98-0118
IN
01/30/98
02/02/98
NA
E. Larson
Approved
Ghostview and Forcheck need to be installed on SSI&T Machines
N/A
98-0119
IN
01/30/98
02/02/98
NA
R. Haynes
Approved
Add FDDI Concentrator to VATC Network
N/A
98-0120
IN
01/30/98
02/02/98
NA
D. Tietz
Approved
Install Sybase SQL software for the ECS Software Reuse Project
N/A
98-0121
IN
01/30/98
02/02/98
NA
T. Wells
Deferred
Request for Host Name and IP Address
Deferred because no presentor was available. M&O to return to board 2/3/98.
98-0122
IN
02/02/98
02/02/98
NA
M. Johnson
Approved
Maintance Upgrades to COTS in EDF
N/A
98-0123
IN
02/02/98
02/02/98
NA
M. Johnson
Deferred
Install Builder Xcessory 3.5.1 in the EDF
N/A
98-0124
IN
02/02/98
02/02/98
NA
D. Brown
Deferred
NFS Mount Points for the RAID on Raven Exported to Cherokee
Deferred to get more Clarification from Chip Schwartz on what needs to be done with the NFS Mount Points.
98-0125
IN
02/02/98
02/02/98
NA
M. Johnson
Deferred
Request for Quantify to be installed on "Yakko" EIN#0370
Deferred to submit an evaluation plan for justification and a no-cost purchase order before evaluating the 30-day trial of Quantify.
98-0127
IN
02/02/98
02/02/98
NA
B. Peters
Approved
EMASS AMU Software Upgrade
N/A
98-0113
IN
01/29/98
02/03/98
NA
M. Johnson
Approved
"To configure "Amazon" for MSS protyping Efforts"
N/A
98-0128
IN
02/02/98
02/03/98
NA
B. Peters
Approved
Implement Secure Sheel 1.2.21 in VATC and EDC
N/A
98-0129
IN
02/02/98
02/03/98
NA
L. Klein
Approved
SGI V7.2 Compiler Test
N/A
98-0095
II
02/02/98
02/04/98
NA
R. Billups
Forwarded
Update Release Development at launch System Capabilities
Forwarded to ECS CCB.
98-0103
IN
01/27/98
02/04/98
NA
M. Johnson
Approved
Request for Two Sun Machines for CEOS Development
N/A
98-0130
II
02/03/98
02/04/98
NA
M. Mahoney
Forwarded
Remove install TSI Mini-DAAC activity for Drop 3 from the ECS Dev. Project Master Basleine Sch.
Forwarded to ECS CCB.
98-0131
II
02/03/98
02/04/98
NA
M. Mahoney
Forwarded
Install Mini-DAAC install activity for Drop 3.5 from the ECS Dev. Project Master Baseline Schedule
Forwarded to ECS CCB
98-0132
IN
02/03/98
02/04/98
NA
K. Cockerill
Approved
Database Administration accounts for M&O Personnel
N/A
98-0134
IN
02/03/98
02/04/98
NA
G. Mellis
Approved
DAAC Disk & RAID Partitioning Diagram Mods
N/A
98-0136
IN
02/05/98
02/05/98
NA
M. Johnson
Approved
Database Login EDF 
(Development Only)
N/A
98-0137
IN
02/05/98
02/05/98
PBL
D. Compton
Approved
Sun Patch for Incagold's Erratic Fiber SCSI Channel Behavior
Test changes to be documented in lab book; baseline (911-TDA-007) to be updated after tests are completed. 
98-0124
IN
02/02/98
02/06/98
NA
D. Brown
Deferred
NFS Mount Points for the RAID on Raven Exported to Cherokee
Deferred until 2/9/98, orginator not avaiable for presentation
98-0139
IN
02/05/98
02/06/98
NA
V. Sagar
Disapproved
Project Plan for 7.2 Compilers Testing on s0mog01 (SGI) Machine
CCR not required. Information is in response to Action Item AC-98-0047
98-0142
IN
02/05/98
02/06/98
NA
G. Gadson
Approved
Install X-Mail 4.0
Install Z-Mail 4.0 on TICK only subject to presence of licenses
98-0143
IN 
02/05/98
02/06/98
NA
G. Gadson
Approved
Move Sun Workstation "Tiger"
Ensure EIN # gets to Ken Ross if the test machines are project machines.
98-0144
IN 
02/05/98
02/06/98
NA
G. Gadson
Approved
Install C++ Compiler Licenses
N/A
98-0124
IN
02/02/98
02/06/98
NA
D. Brown
Approved
NFS Mount Points for the RAID on Raven Exported to Cherolee
Repartition disk to 20 Gig to limit total avaiable space to a resonalbe limit.
98-0148
IN
02/06/98
02/09/98
NA
R. Parham
Approved
Upgrade of HiPPI Switch controller card
Software versions baselined in CCR 98-0152.
98-0151
IN
02/06/98
02/09/98
NA
M. Molinet
Deferred
New MSS DB Accounts for Drop 4
No Presentor
98-0152
II
02/06/98
02/09/98
NA
H. Ausden
Approved
Add directory for each product  to the COTS Software Cdersion Baseline
The responsible Engineer will be a hidden column in the posted version and a column will be added to show the responsible office. CM will maintain the responsible engineer copy.
98-0153
II
02/06/98
02/09/98
NA
H. Ausden
Defferred
Define the contents of the ECS Baseline
Tom Kehoe to work with H. Ausden to develop reformat of document and bring back to CCB.
98-0154
IN
02/06/98
02/09/98
NA
B. Franks
Approved
Grant Permission to build task against Drop3 Baseline
Need approval from R. Gorsky
98-0155
IN
02/06/98
02/09/98
NA
M. Johnson
Approved
Install ODBC Driver on PC in Database Development and Management's Group
N/A
98-0156
IN
02/06/98
02/09/98
NA
D. Compton
Approved
Installation of Idled through out the infrastructure
N/A
98-0151
IN
02/06/98
02/10/98
NA
M. Molinet
Approved
New MSS DB Accounts for Drop 4
N/A
98-0159
IN
02/09/98
02/10/98
NA
C. Thomas
Approved
Update drop 3 descriptors to represent changes to MODIS descriptors
Determine patch number and deliver in accordance with patch IPT procedures
98-0160
IN
02/09/98
02/10/98
NA
L. Moses
Approved
Sybase Open Switch Software Evaluation
N/A
98-0162
II
02/09/98
02/11/98
PBL
L. Moses
Approved
Baseline Changes to Support Sybase Replication Server Design
Correct SMC, VATC, insonsistences.
