General Decision Number: ID080014 02/08/2008 ID14 Superseded General Decision Number: ID20070021 State: Idaho Construction Type: Highway Counties: Ada, Boise, Canyon, Gem and Owyhee Counties in Idaho. Modification Number Publication Date 0 02/08/2008 * CARP0808-006 01/01/2008 Ada, Boise, Canyon, Gem and Owyhee Counties Rates Fringes CARPENTER........................$ 23.92 8.10 If a project is located in more than one zone the lower zone rate shall apply Zone Differential (add to Zone 1 rate): Zone 2 - $1.50 Zone 1: That area within the State of Idaho located within 30 miles on either side of I-84 from the Oregon-Idaho State Line on the West to the Intersection of I-84 and I-86 in Cassia County, then following I-86 to Pocatello, then following I-15 to Idaho Falls, then following State Highway #20 - 10 miles north to the intersection with Moody Road then following I-15 south from the city of Pocatello to a point 10 miles South of the Southern Boundary of Bannock County extended to the West. Zone 2: The remaining area of that portion of the State of Idaho south of Parallel 46 (the Washington-Oregon State Line extended eastward to Montana) that is not included in Zone 1 as described above. ---------------------------------------------------------------- * ELEC0291-008 06/01/2007 Ada, Boise, Canyon, Gem and Owyhee Counties Rates Fringes Cable Splicer....................$ 29.88 3%+$9.04 ELECTRICIAN......................$ 27.16 3%+$9.04 ---------------------------------------------------------------- * SUID2006-002 05/25/2006 Rates Fringes Cement Mason/Concrete Finisher (Includes but not limited to hand chipping and patching, all types of grouting and pointing of all concrete constructions, screed setting including screed pins, dry packing of all concrete, plugging and filling of voids, concrete construction, waterproofing of concrete.)....................$ 16.00 5.41 Laborers: (Common)...............$ 14.02 4.66 Laborers: (Concrete laborer (Includes shoveling, wheel barrow work, and clean-up and excludes all finish work using float, trowel, and other tools))....................$ 15.50 5.41 Laborers: (Fence Erector)........$ 19.84 8.76 Laborers: (Grade Checker)........$ 13.42 3.86 Laborers: (Guardrail Installation (Excludes the installation of post, but includes the bolting of rail to post))........................$ 19.84 8.76 Laborers: (Pavement Marking & Highway Striping Laborer (Includes loading/unloading paint and beads, equipment cleaning, equipment maintenance))....................$ 26.03 0.00 Painter: (Traffic Control Striper (Striping Equipment Operator)).......................$ 27.50 0.00 Painters:........................$ 21.00 0.00 POWER EQUIPMENT OPERATOR: (Asphalt Paver (Self Propelled))......................$ 16.85 3.86 POWER EQUIPMENT OPERATOR: (Asphalt Plant Operator).........$ 17.00 4.25 POWER EQUIPMENT OPERATOR: (Asphalt Roller).................$ 14.44 3.86 POWER EQUIPMENT OPERATOR: (Backhoe-Over 3/4 CY)............$ 15.79 3.86 POWER EQUIPMENT OPERATOR: (Backhoe-Under 3/4 CY)...........$ 21.75 6.97 POWER EQUIPMENT OPERATOR: (Blade Operator/Motor Patrol)....$ 14.89 3.86 POWER EQUIPMENT OPERATOR: (Broom)..........................$ 19.58 5.65 POWER EQUIPMENT OPERATOR: (Concrete Breaker)...............$ 22.13 7.22 POWER EQUIPMENT OPERATOR: (Concrete Slipform Operator).....$ 16.00 5.41 POWER EQUIPMENT OPERATOR: (Crane (Over 50 Ton))............$ 24.40 5.97 POWER EQUIPMENT OPERATOR: (Dragline-Under 3/4 CY)..........$ 21.75 6.97 POWER EQUIPMENT OPERATOR: (Excavator, Track (Over 3/4 CY)).............................$ 15.79 3.86 POWER EQUIPMENT OPERATOR: (Grade Roller (Including Sheepsfoot)).....................$ 13.63 3.86 POWER EQUIPMENT OPERATOR: (Guardrail Equipment Operator (Includes Punch, Auger and Combination))....................$ 21.75 9.73 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead-Over 4 CY and Including 7 CY)..................$ 21.93 4.48 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead-Over 7 CY)..............$ 13.97 3.86 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead-Up to and including 4 CY)............................$ 15.17 3.86 POWER EQUIPMENT OPERATOR: (Mechanic, Heavy Duty)...........$ 16.50 5.41 POWER EQUIPMENT OPERATOR: (Scraper Operator)...............$ 17.27 3.86 POWER EQUIPMENT OPERATOR: (Screed Operator)................$ 17.01 4.55 POWER EQUIPMENT OPERATOR: (Service Oiler)..................$ 18.46 5.85 POWER EQUIPMENT OPERATOR: (Tractor, Rubber Tired-Farm Type)............................$ 20.90 4.48 POWER EQUIPMENT OPERATOR: (Tractor, Rubber Tired-Using Backhoe).........................$ 16.05 3.86 POWER EQUIPMENT OPERATOR: (Welder).........................$ 16.00 5.41 Truck drivers: (Dump Truck-Side, End and Bottom (16-32 CY inclusive))............$ 13.00 3.45 Truck drivers: (Dump Truck-Side, End and Bottom and Concrete Mixer (0-16 CY inclusive))......................$ 21.30 0.00 Truck drivers: (Flat Bed, Low Boy, Truck-Hauling Equipment Trailer (40,000 GVW to 106,000 GVW))....................$ 13.81 4.11 Truck drivers: (Pick-UP, Service, Dry Van, Flat Bed and Other (Less than 40,000 GVW))............................$ 18.72 10.52 Truck drivers: (Tank Truck including Water, Fuel, Oil Distributor, Dry Cement (40,000 GVW to 106,000 GVW)).....$ 18.72 9.30 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION