General Decision Number: NM080001 02/06/2009 NM1 Superseded General Decision Number: NM20070001 State: New Mexico Construction Types: Building and Heavy Counties: New Mexico Statewide. STATEWIDE - EXCLUDING EDDY AND LEA COUNTIES FOR BUILDING CONSTR. GENERAL BUILDING AND HEAVY ENGINEERING CONSTRUCTION shall include the construction, alteration, repair and demolition of buildings, including office buildings, warehouses, industrial and commercial buildings, institutional and public buildings, and all air conditioning, conduit, heating and other mechanical and electrical works and site preparation for building or heavy engineering projects under this classification, stadia; and shall include electrical, gas, water, sewer lines, and other such utility construction which are part of projects under this classification and include within the property line or less than five (5) feet from the building or heavy engineering structure, whichever is closer, provided, however, regard to electrical utilities such construction shall include construction from the first attachment of incoming power source without regard to the property line or proximity to the building or the heavy engineering structure; and include construction, alteration, repair and demolition of heavy engineering work such as power generating plants, pump stations, natural gas compressing stations; covered reservoirs and covered sewage and water treatment facilities concrete linings for canals, ditches and channels; concrete dams; earth dams of one million (1,000,000) cubic yards or over; radio towers, ovens, furnaces, kilins, silos, shafts and tunnels (other than highway shafts and tunnels), hydro-electric projects; and well drilling, telephone and elecltrical transmission lines which are part of GENERAL BUILDING AND HEAVY ENGINEERING PROJECTS: mining appurtenances such as tripples, washeries and loading and discharging chutes, and specialized structures for testing, launching and recovering space and other rocket-type missles. Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 04/04/2008 4 05/02/2008 5 06/06/2008 6 07/04/2008 7 08/01/2008 8 11/07/2008 9 12/05/2008 10 01/02/2009 11 02/06/2009 ASBE0066-003 03/01/2006 CURRY, HARDING, LEA, QUAY, ROOSEVELT & UNION Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems and asbestos removal)....$ 18.38 6.85 ---------------------------------------------------------------- ASBE0076-001 01/01/2009 STATEWIDE, EXCLUDING CURRY, HARDING, LEA, QUAY, ROOSEVELT & UNION Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems and asbestos removal)....$ 27.35 10.43 Asbestos Workers/Insulator LOS ALAMOS COUNTY...........$ 29.70 10.43 ---------------------------------------------------------------- * BOIL0627-001 10/01/2008 STATEWIDE, EXCLUDING BERNALILLO, CIBOLA, MCKINLEY, RIO ARRIBA, SANDOVAL AND SOCORRO Rates Fringes BOILERMAKER......................$ 30.26 18.92 ---------------------------------------------------------------- BRAZ0003-015 10/01/2008 Rates Fringes BRICKLAYER (Bricklayer, Stone & Marble Mason, Pointer/Caulker).................$ 22.80 6.20 ---------------------------------------------------------------- BRAZ0003-016 10/01/2008 Rates Fringes Mosaic & Terrazzo Worker, Tile Layer.......................$ 18.90 6.20 ---------------------------------------------------------------- CARP0092-001 01/01/2008 Rates Fringes Carpenters: (Including Lathers and Piledrivermen).......$ 22.26 6.20 ---------------------------------------------------------------- CARP2834-005 06/01/2005 Rates Fringes MILLWRIGHT.......................$ 24.00 5.51 ---------------------------------------------------------------- ELEC0583-001 12/01/2008 Rates Fringes Cable Splicer Zone 1......................$ 19.39 4.25%+6.13 Zone 2......................$ 21.34 4.25%+6.13 ELECTRICIAN Zone 1......................$ 19.39 4.25%+6.13 Zone 2......................$ 21.34 4.25%+6.13 Zone 1: The area within a 25 mile radius from the downtown Post Office in El Paso, TX. Ft Bliss and Biggs Field proper to be included in this free zone. The area within a 15 mile radius from the Post Office in Las Cruces, NM and within a 5 mile radius from the Post Office in Alamogordo, Deming and Lordsburg. The area 10 miles East and 10 miles West of Interstate 10 between El Paso, Texas and Las Cruces NM. Zone 2: Dona Ana, Otero, Luna and Hidalgo Counties (except that area in Zone 1). ---------------------------------------------------------------- ELEC0611-001 06/29/2008 COMMERCIAL LINE WORK (also applies to switching stations and substations adjacent to power plants) Rates Fringes LINE CONSTRUCTION: Cable Splicer Los Alamos County...........$ 34.12 23%+4.75 Remainder of State..........