 10/17/01 15:35 45069 LB7p23 10M4 dead at splitter 10/18/01 02:00 45080-2 LB7p24 kbeam w/o B4U/V, pibeam,piscat,km21 p25 10/18/01 02:25 45084-8 LB7p25 piscat tirgger studies (Akira) 10/18/01 07:05 45105 LB7p26 9M17 is dead, No power on Summer#7 10/18/01 08:30 45106 LB7p27 update RSLED reference to 45068 10/18/01 11:00 45110 LB7p28 progress on trig hangs 10/18/01 12:00 45119 LB7p28 km22 RS calibration 10/18/01 12:50 45120 LB7p28 check IC/Delco 10/18/01 13:55 45127 LB7p30 beam spike trips all RSSC's 10/18/01 15:00 45130-6 LB7p30 Dick adjusts CCDPEDs 10/18/01 17:20 45143 LB7p31 all_v2_432, tdc3 (64-464ns) 10/19/01 01:40 45162-6 LB7p32 piscat studies 10/19/01 08:10 45169 LB7p32 replace Fera 11-4 10/19/01 08:40 45172 LB7p33 fix beam hours 10/19/01 09:30 45176 LB7p33 replace Fera 11-4 again 10/19/01 14:45 45180 LB7p34 new RS HV hv.rs.45153 10/19/01 17:10 45187 LB7p34 new version of QOD 10/19/01 20:00 45197 LB7p35 move CCDD DS 10/19/01 21:00 45199 LB7p36 SEB on all weekend (due to RHIC cryo problems) 10/19-21 10/20/01 02:00 45214-7 LB7p37 lost runs? tape stuck 30062-3 10/20/01 04:00 45218 LB7p37 I-Hung resets Radmon paddle 10/20/01 16:30 45234 LB7p39 tape problems, again at 22:20 (43 Gbytes...) 10/21/01 09:30 45260 LB7p42 note that /data0 filled up 10/21/01 15:00 45268 LB7p43 SK looks at piscats 10/21/01 21:00 45287 LB7p45 C-line gets all beam (1 hour) 10/21/01 23:00 45292 LB7p46 add L1.1 to prompt 10/22/01 09:45 45307 LB7p48 SK looks at piscats 10/22/01 13:00 45316 LB7p49 PPC update to clear scaler#1 (44747-45315 are bad) 10/22/01 15:30 45323 LB7p50 remove piscat trigger 10/22/01 19:00 45333 LB7p50-1 new RS HV 1P4 increase 250V 10/22/01 19:40 45336 LB7p51 new beam HV 10/22/01 18:30 45336 LB7p51 description of piscat trigger hangs 10/22/01 20:40 45342 LB7p52 CCDPED adjustment 10/23/01 01:10 45348 LB7p52 load CAMAC had errors, RS TDC fucked up 10/23/01 13:45 45365 LB7p55 RS 10M4 TD output dead at splitter 10/23/01 17:00 45373 LB7p55 new RS HV hv.rs.45355 10/23/01 19:20 45377 LB7p56 Xe run 10/23/01 20:00 45378 LB7p56 RSSC calibration (8.5M) 10/23/01 22:20 45379 LB7p56 eckmu2 run 10/24/01 11:50 45395 LB7p58 RS 10M4 splitter box replaced 10/24/01 06:00 45388 LB7p58 RHIC studies cancelled --> SEB on! 10/24/01 12:00 45401 LB7p59 all beam in C-line 10/24/01 13:00 45402 LB7p59 load new BVL HV 10/24/01 13:30 45403 LB7p59 new TDMON program 10/24/01 22:30 45423 LB7p61 problems with DAQ, bad gate generator 10/25/01 08:00 45439 LB7p63 SEB off, repair BV PMTs 10/25/01 10:25 45439 LB7p64 discovery of RS TDC problem again 10/25/01 12:35 45439 LB7p65 update DAQ (EB 2-->4, better cleanup) 10/25/01 16:00 45439 LB7p65 clean BV pins 47M2, 44M4, 44P3, 24M2 10/25/01 16:00 45439 LB7p65 TT JA13 HV cable connected, base replaced 10/25/01 16:00 45439 LB7p65 replace RS 11PT PMT with HPK tube 10/25/01 17:15 45439 LB7p66 load new RS HV hv.rs.45439 10/25/01 17:35 45439 LB7p66 move BD DT to new kludge (OR SQ+delay) (forgot to plug piscat from PS to BD) 10/25/01 17:50 45440 LB7p66 TDMON reports RS 12P5, 3P13 dead; actually 11P5 and 4P13 are dead. 10/26/01 02:50 45452 LB7p67 move TT CCD ch 10/26/01 8:20 45457 LB7p68 Beam off for Westinghouse brake work, ku7 frozen 10/26/01 11:50 45458 LB7p69 load new RS HV hv.rs.45447 10/26/01 12:00 45458 LB7p69 replace base 4P13, 11P5, checked 6PT-6MT 11 fibers, replace 6MT with HPK 10/26/01 11:50 45458 LB7p69 use "fake AGS" while Westinghouse work proceeds 10/26/01 16:50 45465 LB7p70 Xe hangs, change disc channel 10/26/01 18:30 45469 LB7p70 Renee George study RS TDC event bits 10/26/01 18:40 45470 LB7p70 TD problem in 11P19 (not 12P19) 10/26/01 22:30 45483 LB7p71 study of all_v3 (check RS TDC event #) 10/27/01 03:00 45490 LB7p72 use all_v3 10/27/01 05:00 45493 LB7p73 Sep trip - UTC trip 10/27/01 10:40 45497 LB7p73 George (does some changes) 10/27/01 12:40 45499 LB7p74 new QOD 10/27/01 16:40 45510 LB7p77 E2 CCD all has signals 10/27/01 20:00 45514 LB7p78 load new RS HV hv.rs.45475; 11P19 dead 10/28/01 12:00 45545 LB7p82 replug piscat PS->BD cable 10/28/01 13:30 45547-59 LB7p82 RSMON rate study 10/28/01 15:20 45562 LB7p83 new EC HV 2001_04 10/28/01 16:10 45563 LB7p83 move EC fanin 10/28/01 19:20 45570 LB7p84 close jaws, improve hangs 10/29/01 12:25 45590 LB7p87 install BS+DS into TDC1:5:15-16, TDC2:19:94-5 10/29/01 13:30 45592 LB7p87 replace SSP in CCDD 10/29/01 14:10 45594 LB7p87 BS into TDC3 10/29/01 14:10 45594 LB7p87 swap UTC C4-9 and C4-10 for test 10/29/01 14:30 45595 LB7p87 readout failure on A18 0-3 10/29/01 16:30 45596 LB7p87 6M1, 11P1 are noisy, lower HV 10/29/01 19:30 45597 LB7p87 drop TD08 10/30/01 01:00 45609-16 LB7p90 RS TDC disaster, from Renee's unpacking 10/30/01 06:00 45618 LB7p91 -6V off in EC amp crate 10/30/01 10:00 45626 LB7p91 SEB off for RHIC work, Kelvin works on PMT's 10/30/01 10:45 45626 LB7p92 Trigger change; OTB for all but pnn1-2, no more km21n-kp22n 10/30/01 11:00 45626 LB7p92 clean 6MT and 11PT, increase 11PT HV 10/30/01 12:30 45630 LB7p93 restore piscat to PTB 10/30/01 14:25 45633 LB7p94 OTB piscat test -fails 10/30/01 14:45 45634 LB7p94 L1.2 test - fails 10/30/01 14:45 45635 LB7p94 apply L1.1 to prompt, smx_v12n 10/30/01 15:45 45636 LB7p94 Kelvin works on T-counter outputs 10/30/01 14:45 45640 LB7p94 new trigger files smx_v12o(high intensity) and smx_v12p 10/31/01 02:00 45651 LB7p96 E2 gain calibration plots 10/31/01 06:00 45664 LB7p97 SEB off for