May 2001

1  May            Nutation damping operations.
                  CLC Narrow DB used.
                  Maximum nutation 0.24 deg. half-cone.
                  
                  KEP GAS CR#621: FSS, UV (part 1) - 121.08:00 SCET.

2  May            Nutation damping operations.

                  Extended McElrath Man. initiated at 122.11:30 SCET. 
                  Nutation went from 0.44 to 0.34 deg.

                  McElrath Man. initiated at 122.16:36 SCET. Nutation went
                  from 0.39 to 0.13 deg.

                  Maximum nutation 0.44 deg. half-cone.

                  BAM-E calibration - 122.19:17 SCET.
                  BAM-I calibration - 122.19:40 SCET.

3  May            Nutation damping operations.

                  Maximum nutation 0.25 deg. half-cone.

                  GRU Routine Noise Test - 123.01:00 SCET.
                  KEP GAS CR#622: FSS, UV (part 2) - 123.08:00 SCET.

4  May            Nutation damping operations.

                  McElrath Man. initiated at 124.04:26 SCET. Nutation went
                  from 0.32 to 0.11 deg.

                  Maximum nutation 0.32 deg. half-cone.

5  May            Nutation damping operations.

                  McElrath Man. initiated at 125.20:35 SCET. Nutation went
                  from 0.35 to 0.08 deg.

                  Maximum nutation 0.35 deg. half-cone.

                  KEP GAS CR#623: FSS, UV (part 3) - 125.08:00 SCET.

                  DSS-54 Receivers out of lock at 2-way acquisition. 
 125.05:29-05:40  11m realtime 1024 bps data lost. DR L05233 refers.

6  May            Nutation damping operations.

                  Maximum nutation 0.27 deg. half-cone.

 7 May            Nutation damping operations.

                  McElrath Man. #1 initiated at 127.02:43 SCET. Nutation went
                  from 0.19 to 0.12 deg.

                  McElrath Man. #2 initiated at 127.12:43 SCET. Nutation went
                  from 0.29 to 0.17 deg.

                  McElrath Man. #3 initiated at 127.15:46 SCET. Nutation went
                  from 0.21 to 0.10 deg.

                  Maximum nutation 0.33 deg. half-cone.

                  KEP GAS CR#624: FSS, UV (part 4) - 127.08:00 SCET.
                  KEP IFC - 127.18:21 SCET.

                  DSS-63 400kW transmitter warming caused 20kW transmitter drive off. 
 127.14:42-14:51  9m realtime 1024 bps data lost. DR L05240 refers.

8  May            Nutation damping operations.

                  McElrath Man. #1 initiated at 128.01:50 SCET. Nutation went
                  from 0.37 to 0.10 deg.

                  McElrath Man. #2 initiated at 128.10:42 SCET. Nutation went
                  from 0.17 to 0.07 deg.

                  Maximum nutation 0.37 deg. half-cone.

9  May            Nutation damping operations.

                  McElrath Man. #1 initiated at 129.00:31 SCET. Nutation went
                  from 0.48 to 0.23 deg.

                  McElrath Man. #2 initiated at 129.02:59 SCET. Nutation went
                  from 0.34 to 0.11 deg.

                  McElrath Man. #3 (extended) initiated at 129.23:04 SCET. 
                  Nutation went from 0.53 to 0.16 deg.

                  Maximum nutation 0.53 deg. half-cone.

                  KEP GAS CR#625: FSS, UV (part 5) - 129.08:00 SCET.

                  DSS-34 lock drop due to wrong acquision template at transfer.
 129.18:29-18:36  5m realtime 1024 bps data lost. DR L05381 refers.
                  
10 May            Nutation damping operations.

                  McElrath Man. #1 (extended) initiated at 130.15:08 SCET. 
                  Nutation went from 0.37 to 0.05 deg.

                  McElrath Man. #2 initiated at 130.22:29 SCET. 
                  Nutation went from 0.36 to 0.17 deg.

                  Maximum nutation 0.37 deg. half-cone.

                  HED Calibration - 130.01:00 SCET.

                  KEP GAS CR#626: NG - 130.14:00 SCET.

                  DSS-43 Accumulator pump failure resulted in antenna halt.
 130.20:04-20:14  10m realtime 1024 bps data lost. DR A05389 refers.              
 130.20:36-20:45  9m realtime 1024 bps data lost due to additional re-sweep.              

11 May            Nutation damping operations.

                  McElrath Man. #1 initiated at 131.03:00 SCET. Nutation went
                  from 0.23 to 0.13 deg.

