Appendix
A
DOE
Funded Indian Energy Projects
Fiscal Years 1994 through 1999
Fiscal Year 1994
|
State
|
Grantee
|
Funding (Current
Dollars)
|
Description
|
DOE
|
Non DOE
|
Alaska
|
Agdaagux Tribe
|
250,000
|
5,211,000
|
Hydroelectric Plant Construction
|
|
Cape Fox Corporation
|
250,000
|
346,264
|
Hydroelectric Feasibility Study
|
|
Chignik Lagoon Village
|
42,000
|
0
|
Small Hydro Feasibility Study
|
|
Haida Corporation
|
249,918
|
60,805
|
Hydroelectric Feasibility Study
|
|
Koniag Corporation
|
246,944
|
61,736
|
Analysis of Energy & renewable
resources
|
Arizona
|
White Mtn. Apache
|
129,047
|
39,482
|
Feasibility of Wood/Waste Cogeneration
Plant
|
California
|
Hoopa Valley Tribe
|
97,078
|
18,140
|
Solar and Efficiency
|
Colorado
|
Ute Mt. Ute Tribe
|
194,965
|
85,696
|
PV installation for water pumping
|
Montana
|
Blackfeet Tribe
|
126,607
|
25,142
|
Wind Feasibility Study
|
|
Fort Peck Tribes
|
249,476
|
0
|
Wind Farm Feasibility Study
|
New Mexico
|
Laguna Pueblo
|
248,665
|
0
|
PV Manufacturing Feasibility Study
|
|
Zuni Pueblo
|
91,781
|
23,003
|
PV Feasibility Study for water pumping
|
North Dakota
|
Turtle Mt. Band of Chippewas
|
248,133
|
20,000
|
Wind Feasibility Study
|
South Dakota
|
Lower Brule Sioux
|
247,300
|
86,800
|
Analysis of Energy and Renewable Options
|
Wisconsin
|
Oneida Tribe
|
154,855
|
42,525
|
Passive Solar and Energy Efficiency
|
Renewable
|
2,826,769
|
6,020,593
|
|
Montana
|
Crow Tribe
|
299,115
|
299,115
|
Feasibility Study for Minemouth
Cogeneration
|
Washington
|
Confederated Tribes of Colville
|
555,000
|
555,000
|
Gas-fired Cogeneration Plant
|
Non Renewable
|
854,115
|
854,115
|
|
FY 94 Total
|
3,680,884
|
6,874,708
|
|
Fiscal Year 1995
|
State
|
Grantee
|
Funding (Current
Dollars)
|
Description
|
DOE
|
Non DOE
|
Alaska
|
Atka
|
44,000
|
0
|
Hydroelectric Feasibility Study
|
|
Cape Fox
|
125,000
|
110,700
|
Hydroelectric FERC Application
|
|
Haida Corporation
|
190,758
|
95,902
|
Hydroelectric Feasibility Study Phase II
|
Arizona
|
Hualapai
|
200,000
|
50,000
|
PV Water Pumping Stations
|
California
|
Manzanita Band
|
80,000
|
14,608
|
Wind Energy Tribal Office
|
Colorado
|
Ute Mt.Ute Tribe
|
196,780
|
85,696
|
PV Installation for Water Pumping
|
Connecticut
|
Mohegan
|
154,700
|
0
|
Efficiency and Renewable Options
|
Idaho
|
Nez Perce
|
166,702
|
78,521
|
Biodiesel Production Feasibilty Study
|
Michigan
|
Keewenaw
|
181,500
|
10,000
|
Wood Waste Feasibility Study
|
Montana
|
Blackfeet
|
152,865
|
86,053
|
Wind Turbine Construction and Operation
|
New Mexico
|
Jemez Pueblo
|
91,608
|
23,000
|
Wind Farm Feasibility & Resource
Study
|
|
Jicarilla Apache
|
162,136
|
20,698
|
Hydroelectric Feasibility Study
|
|
Nambe Pueblo
|
152,294
|
0
|
PV Feasibility Study for 1 MW facility
|
|
Picuris Pueblo
|
129,197
|
27,299
|
Purchase Renewable and Efficiency
Equipment
|
North Dakota
|
Devil's Lake Sioux
|
190,965
|
63,000
|
Wind Resource Assessment, Installation &
Operation
|
|
Standing Rock Sioux
|
171,617
|
40,000
|
IRP Development Considering Renewable
Energy
|
Renewable
|
2,390,122
|
705,477
|
|
Alaska
|
Chignik Lagoon Village
|
100,717
|
50,000
|
Diesel Generators and Electrical Distribution
Lines
|
Arizona
|
Navajo
|