98-0166
IN
02/10/98
02/11/98
NA
A. Abtahi
Approved
Request of Four Workstations X-terms Dedicated to System Performance Team
N/A
98-0169
II
02/10/98
02/11/98
NA
B. Burford
Forwarded
V2.0 Game Plan (January 1998)
Forwarded to ECS CCB
98-0170
IN
02/10/98
02/11/98
NA
D. Tietz
Approved
Provide more disk space for Stimpy
N/A
98-0171
II
02/10/98
02/11/98
NA
M. Johnson
Deferred
Tape Drive for MSS CM Servers and Other XRP-II Machines
Pending technical issure resolution between B. Clark and Alex Schuster
98-0168
IN
02/10/98
02/10/98
NA
V. Sagar
Approved Off-Line
Need for Additional Disk Space of 10GB in s0mog01 (SGI) with 7.2 Compilers on it.
N/A
98-0180
IN
02/11/98
02/12/98
NA
G. Gadson
Approved
Move Sun Workstations
N/A
98-0183
IN
02/11/98
02/12/98
NA
B. Franks
Approved
Grant permission to build task against Drop 3 baseline
Coordinate with Gorsky.
98-0186
II
02/12/98
02/13/98
NA
J. Uhalzy
Approved
Needed PATCHES for drpepper (SGI)
Sync with 7.2 compiler decision.
98-0187
II
02/12/98
02/13/98
PBL
B. Peters
Approved
NFS Mount Points Revision
N/A
98-0188
II
02/12/98
02/13/98
PBL
K. Cox
Approved
Update B.O. Descriptor File Template to be compatible 
with Drop 4
N/A
98-0191
II
02/13/98
02/17/98
PBL
T. Wells
Approved
LaRC SCSI Cable Management Plan
N/A
98-0192
II
02/13/98
02/17/98
PBL
T. Wells
Approved
LaRC Cable Management Plan
Post to "PETE" Only!
98-0195
II
02/13/98
02/17/98
PBL
T. Wells
Approved
GSFC SCSI Cable Management Plan
N/A
98-0196
II
02/13/98
02/17/98
PBL
T. Wells
Approved
LaRC Floor Plan
N/A
98-0197
II
02/13/98
02/17/98
PBL
M. Alabastro
Approved
LaRC Revised At-Launch Hardware Design
N/A
98-0190
II
02/13/98
02/17/98
NA
L. Jackson
Approved Off-Line
Version 2 Drop 3.02.02
N/A
98-0194
II
02/13/98
02/17/98
NA
A.Hall
Approved Off-Line
Test Data to be Staged at SMC for LaRC Testing
N/A
98-0189
II
02/12/98
02/18/98
HB
G. Mellis
Approved
Final NSIDC DAAC Disk & RAID Partitioning Diagrams (incorporation of at-launch h/w changes)
N/A
98-0198
II
02/17/98
02/18/98
PRO
J. Hurst
Forwarded
Procurement of 1998 HP HW SW Support at NSIDC
N/A
98-0199
IN
02/17/98
02/18/98
NA
M. Johnson
Approved
Changes in desktop hardware for IOS/DMS Subsystem
N/A
98-0200
II
02/17/98
02/18/98
PBL
M. Johnson
Approved
Maintenance upgrade of IDL
Affected Doc: 910-TDA-003
98-0201
II
02/17/98
02/18/98
PBL
M. Johnson
Approved
Maintenance upgrade of FORCHECK
Affected Doc: 
910-TDA-003
98-0204
IN
02/18/98
02/19/98 
 
NA
M. Johnson
Approved
EDF Database Logins
N/A
98-0207
IN
02/19/98
02/20/98
NA
L. Moses
Approved
Increase Disk Partition for Integration Lab Replication Instances
N/A
98-0210
II
02/06/98
02/20/98
PRO
B. Peters
Forwarded
Purchase Secure Shell UNIX Servers and PC Clients
Will be signed out-of-board Chairman
98-0211
II
02/20/98
02/20/98
NA
B. Peters
Approved
Baseline and Implement Secure Shell in all ECS Environments
N/A
98-0212
IN
02/19/98
02/20/98
NA
M. Johnson
Approved
SDSRV Database Size Increase for EDF Development Stability Lab
N/A
98-0213
IN
02/20/98
02/20/98
NA
T. Jaeger
App/Comm
Temporary Replacement for Incagold
When Sun resolves the problem with (or replaces) Incagold, a CCR is required 
98-0218
II
02/20/98
02/20/98
NA
V. Cooke
Approved
Additional Files Needed at LaRC for C/O & Install
Copy given to Frank Watson, RTSC
98-0034
II
01/9/98
02/23/98
PBL
M. Alabastro
Approved
Baseline SGI RAID Controller Microcode (Flare Code)
N/A
98-0217
IN
02/20/98
02/23/98
NA
L. Page
Deferred
Need Xrunner/Load Runner installed in the VATC and accessible from tlinso1 and tlins02
Orginator not avaiable to discuss CCR.
98-0223
IN
02/20/98
02/23/98
PBL
M. Johnson
Approved
Test OD: Versopm 5.0 in the IDG Test Cell
N/A
97-1519B
IN
 01/06/98
02/24/98
NA
B. Singi
Approved
To add Management Agent (Subagent) to system startup procedure
Forwarded to HTSC
98-0125
IN
02/02/98
02/24/98
NA
M. Johnson
Approved
Request for Quantify to be installed on "Yakko" EIN#0370
Deferred to submit an evaluation plan for justification and a no-cost purchase order before evaluating the 30-day trial of Quantify.
98-0224
IN
02/23/98
02/24/98
NA
D. Manion
Approved
Reconfiguration of X-terms to Sukpport Patch Testing in Room 1028
Review Miami and/or T1code1 as the host to house this install
98-0229
II
02/23/98
02/24/98
NA
E. Larson
Approved
Install Digital Elevation Model Data at GSFC and EDC DAACs
Patch No. 3.02.06)
98-0231
IN
02/23/98
02/24/98
NA
M. Johnson
Approved
EDF Database Login
N/A
98-0232
IN
02/23/98
02/24/98
NA
C. Lindsey
Approved
Evaluation of Visual Numerics PV Wave Products
N/A
98-0233
IN
02/23/98
02/24/98
NA
E. Larson
Approved
Install Autosys Agent on S0mog01 for 7.2 Compiler Test
N/A
98-0238
IN
02/25/98
02/25/98
NA
J. Ujhazy
Approved
Drop 4 Build Plan Appendix D
N/A
98-0239
IN
02/25/98
02/25/98
NA
M. Johnson
Approved
Install additional X-terms in the Stability Lab.
