Apollo 14 Lunar Surface Journal Banner

Apollo 14 LM Timeline Checklist


This checklist was scanned by Frank O'Brien.
Last revised 28 September 2002.


Title Page (17k; gif)

Signature Page (11k; gif)

Page 1, Undocking and Separation to Rev 12 LS TCA (30k; gif)

Page 2, Rev 12 LS TCA to CSM Circularization (32k; gif)

Page 3, CSM Circularization to PDI0 (32k; gif)

Page 4, PDI0 to Backside (25k; gif)

Page 5, Backside to PDI (29k; gif)

Page 6, PDI through TD+3 (38k; gif)

Page 7, TD +3 Through T2 Abort (22k; gif)

Page 12, Ascent (37k; gif)

Page 13, Insertion through TPI (37k; gif)

Page 14, TPI Through Docking (34k; gif)

Page 15, Post Docking (19k; gif)

Page 16, Post Docking (18k; gif)

Page 17, Post Docking Circuit Breaker Panel 11 (13k; gif)

Page 18, Post Docking Circuit Breaker Panel 16 (11k; gif)

Page 19, Post Docking LM/CM Transfer List (13k; gif)

Page 21, PDI Summary Data (49k; gif)

Page 22, Range Rate (41k; gif)

Page 23, Insertion Through Boost (28k; gif)

Page 24, Boost Through HAM (24k; gif)

Page 25, Insertion/HAM Through CSI (40k; gif)

Page 26, CSI Through CDH (32k; gif)

Page 27, CDH Through TPI (27k; gif)

Page 28, TPI Through Docking (35k; gif)

Page 29, Inertial and Relative Plots: No PDI 1+12; No PDI 2+12 (54k; gif)

Page 30, Inertial and Relative Plots: 1 <= PDI 1 <= 5 (53k; gif)

Page 31, Inertial and Relative Plots: 6 <= PDI 1 <= 8; 9 <= PDI 1 <= 12 (57k; gif)

Page 32, Inertial and Relative Plots: 9 <= PDI 1 <= 15; 13 <= PDI 2 <= 15; T2-2 (56k; gif)

Page 33, Inertial and Relative Plots: T2-1 (56k; gif)

Page 34, Inertial and Relative Plots: 1 <= PDI 2 <= 5 (54k; gif)

Page 35, Inertial and Relative Plots: 6 <= PDI 2 <= 8 (55k; gif)

Page 36, Inertial and Relative Plots: Normal Rendezvous (56k; gif)

Page 38, LM Bailout Relative Trajectory: HAM Chart (46k; gif)

Page 40, HAM/CSI Bias Chart (36k; gif)


Return to Table of Contents