$ 33.15 23%+4.75 Line Construction: Equipment Mechanic (includes helicopter operator and mechanic) Los Alamos County...........$ 26.37 23%+4.75 Remainder of State..........$ 25.62 23%+4.75 Line Construction: Groundman-Jackhammer Los Alamos County...........$ 18.61 23%+4.75 Remainder of State..........$ 18.08 23%+4.75 Line Construction: Lineman/Line Technician Los Alamos County...........$ 31.02 23%+4.75 Remainder of State..........$ 30.14 23%+4.75 Line Construction: Powderman Los Alamos County...........$ 25.75 23%+4.75 Remainder of State..........$ 25.02 23%+4.75 ---------------------------------------------------------------- ELEC0611-002 06/01/2008 Bernalillo, Catron, Chaves, Cibola, Colfax, Curry, DeBaca, Grant, Guadalupe, Harding, Lincoln, McKinley, Mora, Quay, Rio Arriba, Roosevelt, San Juan, San Miguel, Sandoval, Santa Fe, Sierra, Socorro, Taos, Torrance, Union and Valencia Counties Rates Fringes CABLE SPLICER Zone 1......................$ 30.03 5%+7.80 Zone 2......................$ 32.49 5%+7.80 Zone 3......................$ 34.13 5%+7.80 Zone 4......................$ 37.13 5%+7.80 Electrician Zone 1......................$ 27.30 5%+7.80 Zone 2......................$ 29.76 5%+7.80 Zone 3......................$ 31.40 5%+7.80 Zone 4......................$ 34.40 5%+7.80 Basic Wage Rates City and Miles From Main Post Office Albuquerque - 40 miles Belen - 12 miles Carrizozo - 12 miles Clovis - 12 miles Espanola - 14 miles Farmington - 6 miles Gallup - 10 miles Las Vegas - 8 miles Los Lunas - 12 miles Portales - 12 miles Raton - 6 miles Roswell - 12 miles Ruidoso - 12 miles Santa Fe - 10 miles Tucumcari - 6 miles Zone 2 extending up to twenty (20) miles beyond Zone 1, EXCEPT ALBUQUERQUE. Zone 3 extending up to thirty (30) milesbeyond Zone 1, EXCEPT ALBUQUERQUE. Zone 4 anything beyond thirty (30) miles from Zone 1, EXCEPT ALBUQUERQUE. FOR ESTABLISHING THE OUTLYING ZONES FROM THE ALBUQUERQUE FREE ZONE ONLY, ZONE 2 SHALL EXTEND UP TO TEN (10) MILES BEYOND ZONE 1, ZONE 3 SHALL EXTEND UP TO TWENTY (20) MILES BEYOND ZONE 1, AND ZONE 4 ANYTHING BEYOND TWENTY (20) MILES FROM ZONE 1. ---------------------------------------------------------------- ELEC0611-003 06/01/2008 Los Alamos County Rates Fringes CABLE SPLICER....................$ 34.13 5%+7.80 ELECTRICIAN......................$ 31.40 5%+7.80 ---------------------------------------------------------------- ELEC0611-004 06/01/2008 HEAVY CONSTRUCTION Eddy and Lea Counties Rates Fringes CABLE SPLICER Zone 1......................$ 28.33 5%+7.80 Zone 2......................$ 28.78 5%+7.80 Zone 3......................$ 28.93 5%+7.80 Zone 4......................$ 29.18 5%+7.80 ELECTRICIAN Zone 1......................$ 25.75 5%+7.80 Zone 2......................$ 26.20 5%+7.80 Zone 3......................$ 26.35 5%+7.80 Zone 4......................$ 26.60 5%+7.80 ZONE 1 DISPATCH POINTS Artesia - 12 miles Carlsbad - 12 miles Hobbs - 12 miles Lovington - 12 miles Zone 1 shall be designated from the Main Post Office of Artesia, Carlsbad, Hobbs and Lovington, New Mexico. Zone 2 extending up to ten (10) miles beyond Zone 1. Zone 3 extending up to twenty eight (28) miles beyond Zone 1. Zone 4 anything beyond twenty-eight (28) miles beyond Zone 1. ---------------------------------------------------------------- ELEV0131-001 01/01/2009 Rates Fringes Elevator Constructor Mechanic....................$ 33.61 18.285+a FOOTNOTE: a. Under 5 years service 6%; over 5 years service 8%. 8-Paid Holidays: New Years Day, Memorial Day, July 4th, Labor Day, Veterans' Day, Thansksgiving Day, Friday after Thanksgiving Day, Christmas Day. ---------------------------------------------------------------- ENGI0953-003 04/01/2007 HEAVY CONSTRUCTION Rates Fringes Power Equipment Operator ZONE 1 GROUP I....................$ 16.82 5.27 GROUP II...................$ 18.21 5.27 GROUP III..................$ 18.36 5.27 GROUP IV...................$ 18.57 5.27 GROUP V....................$ 18.63 5.27 GROUP VI...................$ 18.77 5.27 GROUP VII..................$ 18.89 5.27 GROUP VIII.................$ 20.33 5.27 ZONE 2 GROUP I....................$ 19.32 5.27 GROUP II...................$ 20.71 5.27 GROUP III..................$ 20.86 5.27 GROUP IV...................$ 21.07 5.27 GROUP V....................$ 21.13 5.27 GROUP VI...................$ 21.27 5.27 GROUP VII..................$ 21.39 5.27 GROUP VIII.................$ 22.83 5.27 ZONE 3 GROUP I....................$ 20.82 5.27 GROUP II...................$ 22.21 5.27 GROUP III..................$ 22.36 5.27 GROUP IV...................$ 22.57 5.27 GROUP V....................$ 22.63 5.27 GROUP VI...................$ 22.77 5.27 GROUP VII..................