N/A
98-0240
IN
02/25/98 
02/26/98
NA
M. Johnson
Approved
Sybase user Connections Parameter Increase in the EDF
Development Environment Only
98-0241
II
02/25/98 
02/26/98
PBL
R. Haynes
Approved
Add Test X-terms to VATC Network
Affd Doc:921-TDV-003
98-0242
II
 02/25/98
02/26/98
PBL
R. Haynes
Approved
Add Planning WS to LaRC Network
Affd Doc: 
921-TDL-002 
921-TDL-003
98-0245
IN
02/26/98 
02/26/98
NA
G. Johnson
Approved
Replace "neptune" with "akashi"
N/A
97-1703
II
01/06/98 
02/27/98
PBL
D. Manion
Deferred
Add the SGI FORTRAN 90 V 7.2 Compiler to the ECS Baseline
Deffered to resolve issues. to be brought back by Mac McDonald and J. Guzek
98-0246
II
 02/26/98
02/27/98
NA
M. Alabastro
Approved
Install Origin 2000 into EDF Per Procurement 2.
N/A
98-0247
II
 02/26/98
02/27/98
NA
M. Alabastro
Approved
Reallocate et3sv1 (EUN#00003450) to Support ASF/JPL
N/A
98-0249
II
 02/26/98
02/27/98
PBL
M. Johnson
App/Comm
Add Java Run-time Environment (1.1.5) to the technical Baseline
Find common path that is automated
98-0250
IN
02/27/98 
02/27/98
NA
M. Johnson
Approved
EDF Development PDPS Database Rename for "Fault Recovery Lab"
N/A
98-0251
II
 02/27/98
02/27/98
PBL
G. Gavigan
Approved
8 mm and 4 mm Stackers to be reollocated from Version 2.0 Pool to the M&O Pool
N/A
98-0252
IN
02/27/98 
02/27/98
NA
M. Johnson
Approved
EDF Development Stability Lab SDSRV Database Size Increase it
N/A
98-0253
IN
02/26/98 
02/27/98
NA
M. Johnson
Approved
Maintance Upgrade on "Slimer" in the EDF
N/A
98-0254
II
02/27/98 
02/27/98
PBL
M. Alabastro
Approved
EDC Revised At-Launch Hardware Design
N/A
98-0255
II
02/27/98 
02/27/98
PBL
M. Alabastro
Approved
VATC Revised Hardware Design
N/A
98-0256
IN
02/27/98 
02/27/98
NA
M. Johnson
Approved
Maintance Upgrade to EDF Machines
N/A
 
97-1703-A
 
II
 02/27/98
03/02/98
PBL
M. McDonald
App/Comm
Upgrade the SGI Compilers to V7.2 for the Science Processors in the ECS Baseline
Affd Doc:910-TDA-003
Implementation subject to customer direction
98-0259
II
02/27/98 
03/02/98
NA
G. L. Gadson
Approved
Install Secure Shell
N/A
98-0260
II
 03/02/98
03/02/98
NA
M. Corbett
Forwarded
Procurement of Additional M&O SW/HW
Forwarded to ECS/CCB
98-0262
IN
 03/02/98
03/03/98
NA
L. Klein
App/Comm
International Math Statistics Library Port to IRIX 6.2, N32-bit
Ensure that this CI is in the baseline before installation
98-0264
IN
03/02/98 
03/03/98
NA
R. Gorsky
Approved
Install HP Machine as Build Platform for ClearCase Support Group
N/A
98-0267
II
03/03/98 
03/04/98
NA
S. Dennison
Approved
Version 2.0 Segment/Design Specification for the ECS Project
Affd Doc: 305-CD-100
98-0268
IN
03/04/98 
03/04/98
NA
M. Johnson
Approved
Release B Drop 5.0 (Dev04 mode) EDF Functionality/Checkout Lab Database Rename/Creation
N/A
98-0270
II
03/05/98 
03/05/98
PBL
H. Ausden
Deferred
Update the COTS Software Version Baseline
Affd Doc:910-TDA-003 No Presenter for this CCR 
98-0273
IN
03/05/98 
03/05/98
NA
L. Magday
Approved
Patch to deliver Missing Files from the DROP 4 Turnover to the VATC
N/A
98-0272
IN
03/04/98 
03/06/98
NA
K. Cockerill
Approved
Install HP J210(EIN #4570 into SEO Suite of Hardware in the EDF
N/A
98-0276
IN
03/06/98 
03/06/98
NA
M. Johnson
Approved
EDF Database Logins
N/A
98-0277
IN
03/06/98 
03/06/98
NA
M. Johnson
Approved
Install Autosys Remote Agent on "SPRE4SUN" for Fault Recovery Testing Efforts 
N/A
98-0278
IN
03/04/98 
03/06/98
NA
M. Johnson
Approved
STMGT Testing Database
EDF Development Only
98-0275
II
 03.06/98
03/06/98
NA
L. Klein
Approved 
Off- Line
International Math and Statistics Library (MSL) Installation at DACCs
Affected Doc: 910-TDA-003
98-0280
IN
 03/09/98
03/09/98
NA
B. Peters
Withdrawn by Orginator
Test SGI Patch 2654 in VATC
 N/A
98-0281
IN
03/09/98 
03/09/98
NA
M. Johnson
App/Comm
Configure "BATGIRL'EIN#1370 for MSS
Needs verification of licenses for COTS products
98-0270
II
03/04/98 
03/10/98
PBL
H. Ausden
Approved
UKpdate the COTS Software Version Baseline
Affd Doc: 910-TDA-003 orginator will include CCR 97-1702 (Add HDIFF Utility)to this CCR
98-0283
IN
 03/09/98
03/10/98
NA
M. Johnson
Approved
EDF Development DEV01 PDPS Database Size Increase
N/A
98-0286
II
03/09/98 
03/10/98
PBL
R. Gorsky
App/Comm
Upgrade VATC to ClearCase 3.1.1
Identify affected documents, update for All sites. 