6,600,000
|
0
|
Transmission Line
|
California
|
Hoopa Valley Tribe
|
64,500
|
13,759
|
Weatherization and Energy Efficiency
Project
|
Montana
|
Crow Tribe
|
500,000
|
0
|
Minemouth Cogeneration Plant
|
Non Renewable
|
7,265,217
|
63,759
|
|
FY 95 Total
|
9,655,339
|
769,236
|
|
Fiscal Year 1996
|
State
|
Grantee
|
Funding (Current
Dollars)
|
Description
|
DOE
|
Non DOE
|
Alaska
|
Haida Native Village Corp
|
2,000,000
|
4,475,000
|
Hydroelectric Project
|
Reneweable
|
2,000,000
|
4,475,000
|
|
Arizona
|
Navajo
|
6,100,000
|
0
|
Transmission Line
|
Montana
|
Crow
|
500,000
|
0
|
Energy
|
Non Renewable
|
6,600,000
|
0
|
|
FY 96 Total
|
8,600,000
|
4,475,000
|
|
Fiscal Year 1997
|
State
|
Grantee
|
Funding (Current
Dollars)
|
Description
|
DOE
|
Non DOE
|
Alaska
|
Eyak Native Corp.*
|
1,905,000
|
13,505,000
|
Hydroelectric Project
|
|
Haida Native Village Corp.
|
1,000,000
|
**
|
Hydroelectric Project
|
New Mexico
|
Jicarilla Apache Tribe
|
200,000
|
123,915
|
Hydroelectric Project Feasibility Study
|
Renewable
|
3,105,000
|
13,628,915
|
|
Alaska
|
Klawock-Thorne Bay Kassan*
|
952,000
|
1,753,000
|
Electrical Intertie
|
Non Renewable
|
952,000
|
1,753,000
|
|
FY97 Total
|
4,057,000
|
15,381,915
|
|
*The award was made to the State of Alaska
who in turn gave the funds to the appropriate entity.
**The cost share in FY96 was reduced by the amount of the FY97 award.
|
Fiscal Year 1998
|
State
|
Grantee
|
Funding (Current
Dollars)
|
Description
|
DOE
|
Non DOE
|
Alaska
|
Eyak Native Corporation
|
1,757,000
|
***
|
Power Creek Hydroelectric Project
|
|
Village of Old Harbor/Village of Scammon
Bay
|
502,000
|
1,941,900
|
Hydroelectric Project Feasibility Study
|
New Mexico
|
Jicarilla Apache Tribe
|
200,000
|
35,502
|
Hydroelectric Project Feasibility Study
|
Renewables
|
2,459,000
|
1,977,402
|
|
Alaska
|
Skagway Bay
|
877,000
|
4,449,000
|
Upper Lyn Canal Regional Electric Project
|
Non Renewable
|
877,000
|
4,449,000
|
|
FY98 Total
|
3,336,000
|
6,426,402
|
|
***The cost share in FY97 was reduced by the
amount of the FY98 award.
|
Fiscal Year 1999
|
State
|
Grantee
|
Funding (Current
Dollars)
|
Description
|
DOE
|
Non DOE
|
Arizona
|
Navajo
|
210,000
|
120,000
|
PV installations at remote residences
|
California
|
Ramona Band
|
182,000
|
213,070
|
Hybrid PV/Wind/Solar Hot Water System
|
|
Manzanita Band
|
269,036
|
67,640
|
Hybrid Wind/PV installation in tribal
buildings
|
New Mexico
|
Jicarila Apache Tribal Utility Authority
|
109,794
|
30,194
|
PV Installation
|
|
Pueblo Laguna
|
198,518
|
39,703
|
PV/Wind/Solar hot water system
|
North Dakota
|
Three Affiliated Tribes
|
200,000
|
50,000
|
Wind 100 Kw turbine installation Ft. Berthold
Resv.
|
South Dakota
|
Rosebud Sioux Tribe
|
508,750
|
508,750
|
Wind 750 Kw turbine installation
|
Wisconsin
|
Oneida Tribe
|
173,391
|
47,386
|
Solar Hot Water and PV Electric
|
Renewable
|
1,851,489
|
1,076,743
|
|
FY 99
|
1,851,489
|
1,076,743
|
|
Sources: Personal communication with Steve
Sargent, U.S. Department of Energy, Denver Regional Support Office, January 2000,
Peggy Brookshire, U.S. Department of Energy, Idaho Operations Office, February
2000, and Nick Chevance, Western Area Power Administration, March 2000.
|
|