$ 22.89 5.27 GROUP VIII.................$ 24.33 5.27 SHAFT AND TUNNEL WORK - $.15 per hour above regular rate. HAZARDOUS PAY - The following pay shall be applicable for every hour an operating engineer is required by governmental regulations and does wear special equipment for hazardous work at the designated levels. This is applicable in all three zones LEVEL C - 10% above regular hourly wage LEVEL B - 10% above regular hourly wage LEVEL A - 15% above regular hourly wage ZONE PAY The reference point for determining zone pay shall be from the intersection of Interstate Highway 25 and Interstate Highway 40 (the Big "I") in Albuquerque. ZONE I - Albuquerque - 0 to 50 mile radius from the Big "I" shall be a Free Zone - Farmington - 0 to 15 mile radius of Farmington City Hall shall be a Free Zone Zone II - Shall be $2.50 per hour above base pay. Will apply outside of above parameters up to 35 miles Zone III - Shall be $1.50 cents per hour above Zone II for a total of $4.00 per hour and will apply after 35 miles of Zone I's parameters. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP I Fireman, Oiler Screedman, Scale Operators, Rubber Tired farm type tractor, tractors under 50 hp w/o attachments, Breakman, Concrete Paving Curbing Machine (Bridge-Type). GROUP II Rollers, Sheepsfoot or Pneumatic Self-Propelled w/o Dozer, Concrete Conveyor, Service Truck operator, Air compressor (315 CFM & Over), Pumps (6" & Over), Screening plants, Concrete Mixers (Under 1 CY), Concrete Saw or grinder-span type, 1 Drum Hoist (tugger), Air Tugger, Elevating Belt Type Loaders, Forklift, Lumber Stacker, Tractor Farm Type (under 50 HP w/Attachments), Motorman and Industrial Locomotive operator, Winch Truck, Front End Loaders (under 2 CY), Power Plants which Generate Over 15 KW, Welding Machines. GROUP III Bituminous Distributors, Boilers, Retort & Hot Oil Heaters, Concrete Mixers, (1 CV & Over), Conc. Paver-Single Drum, Drilling Equip., Motor Grader (rough), Shaft and Tunnel Equipment: (Refrigeration, slusher, jumbo forms), Trenching Machines (all types), Pump crete and gunite machines, Slipform Paver, Mechanical Bullfloats, Concrete Slab Spreading Machine, Concrete Slab Finishing Machine, Space Heaters, Bituminous Finishing Machines, Water Carrier (all types), Concrete Cleaning Decontamination Machine Operator, Horizontal Directional Drill Locator. GROUP IV Front End Loaders (2 thru 10 CY), Rollers Steel Wheeled-All Types, Bulldozer, Scrapers (Motor or Towed), Elevating Graders Self-Propelled Rollers - Equipped W/Dozer, Twin-Bowl Scrapers and Quad 8 or 9 pushers (35 cents over basic rate), Three bowl scrapers (60 cents over basic rate), Backhoes up to 3/4 yard bucket, Head Oiler (Service Truck Operator). GROUP V Hydraulic Cranes-With less than 50 feet of Boom (20 Tons and Under), Concrete Paver-Double Drum, Cat Cranes, Hysters, 2 Drum Hoist, Auto Fine Grade. GROUP VI Mucking Machines-All Types GROUP VII Steam Engineers, Loader (Front End Over 10 CV) Concrete Pump (Snorkel Type), Concrete batching plants and Asphalt plants, Crushing plants, Hot plants. GROUP VIII All Shovel Type Equipment, Cranes, Draglines, Backhoes over a 3/4 yard bucket, Derricks Guy and Stiff Leg, Pipe mobile (No 2 Operator), Piledriver, Hydrulic Cranes (20 Tons & Over), Mine Hoist, Belt Loader ("C.M.I." Type),Boom and Jibs 150 ft. Through 199 ft.-$.50 per hour above base pay, 200 ft and over-$1.00 per hour above base pay. Shovel (Wheel Type), Boring Machine (Tunnel or Shaft Mole), Pipe Mobile, Side and swing-boom cats, Motor grader (finish), Mechanic-Welder, Heavy Equipment Robotics Operator/Mechanic, Ultra High Pressure Waterjet Cutting Tool System Operator/Mechanic, Vacuum Blasting Machine Operator/Mechanic, Mater Environmental Maintenance Mechanic, Horizontal Directoral Drill Operator. ---------------------------------------------------------------- ENGI0953-004 11/01/2008 BUILDING CONSTRUCTION Rates Fringes Power Equipment Operator GROUP 1.....................$ 19.21 5.70 GROUP 2.....................$ 21.06 5.70 GROUP 3.....................$ 21.45 5.70 GROUP 4.....................$ 21.83 5.70 GROUP 5.....................$ 21.99 5.70 GROUP 6.....................$ 22.17 5.70 GROUP 7.....................$ 22.27 5.70 GROUP 8.....................$ 24.85 5.70 GROUP 9.....................$ 26.90 5.70 GROUP10.....................