                  An adjustment to DSS-63 output power from 0.7 to 1.0 kW
                  during the track caused a nutation increase of about
                  0.18 to 0.35 deg at 131.09:00. DR L05256 refers.

                  McElrath Man. #2 (extended) initiated at 131.10:22 SCET. 
                  Nutation went from 0.56 to 0.15 deg.

                  McElrath Man. #3 (extended) initiated at 131.14:50 SCET. 
                  Nutation went from 0.53 to 0.17 deg.

                  Maximum nutation 0.56 deg. half-cone.

12 May            Nutation damping operations.

                  McElrath Man. #1 initiated at 132.05:51 SCET. Nutation went
                  from 0.40 to 0.12 deg.

                  McElrath Man. #2 initiated at 132.11:24 SCET. Nutation went
                  from 0.34 to 0.09 deg.

                  McElrath Man. #3 with CLC enabled initiated at 132.20:11 SCET. 
                  Nutation went from 0.24 to 0.16 deg.

                  Maximum nutation 0.40 deg. half-cone.

13 May            Nutation damping operations.

                  McElrath Man. with CLC enabled initiated at 133.19:44 SCET. 
                  Nutation went from 0.47 to 0.06 deg.

                  Maximum nutation 0.47 deg. half-cone.

14 May            Nutation damping operations.

                  McElrath Man. with CLC enabled initiated at 134.10:57 SCET. 
                  Nutation went from 0.35 to 0.10 deg.

                  Maximum nutation 0.35 deg. half-cone.

                  KEP IFC - 134.15:20 SCET.

                  DSS-63 Complex-wide power glitch. All subsystems re-initialized.
 134.06:40-07:27  47m realtime 1024 bps data lost. DR L05265 refers.
 134.08:07-08:15  8m realtime 1024 bps data lost due to additional 1-way to 2-way.

                  DSS-34 transmitter late at U/L tansfer. DR A05401.
 134.18:18-18:31  13m realtime 1024 bps data lost due to additional 1-way to 2-way.

15 May            Nutation damping operations.

                  McElrath Man. #1 with CLC enabled initiated at 135.02:39 SCET. 
                  Nutation went from 0.31 to 0.14 deg.

                  McElrath Man. #2 with CLC enabled initiated at 135.06:20 SCET. 
                  Nutation went from 0.34 to 0.09 deg.

                  Maximum nutation 0.34 deg. half-cone.

                  BAM-I Motor Position 3 - 135.15:20 SCET.

16 May            Nutation damping operations.

                  McElrath Man. #1 with CLC enabled initiated at 136.06:01 SCET. 
                  Nutation went from 0.24 to 0.07 deg.

                  McElrath Man. #2 with CLC enabled initiated at 136.10:08 SCET. 
                  Nutation went from 0.24 to 0.04 deg.

                  Maximum nutation 0.28 deg. half-cone.

                  BAM-I Matrix 6 - 136.15:35 SCET.

                  SIM HET Calibration - 136.05:00 SCET.

17 May            Nutation damping operations.

                  McElrath Man. #1 with CLC enabled initiated at 137.03:29 SCET. 
                  Nutation went from 0.30 to 0.05 deg.

                  McElrath Man. #2 with CLC enabled initiated at 137.12:46 SCET. 
                  Nutation went from 0.26 to 0.06 deg.

                  Maximum nutation 0.30 deg. half-cone.

                  DSS-54 problem with RCP-1 to TCA channel. DR L05288 refers.
 137.09:15-09:17  2m realtime 1024 bps data lost.
     09:19-09:29  10m realtime 1024 bps data lost.
     09:31-09:32  1m realtime 1024 bps data lost.

                  GRU CR#635: HV & Threshold changes - 137.15:29 SCET.

18 May            Nutation damping operations.

                  McElrath Man. with CLC enabled initiated at 138.03:34 SCET. 
                  Nutation went from 0.24 to 0.08 deg.

                  Maximum nutation 0.24 deg. half-cone.

                  DSS-24 SCP problem. DR G06994 refers.
 138.15:55-15:59  4m realtime 1024 bps data lost.

                  KEP GAS CR#627: NG Indirect- 138.03:00 SCET.

19 May            Nutation damping operations.

                  McElrath Man. #1 with CLC enabled initiated at 139.00:18 SCET. 
                  Nutation went from 0.27 to 0.06 deg.

                  McElrath Man. #2 with CLC enabled initiated at 139.15:48 SCET. 
                  Nutation went from 0.23 to 0.10 deg.