98-0289
II
03/09/98 
03/10/98
HB
H. Ausden
Approved
Site-Host Map
Affd Doc: 910-TDA-005
98-0291
II
03/09/98 
03/10/98
HB
H. Ausden
Approved
Baseline the ECS Program Register
Affd Doc: 910-TDA-007
98-0292
II
03/09/98 
03/10/98
HB
H. Ausden
Approved
Baseline the Access Control List (ACL) Registry
Affd Doc: 910-TDA-006
98-0293
II
 03/09/98
03/10/98
HB
H. Ausden
Deferred
Revise the GSFC Hardware-Software Map (920-TDG-002)
Resolve issues, and return to Board on 3/11/98. Affd Doc:920-TDG-002
98-0294
IN
03/09/98 
03/10/98
NA
D. Tietz
Approved
ECS Reuse Advertising Science ACL Database
N/A
98-0295
II
 03/09/98
03/10/98
NA
G. Mellis
Approved
SMC Disk Shortage
Affd Doc: 922-TDS-010
98-0296
IN
03/10/98 
03/10/98
NA
B. Peters
Approved
Test BDS 2.0 in the VATC
N/A
98-0297
II
 03/10/98
03/10/98
NA
B. Peters
Approved
Baseline AMASS 4.9.02
Affd Doc: 910-TDA-003
98-0290
II
03/09/98 
03/10/98
NA
C. Thomas
Approved 
Off- Line
Update AST_L1B Descriptor
N/A
97-1702
II
 12/11/97
03/11/98
PBL
D. Manion
Approved
Add HDIF Utility to production SGI Baseline
Affd Doc:910-TDA-003
98-0293
II
03/09/98 
03/11/98
HB
H. Ausden
Deferred
Revise the GSFC Hardware-Software Map (920-TDG-002)
Pending issues. See Action Items
98-0301
IN
03/10/98 
03/11/98
NA
R. Gorsky
Approved
Changes to Clearcase FDDI Ring (119)
N/A
98-0306
IN
03/11/98
03/12/98
NA
M. Johnson
Approved
EDF Development HP Open View Testing Lab Database Creation
Dev 02mode
98-0309
IN
03/09/98
03/12/98
NA
B.Peters
Approved Off-Line
Install BDF 2.0 rollup in VATC
N/A
97-1769
II
02/23/97
03/13/98
NA
R. Meyer
Deferred
Installation of Netscape Security Keys Into the EDF, MiniDAAC and VATC
pending issue os Version to be seen through the fire wall
98-0310
II
03/09/98
03/13/98
NA
M. MacDonald
Approved
Apply IRIX Patches to the SGI Science Processors to Support Compiler Upgrade
N/A
98-0311
II
03/13/98
03/13/98
NA
G. Mellis
App/Comm
EDC DAAC Disk & RAID Partitioning Diagram Updated (in response to NCR's 12286 & 12400)
Temporary change pending Engineering evaluation of total impact to the "System"
98-0312
II
03/13/98
03/13/98
NA
G. Mellis
Approved
LaRC DAAC SPR Disk & RAID Partioning Diagram Updates ( in response to NCR 12343)
Affd Doc: 922-TDL-015
and
Affd Doc: 922-TDL-020
97-1769
II
12/23/97 
03/16/98
NA
R. Meyer
Approved
Installation of Netscape Security Keys Into the EDF, MiniDAAC and VATC
Installation of keys will be coordinated with RTSC.
98-0314
IN
03/13/98
03/16/98
NA
T. Jaeger
Approved
MWO on Apcon SCSI Switches
N/A
98-0315
IN
03/16/98
03/16/98
NA
B. Peters
Approved
Test SGI NFS Roolup #10 patch on VATC HiPPI hosts
Installation of Patch 2654 should be performed with RTSC assistance only
98-0318
IN
 03/16/98
03/18/98
NA
L. Washington
Deferred
Workstation Moves in Science Office
No Presenter
98-0319
IN
 03/16/98
03/18/98
NA
K. Joyner
Approved
Process Sorcerer Training
Approved
98-0328
IN
 03/17/98
03/18/98
NA
J. Weller
Approved
MOG01 Moved to Clearcase Ring
N/A
98-0329
IN
03/17/98 
03/18/98
NA
J. Weller
Deferred
Standardizing all ClearCase Machines root shell and profiles to Korneshell Environment
Deferred to resolve issues.
98-0330
IN
 03/17/98
03/18/98
NA
B. Fortlage
Deferred
NSIDC Network Documentation changes to Incorporate NSIDC Pre-Release B testbed Removal
Deferred for T. Kehoe/R. Miller to resolve issue of adding test information to 921-TDN-002.
98-0331
IN
 03/17/98
03/18/98
NA
M. Johnson
Approved
Install IDL 5.0.2 in "AMAZON" for testing efforts
N/A
98-0332
IN
 03/17/98
03/18/98
NA
M. Johnson
Approved
Install XVT 4.58  on "AMAZON" EIN #526 for testing efforts
N/A
98-0333
IN
03/17/98 
03/18/98
NA
M. Johnson
Approved
To Upgrade FORCHECK from 12.23 to 12.30
N/A
98-0336
II
 03/18/98
03/18/98
NA
B. Peters
Approved
Execute Kerbnet Test
N/A
98-0337
IN
 03/18/98
03/18/98
NA
M. Johnson
Approved
Install Open Client 11.1.1
N/A
98-0338
IN
03/18/98 
03/18/98
NA
K, Lange
Approved
Yograde IS Oatches and Compiler set on lasher, s0mog01
N/A
98-0339
II
03/18/98 
03/19/98
NA
M. Alabastro
Deferred
Insert Origin 2000 into GDAAC HW, NW Cable Management and Floor Plan Baselines
Affd Doc: 920-TDG-001 &002
921-TDG-002 & 003
98-0342
IN
03/19/98 
03/19/98
NA
A. Schuster
App/Com
Install of Second Copy of XRP-II for MSS
RTSC to install. Obtain software tarfile from Alex Schuster and follow "readme" file
98-0345
II
03/19/98 
03/20/98
HB
B. Fortlage
Approved
NSIDC network Documentation Baseline for Test Hardware
Affd Doc: 924-TDN-002 and 003
98-0346
II
03/19/98 
03/20/98
HB
B. Fortlage
Approved
NSIDC Network Documentation Changes to Incorporate NSIDC Pre-Release B Testbed Removal
Affd Doc: 921-TDN-002,003 & 004
98-0348
IN
 03/19/98
03/20/98
NA
E. Martin
App/Comm
Request Hardware Upsate for the Machine "ceoseng"
Request will not be accomplished until the memory procurement is recieved
98-0349
IN
03/19/98 
03/20/98
NA
M. Johnson
Approved
Upgrade in the EDF of Sybase SQL Servers
 
98-0350
IN
 03/19/98
03/20/98
NA
M. Johnson
Approved
Restrict Permissions on "Shelby" EIN#544
N/A
98-0351
IN
 03/20/98
03/20/98
NA
M. Johnson
Approved
Removal of Links in /tools/bin to ECS Assistant common scripts
N/A
98-0352
IN
03/20/98 
03/20/98
NA
J. Schutty
Approved
Weekly reboots of missery, talisman, sorccess, sahara, and incagold
N/A
98-0339
IN
03/18/98 
03/20/98
NA
M. Alabastro
Approved Off-Line
Insert Origin 2000 into GDAAC HW, SW Cable Management and Floor Plan Baselines
Affected Doc: 920-TDG-001, 004
Affected Doc: 921-TDG-002 & 003.
98-0353
IN
 03/20/98
03/23/98
NA
A. Swab
Approved
Lock down the machine Klingon is to used by the ClearCase Support Group and some select users only
N/A
 
98-0355
IN
03/20/98 
03/23/98
NA
G. Gadson
Deferred
Add two newly purchases AIRS Sun machines to the network.