$ 29.80 5.70 POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1 Fireman, Oiler, Screedman, Scale op. such as Bin-a-Batch, Rubber Tired Farm Type Tractor, Tractors under 50 hp w/o Attachments, Brakeman, Concrete Curing Machine(Bridge Type). GROUP 2 Rollers, Sheepsfoot or Pneumatic Self-Propelled w/o Dozer, Concrete Conveyor, Service Truck op. (Head Oiler), Air Compressor (600 CFM & Over), Pumps (6" & Over), Screening Plants, Concrete Mixers (Under 1 CY), Concrete Saw or Grinder-Span Type, 1 Drum Hoists, Elevating Belt Type Loaders, Lumber Stacker (Tractor Farm Type under 50 HP w/Attachments), Winch Trucks, Front End Loader (under 2 CY), Welding Machines, Cat Head Winch, Power Plants which generate over 15 KW, Oiler with CDL, Concrete Curbing Machine. GROUP 3 Bituminous Distributors, Boilers, Retort & Hot Oil Heaters Concrete Mixers, (1 CY & Over), Concrete Paver-Single Drum, Drilling Equipment, Shaft and Tunnel Equipment: Refrigeration, Slusher, Jumbo forms, Trenching Machines (all Types), Pump Crete & Gunite Machines, Slipfrom Paver, Mechanical Bullfloats, Concrete Slab Spreading Machine, Concrete Slab Finishing Machine, Asphalt Plants, Bituminous Finishing Machines, Crushing Plants, Certfied Forklift. GROUP 4 Front End Loaders (2 thru 10 CY), Rollers Steel Wheeled-All Types, Bulldozer, Scrapers (Motor or Towed), Elevating Graders; Concrete Batching Plants, Self-Propelled Rollers - Equipped W/Dozer, Twin-Bowl Scrapers and Quad 8 or 9 Pushers ($.35 Over Basic Rate), Three Bowl Scrapers ($.60 Over Basic Rate), Bobcat w/Hydraulic Backhoes with buckets up to one and one quarter cubic yards, Motor Grader (Rough), Small Articulating Trucks. GROUP 5 Concrete Paver, Double Drum, Two Drum Hoist, Auto Fine Grader, Cat Crane, Hysters, Forklift over 2,000 lbs. Lifting Capacity GROUP 6 Mucking Machines-All Types, Tractor with Hydraulic Backhoe, Backhoes with Buckets up to one and one quarter cubic yards. GROUP 7 Steam Engineers, Loaders (Front end over 10 cubic yards), Concrete Pump (Snorkel Type), Heavy Equipment Low Boy Driver with CDL, Mining Machine, Roof Bolting Machine, Shuttle Car. GROUP 8 All Shovel Type Equipment, Side Boom Cats, Cranes, Draglines, Track or Excavator Backhoe, Backhoes with Buckets over one and one quarter cubic yards, Derricks, Guy and Stiff Leg, Pipemobile (No.2 Operator), Pile Driver, Shovel (wheel type), Boring Machine (tunnel or shaft mode), Pipe Mobile, Motor Grader (finish), Mechanic, Welder, Mobile Pipeline Inspection Camera, Operator/Rigger, Continuous Mining Machine, VAC Jet Rodder GROUP 9 Hydraulic Cranes with less than 50 feet of boom (20 tons & under) including Boom Trucks GROUP 10 Hydraulic Cranes and Boom Trucks (20 tons & over), Cranes and Draglines with booms and jibs over 150 feet through 199 feet, Cranes 200 feet and over ---------------------------------------------------------------- IRON0495-001 12/01/2008 Rates Fringes IRONWORKER Ornamental; Structural and Reinforcing.................$ 24.55 9.93 ---------------------------------------------------------------- LABO0016-001 06/01/2008 BUILDING CONSTRUCTION Rates Fringes LABORER GROUP I.....................$ 15.02 4.69 GROUP II....................$ 15.65 4.69 GROUP III...................$ 16.51 4.69 GROUP IV....................$ 18.76 4.69 LABORER CLASSIFICATIONS GROUP I: Chainmen, Stakedrivers, Stake Hopper, Heater Tenders, Window Cleaning and Clean Up, Unloading of Furniture and Fixtures. (Chainman and Stakedrivers working solely for an engineering firm are not subject to this agreement.) GROUP II: Carpenter Tenders, Concrete Workers, Concrete Buggy Operators, Industrial and Plant Laborers, Fire Watch, Swinging Scaffolds Tender, Flagman, Landscaping and Planter, Fence Builder, Guardrail Builder, Fine Grader, Form Stripper, Gabian Basket Builders, Rip Rap Stoneman, Drywall Stocking and Handling, Fly Ash Vacuum Operator, Man Hole Builder, Tool Room Person and Checker on Jobsite. GROUP III: Electric Air and Gas Operated Power Tools, Asphalt Rakers, Chain Saw Operators, Oxy Gasoline Torch Operators, Cutting Torch Operators or Burner Person, Gunite Rebound Men, Fog Machine Operators, Power Buggy Operators, Rodmen, Sandblasters (potmen), Wagon Drill and Diamond Core Driller, Air Track, Drill Operator Hydraulic Core Drill Diamond, Tenders Outside with Pumps under 6", Concrete Burners, Cement Mason Tenders, Plasterers Hodcarriers, Mortar Mixer, Plaster Spreader Operators, Plaster Tenders, Gunite Nozzlemen, Pipelayer, Pumpcrete Nozzlemen, Powdermen Tender Demolition, Grade Checker, Vibrator Operator, Concrete Saw Operators, Stone Mason Tender, Jack Hammer and Chipping Hammer Operator, Green Cutter High Pressure Air and Water on Concrete Blaster, Pipelayer (includes but not limited to water pipe, sewer pipe, drainage pipe, pvc, and all underground tile, pipe), Cast Iron Concrete pipe, unloading, handling, distribution, and installation, Scaffold Worker. GROUP IV: Asbestos Abatement Laborer, Toxic and Hazardous Waste Removal Laborer, Lead Base Paint Removal Laborer, Laborer/Concrete Specialist, Pest Technician (Licensed by the Bureau of Rodent Management), State Licensed Powder man and, Blaster, Laborers AGC Certified Scaffold Builder Laborer, or Hydromobile Scaffold Builder, Radiation Worker II. ---------------------------------------------------------------- LABO0016-003 04/01/2006 HEAVY CONSTRUCTION Rates Fringes LABORER HEAVY CONSTRUCTION ZONE 1......................