1. |
1995 - 07/28/1995 - Clarification of the electric power generation, transmission, and distribution standard. |
20k |
July 28, 1995 Mr. Charles H. Williams Director, Codes and Standards National Electrical Contractors Association 3 Bethesda Metro Center, Suite 1100 Bethesda, MD 20814 Dear Mr. Williams: This is in fu...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=21871
|
2. |
1995 - 08/10/1995 - Guidelines for the Enforcement of the Apparel Standard. |
23k |
August 10, 1995 MEMORANDUM FOR: REGIONAL ADMINISTRATIONS FROM: JAMES W. STANLEYDeputy Assistant Secretary SUBJECT: Guidelines for the Enforcement of the Apparel Standard, 29 CFR 1910.269(l)(6), of th...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=21878
|
3. |
1994 - 12/01/1994 - Final Rule on Electric Power Generation, Transmission, and Distribution. |
15k |
December 1, 1994 Mr. Tom Callahan Director of Personnel South Mississippi Electric Power Association Post Office Box 15849 Hattiesburg, MS. 39404-5849 Dear Mr. Callahan: This is in response to your J...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=21640
|
4. |
1995 - 07/31/1995 - A qualified employee wearing a short sleeve shirt when working on or nearby energized electric power line or equipment and subject to potential exposure to an electric arc. |
14k |
July 31, 1995 Mr. Jack Callaway Director of Environment Affairs SHO-ME POWER Electric Cooperative P. O. Box D Marshfield, MO 65706 Dear Mr. Callaway: This is in response to your July 29 letter, reque...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=21872
|
5. |
2003 - 05/27/2003 - OSHA does not specify payment requirements for apparel covered in the Electrical Power Transmission and Distribution Standard. |
14k |
May 27, 2003 The Honorable Frank Lautenberg United States Senate Washington, D.C 20510 Dear Senator Lautenberg: Thank you for your letter dated March 28, 2003 on behalf of your constituent, Mr. Dan C...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=24546
|
6. |
1994 - 05/24/1994 - Natural fabrics and synthetic materials that are acceptable under the electric power generation, transmission and distribution standard. |
13k |
May 24, 1994 Ms. Catherine J. Morin Product Manager Textile Flame Retardants Albright & Wilson Americas P.O. Box 26229 Richmond, Virginia 23260-6229 Dear Ms. Morin: Thank you for your letter of April...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=21495
|
7. |
1995 - 04/12/1995 - Section that requires the employer to insure that apparel worn by employees not increase the injury should they be exposed to flame. |
15k |
April 12, 1995 The Honorable Patricia Schroeder U.S. House of Representatives Washington, D.C. 20515 Dear Congresswoman Schroeder: This is in further response to your December 8, 1994 letter regardin...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=21771
|
8. |
1995 - 03/07/1995 - Enforcement of Electric Power Generation, Transmission, and Distribution and Electrical Protective Equipment. |
12k |
March 7, 1995 MEMORANDUM FOR: REGIONAL ADMINISTRATORS FROM: JOHN B. MILES, JR., DIRECTOR DIRECTORATE OF COMPLIANCE PROGRAMS SUBJECT: Enforcement of the 29 CFR 1910.269 (Electric Power Generation, Tra...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=21713
|
9. |
2006 - 10/04/2006 - Requirements for embroidery on flame-resistant clothing under 29 CFR 1910.269. |
14k |
This letter constitutes OSHA's interpretation only of the requirements discussed and may not be applicable to any situation not delineated within the original correspondence. October 4, 2006 Mr. ...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=25544
|
10. |
1995 - 12/07/1995 - Interpretation of the electric power generation, transmission, and distribution standard. |
17k |
December 7, 1995 Mr. David L. White Business Representative IBEW-Local Union No. Two 2131 59th Street St. Louis, MO. 63110 Dear Mr. White: This is in response to your December 9, 1994 letter and your...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=22028
|