Dave Compton to meet with Andy Miller today, 3/23/98, and will discuss funding and charge number for this CCR.
98-0357
IN
03/23/98 
03/23/98
NA
M. Johnson
Approved
Upgrade the shared raid on Cherokee EIN #3447 and Comanche EIN#1223
N/A
98-0358
II
03/23/98 
03/23/98
NA
M. Johnson
App/Com
Enhancements to ECS Assistant
Temporary - new CCR required to make permanent documentation updated.
98-0372
IN
03/25/98
03/26/98
NA
C. Duffy
Deferred
Machine for Mini-EOC Mini-DAAC Integration
Orginator did not present CCR.
98-0373
IN
03/26/98
03/26/98
NA
M. Johnson
App/Com
Changes to Netscape Enterprise Server-Functionality Lab
RTSC to contact William Jew to include him in actual work on CCR. his las day is 3/27/98. Pager # is (410)797-2181
98-0354
II
03/25/98
03/26/98
NA
C. Thomas
Approved
Copy MISLOMTR shared object to SMC
N/A
98-0371
IN
03/25/98
03/26/98
NA
R. Simanowith
App/Com
Bring pre-integration equipment to Baseline-kidnapped, Juror, Sious, spre4sun
Bring to current baseline and turn control over to development.
98-0375
IN
03/26/98
03/27/98
NA
M. Johnson
Approved
To Remove Old Roguewave Libraries
N/A
98-0376
II
03/26/98
03/27/98
NA
A. Lake
Approved
Testing of Server failover at GSFC
N/A
98-0378
II
03/26/98
03/27/98
NA
M. Johnson
Approved
Installation of CPUs in PDPS1 EIN#4453
N/A
98-0379
II
03/27/98
03/27/98
NA
M. Johnson
Forward
Request for two ODBC Drivers for Database Development and Management
Forwarded to ECS CCB for disposition
98-0369
II
03/25/98
03/27/98
NA
D. Arrington
Approved Off-Line
MODIS required the following functional fix to continue development for lauch using Toolkit: Bad Return Vaule from PGS_PCInitcom(ECSedc13404)
N/A
98-0370
II
03/25/98
03/27/98
NA
D. Arrington
Approved Off-Line
MODIS Requires the following functional fix to continue development for launch using Toolkit: "Function Gdetpixvaules was modified to reudce overhead"
N/A
98-0092
IN
01/23/98
03/30/98
NA
M.Johnson
Approved
To increase RAM on "Bajoran" and "Protege"
N/A
98-0355
IN
03/20/98
03/30/98
NA
G. Gadson
App/Comm
Add two newly purchased AIRS Sun machines to the network
Bill Time to 
Lockheed Martin.
98-0367
II
03/02/98
03/30/98
NA
K. Joyner
Deferred
FLEXLM Servers for SGI Pro Dev Licenses
Deferred to determine which 2 redundant servers at each DAAC will be used to backup the primary servers. Update COTS Software Version Baseline and HW/SW mappings accordingly and incorporate into CCR.
98-0372
IN
03/25/98
03/30/98
NA
C. Duffy
Approved
Machine for Mini-EOC Mini-DAAC Integration
N/A
98-0380
II
03/27/98
03/30/98
NA
M.Alabastro
Approved
Move RAID Unit EIN#3433 from orgin EIN#3432 to t1icg01 EIN#1197
Affd Doc: 920-TDV-001
Copy of CCR given to Frank Watson
98-0382
IN
03/27/98
03/30/98
NA
V. Harris
Approved
Configure phobos, deimos and olymopus for Discover use.
N/A
98-0385
I
03/30/98
03/30/98
NA
E.Obligacion
Deferred
G0dmh01 Relocation from S1310 to C101C Console #32
Affd Doc: 920-TDG-004 and 920-TDG-005. CCR will be forwarded to the ESDID ERB and return to the REL2 CCB for final disposition.
98-0387
IN
03/30/98
03/30/98
NA
M. Johnson
App/Comm
Install Sybase OpenSwitch 2.0 Product Evalution
Attach the No-Cost Purchase order to CCR and notify CM after 30 day evaluation of CCR (5/1/98).
98-0153A
II
03/31/98
04/01/98
PBL
B. Burford
Forward
Define the Contents of the ECS Baseline
Affd Doc: 220-WP-003; Forwarded to ECS Board
98-0389
II
03/31/98
04/01/98
PRO
R. Miller
Forwarded
Baseline Fixed Version of AMASS 4.9.0.2
Forwarded  to ECS CCB Board
98-0390
II
03/31/98
04/01/98
NA
B. Peters
Approved
Baseline Fixed Version of AMASS 4.9.0.2
Affd Doc:  910-TDA-003
98-0399
I
03/31/98
04/01/98
NA
G. Stensaas
Deferred
Move Six Release B SPRHW X-Terms From Production Network to M&O Network
Affd Doc:  921-TDE-002; Pending Review by ESDIS ERB
98-0402
IN
03/31/98
04/01/98
NA
H. Ausden
Deferred
Modify boot scripts and login scripts to set the ECS Environment
Deferred on 4/1/98 for originator to coordinate the impact assessments with SED, M&O , SV&A, and REDV.  Also investigate if change is applicable to the DAACS.
98-0403
IN
03/31/98
04/01/98
NA
B. Nguyen
Approved off-line
Install S. Designor software on PC located in cubicle  2038A
N/A
98-0405
IN
03/31/98
04/01/98
NA
M. Johnson
Approved off-line
To configure "Iceland" for DSS subsystem, EIN#2346
N/A
98-0406
IN
03/31/98
04/01/98
NA
M. Johnson
Approved off-line
To configure "Portugal" for DMS Subsystem, EIN 0688
N/A
98-0408
IN
03/31/98
04/01/98
NA
M. Johnson
Approved off-line
Establish a temporary NIS Group on "Maliboo" EIN #0388
N/A
98-0409
IN
03/31/98
04/01/98
NA
M. Johnson
Approved off-line
Development is requesting a stronger SUN for IDG Subsystem
N/A
98-0410
IN
03/31/98
04/01/98
NA
M. Johnson
Approved off-line
To configure "Sydney" for Client Subsystem
N/A
98-0411
IN
03/31/98
04/01/98
NA
M. Johnson
Approved off-line
Evaluate on Toolkit Machine "DADEC" Fortran 77 and 90 Version 5.0
N/A
98-0412
IN
03/31/98
04/01/98
NA
M. Johnson
Approved off-line
Request the Move of CEOS Development Machines, "ceossun1", "ceossun2" and "ceoseng"
N/A
98-0414
IN
03/31/98
04/01/98
NA
B. Peters
Approved off-line
Test SGI Mount Patch on VATC HiPPI Hosts
N/A
98-0404
II
03/31/98
04/02/98
NA
T. Wells
Approved
NSIDC Version 2 Floor Plan
N/A
98-0413
IN
04/01/98
04/02/98
NA
J. Weller
Approved
Upgrade to Jenga cpu's
N/A
98-0415
IN
04/01/98
04/02/98
NA
G. Johnson
Approved
World Wide Web Proxy Server Implementation
N/A
98-0417
II
04/02/98
04/02/98
NA
T. Wells
Approved
NSIDC Version 2.0 SCSI Cable Management 
Affd Doc: 920-TDN-012
98-0418
II
04/02/98
04/02/98
NA
T.Wells
Approved
GSFC Floor Plan-GSFC Cable Management Plan
Affd Doc: 920-TDG-004
920-TDF-005
920-TDG-012
98-0419
II
04/01/98
04/02/98
PBL
T. Wells
Approved
NSIDC Version 2.0 Cable Management Plan
Affd Doc: 920-TDN-005
98-0420
IN
04/01/98
04/02/908
NA
R. Haynes
Deferreed
Install PowerHub 8000 in VATC Network
Defer until a stratedy is found for a NO RISK approach.
98-0421
IN
04/01/98
04/02/98
PBL
R. Haynes
App/Comm
Add test Host to LaRC Network
CCR 98-0114 must be approved prior to implementation of 98-0421.
Affd Doc: 924-TDL-002
924-TDF-003
 
98-0422
IN
04/02/98
04/02/98
NA
B. Peters
App/Comm
Test SGI network patch on VATC HiPPI hosts
Must coordinate with RTSC and TEST for time.
98-0368
IN
04/01/98
04/03/98
NA
D. Tietz
Approved
Request the following COTS packages be installed on "ceossun1" and "ceossun2"
N/A
98-0420
IN
04/01/98
04/03/98
NA
R. Haynes
Approved
Install PowerHub 8000 in VATC Network.
N/A
98-0423
IN
04/02/98
04/03/98
NA
E. Martin
Approved
Addition od user account to machine "ceoseing"
N/A
98-0424
IN
04/02/98
04/03/98
NA
R. Gorsky
Approved
FDDI Card in SMG01 Build Plattform
N/A
97-1538
II
11/05/97
04/06/98
NA
D. Kelley
Closed
Add Big Brother to SMC and DAAC Baselines
Closed by Board.  Big Brother not needed at DAACs.
98-0075
II
01/22/98
04/06/98
PBL
H. Ausden
Deferred
Do not automount libraries and COTS Software used during operations, for reliability reasons
Defer until 4/20/98 for Terry Fisher and Howard Ausden to resolve issues.
98-0077
II
01/22/98
04/06/98
PBL
H. Ausden
Deferred
Add directory for each product to the COTS Software Version Baseline
Defer until 4/20/98 for Terry Fisher and Howard Ausden to resolve issues.
98-0114
II
01/28/98
04/06/98
NA
D. McCartney
Deferred
Installation of Test Tool Support H/W and S/W at the DAACs
Deferred by Karl Leatham to get affected documents updated.
98-0171
II
02/11/98
04/06/98
NA
M. Johnson
Deferred
Tape Drive for MSS CM Servers and Other XRP-II Machines
Defer until 4/13/98 by Bruce Clark to resolve issue of database backups.
98-0293
II
03/31/98
04/06/98
HB
H. Ausden
Deferred
Revise the GSFC Hardware-Software Map (920-TDG-002)
Deferred
98-0318
IN
03/16/98
04/06/98
NA
D. Manion
App/Comm
Workstation Moves in Science Office
Moves for X-Terms NCDS021 and MCD44 are approved but Workstation SO-2 stays in current location and must be repaired.
98-0367
II
03/31/98
04/06/98
NA
K. Joyner
Approved
FLEXLM Servers for SGI Pro Dev Licenses
N/A
98-0385
I
03/30/98
04/06/98
NA
E. Obligacion
Forwarded to ESDIS ERB
G0dmh01 Relocation from S1310 to C101C Console #32
CCR will be forwarded to the ESDIS ERB and will return to the REL2 CCB for final disposition.
98-0399
I
01/23/98
04/06/98
NA
G.Stensaas
Forward to ESDIS ERB
Move Six Release B SPRHW X-terms from Production Network to M&O Network
CCR will be forwarded to the ESDIS ERB and return to the REL2 CCB for final disposition.
98-0402
IN
03/31/98
04/06/98
NA
H. Ausden
Deferred
Modify boot scripts and login scripts to set the ECS Environment
Defer until 4/20/98 for Terry Fisher and Howard Ausden to resolve issues.
98-0407
IN
04/08/98
04/08/98
NA
M. Johnson
Approved with comment
Establish 25 temporary alias UNIX Accounts
Accounts restricted to machine to be identified by Michelle
98-0434
IN
04/06/98
04/08/98
NA
M. Johnson
Approved
EDF DMS Database Login
N/A
98-0435
IN
04/06/98
04/08/98
NA
M. Johnson
Approved
Evaluation of Purifky Version 4.1
N/A
98-0436
IN
04/08/98
04/08/98
N/A
M. Johnson
Approved
Install Tivoli Clients in the EDF
N/A
98-0437
IN
04/06/98
04/08/98
N/A
M. Johnson 
Approved
EDF SDSRV Stability Lab Sybase Database
N/A
98-0438
IN
04/06/98
04/08/98
N/A
M. Johnson
Approved
EDF Cherokee Sybase Databases
N/A
98-0439
IN
04/06/98
04/08/96
N/A
M. Johnson
Approved
Install DCE Patches and NFS Mounts on "Maliboo"
N/A
98-0440
IN
04/06/98
04/08/98
N/A
M. Johnson
Approved
EDF Database Owner Changes
N/A
98-0443
IN
04/08/98
04/08/98
PBL
M. Johnson
Approved
Change EDC e0wkg01 disk partition to support MODIS
Affectted Doc:  922-TDE-018
98-0444
IN
04/08/98
04/08/98
N/A
G. Johnson
Approved
GSFC Firewall Implementation
N/A
98-0445
IN
04/08/98
04/08/98
N/A
M. Johnson
Approved
Delivery IMSL libraries to the SMC
NA
98-0447
IN
04/09/98
04/09/98
N/A
M. Alabastro
Approved
Increase swap space on t1icg01 in VATC
N/A
98-0448
IN
04/09/98
04/10/98
NA
M. Johnson 
App/Comm
Sybase Open Database Configuration Parameter Increase on "Illiad" Mini-DAAC Platform
Development needs to baseline Mini-DAAC Sybase configuration parameters
98-0449
IN
04/09/98
04/10/98
NA
L. Case
Deferred
Install Java ncss in /tools something
Defer until 4/13/98 to get additional information
98-0454
II
04/10/98
04/10/98
PBL
B. Peters
Approved
Baseline NSIDC NFS mount points
N/A
98-0457
IN
04/10/98
04/10/98
NA
M. Johnson
Approved
Removal of: Shelby from Big Brother monitoring efforts
N/A
98-0458
IN
04/10/98
04/10/98
NA
M. Johnson
App/Comm
Downgrade isq1 and bcp to 10.0.4
EDF only, submit a new CCR that would affect the baseline for all DAACs.
98-0075
II
01/22/98
04/13/98
PBL
H. Ausden
Deferred
Do not automount libraries and COTS software used during operations, for reliability reasons
Defer until 4/20/98 for Terry Fisher and Howard Ausden to resolve issues.
98-0077
II
01/22/98
04/13/98
PBL
H. Ausden
Deferred
Add directory for each product to the COTS Sofrware Version Baseline
Defer until 4/20/98 for Terry Fisher and Howard Ausden to resolve issues.
98-0114
II
01/28/98
04/13/98
NA
R. King
Deferred
Installation of Test Tool Support H/W and S/W at the DAACs
Defer for Tom Kehoe and Vic Cooke to determine what documents are affected and bring back redlines.
98-0171
II
02/10/98
04/13/98
NA
M. Johnson
Disapproved
Tape Drive for MSS CM Servers and Other XRP-II Machines
CCR no longer needed.  Problem was reworked.
98-0293
II
03/03/98
04/13/98
NA
H. Ausden
Deferred
Revise the GSFC Hardware-Software Map (920-TDG-002) 
Defer until 4/20/98 for Terry Fisher and Howard Ausden to resolve issues.
98-0385
I
03/30/98
04/13/98
NA
E. Obligacion
App/Comm
G0dmh01 Relocation from S1310 to Ck101C Console #32
All work to be paid for by Sustaining Engineering WBS.
98-0399
I
03/31/98
04/13/98
NA
G. Stensaas
App/Comm
Move six release B SPRHW X-terms from production network to M&O Network
All work to be paid for by Sustaining Engineering WBS.
98-0402
II
03/31/98
04/13/98
NA
H. Ausden
Deferred
Modify boot scripts and login scripts to set the ECS Environment.
Deferred on 4/1/98 for originator to coordinate the impact assessments with SED, M&O, SV&A, and REDV.  Also investigate if change is applicable to the DAACs.
98-0449
IN
04/09/98
04/13/98
NA
L. Case
Deferred
Install Java ncss in /tool something
Defer for Rich Gorsky and Michelle Johnson to resolve code count discrepancies.
98-0459
IN
04/10/98
04/13/98
NA
E. Martin
Approved
Create CEOS_DEV Mode EDF Database
N/A
98-0463
II
04/13/98
04/13/98
NA
M. Johnson
Approved
Installation Matrix for Drop 4 at NSIDC
N/A
98-0464
IN
04/13/98
04/13/98
NA
M. Johnson
App/Comm
Installation of Spatial Query Server Version 2.2.2. 29_1A in EDF
Document the existing baseline; evaluate the patch and generate a new CCR to update the baseline.
98-0465
IN
04/13/98
04/13/98
NA
M. Johnson
Approved
Installation of Spatial Query Server Version 3.0/1 in EDF
N/A
98-0466
IN
04/14/98
04/15/98
NA
M. Johnson
Approved
Request to Install DB Artisan
N/A
98-0467
IN
04/14/98
04/15/98
NA
M. Johnson
Approved
Move a S-Designor License
N/A
98-0468
II
04/14/98
04/15/98
PBL
M. Johnson
Approved
Maintenance Upgrade of IDL from 4.0/1 to 5.0.2 
N/A
98-0469
IN
04/14/98
04/15/98
NA
M. Johnson
Approved
Release B Drop 4P (DEV06 mode) EDF ECS Assist Testing Lab Database Rename/Creation
N/A
98-0470
IN
04/14/98
04/15/98
NA
M. Johnson
Approved
EDF Development PDPS Database on "MILO"
N/A
98-0471
IN
04/14/98
04/15/98
NA
M. Johnson
App/Comm
Increase RAM on "Calypso" EIN#0550
Review performance of "Calypso."  If determined that memory is needed, it will be added.
98-0472
II
04/14/98
04/15/98
NA
S. Sharma
App/Comm
Missing Server UP.map file
Obtain CCR number from CM.
98-0473
IN
04/15/98
04/15/98
NA
B. Franks
Deferred
Add fourth mode to Mini-DAAC for use in ECS Assist install test
Two part exercise - (1) study the feasibility of doing the 4th mode, and (2) then make decision on whether to do it or not
98-0474
IN
04/15/98
04/15/98
NA
M. Johnson
Approved
Maintenance Upgrade to Purify from 4.0 to 4.1 for Sun Platform
N/A
98-0293
IN
03/09/98
04/16/98
PBL
H. Ausden
Approved
Revise the Hardware-Software Maps
N/A
98-0475
IN
04/15/98
04/16/98
NA
M. Johnson
Approved
To configure external raid on "Batgirl" #1463
N/A
98-0478
II
04/15/98
04/16/98
PBL
J. Weller
Approved
Add ClearCase Patch Levels to Baseline for SCDO
N/A
98-0479
IN
04/15/98
04/16/98
NA
M.. Johnson
Deferred
EDF Sybase database login name change
M. Johnson to coordinate with Lisa Colombo to find the impact of not changing name because of other changes that would have to be completed because of the name change.
98-0480
IN
04/15/98
04/16/98
NA
M. Johnson
Approved
EDF Ingest Database Login
N/A
98-0482
IN
04/15/98
04/16/98
NA
M. Johnson
Approved
Evaluation of Purify 4.0.1  for SGI Platform
N/A
98-0481
IN
04/15/98
04/16/98
NA
B. Franks
Approved Out-of-Board
Build the "Purple" Patch for Patch IPT Testing in the Mini-DAAC
N/A
98-0473A
IN
04/15/98
04/17/98
NA
B. Franks
App/Comm
Add fourth mode to Mini-DAAC for use in ECS Assist Install Test
Actions required for items 3-6, approval for items 1 & 2 only.
98-0484
II
04/17/98
04/17/98
PBL
M. Alabastro
Approved
Baseline Test Hardware at EDC, LaRC, and NSIDC
Affected documents:  924-TDE-001, 924-TDL-001, 924-TDN-001
98-0485
IN
0417/98
04/17/98
NA
B. Peters
App/Comm
Test Communications Kernel Change on HiPPI VATC SGIs
Coordinate with Kevin Lange
98-0487
IN
04/16/98
04/17/98
NA
D. Arrington
Deferred
Deliver the correct mkconfig files for the 4.01.01 patch
Pending PSR and writing installation instructions for new patch.