$ 17.66 4.35 Group 1....................$ 15.00 4.35 Group 2....................$ 15.75 4.35 Group 3....................$ 17.26 4.35 Group 4....................$ 17.66 4.35 HEAVY CONSTRUCTION ZONE 2......................$ 20.16 4.35 Group 1....................$ 17.50 4.35 Group 2....................$ 18.25 4.35 Group 3....................$ 19.76 4.35 Group 4....................$ 20.16 4.35 HEAVY CONSTRUCTION ZONE 3......................$ 21.66 4.35 Group 1....................$ 19.00 4.35 Group 2....................$ 19.75 4.35 Group 3....................$ 21.26 4.35 Group 4....................$ 21.66 4.35 LABORER CLASSIFICATIONS FOR HEAVY CONSTRUCTION GROUP I: Journeyman Laborer, Dump Man, Spotter, Signaling, Mulching & Planting Trees, Traffic Control Devices, Waterproofing Concrete, Stake Hopper. GROUP II: Carpenter Tender, Concrete Tender, Flagman, Chuck Tender, Asphalt Heaterman, Asphalt Joint Man, Cement finisher Tender, Concrete Puddler, Kettleman, Pumpcrete Man, Placement Man, Pump Tender (Under 6 Inches), Manhole Builder (Block or Brick), Rebound Man, Stakedriver. GROUP III: Electric Air & All Gas Operating Power Tools, Asphalt Raker, Chain Saw Operator, Cutting Torch Operator, Demolition, Gunite Rebound Man, Rod & Chainman, Grade Setter, Sand Blaster (Pot Men), Nozzleman, Wagon Core & Diamond Driller Tender, Outside Scaler, Fog Machine Operator, Air, Gas, Hydraulic Tool & Electrical Tool Operator, Barco Hammer Cutting Torch, Drill, Diamond & Core Drill, Electric Hammer, Jackhammer, Hydraulic Jack, Tamper, Air Tamper, Concrete Processing Material, Form Setter, Highway, Streets & Airport Runways, Operator of Concrete Saws on Pavement (Other Than Gang Saws), Hot Asphalt Labor, Cofferdam, Boxtender, Caissons 8' to 12', Jackhammer Operator in Caissons over 12', Labor Applicable to Pipe Coating or Wrappers, Pipe Wrapper, Plant & Yard, Relining Pipe, Hydroliner (A Plastic May Be Used To Waterproof), Pipelayer on Underground Bores, Sewer, Water, Gas, Oil & Telephone Conduit, Enameler or Pipe, Inside & Out, Mechanical Grouter, Monitor, Jeep Holiday detector Man, Pump Operator, Raker, Vibrator, Hydro-Boom, Mixer Man, Gunnite Nozzleman, Shotcrete Operator, Timber Man, Timber & Chainsaws, Sand Blasters, Signalmen, Grade Checker. GROUP IV: Asbestos Abatement Laborer, Toxic & Hazardous Waste Removal Laborer, Lead Base Paint Removal Laborer, Laborer/Concrete Specialist, Pest Technician (Licensed by thye Bureau of Rodent Management), State Licensed Powderman & Blaster, Laborer/AGC Certified Rigger & Signal Man, Laborer/AGC Certified Scaffold Builder, Radiation Worker II, Airtrack Driller, Concrete Burner, Hodcarriers, Mortar Mixers, Plaster Spreader Operator, Plaster Tender Gunite Nozzlemen, Pipelayer, Pumpcrete Nozzlemen. ZONE PAY The reference point for determining zone pay shall be from the intersection of Interstate Highway 25 and Interstate Highway 40 (The Big "I") in Albuquerque. ZONE 1 - FREE ZONE - 0 to 50 miles ZONE 2 - 50 to 85 miles from reference points. $2.50 per hour above base wage. ZONE 3 - over 85 miles from reference points. $4.00 per hour above base wage. ---------------------------------------------------------------- LABO0016-004 04/01/2006 HEAVY CONSTRUCTION TUNNELS, SHAFTS, RAISES, MISSILE SILOS & ALL OTHER UNDERGROUND WORK Rates Fringes LABORER ZONE 1 Group 1....................$ 16.91 4.35 Group 2....................$ 17.28 4.35 Group 3....................$ 17.63 4.35 ZONE 2 Group 1....................$ 19.41 4.35 Group 2....................$ 19.78 4.35 Group 3....................$ 20.13 4.35 ZONE 3 Group 1....................$ 20.91 4.35 Group 2....................$ 21.28 4.35 Group 3....................