Public Lessons Learned Entry: 0240

Lesson Info:

  • Lesson Number: 0240
  • Lesson Date: 1993-07-17
  • Submitting Organization: LERC
  • Submitted by: S. Papell

Subject:

Pneumatic Explosion

Description of Driving Event:

A cover plate bolted to the top of a high pressure helium filter was blown off and the contents of the filter (pyrex wool and silica gel) were expelled. The resulting failure occurred because there were only three bolts holding the cover in place instead of the sixteen bolts required to fill all the bolt holes. The filter was pressurized to 1700 pounds per square inch with helium when the pneumatic explosion occurred.

Preceeding the accident, as part of a maintenance program, the filter cover was removed for cleaning and reactivation. The bolts were frozen and difficult to remove. After three bolts were removed, the balance of them were cut off. When the cover was reinstalled, the three good bolts were put on but other bolts were not available to complete the bolt hole circle. Without knowledge of the incomplete assembly, the system was pressurized by the test crew resulting in the pneumatic explosion.

Lesson(s) Learned:

Maintenance programs that include disassembly and reassembly of test cell components require a check out procedure to establish work completion before initiating a test run.

Recommendation(s):

Training should emphasize the importance for team members to check the actions of other members to prevent initiation of hazardous situations.

Evidence of Recurrence Control Effectiveness:

N/A

Documents Related to Lesson:

N/A

Mission Directorate(s):

N/A

Additional Key Phrase(s):

  • Logistics
  • Pressure Vessels

Additional Info:

    Approval Info:

    • Approval Date: 1994-06-08
    • Approval Name: Maria Havenhill
    • Approval Organization: LERC/EBAS
    • Approval Phone Number: 216-977-1483


    FirstGov - Your First Click to the US Government
    + 2004 Vision for Space Exploration
    + FY 2005 Budget Request
    + 2003 Strategic Plan
    + Freedom of Information Act
    + The President's Management Agenda
    + FY 2003 Agency Performance and Accountability Report
    + NASA Privacy Statement, Disclaimer,
    and Accessibility Certification

    + Freedom to Manage
    NASA
    Curator:Celeste Merryman
    NASA Official: Gregory Robinson
    + Contact LLIS