Berkeley 21 July 1994 GEM 2.3 GHz Radiometer ============================================================================= (*) Items already available Record of microwave components: orders and shipping ------------------------------------------------------------------- Feed antenna, including transition and waveguide filter Design and construction by FPM space, Torino 39-11-650 3782 Contact: E.Pagana Order sent: .... (depending on ASI money) Expected delivery: late Sept 1994 US$ about 3000 -------------------------------------------------------------------- First stage HEMT amp Berkshire, Oakland, CA Tel. (510) 655-1986 Contact: T. Lum Order sent: 20 July 1994 Expected delivery: 5 Sept 1994 US$ 2350 -------------------------------------------------------------------- Second stage amp MITEQ, Hauppauge, N.Y. Tel. (516) 436 7400 Contact: F.Maqbool (Ext. 254) Order sent 22 July 1994 Expected delivery: Aug 22 -- Sept 5 US$ 550 -------------------------------------------------------------------- Bandpass Tubular filter Thrilithic, Indianapolis, IN Tel. 800-344-2412 Contact: D.Distler Order sent 22 July 1994 Expected delivery: Aug 22 -- Sept 5 US$ 165 -------------------------------------------------------------------- Detector Diode(* -Spare ordered) HP, Sunnyvale, CA Tel. 800-538-8787 Contact: George (Ext. 1105) Order sent 22 July 1994 Expected delivery: Aug 20 (?) US$ 350 -------------------------------------------------------------------- Attenuators Thrilithic, Indianapolis, IN Tel. 800-344-2412 Contact: D.Distler Order sent ..... Expected delivery: ...... ( < 4 weeks ) US$ 61 each (1--9) 55 each (10--24) -------------------------------------------------------------------- Total of expenses (1994 July 18-22), including spare diode: First amp 2350 $ Second amp 550 $ Bandpass filter 165 $ Detector diode 350 $ ------------------------------ Total 3415 $ ------------------------------ Electronics and temperature regulation ------------------------------------------------------------------- Power supply +/- 15 volts supply centralized. Will need extension cables to get to prime focus. -------------------------------------------------------------------- DC amplifier Spare board available.(*) Needs to be modified to get adjustable gain scales and mounted. -------------------------------------------------------------------- Temperature sensors Extra board to be wired at LBL. One board for 4 sensors. -------------------------------------------------------------------- Temperature regulation Extra board to be wired at LBL. -------------------------------------------------------------------- Cooling system Electronics control centralized. Two MELCOR small unites available.(*) Two heat sinks available.(*) --------------------------------------------------------------------