$ 21.63 4.35 LABORER CLASSIFICATIONS FOR TUNNELS, SHAFTS, RAISES, MISSLE SILOS, AND ALL OTHER UNDERGROUND WORK GROUP I: Outside Laborer, Minimum Tunnel, Labor, Dry Houseman, and Hand Mucker Top Lander, Trackmen. GROUP II: Chuck Tender, Cable or Hose Tender, Concrete Laborer, Dumpmen, Whirley Pump Operator, Tender on Shotcrete, Gunniting and Sandblasting, Tender Core & Diamond Drill, Pot Tender, Concrete Specialist (1) Including Finishing, Grouting, Patching, & Curing, Concrete Specialist Tender (2), Applying of Concrete Processing Materials, Concrete Worker (Including All Chipping & Finishing Underground). GROUP III: Shaft Miner, Tunnel Miner, Air Tugger Operator, Collapsible Form Movers & Setters, Machine Men & Bit Grinder, Nipper, Powderman & Blaster, Reinforcing Steel Setter, Timbermen (Steel or Wood Tunnel Support, Including the Placement of Sheeting When Required), Tunnel Liner, Plate Setter, All Cutting & Welding Incidental to Miners' Work, Vibrator Men, Internal & External, Unloading, Stopping & Starting of Moran Agitator Cars, Diamond & Core Drill Operator, Shotcrete Operator, Gunnite Nozzlemen. ZONE PAY The reference point for determining zone pay shall be from the intersection of Interstate Highway 25 and Interstate Highway 40 (The Big "I") in Albuquerque. Free Zone - 0 to 50 miles. Zone 2 - 50 to 85 miles from above reference points. $2.50 per hour above base wage. Zone 3 - over 85 miles from above reference points. $4.00 per hour above base wage. ---------------------------------------------------------------- PAIN0823-001 04/01/2007 Rates Fringes Painters: (Mines, mills, Power plants, energy plants, refineries, coal gassification plants, nuclear related facilities & all steel work incidental thereto including stacks of all descriptions) Brush, roller, pot tender, sand-blaster, grinder operator Zone 1.....................$ 18.30 5.35 Zone II....................$ 19.30 5.35 Zone III...................$ 20.80 5.35 Paperhanger Zone I.....................$ 18.55 5.35 Zone II....................$ 19.55 5.35 Zone III...................$ 21.05 5.35 PAINTERS ZONE DEFINITIONS Free Zone: An area within a 30 mile radius of the main post office in the city or town where an employee permanently resides at the time of hire shall be considered Zone I. All jobs beyond the 30 mile radius shall be covered by the zone schedule below: ZONE I - BASE PAY UP TO 30 MILES ZONE II - EXTENDING 30 MILES TO 75 MILES BEYOND ZONE I ZONE III - EXTENDING 75 MILES AND BEYOND Albuquerque, Santa Fe and Belen shall be considered in Zone I. ---------------------------------------------------------------- PAIN0823-002 04/01/2007 Rates Fringes GLAZIER..........................$ 20.55 4.61 ---------------------------------------------------------------- PAIN0823-003 04/01/2008 Rates Fringes FLOOR LAYER: CARPET (SOFT) FLOOR Zone I......................$ 19.94 5.03 Zone II.....................$ 20.94 5.03 Zone III....................$ 23.065 5.03 SOFT FLOOR LAYER ZONE DEFINITIONS Free Zone: An area within a 30 mile radius of the main post office in the city or town where an employee permanently resides at the time of hire shall be considered Zone I. All jobs beyond the 30 mile radius shall be covered by the zone schedule below: ZONE I -- Up to 30 miles ZONE II -- 30 to 75 miles ZONE III - 75 miles and beyond Albuquerque, Santa Fe and Belen shall be considered Zone I. ---------------------------------------------------------------- PAIN0823-004 04/01/2007 Rates Fringes PAINTER (All Other Work: Commercial) Brush, roller, spray and special coatings; Sand blaster, Striping machine operator, Sign painter and Wall coverer Zone I.....................$ 16.10 4.35 Zone II....................$ 17.10 4.35 Zone III...................$ 18.60 4.35 PAINTERS ZONE DEFINITIONS Free Zone: An area within a 30 mile radius of the main post office of the city or town where an employee permanently resides at the time of hire shall be considered Zone I. All jobs beyond the 30 mile radius shall be covered by the zone schedule below: ZONE I - BASE PAY UP TO 30 MILES ZONE II - EXTENDING 30 MILES TO 75 MILES BEYOND ZONE I ZONE III - EXTENDING 75 MILES AND BEYOND Albuquerque, Santa Fe and Belen shall be considered in Zone I. ---------------------------------------------------------------- PAIN0823-005 04/01/2008 Rates Fringes DRYWALL FINISHER/TAPER (Mines, mills, power plants, energy plants, refineries, coal gassification plants, nuclear related facilities & all steel work incidental thereto including stacks of all descriptions) Ames Tool Operator Zone I.....................$ 23.41 5.35 Zone II....................$ 25.285 5.35 Zone III...................$ 27.785 5.35 Hand Finisher/Machine Texture Zone I.....................$ 22.41 5.35 Zone II....................$ 24.285 5.35 Zone III...................$ 26.785 5.35 PAINTERS ZONE DEFINITIONS Free Zone: An area within a 30 mile radius of the main post office in the city or town where an employee permanently resides at the time of hire shall be considered Zone I. All jobs beyond the 30 mile radius shall be covered by the zone schedule below: ZONE I - BASE PAY UP TO 30 MILES ZONE II - EXTENDING 30 MILES TO 75 MILES BEYOND ZONE I ZONE III - EXTENDING 75 MILES AND BEYOND Albuquerque, Santa Fe and Belen shall be considered in Zone I. ---------------------------------------------------------------- PAIN0823-006 04/01/2008 Rates Fringes DRYWALL FINISHER/TAPER (All other work: Commercial) Ames Tool Operator Zone I.....................