                  Maximum nutation 0.32 deg. half-cone.

20 May            Nutation damping operations.

                  McElrath Man. with CLC enabled initiated at 140.20:17 SCET. 
                  Nutation went from 0.23 to 0.08 deg.

                  Maximum nutation 0.28 deg. half-cone.

                  KEP GAS CR#628: FSS NG Mode Pt. 1 - 140.08:00 SCET.

21 May            Nutation damping operations.

                  McElrath Man. #1 with CLC enabled initiated at 141.16:31 SCET. 
                  Nutation went from 0.16 to 0.10 deg.

                  McElrath Man. #2 with CLC enabled initiated at 141.20:56 SCET. 
                  Nutation went from 0.16 to 0.05 deg.

                  Maximum nutation 0.34 deg. half-cone.

                  DSS-24 LMC problems. DR L05297 refers.
 141.04:07-04:22  18m realtime 1024 bps data lost.

                  KEP IFC - 141.15:24 SCET.

                  DSS-34 transmitter problem. DSS-43 filled in U/L gap from
                  141.18:55 to 20:30 ETT, when it transferred to DSS-34, once 
                  transmitter problem had been fixed. DR A05415 refers.
 141.18:23-18:25  2m realtime 1024 bps data lost, due to transition to 1-way.
 141.19:11-19:16  5m realtime 1024 bps data lost, due to transition to 2-way.

22 May            Nutation damping operations.

                  McElrath Man. with CLC enabled initiated at 142.05:11 SCET. 
                  Nutation went from 0.23 to 0.08 deg.

                  Maximum nutation 0.29 deg. half-cone.

                  KEP GAS CR#629: FSS NG Mode Pt. 2 - 142.08:00 SCET.

23 May            Nutation damping operations.

                  Maximum nutation 0.25 deg. half-cone.

                  HED Calibration - 143.01:00 SCET.

24 May            Nutation damping operations.            

                  McElrath Man. with CLC enabled initiated at 144.09:24 SCET. 
                  Nutation went from 0.21 to 0.05 deg.

                  Maximum nutation 0.26 deg. half-cone.

                  KEP GAS CR#630: FSS NG Mode Pt. 3 - 144.07:00 SCET.

                  DSS-24 LBW opened to 35Hz caused drop in RX lock. 
 144.14:22-14:26  4m realtime 1024 bps data lost. DR G07019 refers.

25 May            Nutation damping operations.

                  McElrath Man. with CLC enabled initiated at 145.05:36 SCET. 
                  Nutation went from 0.27 to 0.08 deg.

                  Maximum nutation 0.27 deg. half-cone.

26 May            Nutation damping operations.

                  Maximum nutation 0.19 deg. half-cone.

                  KEP GAS CR#631: FSS NG Mode Pt. 4 - 146.06:00 SCET.

27 May            Nutation damping operations.

                  Failed U/L TSF transfer (DSS-54 to DSS-24) instead of XA. 
 147.11:36-11:44  8m realtime 1024 bps data lost. DR G07029 refers.

                  McElrath Man. with CLC enabled initiated at 147.13:30 SCET. 
                  Nutation went from 0.30 to 0.06 deg.

                  Maximum nutation 0.30 deg. half-cone.

28 May            Nutation damping operations.

                  McElrath Man. with CLC enabled initiated at 148.20:48 SCET. 
                  Nutation went from 0.27 to 0.09 deg.

                  Maximum nutation 0.27 deg. half-cone.

                  KEP IFC - 148.15:34 SCET.

                  KEP GAS CR#632: FSS NG Mode Pt. 5 - 148.05:00 SCET.

29 May            Nutation damping operations.

                  Maximum nutation 0.25 deg. half-cone.

                  KEP GAS CR#637: NG - 149.12:00 SCET.

30 May            Nutation damping operations.

                  Maximum nutation 0.27 deg. half-cone.

                  BAM-E calibration - 150.15:36 SCET.
                  BAM-I calibration - 150.15:56 SCET.

31 May            Nutation damping operations.

                  Maximum nutation 0.32 deg. half-cone.

                  McElrath Man. #1 with CLC enabled initiated at 151.06:06 SCET. 
                  Nutation went from 0.25 to 0.05 deg.

151.12:22-12:37   Command system problem caused switch from Idle2-Cal2 unexpectedly. AR106272.

                  McElrath Man. #2 with CLC enabled initiated at 151.17:08 SCET. 
                  Nutation went from 0.32 to 0.12 deg.

                  GRU Routine Noise Test (CR# 636) - 151.19:00 SCET.