98-0488
II
04/17/98
04/17/98
PBL
G. Mellis
App/Comm
Incorporation of Ingest Functionality into NSIDC APC Disk & RAID Partitioning Design
Byron Peters will provide Mount Points updates by 12:00 noon.
98-0477
IN
04/16/98
04/17/98
NA
C. Thomas
Approved Out-of-Board
Release Blue Patch to the DAACs
N/A
98-0483
II
04/16/98
04/17/98
NA
C. Thomas
Approved Out-of-Board
Missing AM1HK EST from Drop 4 Baseline
N/A
98-0489
II
04/16/98
04/17/98
PBL
B. Peters
Approved  Out-of-Board
Update NSIDC NFS Mount Points
Affec Doc:  920-TDN-008
98-0114
II
01/28/98
04/20/98
NA
R. King
Disapproved
Installation of Test Tool Support H/W and S/W at the DAACs
Four CCRs have already been submitted to CCB.  CCRs 98-0019, 98-0345, 98-0421, and 98-0484.
98-0449
IN
04/15/98
04/20/98
NA
L. Case
Approved
Install Javancss in /tools something
N/A
98-0479
IN
04/17/98
04/20/98
NA
M. Johnson
Approved
EDF Sybase Database Login Name Change
N/A
98-0490
IN
04/17/98
04/20/98
NA
V. Harris
Approved
Configure phobos, deimos, and olympus for Discover use (software install)
N/A
98-0491
IN
04/17/98
04/20/98
NA
M. Johnson
Deferred
Distribution Server Platform Sybase Installation
Pending further review of CCR to include docs affected and impact sheet and a list of back-up machines.
98-0492
IN
04/17/98
04/20/98
NA
M. Johnson
Approved
Release B Drop 4P (TS3 mode) Mini-DAAC ECS Assist Testing Lab Database Creation
N/A
98-0493
IN
04/20/98
04/20/98
NA
B. Peters
Deferred
Test new SGI NFS Rollup in VATC
Pending discussion between K. Lange, B. Peters, K. Kleis, and A. Abtahi to come up with a strategy plan for SGI patches.
98-0494
IN
04/20/98
04/20/98
NA
H. Ausden
App/Comm
Extend rmagill's sudo access to amazon and yakko
Work with Kevin Lange.
98-0495
IN
04/20/98
04/20/98
NA
M. Johnson
Approved
Configure "Kickapoo" to accommodate PDPS
N/A

98-0421
II
4/01/98
4/22/98
PBL
R. Haynes
Approved
Add Test Host to LaRC Network
Previous A/C disposition Overcome by Events
98-0496
II
4/20/98
4/22/98
NA
B. Fortlage
App/Comm
Move Six EDC Version 2.0 SPRHW X-Terms from Production Network to M&O Network
All work to be funded by SEO/M&O WBS
98-0497
II
4/21/98
4/22/98
PBL
T. Wells
App/Comm
GSFC Floor Plan
All work to be funded by SEO/M&O WBS
98-0499
II
4/21/98
4/22/98
PBL
B. Fortlage
Approved
Add Test Host to EDC V2 Network
N/A
98-0501 
IN 
4/22/98 
4/23/98 
NA 
E. Finch 
Approved 
Add memory to "russell" which serves the Problem Reporting System (PRS) and Software Turnover & Tracking System (SITS) 
N/A 
98-0503
IN
4/22/98
4/23/98
NA
E. Chomko
Approved
Add a DLT tape drive to the miniDAAC system raven
N/A
98-0504
IN
4/22/98
 
NA
A. Lake
Deferred
Exchange one 8mm stacker between GSFC and the Landover Facility
Pending coordination with Gary Roth
98-0505
IN
4/23/98
4/23/98
NA
J. Ujhazy
Approved
Delete obsolete softlinks for use in ECS Assist Install Test
N/A
98-0500
IN
4/21/98
4/21/98
NA
J. Ujhazy 
Approved
Mini-DAAC ECS  Assist Test installation support for drop 4P
N/A
98-0511
II
4/23/98
4/23/98
NA
B. Franks
Approved
Build the "Gray" Patch for Patch IPT, deliver to the VATC for testing
N/A
98-0506
II
4/22/98
4/24/98
NA
M. Johnson
Approved
Revisions to the installation Matrix for Drop 4 at NSIDC
N/A
98-0509
IN
4/23/98
4/24/98
NA
V. Harris
App/Comm
Sudo access for Discover Administrator
What cmds for how long?
98-0510
IN
4/23/98
4/24/98
NA
V. Harris
App/Comm
Move disk drive from olympus to phobos
Make sure property records are updated.
98-0513
IN
4/23/98
4/24/98
NA
D. Smith
App/Comm
Additional Hardware for the FOS Mini-EOC
Prepare memo for record for contracts indicating upgrades to be done
 
98-0514
IN
4/23/98
4/24/98
NA
M. Johnson
Deferred
Upgrade Clearcase to 3.1.1 in the Mini-DAAC to the COTS Baseline
Deferred to resolve compelling need issue.
98-0075
II
1/22/98
4/27/98
PBL
H. Ausden
Deferred
Do not Automount libraries and COTS Software used during operations, for reliability reasons
Maybe withdrawn depending on the  testing of boot scripts for CCR 98-0402.  Will be brought back on 5/4/98.
98-0402
IN
3/31/98
4/27/98
NA
H. Ausden
Deferred
Modify boot scripts and login scripts to set the ECS Environment 
Will be brought back on 5/4/98 for resolution.
98-0491
IN
4/17/98
4/27/98
NA
M. Johnson
Deferred
Distribution Server Platform Sybase Installation
CCR 98-0429 should not be completed until this CCR has been completed.  see ccmail.  CCR to be brought back on 5/4/98.
98-0493
IN
4/17/98
4/27/98
NA
B. Peters
Deferred
Test new SGI NFS Rollup in VATC
Pending discussion between K. Lange, B. Peters, K. Kleis, and A. Abtahi to come up with a strategy plan for SGI Patches.  CCR to be brought back on 5/4/98.
98-0504
IN
4/22/98
4/27/98
NA
A. Lake
Deferred
Exchange one 8mm stacker between GSFC and the Landover Facility
Pending coordination with Gary Roth.  Will be brought back on 5/4/98.
98-0514
IN
4/24/98
4/27/98
NA
M. Johnson
Deferred
Upgrade Clearcase to 3.1.1 in the Mini-DAAC to the COTS Baseline
Deferred to resolve compelling need issue.  Will be brought back on 5/4/98.
98-0515
IN
4/24/98
4/27/98
NA
D. Compton
Deferred
Need to Replace/Repair Desktop UPS Systems
Deferred to resolve funding issue.  Will be brought back on 5/4/98.