$ 22.60 4.35 Zone II....................$ 24.475 4.35 Zone III...................$ 26.975 4.35 Hand Finisher/Machine Texture Zone I.....................$ 21.60 4.35 Zone II....................$ 23.475 4.35 Zone III...................$ 25.975 4.35 PAINTERS ZONE DEFINITIONS Free Zone: An area within a 30 mile radius of the main post office of the city or town where an employee permanently resides at the time of hire shall be considered Zone I. All jobs beyond the 30 mile radius shall be covered by the zone schedule below: ZONE I - BASE PAY UP TO 30 MILES ZONE II - EXTENDING 30 MILES TO 75 MILES BEYOND ZONE I ZONE III - EXTENDING 75 MILES AND BEYOND Albuquerque, Santa Fe and Belen shall be considered in Zone I. ---------------------------------------------------------------- PLAS0254-001 06/01/2008 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 18.65 8.25 ---------------------------------------------------------------- PLAS0254-002 06/01/2006 Rates Fringes PLASTERER........................$ 18.65 6.80 ---------------------------------------------------------------- PLUM0412-001 04/01/2008 Rates Fringes Plumbers and Pipefitters LOS ALAMOS, SOUTH MESA, McGREGOR RANGE, WHITE SANDS MISSILE RANGE AND/OR PROVING GROUNDS.............$ 28.09 10.45 REMAINING COUNTIES..........$ 27.29 10.45 ---------------------------------------------------------------- ROOF0123-003 10/01/2006 STATEWIDE EXCEPT FOR NAVAJO RESERVATION Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 17.72 5.31 ---------------------------------------------------------------- ROOF0135-003 06/01/2005 NAVAJO RESERVATION ONLY Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 13.50 2.30 ---------------------------------------------------------------- SHEE0049-001 04/01/2008 REMAINING COUNTIES Rates Fringes Sheet metal worker Zone 1......................$ 25.35 13.76 Zone 2......................$ 26.35 13.79 Zone 1 - All Other Work Zone 2 - Work on Electrical generation plants, Co-generation plants 50 megawatts and over, Refineries, Natural & LP Gas plants, Mills, Mines & Concentrators ---------------------------------------------------------------- SHEE0049-002 04/01/2008 LOS ALAMOS Rates Fringes Sheet metal worker...............$ 27.35 13.82 ---------------------------------------------------------------- SUNM1993-001 08/11/1993 Rates Fringes SPRINKLER FITTER Bernalillo, Los Alamos & Santa Fe Counties...........$ 15.55 Otero County................$ 17.45 3.75 Remaining Counties (Except Dona Ana)...................$ 16.06 2.95 ---------------------------------------------------------------- * TEAM0492-001 11/15/2007 Rates Fringes TRUCK DRIVER BUILDING CONSTRUCTION: Zone I GROUP 1....................$ 13.12 5.50 GROUP 2....................$ 13.34 5.50 GROUP 3....................$ 13.78 5.50 GROUP 4....................$ 13.80 5.50 GROUP 5....................$ 13.87 5.50 GROUP 6....................$ 14.00 5.50 GROUP 7....................$ 14.13 5.50 GROUP 8....................$ 14.32 5.50 GROUP 9....................$ 14.51 5.50 BUILDING CONSTRUCTION: Zone II GROUP 1....................$ 15.09 5.50 GROUP 2....................$ 15.32 5.50 GROUP 3....................$ 15.75 5.50 GROUP 4....................$ 15.77 5.50 GROUP 5....................$ 15.83 5.50 GROUP 6....................$ 15.98 5.50 GROUP 7....................$ 16.10 5.50 GROUP 8....................$ 16.28 5.50 GROUP 9....................$ 16.48 5.50 BUILDING CONSTRUCTION: Zone III GROUP 1....................$ 15.66 5.50 GROUP 2....................$ 15.88 5.50 GROUP 3....................$ 16.32 5.50 GROUP 4....................$ 16.52 5.50 GROUP 5....................$ 16.40 5.50 GROUP 6....................$ 16.54 5.50 GROUP 7....................$ 16.66 5.50 GROUP 8....................$ 16.84 5.50 GROUP 9....................$ 17.04 5.50 HEAVY CONSTRUCTION: Zone I GROUP 1....................$ 13.37 5.50 GROUP 2....................$ 13.59 5.50 GROUP 3....................$ 14.03 5.50 GROUP 4....................$ 14.05 5.50 GROUP 5....................$ 14.12 5.50 GROUP 6....................$ 14.25 5.50 GROUP 7....................$ 14.38 5.50 GROUP 8....................$ 14.57 5.50 GROUP 9....................$ 14.76 5.50 HEAVY CONSTRUCTION: Zone II GROUP 1....................$ 15.34 5.50 GROUP 2....................$ 15.57 5.50 GROUP 3....................$ 16.00 5.50 GROUP 4....................$ 16.02 5.50 GROUP 5....................$ 16.08 5.50 GROUP 6....................$ 16.23 5.50 GROUP 7....................$ 16.35 5.50 GROUP 8....................