Verification Plan for the ECS Project ## John Rubenacker ## jrubenac@eos.hitc.com ## 194-401-VE1-002 ## 6/94 ## CDRL ## SDR ## N/A ## ato, acceptance, configuration, I&T, methodology, nonconformance, release, segment, system, level, integration, test, validation, verification ## ato ## single ##