 CRBSCP - P&RPU 
 Engineering Data

CRBSCP - Protective & Regulatory Pumping Unit  -  Main Page

Facilities in Operation

Wells

21      

242 Lateral

12.4 mi  

Access road

12 mi  

Transmission line, 34.5 kV

11.7 mi  

Transmission line, 69 kV (WAPA)

18 mi  

Sediment Retention Facilities

Two settling basins provide storage for the accumulation of sediment.

Carriage Facilities

242 Lateral

Location

Starts near well No. 22 and extends 12.4 miles west along the Southerly International Boundary to the afterbay of the existing Yuma Project's Boundary Pumping Plant near San Luis, Arizona.

Construction period

1977-1978  

Length

12.4 mi  

Diversion capacity

7.5-220 cfs  

Typical section, earth lined:

 

   Bottom width

4-6 ft  

   Side slopes

1.5:1  

   Water depth

2.8-5.8 ft  

   Lining thickness

2.5 in  

Well Field

Location

On South Yuma Mesa, north of the Southernly International Boundary.

Construction period

1977-1983  

Number of wells

21  

Depth

600 ft  

Diameter of well at surface

10-26 in  

Total annual production

125,000 acre-ft  

Pumping Plants

Designation

Number of units

Total capacity, cfs

Total dynamic head, ft

Total horsepower

Well pump units

21

7.5

128-145

125-250

 
 