$ 16.53 5.50 GROUP 9....................$ 16.73 5.50 HEAVY CONSTRUCTION: Zone III GROUP 1....................$ 15.91 5.50 GROUP 2....................$ 16.13 5.50 GROUP 3....................$ 16.57 5.50 GROUP 4....................$ 16.77 5.50 GROUP 5....................$ 16.65 5.50 GROUP 6....................$ 16.79 5.50 GROUP 7....................$ 16.91 5.50 GROUP 8....................$ 17.09 5.50 GROUP 9....................$ 17.29 5.50 LIGHT COMMERCIAL BUILDING CONSTRUCTION: Zone I GROUP 1....................$ 10.50 5.50 GROUP 2....................$ 10.68 5.50 GROUP 3....................$ 11.03 5.50 GROUP 4....................$ 11.04 5.50 GROUP 5....................$ 11.10 5.50 GROUP 6....................$ 11.20 5.50 GROUP 7....................$ 11.31 5.50 GROUP 8....................$ 11.46 5.50 GROUP 9....................$ 11.61 5.50 LIGHT COMMERCIAL BUILDING CONSTRUCTION: Zone II GROUP 1....................$ 12.08 5.50 GROUP 2....................$ 12.26 5.50 GROUP 3....................$ 12.60 5.50 GROUP 4....................$ 12.62 5.50 GROUP 5....................$ 12.67 5.50 GROUP 6....................$ 12.79 5.50 GROUP 7....................$ 12.88 5.50 GROUP 8....................$ 13.03 5.50 GROUP 9....................$ 13.19 5.50 LIGHT COMMERCIAL BUILDING CONSTRUCTION: Zone III GROUP 1....................$ 12.53 5.50 GROUP 2....................$ 12.71 5.50 GROUP 3....................$ 13.06 5.50 GROUP 4....................$ 13.12 5.50 GROUP 5....................$ 13.22 5.50 GROUP 6....................$ 13.24 5.50 GROUP 7....................$ 13.33 5.50 GROUP 8....................$ 13.48 5.50 GROUP 9....................$ 13.64 5.50 TRUCK DRIVER (BUILDING & HEAVY CONSTRUCTION) CLASSIFICATIONS GROUP I: Pickup 3/4 Ton and Under, Lubrication, Light Tire Repair and Washer, Swamper, 2 or 4 and up. GROUP II: Dump or Batch Truck Under 8 C.Y.W.L.: Flat Bed (bobtail) 2 Ton and Under, Warehouseman including Material Check, Fork Lift Under 5 Ton MRC. GROUP III: Dump Trucks (Including All Highway and Off Highway) 8 up to 16 C.Y.W.L.C.; Water, Fuel or Oil Trucks Less Than 3,000 gallon Flat Bed (bobtail) Over 2 Tons. GROUP IV: Distributor Driver, Heavy Tire Repair, Lumber Carrier Driver, Young Buggy or Similar Equipment, Transit Mix or Agitator 2 or 3 Axle Bobtail Equipment, Scissor Truck, Bulk Cement Bobtail 2 or 3 Axle, Semi-Trailer ( Flat Bed or Van Single Axle) Forklift 5 Ton and over M.R.C. GROUP V: Dumpsters and Dumpcrete Driver; Water, Fuel or Oil Trucks 3,000 to 6,000 Gallons; Lowboys and Light Equipment Driver; Euclid Type Tank Wagon Under 6,000 Gallons. GROUP VI: Vacuum Truck; Dump Trucks (including all highway and off-highway 16 up to 22 C.Y.W.L.C.) GROUP VII: Transit Mix or Agitator Semi or 4 Axle Equipment Driver; Flaherty Truck Type Spreader Box Driver; Slurry Truck Driver Bulk Cement Driver; Semi-Doubles; 4 Axle Bobtail; Winch Truck and "A" Frame; Dump Truck (including all Highway and Off-Highway) 22 CY up to 35 C.Y.W.L.C. GROUP VIII: Euclid Diesel Power Turnarocker; Terra Cobra-DW20-Tourneau Pulls and Similar Diesel Powered Equipment when used to haul Materials and Assigned to a Teamster-Lowboy Heavy Equipment Driver; Water, Fuel and Oil Trucks 6,000 Gallons and Over Including Tank Wagon Drivers, Semi-Trailer Driver (Flat-Bed or Van Tandems); Light Equipment Mechanic; Dump Trucks (Including All Highway and Off-Highway) 35 C.Y.W.L.C. and Over; Truck and Trailer or Semi-Trailer (Flated); eject all. GROUP IX: Lowboy (Heavy Equipment Double Gooseneck); Heavy Equipment Mechanic; Welder (Body and Fender Men). TRUCK DRIVERS ZONE PAY BASING POINTS AND DEFINITIONS LISTED BELOW FOR BUILDING AND HEAVY CONSTRUCTION - BASING POINTS ARE AS FOLLOWS: ALAMOGORDO, ALBUQUERQUE, ARTESIA, BAYARD, BELEN, CARLSBAD, CLOVIS, DEMING, ESPANOLA, EUNICE, FARMINGTON, GALLUP, GRANTS, HOBBS, LAS CRUCES, LAS VEGS, LORDSBURG, LOVINGTON, PORTALES, RATON, ROSWELL, RUIDOSO, SANTA FE, SANTA ROSE, SILVER CITY, SOCORRO, TAOS, TUCUMCARI ZONE I Projects within 15 miles from the starting points above. ZONE II Projects 15 or more road miles but less than 35 miles from above, includes all of Los Alamos County. ZONE III Projects more than 35 road miles, or more from above. ----------------------------------------------------------- FOOTNOTE: **LIGHT COMMERCIAL DEFINITION Construction, erection, alteration, repair, modification, addition to or improvement in whole or in part of structures for which the major support system is wood frame construction and will also include all residential housing apartments, convenience stores, fast food restaurants, automobile service stations & motels up to 2 stories high. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION