Site/Building | Test date | Species | NOECb (%)
| 48-h LC50c (%)
| 96-h LC50d (%)
| IWCe (%)
|
---|---|---|---|---|---|---|
Groundwater Treatment Facility | 4/5 | Ceriodaphnia | 0.5 | 2.09 | ||
(Outfall 512) | Fathead minnow | 10 | 2.09 | |||
Outfall 201 | 5/3 | Ceriodaphnia | 100 | \math{>}100 | f | |
Fathead minnow | 100 | \math{>}100 | f | |||
Outfall 201 | 5/10 | Ceriodaphnia | 80 | \math{>}100 | f | |
Fathead minnow | 100 | \math{>}100 | f | |||
Outfall 201 | 5/17 | Ceriodaphnia | \math{<}80 | \math{>}100 | f | |
Fathead minnow | 100 | \math{>}100 | f | |||
Outfall 201 | 5/31 | Ceriodaphnia | 80 | \math{>}100 | f | |
Fathead minnow | 100 | \math{>}100 | f | |||
Central Pollution Control Facility | 5/31 | Ceriodaphnia | 100 | 0.23 | ||
(Outfall 501) | Fathead minnow | 100 | 0.23 | |||
Outfall 201 | 6/7 | Ceriodaphnia | 80 | \math{>}100 | f | |
Fathead minnow | 100 | \math{>}100 | f | |||
Outfall 201 | 6/14 | Ceriodaphnia | 100 | \math{>}100 | f | |
Fathead minnow | 80 | \math{>}100 | f | |||
Groundwater Treatment Facility | 6/15 | Ceriodaphnia | \math{>}100 | 0.73 | ||
Fathead minnow | \math{>}100 | 0.73 | ||||
9422-11 Storm Sewer | 6/15 | Ceriodaphnia | 38.5 | g | ||
Fathead minnow | \math{>}100 | g | ||||
9422-15 Storm Sewer | 6/15 | Ceriodaphnia | 77.2 | g | ||
Fathead minnow | \math{>}100 | g | ||||
9422-12 Storm Sewer | 6/17 | Ceriodaphnia | 37.3 | g | ||
Fathead minnow | 74.8 | g | ||||
9422-16 Storm Sewer | 6/17 | Ceriodaphnia | \math{>}100 | g | ||
Fathead minnow | \math{>}100 | g | ||||
Central Pollution Control Facility | 6/19 | Ceriodaphnia | \math{>}100 | 0.40 | ||
(Outfall 501) | Fathead minnow | \math{>}100 | 0.40 | |||
Outfall 201 | 6/21 | Ceriodaphnia | 100 | \math{>}100 | f | |
Fathead minnow | 100 | \math{>}100 | g | |||
aThese 7-day chronic tests and 48-hour acute tests using fathead minnows and Ceriodaphnia
were completed in 1995 as part of the TCMP conducted for the Y-12 Plant by ORNL. Summarized are the effluents and their corresponding no-observed-effect concentrations, 48- or 96-hour LC50s, and in-stream waste concentrations (IWCs). Note: Discharge from the treatment facilities are intermittent because of batch operations.
| ||||||
bNo-observed-effect concentrations. | ||||||
cThe concentration of effluent that is lethal to 50% of the test organisms in 48 hours.
| ||||||
dThe concentration of effluent that is lethal to 50% of the test organisms in 96 hours. The 96-hour LC50s were developed during the chronic tests.
| ||||||
e The IWC based on actual flows at East Fork Poplar Creek, station 8. | ||||||
fThis is an in-stream point; therefore, an IWC is not applicable.
| ||||||
gThis point is in the storm sewer system; therefore, an IWC is not applicable.
|