RHIC studies (6-18:00) 10/31/01 08:30 45662 LB7p97 Joe/Jingliang work on CCD 10/31/01 09:00 45665 LB7p98 Neil to work on 11P19 10/31/01 12:30 45665 LB7p98 George fixed TD08 (bad DAC board) 10/31/01 12:50 45665 LB7p98 11P19 fixed (old 11P19 cable on 10P19) 10/31/01 12:50 45665 LB7p98 new PMT for TT Z 16, Z 13 finally cabled 10/31/01 13:00 45665 LB7p98 DAQ New pedestals 10/31/01 13:30 45668 LB7p98 George/Henry work on bent pin in TD08, fiducial prob 10/31/01 17:50 45672 LB7p100 atten on CCD strobes 10/31/01 22:20 45681 LB7p100 run w/o TD08 again 10/31/01 20:20 45682-4 LB7p100 Meantimer studies 10/31/01 21:00 45685 LB8p1 ku7 frozen 11/1/01 00:50 45697 LB8p3 add BVL_bar to 1gamma 11/1/01 02:30 45698-705 LB8p3 online PV study 45698-9 BVL=200, BV=150 45700 BVL=300, BV=150 45701 BVL=400, BV=150 45702 BVL=300, BV=MT_30mV 45703 BVL=MT_30mV, BV=MT_30mV 45704 BVL=MT_30mV, BV=150 45705 BVL=300, BV=150 11/1/01 07:00 45709 LB8p5 install L2-C1 Voltage Mon card 11/1/01 08:50 45714-7 LB8p5 kbeam data 11/1/01 10:50 45718 LB8p5 change 1gamma to use BVL instead of BVL_bar 11/1/01 11:00 45720 LB8p6 SEB off today for RHIC beta*=1 11/1/01 12:30 45720 LB8p6 CF4 up to 8.1 (from 4-6) 11/1/01 14:45 45721 LB8p6 bnlku9 loses nfs 11/1/01 15:00 45721 LB8p6 rebuild DAQ - tape lables, dr's in different dir's. 11/1/01 17:00 45723 LB8p7 fix TD08 (old DAC board with good terminators) 11/1/01 20:00 45727 LB8p7 bu9/ku7 console problems, nfs problems 11/1/01 20:00 45727 LB8p7 Sep#1+ down from +300kV to +250kV 11/2/01 00:00 45728 LB8p8 bad beam, no KB, no CAMAC, bad E2 crate.... 11/2/01 01:00 45728 LB8p8 25 Tp tp D-line, C3 off 11/2/01 02:30 45731 LB8p8 pnn1-2 from OTB 11/2/01 06:40 45739 LB8p9 towa12 full, dp0 errors, remove km22's 11/2/01 17:00 45756 LB8p11 10th E2 CFD input cable reattached 11/2/01 17:00 45757 LB8p11 change RS TDC stop from 10usec to 6usec 11/2/01 17:00 45758 LB8p12 change RS TDC to keep trailing edge (12->8usec) 11/2/01 20:30 45759 LB8p12 OTB trigger tests pnn1-2, piscat - all work 11/2/01 20:30 45759 LB8p13 km21 for UTC 11/2/01 21:30 45762 LB8p13 add L0_zfrf to pnn1 11/3/01 09:00 45772 LB8p15 adjust CCD peds 11/3/01 17:00 45776 LB8p16 OTB tests 11/3/01 21:45 45783-91 LB8p17 L19_veto tests 11/4/01 01:00 45792-3 LB8p17 MT test 11/4/01 01:30 45794 LB8p17 L0_zfrf test 11/4/01 02:00 45796 LB8p18 piscat 11/4/01 06:00 45809 LB8p19 CCD ped adjustments 11/4/01 07:00 45809 LB8p19 more piscat 11/4/01 11:00 45822 LB8p20 T-counter inefficiency plots 11/4/01 11:00 45822 LB8p21 IC-ineff plots 11/4/01 10:45 45823 LB8p22 prompt data 11/4/01 11:30 45827 LB8p23 CP3 problems 11/4/01 12:30 45830 LB8p23 km22 11/4/01 13:00 45834 LB8p24 new Cer HV, replace CCD-D 11/4/01 11:30 45837 LB8p25,6 km21,kp21 study 11/4/01 16:45 45838 LB8p25 replace CCD-D hybrid 11/4/01 17:30 45838 LB8p26 discovery of tape cycling problem 11/4/01 19:00 45840 LB8p27 prompt, pnnL0 11/4/01 23:00 45855 LB8p28 MT thresh 30->50mV 11/5/01 00:00 45859 LB8p28 km21,kp21,pnnl0 studies 11/5/01 02:00 45866 LB8p29 adjust CCD peds 11/5/01 05:30 45875-87 LB8p29 rsmon intensity study 11/5/01 07:00 45889 LB8p30 km22 vs intensity runs 11/5/01 10:00 45903 LB8p31 disc study, km21_kp2_piscat 11/5/01 10:45 45906 LB8p31 change to Burst Guard (one was already) 11/5/01 12:00 45911 LB8p31 IHC sets radmon paddle 11/5/01 13:30 45911-6 LB8p31 UTC off from trip, no alarm 11/5/01 14:30 45920 LB8p32 special T-counter disc cables installe (sect 6, 11) 11/5/01 16:00 45925 LB8p32 fix tape_cycling? no.; p33, 11/5/01 16:30 45925 LB8p32 all RS discriminators back to Update mode 11/5/01 16:45 45926 LB8p32 new RS HV hv.rs.45891 11/5/01 17:15 45927 LB8p32 drop RS TDC trailing edges 11/5/01 18:30 45933 LB8p33 move bad TD baord to TD08, no spares 11/5/01 19:30 45935 LB8p33 change MT threshold 50mV --> 100mV 11/5/01 20:00 45938 LB8p33 high rate (Ck=7M), Woody is setting up for tomorrow 11/6/01 02:00 45955 LB8p35 lower MT threshold 100mV --> 30mV 11/6/01 05:30 45967 LB8p36 online PV study plots 11/6/01 10:00 45981 LB8p38 move TT R14,16 to new disc 11/6/01 10:00 45981-9 LB8p38 RSSC calibration data 11/6/01 high rate, target temp, beam spot scan,... 11/6/01 11:20 45987 LB8p39 add 20 cables to trim MT 11/6/01 13:30 45992 LB8p39 tape cycling works 11/6/01 15:30 46001-6 LB8p40 high rate km22 data 11/6/01 16:45 46007-12 LB8p41 SCF study - km21_kp2_piscat 46007 stc15.asc (T*2=0 -> HEX=7) -> Normal 46008-9 stc14.asc (T*2=0 -> HEX=0, T*2>=2 -> HEX=OK) 46010 stcn11.asc (T*2=0 -> HEX=0, T*2>=2 -> HEX=Random[1-7]) 46011 stc15.asc (T*2=0 -> HEX=7) 46012 stc14.asc (T*2=0 -> HEX=0, T*2>=2 -> HEX=OK) 11/6/01 18:00 46015-6 LB8p41 L1.2 enabled, smx 11/6/01 18:00 46015-6 LB8p41 20 Tp to C3, we have also ~20 Tp 11/6/01 20:00 46019 LB8p42 new RS hv.rs.46000 11/6/01 21:45 46021 LB8p42 new B4 HV 11/6/01 23:45 46022-32 LB8p42 kbeam datafor T-counters 11/7/01 01:00 46029 LB8p42 new RSLED format 11/7/01 02:30 46038 LB8p43 smx_v12v, prescale pnn2 by x3 11/7/01 03:00 46039 LB8p43 change to BV_MT and BVL_MT 11/7/01 04:15 46047-8 LB8p44 back to BV,BVL 11/7/01 04:45 46050 LB8p44 change to BV_MT and BVL_MT 11/7/01 05:30 46051 LB8p44 SEB off for RHIC studies 6:00-18:00 11/7/01 22:00 46069 LB8p46 Ck from 8.0M -> 0.3M 11/8/01 01:00 46072 LB8p46 back to BV,BVL 11/8/01 01:30 46072 LB8p46 rsmon.slower 11/8/01 02:00 46074 LB8p47 rsmon.slow 8.0->0.3 11/8/01 04:00 46090 LB8p48 SEB off 11/8/01 10:00 46091 LB8p48 turn off CsI and D3