IAEA/USA Interregional course on
Preparations to Ship Spent Nuclear Fuel (1997)
Case Study: Sept. '96 Shipment
from Chile and Colombia to SRS
PDF version available
This lecture is provided in both HTML format and in Adobe's Portable Document Format (PDF). This software needs to be installed on your computer either
as a separate program or as part of an Internet browser in order to read
this paper. Adobe Acrobat Reader can be downloaded
free of charge from Adobe's site on the World Wide Web.
If Adobe's Acrobat Reader is installed on your computer, click here to access the full paper in PDF format.
Contact:
Mr. Keith Brown
Science Applications International Corp.
20201 Century Blvd., Third Floor
Germantown, MD 20874
Tel.: +1-301-353-8343
Fax: +1-301-428-1973
E-mail: Keith_Brown@ccmail.gmt.saic.com
IAEA/USA Interregional Training Course
Technical and Administrative Preparations Required for Shipment of Research Reactor Spent
Fuel to its Country of Origin
13-24 January 1997
Argonne, IL
Case Study: Sept. '96 Shipment
from Chile and Colombia to SRS
Keith Brown
Science Applications International Corporation
Chronology of Activities Leading Up to the South American SNF Shipment
ROD Issued |
5/13/96 |
Assessment Team Visit to Chile, Colombia, and Brazil | 6/18-25/96 |
Second Assessment Team Visit to Colombia | 7/23-24/96 |
NAC-LWT Cask Arrives by Aircraft in Chile | 8/1/96 |
NAC-LWT Cask Arrives via Ship in Colombia | 9/4/96 |
Fuel Loaded in Chile | 8/23/96 |
Vessel Departs Chile for Colombia | 8/27/96 |
Fuel Loaded in Colombia | 9/14-15/96 |
Colombia Cask Airlifted to Cartagena | 9/16/96 |
Vessel Departs Colombia for U.S. | 9/16/96 |
European and South American Vessels Arrive at Charleston, South Carolina | 9/22/96 |
Casks Off Loaded from Vessels and Placed on Dedicated Train | 9/22/96 |
Dedicated Train Arrives at Savannah River Site | 9/22/96 |
Challenges Accomplished
on the
South American Fuel Shipment
- Timely Arrival of the Shipping Cask in Santiago, Chile
- Completion of the Appendix A Data for the Colombian
Shipment
- Variance on the Cask Minimum Cooldown Time Requirement
on the Colombian Shipment
- Method of Handling the Slightly Irradiated Loose Plates
on the Colombian Shipment
- Change to the ROD Concerning the Point at which Title
to the Fuel Changes
- Decision to Airlift the Loaded Cask from Bogata to Cartagena, Colombia