CO0784 1. Exterior view of north and east exterior walls of Long-Term Oxidizer Silo (T-28B), looking south. Silo was designed to assess long-term environmental impacts on storage of the Titan II's oxidizer (nitrogen tetroxide). The shorter Oxidizer Conditioning Structure (T-28D) is located behind and to the immediate left of T-28B. 2. Exterior view of north wall of Long-Term Oxidizer Silo (T-28B) and Oxidizer Conditioning Structure (T-28D) behind and to its immediate left, looking south. A nitrogen line, used to prepare the Titan II's nitrogen-tetroxide oxidizer, is in the right foreground. 3. Exterior view of west wall of Long-Term Oxidizer Silo (T-28B) at left (taller structure) and adjacent Oxidizer Conditioning Structure (T-28D) at right (lower structure). 4. Exterior view of Long-Term Oxidizer Silo (T-28D) in left background (taller structure) and adjacent Oxidizer Conditioning Structure (T-28B) at extreme left background, looking south. At far right in foreground is a nitrogen tank in a concrete truck well.